BoQ For All Three LLRP Davis 2017
BoQ For All Three LLRP Davis 2017
Submersible centrifugal pump to supply 152.64m3/day at 120.24m We have offered 9.2kw SUBMERSIBLE
head directly coupled to 9.2kW submersible PUMP C/W 9.2
1 AC motor (380/400V 3-phase) 1 set 1,010,946.00 1,010,946.00 KW motor
2 Solar controller as DC-AC inverter for the above pump 1 pc 342,406.00 342,406.00 We have offered 11KW Solar
controller
12 Well sensor kit for dry run protection and which must be 1 pc 12,812.00 12,812.00
compatible with the supplied controller
14 6-meter length 6" borehole steel pipe complete with 19 pc 18,200.00 345,800.00
steel sockets
Well head cover for 10" steel casing c/w well head accessories
including valve, test tee, pressure
15 gauge connection, union etc. 1 set - -
Allow for civil works of reinforced concrete and foundation bolts, the
whole foundation must be raised to a level such that steel column
17 won’t be in contact with storm water 1 LS
Supply and erect a panel support structure made of 4'' Pipe Class A Panel Support steel Structure made of
poles, drilled plates 160*160*8mm, 50x50x3mm rafters, 2.5" GI Pipe, with 40*40*3mm Angle
50x50x3mm SHS struts and ties, 40x40x4mm angle iron, 150 tilt and 327,409.76 327,409.76
Iron [Link] height of
lower end to be minimum 1.2m above ground level to support the structure 1.5m
quantity of panels above. All joints to be bolt and nuts with spot
18 1 LS
welding
19 Inverter and DC breaker locker made of metal frame with proper 1 LS 24,538.00 24,538.00
ventilation openings
PART H: Installation
Construction of woven wire mesh fence circumference around the
solar pumping system. The fencing work consist of preparing and
fixing of 3m high 40x40x3mm Angle iron spaced at 2m interval
around the circumference and a length of 500mm Angle Iron buried
below ground level and anchored with mass concrete of [Link] mix
ratio, and length of Angle Iron above 2m fom ground level should be
bent 45 degree to the inner side of the fence and should be fixed with
barbed wire at 15cm interval the entire circumference of the fence.
The fence should be 2m away from the solar panels in all four sides
and the hole should have minimum dimension of Fence around the structure -
40mmx400mmx500mm depth and base of the fence should be Made of angle iron pole
20 reinforced with mass concrete of [Link] mixed ratio having a 1 LS 245,428.57 245,428.57 40*40*3, 2.5" GI corner pole ,
dimension of 0.3mx0.4m around the entire circumference of the Gabion and mesh wire- 2 meter
fence. Price shall include excavation, cart away, supplying away from each array
construction materials (gravel, sand, cement), fixing formwork, tying
wire, cutting angle iron, bending, erecting and bracing.
21 Transport and installation of all the equipment and materials to 1 LS 722,490.46 722,490.46
Amomalita site, 14km from Awra Woreda centre
PART I: Others
23 Cable clamp per 3-meter length for total power cable 1 set 516.00 516.00
length
Metallic Enclosure for housing the controls, well ventilated and SMALL METAL BOX FOR ENCLOSURE
24 lockable 1 pc 17,038.00 17,038.00 OF CHANGE OVER
SWITCH
Alarm system set with siren for intrusion and safety protection of
solar modules, where intrusion detection is based on mechanical
vibrations/ tampering of the solar array structure, wired and
26 integrated within the 1 LS - -
installation; complete with all accessories
For earthing
Submersible centrifugal pump to supply 457.92m3/day at 120.24m We have offered 9.2kw SUBMERSIBLE
head directly coupled to 9.2kW submersible PUMP C/W 9.2
1 AC motor (380/400V 3-phase) 1 set 1,010,946.00 1,010,946.00 KW motor
2 Solar controller as DC-AC inverter for the above pump 1 pc 342,406.00 342,406.00 We have offered 11KW Solar
controller
8 Lightning arrestor with copper strips of not less than 1 pc We have offered lighting arrestor with
25mmx4mm 35m 16mm2 earthing cable and 2 PCS of
eathing rod
9 5/8 100% copper earth rod. 1 pc 37,547.00 37,547.00
PART D: Sensors
12 Well sensor kit for dry run protection and which must be 1 pc 12,812.00 12,812.00
compatible with the supplied controller
14 6-meter length 6" borehole steel pipe complete with 19 pc 18,200.00 345,800.00
steel sockets
Well head cover for 10" steel casing c/w well head accessories
including valve, test tee, pressure
15 gauge connection, union etc. 1 set - -
Allow for civil works of reinforced concrete and foundation bolts, the
whole foundation must be raised to a level such that steel column
17 won’t be in contact with storm water 1 LS
Supply and erect a panel support structure made of 4'' Pipe Class A Panel Support steel Structure made of
poles, drilled plates 160*160*8mm, 50x50x3mm rafters, 2.5" GI Pipe, with 40*40*3mm Angle
50x50x3mm SHS struts and ties, 40x40x4mm angle iron, 150 tilt and 327,409.76 327,409.76 Iron [Link] height of structure
lower end to be minimum 1.2m above ground level to support the 1.5m
quantity of panels above. All joints to be bolt and nuts with spot
18 welding 1 LS
19 Inverter and DC breaker locker made of metal frame with proper 1 LS 24,538.00 24,538.00
ventilation openings
PART H: Installation
Construction of woven wire mesh fence circumference around the
solar pumping system. The fencing work consist of preparing and
fixing of 3m high 40x40x3mm Angle iron spaced at 2m interval
around the circumference and a length of 500mm Angle Iron buried
below ground level and anchored with mass concrete of [Link] mix
ratio, and length of Angle Iron above 2m fom ground level should be
bent 45 degree to the inner side of the fence and should be fixed with
barbed wire at 15cm interval the entire circumference of the fence.
The fence should be 2m away from the solar panels in all four sides
and the hole should have minimum dimension of
40mmx400mmx500mm depth and base of the fence should be
reinforced with mass concrete of [Link] mixed ratio having a Fence around the structure - Made
dimension of 0.3mx0.4m around the entire circumference of the of angle iron pole 40*40*3, 2.5"
20 fence. Price shall include excavation, cart away, supplying 1 LS 245,428.57 245,428.57 GI corner pole , Gabion and mesh
construction materials (gravel, sand, cement), fixing formwork, tying wire- 2 meter away from each array
wire, cutting angle iron, bending, erecting and bracing.
21 Transport and installation of all the equipment and materials to 1 LS 722,490.46 722,490.46
Amomalita site, 14km from Awra Woreda centre
PART I: Others
23 Cable clamp per 3-meter length for total power cable 1 set 516.00 516.00
length
Metallic Enclosure for housing the controls, well ventilated and SMALL METAL BOX FOR ENCLOSURE OF
lockable CHANGE OVER
24 1 pc 17,038.00 17,038.00 SWITCH
Alarm system set with siren for intrusion and safety protection of
solar modules, where intrusion detection is based on mechanical
vibrations/ tampering of the solar array structure, wired and
26 integrated within the 1 LS - -
installation; complete with all accessories
TOTAL 4,800,197.51
Reference Comments
For earthing
Submersible centrifugal pump to supply 457.92m3/day at 120.24m We have offered 9.2kw SUBMERSIBLE
head directly coupled to 9.2kW submersible PUMP C/W 9.2
1 AC motor (380/400V 3-phase) 1 set 1,010,946.00 1,010,946.00 KW motor
2 Solar controller as DC-AC inverter for the above pump 1 pc 342,406.00 342,406.00 We have offered 11KW Solar
controller
8 Lightning arrestor with copper strips of not less than 1 pc We have offered lighting arrestor with
25mmx4mm 35m 16mm2 earthing cable and 2 PCS of
eathing rod
9 5/8 100% copper earth rod. 1 pc 37,547.00 37,547.00
PART D: Sensors
12 Well sensor kit for dry run protection and which must be 1 pc 12,812.00 12,812.00
compatible with the supplied controller
14 6-meter length 6" borehole steel pipe complete with 19 pc 18,200.00 345,800.00
steel sockets
Well head cover for 10" steel casing c/w well head accessories
including valve, test tee, pressure
15 gauge connection, union etc. 1 set - -
Allow for civil works of reinforced concrete and foundation bolts, the
whole foundation must be raised to a level such that steel column
17 won’t be in contact with storm water 1 LS
Supply and erect a panel support structure made of 4'' Pipe Class A Panel Support steel Structure made of
poles, drilled plates 160*160*8mm, 50x50x3mm rafters, 2.5" GI Pipe, with 40*40*3mm Angle
50x50x3mm SHS struts and ties, 40x40x4mm angle iron, 150 tilt and 327,409.76 327,409.76 Iron [Link] height of structure
lower end to be minimum 1.2m above ground level to support the 1.5m
quantity of panels above. All joints to be bolt and nuts with spot
18 welding 1 LS
19 Inverter and DC breaker locker made of metal frame with proper 1 LS 24,538.00 24,538.00
ventilation openings
PART H: Installation
Construction of woven wire mesh fence circumference around the
solar pumping system. The fencing work consist of preparing and
fixing of 3m high 40x40x3mm Angle iron spaced at 2m interval
around the circumference and a length of 500mm Angle Iron buried
below ground level and anchored with mass concrete of [Link] mix
ratio, and length of Angle Iron above 2m fom ground level should be
bent 45 degree to the inner side of the fence and should be fixed with
barbed wire at 15cm interval the entire circumference of the fence.
The fence should be 2m away from the solar panels in all four sides
and the hole should have minimum dimension of
40mmx400mmx500mm depth and base of the fence should be
reinforced with mass concrete of [Link] mixed ratio having a Fence around the structure - Made
dimension of 0.3mx0.4m around the entire circumference of the of angle iron pole 40*40*3, 2.5"
20 fence. Price shall include excavation, cart away, supplying 1 LS 245,428.57 245,428.57 GI corner pole , Gabion and mesh
construction materials (gravel, sand, cement), fixing formwork, tying wire- 2 meter away from each array
wire, cutting angle iron, bending, erecting and bracing.
21 Transport and installation of all the equipment and materials to 1 LS 722,490.46 722,490.46
Amomalita site, 14km from Awra Woreda centre
PART I: Others
23 Cable clamp per 3-meter length for total power cable 1 set 516.00 516.00
length
Metallic Enclosure for housing the controls, well ventilated and SMALL METAL BOX FOR ENCLOSURE OF
lockable CHANGE OVER
24 1 pc 17,038.00 17,038.00 SWITCH
Alarm system set with siren for intrusion and safety protection of
solar modules, where intrusion detection is based on mechanical
vibrations/ tampering of the solar array structure, wired and
26 integrated within the 1 LS - -
installation; complete with all accessories
TOTAL 4,800,197.51
Reference Comments
For earthing
Submersible centrifugal pump to supply 457.92m3/day at 120.24m We have offered 9.2kw SUBMERSIBLE
head directly coupled to 9.2kW submersible PUMP C/W 9.2
1 AC motor (380/400V 3-phase) 1 set 1,010,946.00 1,010,946.00 KW motor
2 Solar controller as DC-AC inverter for the above pump 1 pc 342,406.00 342,406.00 We have offered 11KW Solar
controller
8 Lightning arrestor with copper strips of not less than 1 pc We have offered lighting arrestor with
25mmx4mm 35m 16mm2 earthing cable and 2 PCS of
eathing rod
9 5/8 100% copper earth rod. 1 pc 37,547.00 37,547.00
PART D: Sensors
12 Well sensor kit for dry run protection and which must be 1 pc 12,812.00 12,812.00
compatible with the supplied controller
14 6-meter length 6" borehole steel pipe complete with 19 pc 18,200.00 345,800.00
steel sockets
Well head cover for 10" steel casing c/w well head accessories
including valve, test tee, pressure
15 gauge connection, union etc. 1 set - -
Allow for civil works of reinforced concrete and foundation bolts, the
whole foundation must be raised to a level such that steel column
17 won’t be in contact with storm water 1 LS
Supply and erect a panel support structure made of 4'' Pipe Class A Panel Support steel Structure made of
poles, drilled plates 160*160*8mm, 50x50x3mm rafters, 2.5" GI Pipe, with 40*40*3mm Angle
50x50x3mm SHS struts and ties, 40x40x4mm angle iron, 150 tilt and 327,409.76 327,409.76 Iron [Link] height of structure
lower end to be minimum 1.2m above ground level to support the 1.5m
quantity of panels above. All joints to be bolt and nuts with spot
18 welding 1 LS
19 Inverter and DC breaker locker made of metal frame with proper 1 LS 24,538.00 24,538.00
ventilation openings
PART H: Installation
Construction of woven wire mesh fence circumference around the
solar pumping system. The fencing work consist of preparing and
fixing of 3m high 40x40x3mm Angle iron spaced at 2m interval
around the circumference and a length of 500mm Angle Iron buried
below ground level and anchored with mass concrete of [Link] mix
ratio, and length of Angle Iron above 2m fom ground level should be
bent 45 degree to the inner side of the fence and should be fixed with
barbed wire at 15cm interval the entire circumference of the fence.
The fence should be 2m away from the solar panels in all four sides
and the hole should have minimum dimension of
40mmx400mmx500mm depth and base of the fence should be
reinforced with mass concrete of [Link] mixed ratio having a Fence around the structure - Made
dimension of 0.3mx0.4m around the entire circumference of the of angle iron pole 40*40*3, 2.5"
20 fence. Price shall include excavation, cart away, supplying 1 LS 245,428.57 245,428.57 GI corner pole , Gabion and mesh
construction materials (gravel, sand, cement), fixing formwork, tying wire- 2 meter away from each array
wire, cutting angle iron, bending, erecting and bracing.
21 Transport and installation of all the equipment and materials to 1 LS 722,490.46 722,490.46
Amomalita site, 14km from Awra Woreda centre
PART I: Others
23 Cable clamp per 3-meter length for total power cable 1 set 516.00 516.00
length
Metallic Enclosure for housing the controls, well ventilated and SMALL METAL BOX FOR ENCLOSURE OF
lockable CHANGE OVER
24 1 pc 17,038.00 17,038.00 SWITCH
Alarm system set with siren for intrusion and safety protection of
solar modules, where intrusion detection is based on mechanical
vibrations/ tampering of the solar array structure, wired and
26 integrated within the 1 LS - -
installation; complete with all accessories
TOTAL 4,800,197.51