0% found this document useful (0 votes)
129 views6 pages

Engine and APU Data Summary

The document is a job card package detailing the maintenance task for the engine and APU data of aircraft VT-RTW with tail number 11933. It includes references for procedures, setup information, and a certificate of task completion, certifying that the inspection meets required standards. The job card outlines steps for printing engine/APU hours and cycles from the Flight Data Interface and Management Unit (FDIMU).

Uploaded by

Yogesh Memane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
129 views6 pages

Engine and APU Data Summary

The document is a job card package detailing the maintenance task for the engine and APU data of aircraft VT-RTW with tail number 11933. It includes references for procedures, setup information, and a certificate of task completion, certifying that the inspection meets required standards. The job card outlines steps for printing engine/APU hours and cycles from the Flight Data Interface and Management Unit (FDIMU).

Uploaded by

Yogesh Memane
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

JOB CARD PACKAGE TITLE: AIC -

Eng and apu data Tail Number - MSN -


FSN
VT-RTW - 11933 - 955

Eng and apu

MPD Reference Title DocType


Printout of the Engine/APU Hours and Cycles
NONE 31-36-00-740-015-A Stored in the Flight Data Interface and AMM
Management Unit (FDIMU)

Job Cards Package is made of: 1 job cards.

JCP Title: Eng and apu data CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 2
PRINT DATE: Jan 26/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
JOB CARD PACKAGE TITLE: AIC -
Eng and apu data Tail Number - MSN -
FSN
VT-RTW - 11933 - 955

Eng and apu

INTENTIONALLY LEFT BLANK

JCP Title: Eng and apu data CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 2
PRINT DATE: Jan 26/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Dec
JOB CARD
15/2024
AMM - AIC - A318/A319/A320/A321 TASK:
31-36-00-740-015-A
31-36-00-02 CONF 00
TITLE:
Tail Number - MSN -
MPD TASK:
FSN: 31-36-00-740-015-A - Printout of the Engine/APU Hours and
Cycles Stored in the Flight Data Interface and Management NONE
VT-RTW - 11933 - 955
Unit (FDIMU)

Eng and apu


MECH. INSP.

** ON A/C FSN 002-050, 105-150, 201-500, 508-850, 901-999


TASK 31-36-00-740-015-A
Printout of the Engine/APU Hours and Cycles Stored in the Flight Data Interface and
Management Unit (FDIMU)
FIN: 10TV
1. Reason for the Job
Self explanatory

2. Job Set-up Information

A. Work Zones and Access Panels

ZONE/ACCESS ZONE DESCRIPTION


120 AVIONICS COMPARTMENT
210 CKPT,FWD COMPT BHD TO FLT COMPT
BULKHEAD

B. Referenced Information

REFERENCE DESIGNATION
Ref. Energize the Aircraft Electrical Circuits from
24-41-00-861-002-A the External Power
Ref. Energize the Aircraft Electrical Circuits from
24-41-00-861-002- the APU
A01
Ref. Energize the Aircraft Electrical Circuits from
24-41-00-861-002- Engine 1(2)
A02
Ref. De-energize the Aircraft Electrical Circuits
24-41-00-862-002-A Supplied from the External Power
Ref. De-energize the Aircraft Electrical Circuits
24-41-00-862-002- Supplied from the APU
A01

JCP Title: Eng and apu data CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 1 of 4
PRINT DATE: Jan 26/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Dec
JOB CARD
15/2024
AMM - AIC - A318/A319/A320/A321 TASK:
31-36-00-740-015-A
31-36-00-02 CONF 00
TITLE:
Tail Number - MSN -
MPD TASK:
FSN: 31-36-00-740-015-A - Printout of the Engine/APU Hours and
Cycles Stored in the Flight Data Interface and Management NONE
VT-RTW - 11933 - 955
Unit (FDIMU)

Eng and apu


MECH. INSP.

REFERENCE DESIGNATION
Ref. De-energize the Aircraft Electrical Circuits
24-41-00-862-002- Supplied from the Engine 1(2)
A02

3. Job Set-up

** ON A/C FSN 002-050, 105-150, 201-500, 508-850, 901-999

EMB SB 31-1168 for A/C 901-901


EMB SB 31-1306 for A/C 508-515
SUBTASK 31-36-00-860-090-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
Ref. AMM TASK 24-41-00-861-002.
(2) Make sure that the aircraft is in ground configuration (landing
gear compressed and all engines stopped).

** ON A/C FSN 002-050, 105-150, 201-500, 508-850, 901-999


SUBTASK 31-36-00-865-091-A
B. Make sure that this (these) circuit breaker(s) is (are) closed:

PANEL DESIGNATION FIN LOCATION

** ON A/C FSN 002-050, 105-150, 201-300, 401-500, 551-750, 801-850,


901-999
121VU AIDS & RCDR/FDIMU 5TV K15

** ON A/C FSN 002-050, 105-150, 201-500, 508-850, 901-999


4. Procedure

JCP Title: Eng and apu data CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 2 of 4
PRINT DATE: Jan 26/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Dec
JOB CARD
15/2024
AMM - AIC - A318/A319/A320/A321 TASK:
31-36-00-740-015-A
31-36-00-02 CONF 00
TITLE:
Tail Number - MSN -
MPD TASK:
FSN: 31-36-00-740-015-A - Printout of the Engine/APU Hours and
Cycles Stored in the Flight Data Interface and Management NONE
VT-RTW - 11933 - 955
Unit (FDIMU)

Eng and apu


MECH. INSP.

** ON A/C FSN 105-150, 201-500, 508-652, 901-999


PRE SB 31-1460 for A/C 105-120, 201-204, 251-255, 901-919

EMB SB 31-1168 for A/C 901-901


EMB SB 31-1306 for A/C 508-515
SUBTASK 31-36-00-740-074-A
A. Printout of the Engine/APU Hours and Cycles

ACTION RESULT
On the MCDU: On the MCDU display:
- Push the MCDU MENU - The MCDU MENU page
mode key. comes into view.
- Push the line key adjacent - The AIDS page comes into
to the AIDS indication. view.
- Push the line key adjacent - The AIDS:SPECIAL FUNC/
to the SPECIAL REPROG page comes into
FUNCTION/ view.
REPROGRAMMING
indication.
- Push the line key adjacent - The AIDS ACCESS
to the STATISTIC CONTROL page comes
COUNTER indication. into view.
- Push the line key adjacent - The AIDS:STATISTIC
to the READ ONLY CNTR 1/2 page comes into
indication. view.
On the MCDU: On the printer:
- Push the line key adjacent - The data for the engine and
to the PRINT indication. APU flight hours prints out.
On the MCDU: On the MCDU display:
- Push the arrow down - The AIDS:STATISTIC
mode-key. CNTR 2/2 page comes into
view.

JCP Title: Eng and apu data CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 3 of 4
PRINT DATE: Jan 26/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE
REV DATE: Dec
JOB CARD
15/2024
AMM - AIC - A318/A319/A320/A321 TASK:
31-36-00-740-015-A
31-36-00-02 CONF 00
TITLE:
Tail Number - MSN -
MPD TASK:
FSN: 31-36-00-740-015-A - Printout of the Engine/APU Hours and
Cycles Stored in the Flight Data Interface and Management NONE
VT-RTW - 11933 - 955
Unit (FDIMU)

Eng and apu


MECH. INSP.

ACTION RESULT
On the MCDU: On the printer:
- Push the line key adjacent - The data for the engine and
to the PRINT indication. APU cycles prints out.
On the MCDU: On the MCDU display:
- Push the MCDU MENU - The MCDU MENU page
mode key. comes into view.

** ON A/C FSN 002-050, 105-150, 201-500, 508-850, 901-999


5. Close-up

** ON A/C FSN 002-050, 105-150, 201-500, 508-850, 901-999

EMB SB 31-1168 for A/C 901-901


EMB SB 31-1306 for A/C 508-515
SUBTASK 31-36-00-860-091-A
A. Aircraft Maintenance Configuration
(1) De-energize the aircraft electrical circuits
Ref. AMM TASK 24-41-00-862-002.

© *** END OF CARD ***

JCP Title: Eng and apu data CERTIFICATE OF TASK / INSPECTION COMPLETION: Page 4 of 4
PRINT DATE: Jan 26/2025
CERTIFIES THAT THE TASK / INSPECTION HAS BEEN
COMPLETED TO THE REQUIRED STANDARD AND SUPPORTS
THE FINAL MAINTENANCE RELEASE / CERTIFICATE OF
RELEASE TO SERVICE

You might also like