The NCR SelfServ™ 22e ATM requires specific site preparation for installation, including positioning away from heat sources and ensuring adequate doorways and corridors for access. It must be installed on a level, noncombustible surface with proper ambient lighting and temperature conditions. Additionally, a power disconnect device is necessary for safe operation, and the floor must support the ATM's weight without risk of damage.

Uploaded by

Shailesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views1 page

ATM Environment

The NCR SelfServ™ 22e ATM requires specific site preparation for installation, including positioning away from heat sources and ensuring adequate doorways and corridors for access. It must be installed on a level, noncombustible surface with proper ambient lighting and temperature conditions. Additionally, a power disconnect device is necessary for safe operation, and the floor must support the ATM's weight without risk of damage.

Uploaded by

Shailesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

NCR SelfServ™ 22e ATM Site Preparation

Site Requirements 5‐1


POSITIONING THE ATM DOORWAYS AND CORRIDORS BAROMETRIC PRESSURE
The SelfServ 22e is only suitable for installation in an interior environment. The Make sure that doorways and corridors leading to your point of installation are  Operating/Transit Limits: 105 kPa (15.2 lb.F/in.) to 70 kPa (10.2 lb.F/in.)
ATM must be positioned away from heat sources or any air conditioning wide enough to allow the package to pass through, or make arrangements to  Equivalent Altitude: Up to a maximum of 3000 m (9842.52 ft)
equipment. unpack the ATM and remove it from the palette in an area with sufficient
access then move it to the installation site.
Bright lights and windows behind the user may degrade camera performance.
Position the ATM away from direct sunlight. Make sure that any corridors can support the weight of the ATM, including all TEMPERATURE AND HUMIDITY
packaging and the pallet. Continuous operating at or near the range limits, or in a location where the
Allow sufficient room for installation and servicing requirements.
Corridor sizes and ATM weights can be found in the Variant Details section for temperature and humidity change beyond the specification, should be avoided.
your ATM.
Power Disconnect Device
Normal Operating Range (Interior Environment)
AMBIENT LIGHTING  Temperature: 10°C to 40°C (50°F to 104°F)
CAUTION Early SelfServ 22e ATMs do not have a power disconnect device If the ATM is fitted with a camera, it is strongly recommended that there is a  Relative Humidity: 20% to 80%
(e.g. on/off switch). If the ATM does not have the power switch minimum of 50 LUX lighting at floor level within the area illustrated below.  Dew Point Temperature Restriction: 26°C (79°F) maximum
shown below then an easily accessible, switchable, mains socket is
required to allow safe isolation from the power supply, resetting
and power cycling of the ATM. Storage Range (Up To Three Months)
 Temperature: ‐10°C to 50°C (14°F to 122°F)
 Relative Humidity: 10% to 90%

Transit Range (Up To One Week)


 Temperature: ‐40°C to 60°C (‐40°F to 140°F)
 Relative Humidity: 5% to 95%
Note: If an uninterruptible power supply (UPS) is fitted to the ATM, the
temperature during transit should not drop below ‐15°C (15°F).

1000 mm
(39.37 in.) Extreme Power On Range (Up To One Hour)
 Temperature: 0°C to 45°C (32°F to 113°F)
Power Switch  Relative Humidity: 10% to 95%

1550 mm
(61.02 in.)
FLOOR
The ATM must be installed on a level, even, concrete or other noncombustible
surface. In locations where the floor may be uneven, it is recommended that a
steel plate is used under the ATM.
TASK LIGHTING
An antistatic floor covering should be used and must be of a type that will not A minimum of 200 lux is required for task lighting.
generate dust or fluff.
The ATM must be installed on a floor capable of supporting the maximum
weight including media. Only the maximum weight should be considered as
additional options may be added after installation. Floor loading is calculated by
dividing the maximum weight of the ATM by the surface area of the ATM base
in contact with the floor.
Service areas, ATM weights and floor loading can be found in the Variant Details
section for your ATM.

NCR Proprietary Information ‐ not to be disclosed or reproduced without written consent. © 2010, 2012, 2013, 2014, 2015, 2017 by NCR Corporation, Duluth, Georgia, U.S.A. [Link] Rights Reserved B006‐6902‐K000

You might also like