0% found this document useful (0 votes)
31 views1 page

Contractor Responsibilities for Building Setup

The document outlines the responsibilities and guidelines for contractors regarding the construction project, including setting out buildings, verifying dimensions, and protecting existing services. It emphasizes the importance of adhering to quality control standards and reporting any discrepancies to the architect. Additionally, it includes specific instructions about damp proof courses and the prohibition of scaling the drawing.

Uploaded by

mukesh singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views1 page

Contractor Responsibilities for Building Setup

The document outlines the responsibilities and guidelines for contractors regarding the construction project, including setting out buildings, verifying dimensions, and protecting existing services. It emphasizes the importance of adhering to quality control standards and reporting any discrepancies to the architect. Additionally, it includes specific instructions about damp proof courses and the prohibition of scaling the drawing.

Uploaded by

mukesh singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

COPYRIGHT AND RIGHT OF REPRODUCTION OF THIS DRAWING OR ANY PORTION

GENERAL NOTES
1. The Contractor is responsible for the correct setting out of the buildings/shopfront and all
external and internal walls with particular reference to boundaries, building lines and
setting out points.
2. The Contractor is to verify all levels, heights and dimensions on site and is to check
these against the drawing before putting any work in hand.
3. The Contractor is to locate and identify existing services on the site and to protect
these from damage throughout the duration of the contract
4. The Contractor is referred to the Standard Guidelines for Quality Control issued by this
office for all minimum requirements for workmanship and materials. This document is
to be used in conjunction with this drawing.
5. Any errors, discrepancies or omissions are to be reported to the Architect immediately
6. Contractor is to build in Approved D.P.C.'s, whether or not these are shown on drawings,
to all external walls at each floor, beam or parapet level and to all windows, doors,
grilles or other opening in external walls. Cavity walls to have stepped D.P.C.'s.
7. Any queries arising from all the above must be reported to the Architects for clarification
before any work is put in hand.
8. Do not scale this drawing; refer to figured dimensions only

REVISIONS

REV DATE ISSUED DESCRIPTION

R0 - - -

LEGEND
1x2 1x1 1 2 3 4 5 6 7 8 9 9x1 10 11 12 14 15 16 17 18 19 20 21 21x1 21x2 22 23 24 25 26

REFERENCE DRAWING NO.

H H

SPECIAL NOTES

Balcony Balcony Balcony


Outdoor Unit

Outdoor Unit Outdoor Unit Outdoor Unit

Gents Toilet
Refuge
G Area

EI-892 EI-893 EI-894



Outdoor Unit

B.O.H
Office Jy1

ROOM BAL ROOM BAL ROOM BAL Office Gents Ladies

EI-898 Toilet Toilet Electrical VIP

Electrical
SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. Outdoor Unit
Lift
Outdoor Unit

Outdoor Unit
Balcony Balcony Freight

Room
Accessible 1200 1200

BU 1491 285 BU 1237 235 BU 1282 244 Toilet


SE 828/829/830 SE 831/832
Janitor
Office. Lift EI 801 EI 802 EI 803 EI 804 EI 805 EI 806 EI 807 EI 868 EI 869 Service EI 851 EI 852 / 853 EI 854 EI 855 Gents Toilet
DOOR DOOR Room
Lift Lobby Passenger
Lobby

ROOM BAL Room


ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL Lobby
ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL
Apt. Lift
Terrace Below
SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT.

Lobby
SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT.
SQFT. SQFT.

Balcony CA1385 271 CA1153 231 CA1180 238 BU 773 77 BU 441 44


Accessible
BU 366 37 BU 261 26 BU 261 26 BU 261 26 BU 256 26 BU 255 26 BU 261 25
EI 808
BU 316 35 BU 315 36

Lobby
BU 313 36 BU 617 70 BU 306 35 BU 315 36
EI-882 EI-883
BU 566 0 CA 707 69 CA 396 39 Toilet CA 316 316 CA 242 24 CA 242 24 CA 235 23 CA 231 22 CA 237 24 CA 229 23 CA 277 34 CA 277 33 CA 271 33 CA 546 67 CA 276 33 CA 277 33

Store
ROOM BAL
J


Pantry
11'-2"X25'-7" 11'-2"X25'-7" 11'-2"X25'-7" 23'-0"X25'-7" 11'-2"X25'-7" 11'-2"X25'-7"
℄ ℄
SQFT. SQFT.


26'-11"X26'-6" 15'-0"X26'-6" 12'-3"X26'-6" 8'-11"X26'-6" 8'-11"X26'-6" 8'-11"X26'-6" 8'-9"X26'-6" 8'-9"X26'-6" 8'-6"X26'-6" BU 190 0 Freight ROOM BAL ROOM BAL
46'-4"X30'-4" 38'-9"X30'-4" 39'-11"X30'-4" Ladies Toilet CA 492 0 Freight CA 159 0 SQFT. SQFT. SQFT. SQFT.
Lift Lobby


Printer Electrical Room Lift Lobby
F Office Office Office Janitor
Vending
Room Vending
Machine 12'-1"X12'-10"
Ladies Toilet
BU 1732 372 BU 1286 256
Machine Pantry

2.00M Wide Passage Refuge 2.00M Wide Passage CA1614 365 CA1191 249
Area
2.00M Wide Passage Accessible
Toilet 55'-10"X29'-8" 41'-4"X29'-8"


EI 827 EI 826 EI 825 EI 824 EI 823 EI 822 EI 821 EI 820 EI 819 EI 818 EI 817 EI 816 EI 815 EI 814 EI 813 EI 812 EI 811 EI 810 EI 809
Office Office


Passenger

2.15M Wide Passage


ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL

Ramp Slope
SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT.

Outdoor Unit
Vending

1:10
BU 343 33 BU 281 29 BU 281 29 BU 281 29 BU 375 38 BU 341 39 BU 375 39 BU 375 38 BU 375 39 BU 375 39 BU 375 38 BU 375 39 BU 375 39 BU 281 29 BU 281 29 BU 281 29 BU 281 29 BU 366 40 BU 406 44
Elec. CA 284 29 CA 262 27 CA 262 27 CA 253 27 CA 352 36 CA 319 38 CA 348 37 CA 348 36 CA 353 38 CA 349 37 CA 348 36 CA 353 38 CA 349 37 CA 258 27 CA 262 27 CA 262 27 CA 258 27 CA 340 36 CA 364 38
Machine DISPLAY Lift Lobby
14'-3"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 18'-1"X25'-6" Pantry
Office Office Office Office Room 10'-11"X25'-10" 9'-11"X25'-10" 9'-11"X25'-10" 9'-11"X25'-10" 13'-5"X25'-10" 12'-1"X25'-10" 13'-5"X25'-10" 13'-5"X25'-10" 13'-5"X25'-10" 13'-5"X25'-10" 13'-5"X25'-10" 13'-5"X25'-10" 13'-5"X25'-10" 9'-11"X25'-10" 9'-11"X25'-10" 9'-11"X25'-10" 9'-11"X25'-10" 13'-1"X25'-10" 14'-1"X25'-10"
Janitor
Room K
Reception
EI-891 EI-897 EI-896 EI-895 Terrace Below Ramp Slope 1:8.3

ROOM BAL ROOM BAL ROOM BAL ROOM BAL EI 867


ROOM BAL
EI 866
ROOM BAL
EI 865
ROOM BAL
EI 864
ROOM BAL
EI 863
ROOM BAL
EI 862
ROOM BAL
EI 861
ROOM BAL
EI 860
ROOM BAL
EI 858 / 859
ROOM BAL
EI 857
ROOM BAL
EI 856
ROOM BAL
SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. Outdoor Unit SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT.

BU 404 45 BU 363 41 BU 358 41 BU 362 41 BU 363 41 BU 358 41 BU 362 41 BU 362 41 BU 362 41 BU 362 41 BU 491 56

DOOR
1200
Outdoor Unit
BU 1407 0 BU 1378 0 BU 1388 0 BU 1202 102 CA 346 43 CA 325 39 CA 323 39 CA 322 39 CA 325 39 CA 323 39 CA 322 39 CA 325 39 CA 322 40 CA 322 40 CA 442 54 Office Office
E
CA1328 0 CA1315 0 CA1330 0 CA1142 83 EI-881 EI-884
KEY PLAN

38'-9"X35'-1" 38'-9"X35'-1" 38'-9"X35'-1" 31'-0"X35'-1" Electrical ROOM BAL ROOM BAL


Room SQFT. SQFT. SQFT. SQFT.

BU 1982 ### BU 2747 ###


C

L 1x2 1x1 1 2 3 4 5 6 7 8 9 9x1 10 11 12 14 15 16 17 18 19 20 21 21x1 21x2 22 23 24 25 26


CA1872 ### CA2638 ###

Outdoor Unit
1200 1200 1200 1200 1200
DOOR
55'-10"X31'-0" DOOR
Outdoor Unit
DOOR
87'-4"X31'-0" DOOR
Outdoor Unit
DOOR

By2
Terrace H

Gents Toilet
Refuge
H


EI-892 EI-893 EI-894 Area
B.O.H
Jy1


ROOM BAL ROOM BAL ROOM BAL Gents Ladies
EI-898

Electrical
SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. Toilet Toilet

Room
Accessible 1200 1200

BU 1491 285 BU 1237 235 BU 1282 244 Toilet


SE 828/829/830 SE 831/832 Janitor
Office. Lift EI 801 EI 802 EI 803 EI 804 EI 805 EI 806 EI 807 EI 868 EI 869 Service EI 851 EI 852 / 853 EI 854 EI 855
DOOR DOOR


Gents Toilet
ROOM BAL ROOM BAL ROOM BAL
Room
ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL ROOM BAL
SQFT. SQFT. SQFT. SQFT. SQFT. SQFT.

Lobby
SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT.
SQFT.

BU 316
SQFT.

35
SQFT.

BU 315
SQFT.

36 Apt. Lift SQFT.

BU 313
SQFT.

36
SQFT.

BU 617
SQFT.

70
SQFT.

BU 306
SQFT.

35
SQFT.

BU 315
SQFT.

36
CA1385 271 CA1153 231 CA1180 238 BU 773 77 BU 441 44 Accessible
BU 366 37 BU 261 26 BU 261 26 BU 261 26 BU 256 26 BU 255 26 BU 261 25
EI 808
Lobby EI-882 EI-883
BU 566 0 CA 707 69 CA 396 39 Toilet
CA 316 316 CA 242 24 CA 242 24 CA 235 23 CA 231 22 CA 237 24 CA 229 23 CA 277 34 CA 277 33 CA 271 33 CA 546 67 CA 276 33 CA 277 33

Store
J


Pantry ROOM
SQFT.
BAL
SQFT.
11'-2"X25'-7" 11'-2"X25'-7" 11'-2"X25'-7" 23'-0"X25'-7" 11'-2"X25'-7" 11'-2"X25'-7"


26'-11"X26'-6" 15'-0"X26'-6" 12'-3"X26'-6" 8'-11"X26'-6" 8'-11"X26'-6" 8'-11"X26'-6" 8'-9"X26'-6" 8'-9"X26'-6" 8'-6"X26'-6" BU 190 0 Freight ROOM BAL ROOM BAL
46'-4"X30'-4" 38'-9"X30'-4" 39'-11"X30'-4" Ladies Toilet CA 492 0 Freight CA 159 0 SQFT. SQFT. SQFT. SQFT.
Lift Lobby


Printer
Electrical Room Lift Lobby
F Vending
Room Vending
Machine
12'-1"X12'-10"
Ladies Toilet BU 1732 372 BU 1286 256
Janitor
Machine Pantry

2.00M Wide Passage Refuge 2.00M Wide Passage CA1614 365 CA1191 249
Area Accessible
55'-10"X29'-8" 41'-4"X29'-8"


Toilet

EI 827 EI 826 EI 825 EI 824 EI 823 EI 822 EI 821 EI 820 EI 819 EI 818 EI 817 EI 816 EI 815 EI 814 EI 813 EI 812 EI 811 EI 810 EI 809


2.15M Wide Passage
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.
Vending
BU 343 33 BU 281 29 BU 281 29 BU 281 29 BU 375 38 BU 341 39 BU 375 39 BU 375 38 BU 375 39 BU 375 39 BU 375 38 BU 375 39 BU 375 39 BU 281 29 BU 281 29 BU 281 29 BU 281 29 BU 366 40 BU 406 44

M
Machine DISPLAY
CA 284 29 CA 262 27 CA 262 27 CA 253 27 CA 352 36 CA 319 38 CA 348 37 CA 348 36 CA 353 38 CA 349 37 CA 348 36 CA 353 38 CA 349 37 CA 258 27 CA 262 27 CA 262 27 CA 258 27 CA 340 36 CA 364 38
14'-3"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 13'-2"X25'-6" 18'-1"X25'-6" Pantry

10'-11"X25'-10" 9'-11"X25'-10" 9'-11"X25'-10" 9'-11"X25'-10" 13'-5"X25'-10" 12'-1"X25'-10" 13'-5"X25'-10" 13'-5"X25'-10" 13'-5"X25'-10" 13'-5"X25'-10" 13'-5"X25'-10" 13'-5"X25'-10" 13'-5"X25'-10" 9'-11"X25'-10" 9'-11"X25'-10" 9'-11"X25'-10" 9'-11"X25'-10" 13'-1"X25'-10" 14'-1"X25'-10"
Janitor
Room K
EI-891 EI-897 EI-896 EI-895
ROOM BAL ROOM BAL ROOM BAL ROOM BAL EI 867
ROOM BAL
EI 866
ROOM BAL
EI 865
ROOM BAL
EI 864
ROOM BAL
EI 863
ROOM BAL
EI 862
ROOM BAL
EI 861
ROOM BAL
EI 860
ROOM BAL
EI 858 / 859
ROOM BAL
EI 857
ROOM BAL
EI 856
ROOM BAL
SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT. SQFT.

BU 404 45 BU 363 41 BU 358 41 BU 362 41 BU 363 41 BU 358 41 BU 362 41 BU 362 41 BU 362 41 BU 362 41 BU 491 56

DOOR
BU 1407 BU 1378 BU 1388 BU 1202

1200
0 0 0 102 CA 346 43 CA 325 39 CA 323 39 CA 322 39 CA 325 39 CA 323 39 CA 322 39 CA 325 39 CA 322 40 CA 322 40 CA 442 54
E

By1
CA1328 0 CA1315 0 CA1330 0 CA1142 83 EI-881 EI-884


38'-9"X35'-1" 38'-9"X35'-1" 38'-9"X35'-1" 31'-0"X35'-1" ROOM
SQFT.
BAL
SQFT.
ROOM
SQFT.
BAL
SQFT.


BU 1982 ### BU 2747 ###



C


L


CA1872 ### CA2638 ###
1200 1200 1200 1200 1200
DOOR
55'-10"X31'-0" DOOR DOOR
87'-4"X31'-0" DOOR DOOR

By2

M
By1

A A

Pedestrian Entry

B
1x2 1x1 1 2 3 4 5 6 7 8 9 9x1 10 11 12 14 15 16 17 18 19 20 21 21x1 21x2 22 23 24 25 26

A A

Pedestrian Entry

PROJECT DESCRIPTION

CP-67 AT MOHALI

CLIENT
Unity Group
G-3, Aggarwal Corporate Tower 23, Rajendra Place,
New Delhi – 110008 Ph. 011 – 2580 6666, info@[Link]

1x2 1x1 1 2 3 4 5 6 7 8 9 9x1 10 11 12 14 15 16 17 18 19 20 21 21x1 21x2 22 23 24 25 26 CONSULTANTS


STRUCTURAL CONSULTANT
Newtech Inprastructure Pvt. Ltd.
581/4, Main road, Chirag Delhi, New Delhi-110017
PH: 011-27515220 , 011-29251044, 9560198381
Email :- nutech581@[Link]
MEP CONSULTANT
EIGHTH FLOOR V Consulting
B-50, Soami Nagar, New Delhi-110056
Ph: 011-49848197, 011-49849205

ARCHITECT ON RECORD
Gian P Mathur & Associates Pvt. Ltd.
C-55, East Of Kailash, New Delhi - 110065
info@[Link]
Ph: +91 - 11- 46599599

DRAWING ISSUED BY
DESIGN CONSULTANT
MUMBAI JOHANNESBURG
A/401, Business Square, Illovo Edge, cnr Fricker & Harries Rd,
Solitiare Corporate Park, Chakala, Illovo,P O Box 87619,
Andheri-East, Mumbai 400 093 Houghton 2041, South Africa .
Tel: 022 40664600 Tel: +27 (0) 11 884 7111
Fax: 022 40664800 Fax: +27 (0) 11 884 7110

DRAWING INTENTION

SCHEMATIC

DRAWING DESCRIPTION

GENERAL ARRANGEMENT PLAN


EIGHTH FLOOR
SCALE 1:300

DATE 26/09/2017 N

ISSUED Amit

DRAWN Sagar

PROJECT NO DRAWING NO REVISION

8288 02.0.10 R0

You might also like