Compliance On Report

The document outlines compliance status for various chapters of a project report, indicating which sections have been completed, are in progress, or require further work. Specific remarks highlight necessary changes, such as adding benefits of the project, correcting survey dates, and ensuring readability of impact assessments. Overall, several chapters are marked as done, while some are still in progress and need additional details.

Uploaded by

royal swami
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views1 page

Compliance On Report

The document outlines compliance status for various chapters of a project report, indicating which sections have been completed, are in progress, or require further work. Specific remarks highlight necessary changes, such as adding benefits of the project, correcting survey dates, and ensuring readability of impact assessments. Overall, several chapters are marked as done, while some are still in progress and need additional details.

Uploaded by

royal swami
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Soultion

Sr. No. Compliance Given by Client Remark (If any)


Yes No Inprogress

Chap-2 Over View of Client


1 Done
1. Write in Short

Chap 4 Socioeconomic Profile


1. Add Some benefits of project bridge after the
2 Done
construction completed. What are the benefits will
be there

Chap 6 Traffic Analysis


3 1. ATCC is mention in paragrapgh which have to Done
remove
Cahp 7. Reconnaissance Survey
1. Topography Survey date is mention wrong
4 2. Ref. should mentioned of all the data collected Done
from the internet

Cahp 8. Geotechnical Investigation


5 Done
1. Attached geotech report
All the drawings atatched with the report shall be
6 Chap 9. Sign of TL on Hydrology Report Done
signed and checked by TL

Chap. 12 Environment Assessment Reprot


1. write the necessary details as project required
7 Inprogress
2. Anticipted Impact and Mitigation is not
readable.

Chap 13. Initial Social Assessment/ Preliminary


8 LA Resettlement Plan Inprogress
1. 1. write the necessary details as project required

Chap. 16 Strip Plan


9 1. Letter of submission of Land Acquisition details Done
should be attached in report