Videotron Foundation Analysis Report

Uploaded by

Beny Adisaputro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views3 pages

Videotron Foundation Analysis Report

Uploaded by

Beny Adisaputro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Job No Sheet No Rev

1
Part

Job Title Ref


Fondation of Videotron Analysis
By Date04-Jun-24 Chd

Client File [Link] Date/Time 04-Jun-2024 11:32

Job Information
Engineer Checked Approved

Name:
Date: 04-Jun-24

Structure Type SPACE FRAME

Number of Nodes 42 Highest Node 42


Number of Elements 93 Highest Beam 101
Number of Plates 7 Highest Plate 95

Number of Basic Load Cases -2


Number of Combination Load Cases 1

Included in this printout are data for:


All The Whole Structure

Included in this printout are results for load cases:


Type L/C Name

Primary 1 SELF WEIGHT


Primary 2 WIND
Combination 3 COMBINATION LOAD CASE 3

VIDEOTRON

Concrete fondation
with size
1.5x1.5x1.6 m

Print Time/Date: 04/06/2024 13:39 [Link] V8i (SELECTseries 6) [Link] Print Run 1 of 2
Job No Sheet No Rev
2
Part

Job Title Ref

By Date04-Jun-24 Chd

Client File [Link] Date/Time 04-Jun-2024 11:32

Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kg) (kg) (kg) (kNm) (kNm) (kNm)
Max FX 21 3:COMBINATION LOAD CASE 2.24
70.625 3 E+3 -54.838 0.115 0.004 -0.194
Min FX 22 3:COMBINATION LOAD CASE 2.33
-63.369 3 E+3 -33.828 0.143 0.018 -0.314
Max FY 22 -63.369
3:COMBINATION LOAD CASE 2.33
3 E+3 -33.828 0.143 0.018 -0.314
Min FY 2 2:WIND 8.088 -298.919 -7.835 -0.047 -0.001 0.015
Max FZ 2 -51.406
3:COMBINATION LOAD CASE 2.26
3 E+3 45.925 0.137 0.005 -0.123
Min FZ 22 2:WIND -8.730 301.129 -80.100 -0.060 -0.008 -0.029
Max MX 22 -63.369
3:COMBINATION LOAD CASE 2.33
3 E+3 -33.828 0.143 0.018 -0.314
Min MX 22 2:WIND -8.730 301.129 -80.100 -0.060 -0.008 -0.029
Max MY 22 -63.369
3:COMBINATION LOAD CASE 2.33
3 E+3 -33.828 0.143 0.018 -0.314
Min MY 22 2:WIND -8.730 301.129 -80.100 -0.060 -0.008 -0.029
Max MZ 1 2:WIND -5.379 -270.999 -6.896 -0.043 0.001 0.017
Min MZ 22 -63.369
3:COMBINATION LOAD CASE 2.33
3 E+3 -33.828 0.143 0.018 -0.314

Based on above table Maximum turning momen is 0.314 KN-m or equal with 350 kg-m

Concrete fondation with actual demesion is 1.5m x 1.5m x 1.6m or equal with weight 8.641 kg
are having resistant turning moment = 6.480 kg-m
Safety factor of turning moment is = 6480 / 350 = 18 > 3-------> Fondation OK
Friction between concrete fondation and soil are neglactable.

Print Time/Date: 04/06/2024 13:39 [Link] V8i (SELECTseries 6) [Link] Print Run 2 of 2