No. Page Comments on the Technical Report of Mr.
Kigonya Mutebi Ronald
1 General Comments
2 The applicant should take note of the page numbers in the report as they are not consistent. Applicant should
harmonize this.
3 The report has acronyms used in various sections of the report however, no list of acronyms has been
provided. The Applicant should address this.
4 Bullets have been used in several sections of the report. The applicant should remove bullets in the report. The
applicant should provide the information either in paragraphs or number them.
5 All figures and tables should be well referenced to in the report.
6 The headings should be restricted to at most 3 sub heading levels.
7 Cross cutting Issues and Challenges chapter should be arranged to include; Environmental, Social and gender,
Health and Safety Issues, HIV sensitization, Challenges faced during the project implementation and solutions
adopted and Lessons learnt
8 The drawings attached are not signed and stamped by a registered engineer
9 Conclusions and Recommendations should be made a chapter of their own
10 Cover a) The Cover page should have both the logos of UIPE and ERB.
Page
b) The title of the technical report should also be included on the cover page.
11 i The disclaimer section should rather be renamed as Declaration which should be signed off to show
ownership of the report.
12 iii The executive summary is too big as it is presented on two and half pages. The applicant should rewrite the
executive summary preferably on one page but summarizing all the key components of the report. The
executive summary should include challenges and how they were solved as well as the engineering lessons
learnt. The executive summary should also include; cross cutting issues, conclusions and recommendations.
13 12 Project Description. The content and the subheading are not coherent. The content should be included under a
subheading of Problem statement. The applicant should rewrite this section.
14 13 Figure 1-1 is not referenced anywhere in the text. Applicant should include a subheading for project location
15 14 Figure 1-1 is not referenced anywhere in the text. Applicant should change the subheading to project location
16 17 The sub heading should be changed to “Structure of the Report” and not scope of the report.
17 61 The Risk management register is too big and should be transferred to the appendix
18 88 The applicant has presented that he was involved in quality control of the different construction activities to
ensure they achieved the specifications however he hasn't presented the Quality management system that was
established at the project to define the role of each party in ensuring quality is achieved. He has further not
presented if there were non-conformities and how these were addressed.
19 93 the applicant has not mentioned the solutions adopted the address the challenges
20 The applicant has not presented a section specifically addressing his involvement in the cost control of the
project activities. It is important that the applicant demonstrates how he was involved in the management of
cost during project execution.
21 The applicant has not presented a section specifically addressing his involvement in time management of the
project activities. It is important that the applicant demonstrates how he was involved in the management of
time during project execution.