Patimban Port Car Terminal Drawings

The document outlines various tension splice arrangements for civil works, specifically for beams, columns, shear walls, and slabs. It includes reference drawings, material grades for concrete and rebars, and minimum lengths for lap splices. The document is part of the Patimban Port Development Project and includes details for approval and contractor information.

Uploaded by

AKA 2009
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
162 views1 page

Patimban Port Car Terminal Drawings

The document outlines various tension splice arrangements for civil works, specifically for beams, columns, shear walls, and slabs. It includes reference drawings, material grades for concrete and rebars, and minimum lengths for lap splices. The document is part of the Patimban Port Development Project and includes details for approval and contractor information.

Uploaded by

AKA 2009
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

SHOP DRAWINGS

I.6.2 TENSION SPLICE ARRANGEMENT


CIVIL WORKS
ARRANGEMENT A (BEAM & COLUMN)

KEY PLAN:

ARRANGEMENT B (SHEAR WALL & SLAB)

REFERENCE:
WALL SLAB

ARRANGEMENT C ( RECOMMENDED FOR BEAM )


REFERENCE DRAWING :
WIRATMAN : DED
* ST-00-01 ~ ST-00-09 (STANDARD DETAIL #1 ~ #9)
* ST(A)-03B-02 (ADMIN BUILDING 1ST FLOOR PLAN)
* ST(A)-03B-06E (ADMIN BUILDING SECTION Y1' - Y1 GRID)
* ST[A]-05-02 (ADMIN BUILDING 1ST FLOOR BEAM
REINFORCEMENT DETAIL#1)
* ST[A]-05-02A (ADMIN BUILDING 1ST FLOOR BEAM
REINFORCEMENT DETAIL#2)

NOTES:
1. ALL THE DIMENSIONS ARE IN MILLIMETERS AND THE
ELEVATIONS ARE IN METERS WITH RESPECT TO CHART
DATUM (CD) UNLESS OTHERWISE INDICATED.
2. MATERIAL GRADE
a. CONCRETE
- COLUMN : fc' = 30 MPa
- BEAM & SLAB fc = 30 MPa
- TIE BEAM & PILE CAP fc' = 30 MPa
- PRECAST SPUN PILE fc' = 52 MPa
b. REBARS
- BjTS 280 Ø ≤ 10 : fy = 280 MPa
I.6 LAP SPLICES
- BjTS 420 D ≥ 10 : fy = 420 MPa

LEGEND: TB
AND COMPRESSION LAP SPLICE TB : TOP BAR
BB : BOTTOM BAR HB
WB: WEB BAR WB
MINIMUM LENGTH OF TENSION LAP SPLICES ( st ) OF REINFORCEMENT
HB : HOOP BAR TS
TS : TIES BAR
BB

01 05/11/24 FOR APPROVAL ED TT KS


MINIMUM LENGTH OF COMPRESSION LAP SPLICES ( sc) OF REINFORCEMENT
00 28/10/24 FOR APPROVAL ED TT KS
REV. DATE DESCRIPTION DRN CHK APP
PROJECT :
Ill.6.e WIDE BEAM - COLUMN REINFORCEMENT DETAIL PATIMBAN PORT DEVELOPMENT PROJECT (1-2)
FOR INTERIOR JOINT
PACKAGE 5 - CAR TERMINAL CONSTRUCTION
D
-
EMPLOYER :

DIRECTORATE GENERAL OF
SEA TRANSPORTATION
( DGST )
C
- ENGINEER :
A Joint Venture Of :

OC GLOBAL
Ides INC.

( PLAN VIEW ) In Association With :

1
INDRA KARYA

pt PT INDRA KARYA (PERSERO)


PT. RAYASURVERINDO
CONSULTING ENGINEERS
consulting serv ices TIRTASARANA

CONTRACTOR :
Patimban Port Development Project : PKG5

TOA CORPORATION A I A WAKACHIKU Inovasi Untuk Solusi ABIPRAYA

TWWHA Joint Operation


( SECTION - C ) ( SECTION - D )
DRAWING NO.: PKG5-BLD-CSD-ST-709-002
DRAWING TITLE SCALE:
STANDARD DETAIL (1)
N/A

DRAWING SIZE: ISO A3 SHEET NO.: 03 OF 72