V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
Fire and Life Safety Systems Inspection
Project Name: Date of Issue:
Rev. No.: Location of inspection:
Audited by:
GENERAL
Note: This audit in accordance with SBC 2018 , NFPA standards and Saudi Civil defense requirements
SN Description YES NO NA Remarks
1 Existing building
2 Building under construction
3 FLS package approved by the civil defense
ARCHITECTURE SAFETY
SN Description YES NO NA Remarks
1 GENERAL
1.01 Building hazard classification
1.02 Mixed occupancy buildings
1.03 Type of occupancies in the building
1.04 Type of building construction
1.05 Building consutrction within the height and area range
Building construction within the acceptable number of levels above grade
1.06
plane
1.07 High rise building
1.08 Windowless building
1.09 Underground building
1.10 Civil defence elevator required
1.11 Civil defence elevator connected to a second power source
1.12 Fire trucks can easily access the building
2 Occupant Load and Exits
2.01 Occupant Load and Exits
2.02 Exits as per code
2.03 Number of exits
2.04 Egress capacity/width adequate
2.05 Fire rating of exit stairs
2.06 Fire rating of exit stairs' door
2.07 Self closing doors
2.08 Latching doors
2.09 Exit enclosures free of storage
2.10 Exits discharge 100% to the outside
2.11 More than 50% of the exits discharge to the outside and have sprinklers
3 Doors
V3ME Document Management System
V3ME-KSA-CHK-HSSEI-0002 Rev. 00 1 / 4 Safety Department
SN Description YES NO NA Remarks
3.01 Blocked doors
3.02 Locked doors
3.03 Less than 15-lb force requires to release latch
3.04 Doors swinging direction as per code
3.05 Panic hardware as per code
4 Egress Arrangement
4.01 Clear and unobstructed egress
4.02 Dead-end corridors
4.03 Common path within travel limits
4.04 Travel through intervening rooms
4.05 Blocked egress
4.06 Aisle access way width adequate
4.07 Aisle width adequate
4.08 Travel distance as per code
ELECTRCIAL SAFETY
1 Second Power Source
1.01 Second power source in the building: Generator/Central Battery system
1.02 Second power source room protected
1.03 Type of protection
1.04 Room walls fire rated 2 hours
2 Emergency Lighting
2.01 Adequate emergency lighting achieving 10lux
2.02 Emergency light batteries tested and recorded in the annual record
2.03 Exit signs installed
2.04 Exit signs lead to exit doors
3 Fire Alarm
3.01 FACP located in an accessible area
3.02 FACP located in an fire rated area
3.03 Fire Alarm system connected to the second power source
3.04 Fire resistant/ fire rated wires
3.05 Extended rigid conduits wires
3.06 All areas covered with smoke/heat detectors
3.07 Kitchens & MEP rooms covered by multiple detectors
3.08 Detectors tested and recorded in the annual inspection
3.09 Manual call points near exit doors, visibile & accessible
4 Lightning Protection & Earthing System
4.01 Lightning protection installed on the roof level
4.02 Earthing system completed for all equipments and devices
MECHANICAL SAFETY
1 FIRE PROTECTION
1.01 Water sprinkler system needed based on building classification
1.02 Fire pump room easily accessible
If the fire pump room is located in the building, sprinkler system must be
1.03
installed
V3ME Document Management System
V3ME-KSA-CHK-HSSEI-0002 Rev. 00 2 / 4 Safety Department
SN Description YES NO NA Remarks
Three fire pumps provided: Jockey, 2 Electrical/ 1Elc+1
1.04
Diesel
1.05 Fire pump flow and head as per the design requirments
1.06 Fire pump UL and FM approved
1.07 Fire network pressure inside the pump room adequate
1.08 Control valves and accessories UL listed & FM approved
Water tank capacity as per the required flow rate and storage duration as
1.09
per the building hazard
1.10 Civil defense connection accessible
1.11 Fire fighting network flushed and cleaned before installation
1.12 All required areas have sprinklers
1.13 All sprinklers are UL listed
Sprinklers well distributed following the hazard classification requirements as
1.14
per NFPA 13
1.15 Zone control valves installed and easily accessible
1.16 Fire network pressure in each fire zone control valve adequate
1.17 Pipes sizes as per the NFPA 13
1.18 All pipes supported as per the standards
1.19 All pipes painted and protected
1.20 If fire hose are installed, which type is the fire hose cabinet?
1.21 Adequate fire network pressure in the FHC
1.22 Are the FHCs easily accessible and visible?
Enough FHCs covering all the areawith a maximum of 30m to reach the
1.23
farthest remote point
1.24 Fire extinguishers installed, visible and easily accessible
1.25 Fire extinguishers adequate with the area hazards
Electrical/Data/Communication rooms are protected by the adequate
1.26
clean agent system
1.27 Clean agent system installed and tested by the authorized suppliers
1.28 Kitchen hood protected by an adequate system
Fire hydrants distributed around the building as per
1.29
the standards
2 SMOKE CONTROL
2.01 High rise building
2.02 Protected staircases by pressurization fans
2.03 Pressurization fans interfaced with the fire alarms and tested
2.04 Pressurization fans connected to the second power source
2.05 Corridors and atriums are protected by the smoke management system
Smoke control system is independent as per the Saudi civil defense
2.06
requirements
2.07 Smoke fans and ducts are fire rated 2 hr/ 300c
2.08 Smoke fans connected to the second power source
2.09 Smoke fans interfaced with the fire alarm and tested
3 LPG
LPG tank located as per the SBC standards and the Saudi civil defense
3.01
requirments
Separation distances between the tanks and the surrounding buildings as
3.02
per the SBC standards
All safety devices, automatic shutdown, and detectors installed as per the
3.03
standards and easily accessible for any maintenance
LPG pipe network installed, supported and tested as per the Civil defense
3.04
requirements
OTHER COMMENTS
V3ME Document Management System
V3ME-KSA-CHK-HSSEI-0002 Rev. 00 3 / 4 Safety Department
SN Description YES NO NA Remarks
FLS Engineer Project Manager
Name: Name:
Signature: Signature:
Date: Date:
V3ME Document Management System
V3ME-KSA-CHK-HSSEI-0002 Rev. 00 4 / 4 Safety Department
Main Contractor Logo Client Logo
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
HVAC System Inspection- Air Side Equipment
Project Name: Date of Issue:
Rev. No.: Location of inspection:
Audited by: Eqp Tag Name:
Installation Inspection
1 PRE CHECK
SN Description YES NO NA Remakrs
Test and Commissioning report submitted for the
1.01
equipment by the third party
Air and water balance reports submitted by the third
1.02
party
As built drawings are available and reflected correctly
1.03
as per the site condition
1.04 The readiness of the building for the final operational
All openings, doors, windows..etc can be closed and
1.05
the area can be pressurized
1.06 Access available to all components
1.07 Control and BMS have been installed and operated
1.08 Motor and fan have no unusual noise while turning
All electrical wires are installed properly and no
1.09
exposed or lose connections
2 INSTALLATION CHECK
2.01 Tag number and all details have been labeled
What is the cooling type for the Air side equipment?
2.02
Chilled water or Dx
2.03 Vibration isolator installed
2.04 Air filter installed
2.05 Air filter asily accessible for maintenance issues
Provided access door adequate to do the proper
2.06
maintenance and to change the spare parts
Is the provided access door adequate to do the
2.07
required maintenance or change the electric heater?
2.08 Valve set installed
2.09 Sound attenuator installed as per requirements
2.10 Air ducts installed
2.11 Air duct leakage test done: light or smoke test
2.12 Air duct gauge as per the project specifications
2.13 Air ducts supported properly
Air ducts insulated with approved insulation material
2.14
and the required thickness and density
Exposed air ducts covered by the required cladding
2.15
thickness
Flexible connection connected between the
2.16
equipment and the air ducts
Internal duct liner insulation as per the approved
2.17 drawings
Air volume dampers installed as per the approved
2.18
drawings
2.19 Provided access door adequate to do the air balance
Motorized air dampers installed as per the approved
2.20
drawings and connected to the electric power
Provided access door adequate to do the required
2.21
maintenance
2.22 Fire dampers installed as per the approved drawings
V3ME Document Management System
V3ME-KSA-CHK-ME-0001 Rev. 00 1 / 2 Mechanical Department
SN Description YES NO NA Remakrs
Provided access door adequate to do the required
2.23
maintenance
2.24 Air outlet diffusers installed
2.25 Chilled water pipes installed
2.26 Chilled water pipes supported properly
Chilled water pipes insulated with approved insulation
2.27
material and the required thickness and density
Is the exposed chilled water pipes covered by the
2.28
required cladding thickness?
2.29 Is the condensate pipe from the equipment installed?
Condensate pipe from the equipment connected to
2.30
the nearest drain point with the adequate slope
2.31 Thermostat installed
2.32 HVAC equipment connected to the BMS
2.33 HVAC readings monitored through the BMS
3 INSTALLATION CHECK - DX UNITS
3.01 Outdoor unit installed in an adequate location
3.02 Indoor units installed
Drain from the indoor unit installed and connected to
3.03
the nearest drain point
3.04 Is the copper pipes insulated properly?
3.05 Thermostat installed
3.06 DX unit tested and commissioned by the supplier
Performance Inspection
No. ITEM DESIGN/RECOMMENDED ACTUAL
1.00 Total air quantity- CFM
1.01 Outlets total air quantity - CFM
1.02 Fan static pressure - INCH
1.03 Fan speed - RPM
1.04 Average Temperature - C°
1.05 Noise Level - db
OTHER COMMENTS
Mechanical Engineer Project Manager
Name: Name:
Signature: Signature:
Date: Date:
V3ME Document Management System
V3ME-KSA-CHK-ME-0001 Rev. 00 2 / 2 Mechanical Department
Main Contractors Logo Client Logo
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
Firefighting Systems Inspection
Project Name: Date of Issue:
Rev. No.: Location of inspection:
Audited by:
GENERAL
Note: This audit in accordance with SBC 2018 , NFPA standards and Saudi Civil defense requirements
SN Description YES NO NA Remakrs
LFS package from the civil defense approved by
1
owner/consultant
Test and Commissioning report submitted for
2
Firefighting pumps
1 FIREFGHTING - Pump Room
1.01 Building classification requires a water sprinkler system
1.02 Fire pump room located in an accessible area
In case the fire pump room is located inside the
1.03
building, Is it protected by the water sprinkler system?
Three fire pumps are provided: Jockey, 2 Electrical/
1.04
1Elc+1 Diesel?
Fire pump flow rate and head as per the design
1.05
requirements?
1.06 Fire pumps UL listed and FM approved
1.07 Fire network pressure inside the pump room adequate
Control valves and accessories Ul listed & FM
1.08
approved
Water tank capacity as per the required flow rate?
1.09
And storage duration as per the building hazard?
Test line installed and connected to the tank as per
1.10
the standards
Outside building connection for civil defense clear
1.11
and accessible (siamese connection)
Fire fighting network has been flushed and cleaned
1.12
before installing the sprinklers
2 FIREFGHTING - Sprinklers
2.01 Are the sprinklers cover all the required areaa?
Type of the installed sprinklers: Pendent, Concealed
2.02
pendent, upright, sidewall
2.03 Sprinklers Ul listed
Distribution and spaces between the sprinklers follow
2.04
the hazard classification requirements as per NFPA 13
2.05 Sprinklers head aligned with the final ceiling level
In case of the open grid ceiling, are the sprinklers
2.06
head aligned with the final ceiling level?
2.07 Zone control valves installed and easily accessible
Fire network pressure in each fire zone control valve
2.08
adequate
2.09 Pipes sizes as per the NFPA 13
V3ME Document Management System
V3ME-KSA-CHK-ME-0002 Rev. 00 1 / 2 Mechanical Department
SN Description YES NO NA Remakrs
2.10 All pipes supported as per the standards
2.11 Network vented at the highest point
2.12 All pipes painted and protected
Slope for the last sprinkler adequate to drain the
2.13
network if required
3 FIREFGHTING - Stand pipe system
3.01 Type of the installed stand pipe system (Type I,II,III)
3.02 Fire network pressure in the FHC adequate
FHCs easily accessible and visible (center of the
3.03
wheel at 1.5 m FFL)
Is the number of the FHCs enough to cover the area
3.04
and each hose 30m can reach the most remote
3.05 Landing valve provided by a separate hose reel box
4 FIREFGHTING - Fire Extinguishers
Fire extinguishers installed, visible and easily
4.01
accessible
Provided fire extinguishers type adequate with area
4.02
hazards
5 FIREFGHTING - Clean Agent
Electrical/Data/communication rooms are protected
5.01
by the adequate clean agent system
Clean agent system installed and tested by the
5.02
authorized supplier
5.03 Kitchen hood protected by an adequate system
6 FIREFGHTING - External
Fire hydrants distributed around the building as per
6.01
the standards
Fire hydrant visible, easily accessible and no
6.02
obstructions around it
OTHER COMMENTS
FLS Engineer Project Manager
Name: Name:
Signature: Signature:
Date: Date:
V3ME Document Management System
V3ME-KSA-CHK-ME-0002 Rev. 00 2 / 2 Mechanical Department
Main Contractors Logo Client Logo
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
Plumbing Systems Inspection
Project Name: Date of Issue:
Rev. No.: Location of inspection:
Audited by:
Potable Water System
SN Description YES NO NA Remakrs
1 Potable Water Pump Room and Tank
1.01 Pump room located in an accessible area
1.02 Main water meter located in an accessible area
The minimum number of pumps are provided: 1
1.03
Duty/1 Standby
Pump flow rate and head as per the design
1.04
requirements
Network pressure inside the pump room adequate (4
1.05
bar minimum)
1.06 All control valves and accessories installed
Network vented and the automatic air vent valves
1.07
installed in the proper locations
Water tank capacity as per the required flow rate?
1.08
And storage duration as per the building
Hot water source for the project: Boiler, Electric water
1.09
heaters or other system
If boiler, the location and the structure for the boiler
1.10
room as per the civil defense regulations
All the safety devices and valves installed for the
1.11 boiler as per the approved drawings: Safety relief
valve, automatic shutdown…etc
1.12 Hot water circulation pump provided
If required as per the project specifications, the
1.13
network is flushed and cleaned
2 Potable Water - Pipes Network
2.01 Material type for the pipes network
Material type for the pipes network as per the project
2.02
secifications
Pressure test for the main pipes and branches done
2.03
and approved (1.5 time of the operation pressure)
All pipes supported as per the standards and the
2.04
project specifications
2.05 Distance between the supports as per the standards
Isolating valves installed in the adequate locations for
2.06
the purpose denied
Each riser has a separate isolating valve and is
2.07
prepared to do the required drain in case if required
Provided access door adequate to do the required
2.08
maintenance
Water hammer arrestor installed as per the project
2.09
specifications
Hot water pipes insulated with approved material as
2.10
per the project specifications
V3ME Document Management System
V3ME-KSA-CHK-ME-0003 Rev. 00 1 / 3 Mechanical Department
SN Description YES NO NA Remakrs
Hot water return line implemented as per the
2.11
standards and taken from the last point in the network
Water supply connections size to the sanitary fixtures
2.12
as per the approved drawings and the standards
3 Potable Water - Ro Plant
3.01 RO plant required as per the project specifications
3.02 If yes, RO plant installed by a specialist contractor
RO plant components installed as per the project
3.03
specifications: Filters, mixing pump, media tank…etc
Is the RO plant tested and commissioned by the
3.04
specialist supplier?
Maintenance contract signed to monitor the RO plant
3.05
and do the required maintenance
4 Grey water System
4.01 Grey water system considered for the building
4.02 Required pumps installed
4.03 WC flush tank connected to the grey water system
Drainage System
1 Soil and Waste - Pipes Network
1.01 Material type for the pipes network
Material type for the pipes network as per the project
1.02
secification
Gravity test for the main pipes and branches done
1.03
and approved
Pipes supported as per the standards and the project
1.04
specifications
1.05 Pipes slope as per the standards
1.06 Distance between the supports as per the standards
The ceiling cleanout fittings installed in the adequate
1.07
locations for the purpose denied
P traps installed in the adequate locations to prevent
1.08
the reverse smell
Provided access door adequate to do the required
1.09
maintenance in case of any clogging
1.10 Ventilation network installed
Vent points connected to the proper locations in the
1.11
waste and soil networks
Pipes connections size to the sanitary fixtures as per
1.12
the approved drawings and the standards
Provided access door adequate to do the required
1.13
maintenance for the WC concealed flush tank
Floor cleanouts installed in the adequate locations for
1.14
the purpose denied
In the basement, Is the submersible pump installed?
1.15
And the output pipe connected to the main drainage
1.16 Automatic float valve system installed properly
2 Kitchen - Pipes Network
2.01 Kitchen network a dedicated network
2.02 Material type for the pipes network
Material type for the pipes network as per the project
2.03
specifications
Ceiling cleanout fittings installed in the adequate
2.04
locations for the purpose denied
Provided access door adequate to do the required
2.05
maintenance in case of any clogging
Kitchen network connected to the grease interceptor
2.06 before the connection to the main municipality
network
V3ME Document Management System
V3ME-KSA-CHK-ME-0003 Rev. 00 2 / 3 Mechanical Department
SN Description YES NO NA Remakrs
Roof Rainwater and Stormwater
1 Pipes Network
1.01 Material type for the pipes network
Material type for the pipes network as per the project
1.02 specifications
Gravity test for the main pipes and branches done
1.03
and approved
Storm trench drain installed in the adequate location
1.04
to collect the water as per the road slop
1.05 Roof rainwater outlet installed
OTHER COMMENTS
Mechanical Engineer Project Manager
Name: Name:
Signature: Signature:
Date: Date:
V3ME Document Management System
V3ME-KSA-CHK-ME-0003 Rev. 00 3 / 3 Mechanical Department
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
Structural Design Checklist
Project Name: AL URUBAH PARK Date of Issue:
Rev. No.: Location of inspection:
Audited by: Eqp Tag Name:
1 GENERAL
SN Description YES NO NA Remakrs
1.0 The review comments have been incorporated in preceding
stages of design.
2.0 The design calculations are consistent with the geometry of the
final plans.
Insure that the design calculations are self explanatory and the
results are clearly shown. Both must be readily understandable to
3.0 the reviewer. Do not omit steps and references. Show all
calculations have been reviewed by another engineer.
Ensure that all the drawings should have the scales specified for
each section, plan view, and detail. Also, provide scale legends
4.0 to all the scales used for each sheet.
5.0 North arrows are provided on plan views.
Section cuts are labeled and oriented correctly. Detail references
6.0 Coordinate with the detail drawings.
The architectural, mechanical, or other disciplines do not conflict
7.0 with the structural plans or specifications. Special attention was
paid to:
7.1 Locations of ductwork, wall chases, etc.
Dimensional correctness and architectural gridlines coincide with
7.2 the structural drawings.
7.3 Headroom clearances, structural cutouts and openings for all the
M.E.P services.
7.4 Beams and columns protruding horizontally and vertically into
stairwells, and other interior spaces.
7.5 The differing top of interior masonry wall connection details.
7.6 Structural walls and the wall material are coordinated with the
architectural drawings.
7.7 The slope of the roof has been accounted for in the design of
the roof beams at the gable ends.
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
Structural Design Checklist
Project Name: AL URUBAH PARK Date of Issue:
Rev. No.: Location of inspection:
Audited by: Eqp Tag Name:
2 STRUCTURAL NOTES
1.0 Structural notes are adequate for each building and structure.
2.0 The current codes and design guides are listed including the
current Saudi building code and international codes,
3.0 The following items shall comply with the current Saudi building
code and international codes. It should be provided on the
contract drawings for each individual building or other structures
considered:
Service live loads, super dead loads and other special loads for
3.1 cranes wheel loads, mechanical and electrical equipment loads,
etc.
3.2 Wind speed, exposure category, and importance factor.
3.3 Earthquake parameters Ss and S1.
3.4 Allowable stresses for each material utilized.
Maximum allowable soil bearing pressure using service loads. If
actual soil bearing pressure has not been obtained, then the
3.5 assumed maximum allowable soil bearing pressure using service
loads is listed.
List the type of structural system used (e.g. special reinforced
3.6 concrete frame, reinforced shear walls) and the response
modification coefficient, R, per current code of practice.
3 PERTINENT DESIGN FACTORS
1.0 Design of below grade structures, tunnels, trenches, pits, etc.,
considered uplift and other effects due to groundwater.
Deflection (including long term deflection) was considered and
camber provided where required. These items should be closely
checked where long spans are involved. The deflections of the
2.0
beam and/or slab were calculated if they did not meet the
minimum depths required by section 9.5 in ACI.
The sizes of materials utilized are commonly available and within
stock lengths. If materials (including reinforcing steel), members, or
3.0 assemblies exceed stock lengths or handling and transportation
limitations, splices are specified and detailed.
4.0 The structure and its parts can be built as detailed when materials,
fabrication practices, usual tolerances and discrepancies,
construction techniques, and sequence of operations are taken
into account.
5.0 The height of all columns and walls is provided. The drawings
clearly show the spacing between supporting elements so the
design of the structural components can be easily verified.
The design is complete, i.e. that a design for all structural
6.0 components has been included.
Auxiliary work such as underground tanks, transformer pads,
7.0 machinery and equipment foundation supports, utility pits and
manholes are located and properly detailed.
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
Structural Design Checklist
Project Name: AL URUBAH PARK Date of Issue:
Rev. No.: Location of inspection:
Audited by: Eqp Tag Name:
4 D FOUNDATION AND STRUCTRUAL FRAME
1.0 Walls are designed to resist lateral loads due to backfill
materials and potential surcharges.
2.0 Pipe sleeves are provided in foundation walls where required
for penetrations.
3.0 The bottom of footing elevations has been checked against
boring logs to avoid unnecessary excavation into rock.
Waterproofing for walls, underground tanks and manhole is
4.0 provided as required.
5.0 The elevation of the top of all footings is shown.
6.0 Adequate wall sections and details are shown on the drawings.
Footings are deep enough providing dowel bars extending down
7.0 into them will provide enough embedment for tension
development.
Structural engineer has coordinated with the civil and
geotechnical engineer to ensure the manner of establishing
footing depths is consistent with existing topography, and existing
site conditions with respect to any required clearing, demolition,
8.0 removal or accommodation of existing utilities and other
construction. The establishment of footing depths is consistent with
respect to the construction such as pits, trenches, adjacent water
tanks, or other underground installation.
9.0 Structural engineer has coordinated with the geotechnical
engineer to ensure other recommendations of the soils report
have been complied with, such as minimum footing depth,
magnitude of passive pressures, etc.
10.0 The finished grade symbol and/or label are shown in
appropriate sections.
11.0 Slabs-on-grade do not bear directly on the footings.
12.0 A capillary water barrier, waterproofing, or vapor barrier
membrane is shown where required.
The sub-grade is shown for the different conditions in section or
details. Structural engineer has coordinated with the geotechnical
13.0 engineer concerning the sub-grade, and the sub- grade is noted
on the drawings to meet the requirements in the
specifications concerning compaction, etc.
14.0 The top of foundation level is defined at all points around the
building.
A detail or section is provided to show how the crosstie beams or
hairpins are connected to the foundation. (Especially important
15.0 when large horizontal forces/thrusts are being
resisted in pre- engineered steel buildings, etc…)
16.0 Show how the bases of columns and walls are connected to the
foundation with details and sections.
A detail or section is provided to show how the columns and/or
17.0 walls are connected to the 1st floor, 2nd floor and roof floor etc.
18.0 The recommended 150 mm minimum thick slab-on-grade is
provided especially in locations where quality control and
durability are the main issues.
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
Structural Design Checklist
Project Name: AL URUBAH PARK Date of Issue:
Rev. No.: Location of inspection:
Audited by: Eqp Tag Name:
The foundation system has been designed with regard to possible
19.0 differential settlement upon supported elements.
5 CONCRTE
The special additional information and criteria due to the climate
1.0 in the Middle East listed in item #2 below has been added into the
concrete specification section.
2.0 Along with other criteria, the concrete specifications shall have
the following information:
2.1 Concrete shall be composed of cementitious material, water,
fine and coarse aggregates, and admixtures and shall be in
All structural concrete shall have cylinder compressive strength as
2.2 specified in the structural design calculations at 28 days.
2.3 Concrete shall be comprised of ASTM C 150, Type I or V
cement.
2.4 Concrete shall consist of 2 % to 4.5% air entraining admixture.
2.5 Concrete shall contain a high-range of water-reducer and
plasticizer chemicals in accordance with ASTM [Link] dosage
shall be determined during mixture proportioning study.
The cementitious material shall consist of Portland cement with a
2.6 7.0 to 9.0 percent by mass replacement of cement by silica fume.
Silica fume shall comply with the requirements of
ASTM C1240-60a.
The cementitious material content shall not be less
2.7 than 390 kg/cubic meter. The mixture shall also have a water-
cementitious material ratio of 0.45 or less.
Concrete shall have maximum water-soluble chloride ion content
2.8 for corrosion protection of 0.15 percent by mass of the Portland
cement.
2.9 Hot weather requirements shall comply with the
recommendations of the current ACI 305R.
2.10 All concrete shall be cured for a minimum of 7 days.
2.11 Where aggregates are alkali reactive, as determined by
Appendix XI of ASTM C1260-05a, cement containing less than
0.60 percent by mass alkalies (as Na2O equivalent) shall be
used.
2.12 Concrete members at or below grade shall have a minimum
concrete cover over reinforcement of 75 millimeters.
Reinforcing steel shall be deformed bars conforming to ASTM A
2.13 615M-05, grade 60, and welded wire fabric shall conform to ASTM
A 185M-07.
Type I or V cement with silica fume, air entrainment, and a high
3.0 range water reducing admixture has been specified where
concrete will be exposed to soils or ground water having high
sulfate content.
Details of concrete columns show architectural configuration and
4.0 masonry control joint provisions for all cases.
Concrete members are properly sized and detailed to provide
5.0 required cover and spacing between bars at bar splices and
connections.
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
Structural Design Checklist
Project Name: AL URUBAH PARK Date of Issue:
Rev. No.: Location of inspection:
Audited by: Eqp Tag Name:
Reinforcement placement in beams including grade beams,
girders, joists, and slabs is detailed to show location, bends,
6.0 extensions, rebar sizes, splices, anchorage, stirrup sizes, stirrup
spacing, stirrup locations, and stirrup/tie configurations.
7.0 Reinforcement placement in columns including piers and pilasters
are detailed to show location, bends, extensions, rebar sizes,
splices, anchorage, stirrup sizes, stirrup spacing, stirrup locations,
and stirrup/tie configurations.
8.0 A bar bending diagram is added where required for clarity.
9.0 For better quality control reasons, the recommended straight top
and bottom reinforcement has been used in the beams and slabs
as opposed to bending the bars to economize the design.
In one-way continuous floor and roof slabs, top bars have been
provided transverse to beams, joists, girders, and walls which are
10.0 perpendicular to the slab span. The slab thickness is sufficient to
provide reinforcing in top and bottom of slab in
both directions.
Depressed areas in slabs, when required for setting beds or
11.0 insulation, have been indicated and reinforcement placement
for this condition is clearly detailed.
Concrete cover for reinforcement is shown in notes for all
members and conditions. In areas close to the sea, additional
12.0 cover or other provisions have been provided to protect
reinforcing bars against attack by salt-laden moisture.
Additional reinforcement is provided and clearly detailed around
13.0 openings in concrete walls and slabs.
14.0 Exterior platforms, door pads, and patios are sloped to drain
away from the building.
Floors are pitched to drains and pit floors pitched to drains or
15.0 sumps. (Note: In some cases, trench floors will also be pitched).
16.0 Column center dimensions, wall thickness, and other necessary
dimensions are shown.
Roof structure is adequate to support equipment to be installed,
and the curbs or pads to support the equipment. Special
attention has been paid to areas with large concrete pads like
17.0
the ones
supporting large satellites, etc. Also, large slab openings have
been framed around with intermediate roof beams.
18.0 Potential maintenance and replacement loads have been
considered for roof and other levels.
19.0 All slab designations are noted.
20.0 Splice lengths for all sizes of rebar used have been shown or
tabulated.
21.0 All beam elevations are clearly indicated and all beam offsets
are shown.
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
Structural Design Checklist
Project Name: AL URUBAH PARK Date of Issue:
Rev. No.: Location of inspection:
Audited by: Eqp Tag Name:
22. The following schedules are shown, if required:
a. Footing schedule.
b. Grade beam schedule.
c. Pile cap schedule.
d. Lintel schedule.
e. One-way and two-way concrete slab schedule.
f. Concrete beam schedule.
22.0 g. Column schedule.
The column schedule and detail show all story heights, splice
23.0 points, and the top and bottom of all columns with relation to
some given floor elevations.
When flexural members act as part of a primary lateral load
24.0 resisting system, check the bottom bars will develop the yield stress
in tension at the beams ends. (See ACI 318).
Insure that the setting bed for tiled areas consisting of quarry or
25.0 terrazzo tile are deep enough to accommodate embedded items
such as conduit and construction tolerances.
Insure that concrete water storage tanks are provided with a
watertight membrane liner as part of the system. The technical
26.0 coordinator or leader of the design team should be notified to
ensure this liner is on the drawings and described in the
appropriate specifications.
For primary reinforcement, the recommend 12 mm diameter rebar
minimum has been used. (Typically 10 mm diameter rebar only
27.0 used for lateral reinforcement elements like
stirrups, hoops, ties, etc…)
The reinforcing provided meets the minimum percentage and
temperature requirements of ACI. Also, the reinforcement does
28.0 not exceed the percentage of steel allowed per ACI. Attention
was made to ensure rebar spliced in standard columns does not
exceed 8%, or exceed 6% for special moment frames.
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
Structural Design Checklist
Project Name: AL URUBAH PARK Date of Issue:
Rev. No.: Location of inspection:
Audited by: Eqp Tag Name:
6 JOINTS
1.0 1. Insure that expansion joints through elevated floors, walls,
roof, etc., are clearly detailed.
The maximum spacing of 30 to 45 meters between expansion
joints has been observed for concrete structures. If the spacing
has been exceeded, supporting analysis has been provided.
2.0
Isolation or expansion joints have been used because of L-
shaped, U-shaped, or other irregularly shaped buildings.
3.0 All joints required to build the structure are shown.
4.0 Water stops are provided in joints below grade when water
could enter into a usable space.
The types and locations of control, construction, and expansion
joints are shown, and the layouts are designed so the joints will
5.0 function as intended. The details of control, construction, and/or
expansion joints are shown separately.
6.0 The distance between two crack control joints for slabs on
grade does not exceed the 4 to 6 meters limit.
7.0 The control joints are at least ¼ the depth of the slab.
7 MASONRY
1.0 Coursing of masonry walls and partitions shall be coordinated
between architectural and structural drawings to avoid cutting
blocks, especially the top course of block.
2.0 Control joints are clearly located and fully detailed for each
condition, type of construction, and finish.
3.0 Horizontal joint reinforcing is provided.
Horizontal joint reinforcement is used in the horizontal masonry
mortar joints unless bond beam type construction preferred.
(Rebar used in the mortar joints is usually too large. For normal
4.0 mortar joint thicknesses of 10 mm, proper clearance can't be
achieved around the rebar to ensure proper bonding. In remote
locations, 6 mm rebar can be used in mortar joints, if horizontal
joint reinforcement not available.)
The location, size, and amount of extra reinforcement are shown
5.0 for the concrete masonry units at or near openings.
6.0 All lintels are provided.
7.0 All masonry pilasters are of sufficient capacity for loads
applied.
The design criteria for crack control have been followed where
8.0 applicable. The maximum spacing of 7.2 meters for control joints
has been provided.
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
Structural Design Checklist
Project Name: AL URUBAH PARK Date of Issue:
Rev. No.: Location of inspection:
Audited by: Eqp Tag Name:
For masonry design, the maximum effective width for the wall
stiffeners compression flange shall be limited to the least of six
9.0 times the wall thickness, or the bar spacing, or 180 mm as
determined by minimum reinforcement requirements dictated by
wind or seismic loads.
In concrete frame structures, a detail has been provided showing
the method of supporting the masonry wall. For infill walls and
other non-load bearing wall systems, the top of the wall shall be
free to move in plane relative to the framing beams. Such walls
10.0
shall be designed to span in both the horizontal and vertical
directions assuming a partial fixity at the wall base and hinged or
simply supported at the wall edges or ends.
11.0 Provided design reinforcement for masonry walls and masonry
lintels. Verified the structural masonry walls are designed to meet
the out-of-plane seismic forces of section 12.11, ASCE 7- 05.
12.0 Provide design reinforcement for non-structural masonry walls.
Verify that the non-structural masonry walls are designed to meet
the out-of-plane seismic forces of section
13.3, ASCE 7-05.
No masonry is shown in direct contact with the soil or used below
grade. (If it is necessary to use CMU below grade, all cells shall be
13.0 fully grouted, and an approved protective waterproof barrier is
provided on all masonry surfaces in contact with natural ground.)
Information is provided showing how the masonry walls are
14.0 laterally anchored with ties on the structural sheets.
8 STRUCTURAL STEEL
1.0 The type and size of all fasteners for connecting structural steel
is shown or noted.
2.0 The type, size, and length of all welds are shown utilizing
standard (AWS) welding symbols.
Connections of steel members and joists to concrete are detailed
so that they can be erected independently, providing positive
3.0 bearing on concrete and taking into account the usual variations
in concrete from plan dimensions.
4.0 Check that all beam sizes are shown.
The loads, including shears, moments and axial forces to be
5.0 resisted by individual members and their connections are
provided.
Hangers and supplementary framing for monorails or other
6.0 overhead installations are detailed.
7.0 Miscellaneous metal items are adequately detailed.
Covers and grating are properly sized for possible loads,
8.0 particularly where accessible to wheel loads.
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
Structural Design Checklist
Project Name: AL URUBAH PARK Date of Issue:
Rev. No.: Location of inspection:
Audited by: Eqp Tag Name:
9 PRECAST CONCRETE CHECK
Connections for precast concrete elements are adequately
1.0 designed and detailed on the structural drawings.
2.0 Design of connections consider movement, caused by thermal
expansion and contraction, live loads, wind, settlement, creep,
yielding, etc., acting upon bolts and plates of the connection.
Details of connections include note that indicates correct
procedure for installing bolts of connection designed for thermal
3.0 expansion and contraction.
Connections shall be detailed in accordance with procedures
outlined in the latest edition of the following manuals:
a. MNL-120; "PCI Design Handbook.
b. MNL-121; "PCI Manual for Structural Design of Architectural
Precast Concrete".
4.0 c. MNL-122; "Architectural Precast Concrete".
d. MNL 123; "PCI Manual on Design of Connections for Precast
Prestressed Concrete".
e. MNL-124; "PCI Design for Fire Resistance of Precast Prestressed
Concrete".
5.0 Include notes on tolerances to be allowed.
Precast concrete shall not be used in structures that do not meet
the USCENTCOM minimum required stand-off distance to a
6.0 controlled perimeter fence line.
10 METAL BUILDING CHECK
1.0 Bracing types and locations are shown; or restrictions are covered
by notes.
That masonry control joints in skirt walls are shown and
coordinated with stucco control joints on Architectural Drawings.
2.0
The special additional information and criteria due to the climate
in the Middle East has been added into metal building
3.0 specification section 13 34 19.
Differential deflection of metal building system and other
construction has been considered. Special attention has been
4.0 paid to the potential allowable movement allowed by the metal
building frame versus the masonry veneer.
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
Structural Design Checklist
Project Name: AL URUBAH PARK Date of Issue:
Rev. No.: Location of inspection:
Audited by: Eqp Tag Name:
OTHER COMMENTS
Main Contractor Logo Client Logo
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
AOR Services Checklist - Architecture
Project Name: Date of Issue:
Rev. No.: Location of inspection:
Audited by: Eqp Tag Name:
checklist
1 MUNICIPALITY REQUIREMENTS CHECK
SN Description YES NO NA Remakrs
1.01 Project designed within required setbacks
1.02 Building height as per the requirements
1.03 Gross area and building footprint as per requirement
1.04 Number of parking satisfies the requirements
1.05 Minimum number of elevator satisfies the requirements
1.06 Handicap friendly elevator needed
1.07 Elevator capacity satisfied as per needs
Dimension of entrance and exit of elevator lobby
1.08
satisfied
1.09 Parking dimensions as required
2 SAUDI BUILDING / MOMRA/ King Salman CODE CHECK
2.01 Handicap ramps are provided as required (1:16-1:25)
Handicap parking provided with the rights dimensions
2.02
and count
Travel distance from the elevator to the furthest point
2.03
according to standards
Emergency stairs that can reach all floors satisfied with
2.04
the minimum dimensions required
Minimum distance from emergency stairs to furthest
2.05
point provided
2.06 Emergency stairs leading to an open area
2.07 All emergency doors opening to outside
2.08 Emergency signage satisfied
2.09 Parking ramps according to standard if any
2.10 Disabled parking ratio as requested
2.11 Garbage chute satisfies the requirements
2.12 Parking entraces and exits interfere with the roads
2.13 Dimensions of the parking roads as per standards
Indoor parking height satisfies the standard minumum
2.14
clear height
Disbaled parking satisfies the dimensions, signage and
2.15
standards
2.16 Upper floor setbacks requirements
Auditorium chairs satisfied in code in terms of distances
2.17
and dimensions
V3ME Document Management System
V3ME-KSA-CHK-ME-0001 Rev. 00 1 / 2 AOR Department
SN Description YES NO NA Remakrs
2.18 Number of floors compliant with the affection plan
2.19 Number of toilets satisfied as per SBC table
2.20 Number of accessible toilets as per code
2.21 Accessibility routes as per KSCDR
2.22 Doors and corridors dimensions as per KSCDR
Intermediate handrail provided for stairs where the
2.23
person is within a distance 750 mm from the handrail
2.24 Handicap elevator (1525x1725)
2.25 No unisex WCs
2.26 Drinking fountains as per code
2.27 Lavatory count as per code
Prayer room orientation and ablution satisfy local
2.28
culture
2.29 Parking ramp to be verified against MOMRA (1:8.4)
2.4 meters clear height for parking floors. 3.75 for
2.30
Ground floor
Number of exit lanes of parking as per momra 1 for
2.31
each 250. Entrance lanes 1 for each 500
2.32 Number of accessible auditorium seats as per KSCDR
Architect Project Manager
Name: Name:
Signature: Signature:
Date: Date:
V3ME Document Management System
V3ME-KSA-CHK-ME-0001 Rev. 00 2 / 2 AOR Department
Main Contractor Logo Client Logo
V3 MIDDLE EAST ENGINEERING CONSULTANTS CO.
AOR Services Checklist - Architecture
Project Name: Date of Issue:
Rev. No.: Location of inspection:
Audited by: Eqp Tag Name:
KING SALMAN ACCESIBILITY CODE REQUIREMENTS
1 EXTERIOR ELEMENTS CHECK
SN Description YES NO NA Remakrs
1.01 Over head and protruding object height. height and handrail if needed
1.02 Side walks, pavements and routes. Clear width, passing route and slope
1.03 Exterior ramp Runing slope, horizontal length and handrails
1.04 Exterior stairs Treads and risers, handrails and headroom
1.05 Kerb cuts Slope and width
1.06 Pedestrian crossing Path and travel
1.07 Medians and middle islands Width
1.08 Vehicle parking Number of accesible parking
1.09 Passenger drop off area Location, off street and on street zone size
1.10 Street Furniture Location
1.11 Gates and Turnstiles Opining Clear width
1.12 Courtyards and balconies Depth and doors openings
2 INTERIOR ELEMENTS CHECK
2.01 Entrance Check accesible route and protection
2.02 Routes, corridors and access aisles Clear width, slope, and rest areas
2.03 Interior Ramp Runing slope, horizontal length and handrails
2.04 Interior stairs Treads and risers, handrails and headroom
2.05 Lifts Width of doors, cab dimention and handrails
2.06 Moving Walks Width, Handrails and height along
2.07 Doors Clear opening and two doors in series
2.08 Glazed doors and windows Warning stripes and viewing windows
Clear floor space infront of enrances to
2.09 Toilets facilities
accesible tiolets
2.10 Toilets room Clear floor space (1800*1800), doors (900)
2.11 Family Toilet room Diameter turning space (2100)
2.12 Ablution spaces Located close to prayer rooms
2.13 Toilet stalls Number of accesible toilets
Clear width of pass through and U shaped
2.14 Kitchens and kitchenettes
kitchens
2.15 Dressing rooms At least one, clear floor space (1800*1800)
2.16 Floor sufaces check changes in level
2.17 Drinking fountains Location and spout outlet height
2.18 Viewing spaces at fix seating Location, width and length
V3ME Document Management System
V3ME-KSA-CHK-ME-0001 Rev. 00 1 / 2 AOR Department
SN Description YES NO NA Remakrs
Architect Project Manager
Name: Name:
Signature: Signature:
Date: Date:
V3ME Document Management System
V3ME-KSA-CHK-ME-0001 Rev. 00 2 / 2 AOR Department