Soultion
Sr. No. Compliance Given by Client Remark (If any)
Yes No Inprogress
Chap-2 Over View of Client
1 Done
1. Write in Short
Chap 4 Socioeconomic Profile
1. Add Some benefits of project bridge after the
2 Done
construction completed. What are the benefits will
be there
Chap 6 Traffic Analysis
3 1. ATCC is mention in paragrapgh which have to Done
remove
Cahp 7. Reconnaissance Survey
1. Topography Survey date is mention wrong
4 2. Ref. should mentioned of all the data collected Done
from the internet
Cahp 8. Geotechnical Investigation
5 Done
1. Attached geotech report
All the drawings atatched with the report shall be
6 Chap 9. Sign of TL on Hydrology Report Done
signed and checked by TL
Chap. 12 Environment Assessment Reprot
1. write the necessary details as project required
7 Inprogress
2. Anticipted Impact and Mitigation is not
readable.
Chap 13. Initial Social Assessment/ Preliminary
8 LA Resettlement Plan Inprogress
1. 1. write the necessary details as project required
Chap. 16 Strip Plan
9 1. Letter of submission of Land Acquisition details Done
should be attached in report