MPL Ballast Procedure Sample
MPL Ballast Procedure Sample
B-BP - 00
Ballast Procedure for load out of modules for Shipment 1 Rev : 0
Page 1 of 17
TRANSPORTATION OF MODULES
FROM BATAM, INDONESIA TO
KEPPEL SHIPYARD, SINGAPORE
E
SHIPMENT 1 PL
M
SA
TABLE OF CONTENTS
1. INTRODUCTION
2. INPUT PARAMETERS
3. RO-RO ANALYSES
4. TRAILER LOADING DATA
5. TIDAL DATA
6. WHARF DETAILS
7. BARGE DETAILS
E
8. ADDITIONAL LOADS ON BARGE PL
9. BALLAST CALCULATIONS
M
SA
Transportation of modules from Batam, Indonesia to Keppel Shipyard, Singapore Document : 0180.B-BP - 00
Ballast Procedure for load out of modules for Shipment 1 Rev : 0
Page 3 of 17
1. INTRODUCTION
This section describes the ballasting of the barge required for the load out of the
Module F91, F94 and Module F84 at the P.T. Chitra Kabil Offshore Jetty in
Batam, Indonesia.
The ballast is calculated for the three cases of roll-on from the jetty to barge,
which are summarized as below:
Case 3: Roll-on Module F84 with Module F91 and F94 is already on barge
The planned loads out dates are 10th , 11th and 12th August, 2008.
For ballast calculation, we will use these dates for tidal values.
E
PL
M
SA
Transportation of modules from Batam, Indonesia to Keppel Shipyard, Singapore Document : 0180.B-BP - 00
Ballast Procedure for load out of modules for Shipment 1 Rev : 0
Page 4 of 17
2. INPUT PARAMETERS
The following calculations must be completed before the ballast calculations can
be made:
1. Trailer analysis – to determine the amount of load on each axle line or group
of trailers.
2. Ro-ro calculations – to determine the load variation with distance traveled on
the barge.
3. Tidal calculation – to determine the rate of change of tide during the load out
period.
E
Name of Module
(Ton)
Module F91 18.28
Module F94
PL 26.95
Module F84 19.12
The Ro-Ro calculation determines the ramp load and the load on the barge. The
M
position of the loads relative to the barge is determined as well.
The load out is over the stern of the barge. The ro-ro ramp is connected to a
SA
hinge beam, which is welded to the barge deck. The pivot of the hinge beam is
situated at 0.5m from the barge stern (see sketch here below)
Transportation of modules from Batam, Indonesia to Keppel Shipyard, Singapore Document : 0180.B-BP - 00
Ballast Procedure for load out of modules for Shipment 1 Rev : 0
Page 5 of 17
Figure 1
Ramp Arrangement
12000
Hinge beam
E
Barge Quay side
(Bow)
PL
M
SA
Transportation of modules from Batam, Indonesia to Keppel Shipyard, Singapore Document : 0180.B-BP - 00
Ballast Procedure for load out of modules for Shipment 1 Rev : 0
Page 6 of 17
2. RO-RO ANALYSES
For modules F91, F94 and F84, three separate ro-ro analyses will be made for
double 12 liners SPMT trailers. Finally, in each ro-ro analysis, all the results
will be combined in a summary, which will be used as input for the ballast
calculations.
Figure 2
Line 1 on Ramp
E
PL 12000
Figure 3
Line 2 on Ramp
12000
E
(Bow) PL
M
SA
Transportation of modules from Batam, Indonesia to Keppel Shipyard, Singapore Document : 0180.B-BP - 00
Ballast Procedure for load out of modules for Shipment 1 Rev : 0
Page 8 of 17
Figure 4
Line 1 on Hinge
12000
E
(Bow) PL
M
SA
Transportation of modules from Batam, Indonesia to Keppel Shipyard, Singapore Document : 0180.B-BP - 00
Ballast Procedure for load out of modules for Shipment 1 Rev : 0
Page 9 of 17
Figure 5
Line 2 on Hinge
12000
E
Barge Quay side
(Bow)
PL
M
SA
Transportation of modules from Batam, Indonesia to Keppel Shipyard, Singapore Document : 0180.B-BP - 00
Ballast Procedure for load out of modules for Shipment 1 Rev : 0
Page 10 of 17
The detailed ro-ro calculations can be found with ballast calculation. 6 steps ro-ro care
selected for the load out of each modules and these steps will be used for the ballast
calculations.
E
PL
M
SA
Transportation of modules from Batam, Indonesia to Keppel Shipyard, Singapore Document : 0180.B-BP - 00
Ballast Procedure for load out of modules for Shipment 1 Rev : 0
Page 11 of 17
4. TRAILER LOADING
Double 12 line SPMT trailer will be used for module transportation.
Figure 6
E
PL
11 x 1500 mm
M
The trailer loading data is as following table:
SA
5. TIDAL DATA
Module loads outs are scheduled for 10th , 11th and 12th August, 2008.
The Loads outs operation will be carried out at rising tide.
12:00 2.00
13:00 2.20 0.00333
14:00 2.40 0.00333
15:00 2.50 0.00167
16:00 2.50 0.00000
17:00 2.40 -0.00167
E
The tidal range for 11th August 2008 (Monday):
PL
Time Tide Change in m/min
M
12:00 2.00
13:00 2.20 0.00333
14:00 2.30 0.00167
SA
13:00 2.10
14:00 2.20 0.00167
15:00 2.30 0.00167
16:00 2.30 0.00000
17:00 2.30 0.00000
Transportation of modules from Batam, Indonesia to Keppel Shipyard, Singapore Document : 0180.B-BP - 00
Ballast Procedure for load out of modules for Shipment 1 Rev : 0
Page 13 of 17
6. WHARF DETAILS
E
PL
M
SA
Transportation of modules from Batam, Indonesia to Keppel Shipyard, Singapore Document : 0180.B-BP - 00
Ballast Procedure for load out of modules for Shipment 1 Rev : 0
Page 14 of 17
7. BARGE DETAILS
The selected barge is the ‘YEW CHOON MARINE 7, which is a flat top barge.
The main dimensions of this barge are:
Length: 85.34 m
Width : 24.38 m
Depth: 4.88 m
E
PL
M
SA
Transportation of modules from Batam, Indonesia to Keppel Shipyard, Singapore Document : 0180.B-BP - 00
Ballast Procedure for load out of modules for Shipment 1 Rev : 0
Page 15 of 17
Ballast pumps
Total pump weights = 12 Ton
Vertical C of G is assumed to be 1.0 m up from deck.
Total combined C.O.G is in the middle of the barge.
The total amount of pumps is 6 units
Input data:
Weight: 12.0 T
TCG: 0.0
LCG: 0.00 m
VCG: 4.88+1.0 ≈ 5.9 m
Grillage
Vertical C of G is assumed to be 1.5 m up from deck.
E
The LCG and TCG is at the centre line of barge.
Input data:
Weight: 100.0 T
PL
TCG: 0.0
LCG: 0.0
VCG: 4.88 +1.5 ≈ 6.50 m
M
Weight of ramps = 4 x 8 = 32 T
Total weight on barge = 32/2 = 16 T
Input data:
Weight: 16.0 T
TCG: 0.0 m
VCG: 4.88 + 0.25 ≈ 5.13 m
LCG: (85.34/2-0.5) = 42.17 m
Transportation of modules from Batam, Indonesia to Keppel Shipyard, Singapore Document : 0180.B-BP - 00
Ballast Procedure for load out of modules for Shipment 1 Rev : 0
Page 16 of 17
Cargoes on deck
For Case 1,
No Cargo is on deck.
For case 2,
Cargo F91
Input data:
Weight: 115 T
TCG: 0.168 m
VCG: 9.753 m
LCG: -23.57 m
For case 3,
E
Cargo F91 & F94
TCG: -0.161 m
VCG: 11.95 m
LCG: 0.539 m
Transportation of modules from Batam, Indonesia to Keppel Shipyard, Singapore Document : 0180.B-BP - 00
Ballast Procedure for load out of modules for Shipment 1 Rev : 0
Page 17 of 17
9. BALLAST CALCULATIONS
All the related data of the ‘YEW CHOON MARINE 7’ is entered this ballast
program.
The first step is to put all the loads in the barge (pumps, grillages, cargo and
ramps). Also all the ballast tanks are filled with slop water.
The lower shell (or bottom) of the barge is reinforced with stringers and cross
frames. The purpose of these frames is to reinforce the shell plate, which is
usually comparatively thin. As a result of the lower plate framing it is very
E
common for residual ballast water to become entrapped in the lower section of the
barge between the welded stringers and this trapped water referred to as slop
water can be significant to the barge buoyancy. So, all the tanks are filled with 5%
ballast water in step 0.
PL
The next steps in the ballast calculations are:
M
For All Load out:
Situation 1 Start position (Line 1 on ramp)
2 Line 1 on hinge
SA
3 Line 4 on hinge
4 Line 8 on hinge
5 Line 12 on hinge
6 Final position
Murphy West
Name of Client Africa
Date of Operation 10/8/2008
Job Title Murphy Ballast Calculation - F91
Nos. of lines in Trailer 12
E
Load per Trailer Line 18.28 Tons
Length of Barge 85.34 metres
Loadout over
PL
Bow
TCG -1.924 metres
VCG 9.753 metres
M
Ramp COG on
Situation Reaction LOB Barge
Tons Tons Metre
Line 1 on Ramp 0.00 0.00 0.00 Step 1
SA
S/L Description m
E
PL
M
SA
Ballast Calculation – Yew Choon Marine 11
Step 0 – Slope Water
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S3 5% 0.244 352.250 17.613 -16.002 8.890 0.122 262.501 Maximum
P4 5% 0.244 402.572 20.129 -4.572 -8.890 0.122 300.002 Maximum
C4 5% 0.244 681.275 34.064 -4.572 0.000 0.122 1453.990 Maximum
S4
P5
5%
5%
0.244
0.244
402.572
402.572
PL20.129
20.129
-4.572
7.620
8.890
-8.890
0.122
0.122
300.002
300.002
Maximum
Maximum
C5 5% 0.244 681.275 34.064 7.620 0.000 0.122 1453.990 Maximum
S5 5% 0.244 402.572 20.129 7.620 8.890 0.122 300.002 Maximum
P6 5% 0.244 352.250 17.613 19.050 -8.890 0.122 262.501 Maximum
C6 5% 0.244 596.116 29.806 19.050 0.000 0.122 1272.241 Maximum
M
S6 5% 0.244 352.250 17.613 19.050 8.890 0.122 262.501 Maximum
P7 5% 0.293 345.540 17.277 28.770 -8.890 0.151 262.501 Maximum
C7 5% 0.293 584.761 29.238 28.770 0.000 0.151 1272.241 Maximum
S7 5% 0.293 345.540 17.277 28.770 8.890 0.151 262.501 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
LOR 1 0.000 0.000 42.172 -1.924 9.753 0.000 0.000 User Specified
LOB 1 0.000 0.000 42.172 -1.924 9.753 0.000 0.000 User Specified
Total 128.000 5.271 0.000 6.273 0.000
E
dm
Margin Line (freeboard pos = 42.655 m) 3.638
Deck Edge (freeboard pos = 42.655 m) 3.714
PL
M
SA
LOAD CASE 1
S/L Description m
E
PL
M
SA
Ballast Calculation – Yew Choon Marine 11
Step 1 – Line 1 on Ramp - Preballast
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
P4 40% 1.954 402.572 161.011 -4.575 -8.890 0.975 300.002 Maximum
C4 5% 0.241 681.275 34.064 -4.598 0.000 0.122 1453.990 Maximum
S4 40% 1.954 402.572 161.029 -4.575 8.890 0.975 300.002 Maximum
P5 5% 0.247 402.572 20.129 7.594 -8.890 0.122 300.002 Maximum
C5
S5
5%
5%
0.241
0.247
PL
681.275
402.572
34.064
20.129
7.594
7.594
0.000
8.890
0.122
0.122
1453.990
300.002
Maximum
Maximum
P6 5% 0.247 352.250 17.613 19.030 -8.890 0.122 262.501 Maximum
C6 5% 0.241 596.116 29.806 19.030 0.000 0.122 1272.241 Maximum
S6 5% 0.247 352.250 17.613 19.030 8.890 0.122 262.501 Maximum
P7 70% 3.442 345.540 241.881 29.594 -8.890 1.761 262.501 Maximum
M
C7 5% 0.289 584.761 29.213 28.756 0.000 0.151 1272.241 Maximum
S7 70% 3.442 345.540 241.881 29.594 8.890 1.761 262.501 Maximum
P8 5% 0.860 136.119 6.809 35.847 -8.890 1.382 187.489 Maximum
C8 5% 0.856 230.355 11.522 35.847 0.000 1.382 908.684 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
LOR 1 0.000 0.000 42.172 -1.924 9.753 0.000 0.000 User Specified
LOB 1 0.000 0.000 42.172 -1.924 9.753 0.000 0.000 User Specified
Total 128.000 5.271 0.000 6.273 0.000
E
BML m 287.398
GMt corrected m 24.229
GML corrected m 281.312
KMt m 31.206
KML m
PL
288.289
Immersion (TPc) tonne/cm 18.769
MTc tonne.m 101.124
RM at 1deg = [Link](1) tonne.m 1297.185
Max deck inclination deg 0.1
M
Trim angle (+ve by stern) deg -0.1
S/L Description m
E
PL
M
SA
Ballast Calculation – Yew Choon Marine 11
Step 2 – Line 1 on Hinge
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
P4 37% 1.789 402.572 148.991 -4.562 -8.894 0.902 300.003 Maximum
C4 5% 0.244 681.275 34.063 -4.574 0.000 0.122 1453.990 Maximum
S4 43% 2.089 402.572 173.106 -4.563 8.889 1.049 300.002 Maximum
P5 5% 0.244 402.572 20.128 7.618 -8.890 0.122 300.002 Maximum
C5
S5
5%
5%
0.244
0.244
PL
681.275
402.572
34.063
20.128
7.618
7.618
0.000
8.890
0.122
0.122
1453.990
300.002
Maximum
Maximum
P6 5% 0.244 352.250 17.612 19.049 -8.890 0.122 262.501 Maximum
C6 5% 0.244 596.116 29.806 19.049 0.000 0.122 1272.241 Maximum
S6 5% 0.244 352.250 17.612 19.049 8.890 0.122 262.501 Maximum
P7 61% 3.004 345.540 210.780 29.580 -8.890 1.545 262.501 Maximum
M
C7 5% 0.292 584.761 29.226 28.769 0.000 0.151 1272.241 Maximum
S7 61% 3.004 345.540 210.780 29.580 8.890 1.545 262.501 Maximum
P8 5% 0.859 136.119 6.727 35.825 -8.890 1.379 187.489 Maximum
C8 5% 0.859 230.355 11.385 35.825 0.000 1.379 908.684 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
LOR 1 63.980 63.980 42.172 -1.924 9.753 0.000 0.000 User Specified
LOB 1 18.280 18.280 42.172 -1.924 9.753 0.000 0.000 User Specified
Total 210.260 19.708 -0.753 7.634 0.000
E
GMt corrected m 23.525
GML corrected m 276.878
KMt m 30.537
KML m 283.891
Immersion (TPc) tonne/cm
MTc tonne.m
PL
18.840
102.241
RM at 1deg = [Link](1) tonne.m 1293.802
Max deck inclination deg 0.1
Trim angle (+ve by stern) deg -0.1
M
Key point Type Freeboar
dm
Margin Line (freeboard pos = 42.655 m) 2.943
SA
S/L Description m
E
PL
M
SA
Ballast Calculation - Yew Choon Marine 11
Step 3 – Line 4 on Hinge
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S3 5% 0.234 352.250 17.614 -15.948 8.901 0.122 262.501 Maximum
P4 36% 1.763 402.572 144.935 -4.573 -8.886 0.878 300.003 Maximum
C4 5% 0.257 681.275 34.068 -4.501 0.032 0.122 1453.990 Maximum
S4
P5
44%
5%
2.144
0.238
PL
402.572
402.572
177.124
20.130
-4.573
7.691
8.891
-8.879
1.073
0.122
300.002
300.002
Maximum
Maximum
C5 5% 0.257 681.275 34.068 7.691 0.032 0.122 1453.990 Maximum
S5 5% 0.233 402.572 20.130 7.691 8.901 0.122 300.002 Maximum
P6 5% 0.239 352.250 17.613 19.104 -8.879 0.122 262.501 Maximum
C6 5% 0.256 596.116 29.809 19.104 0.032 0.122 1272.241 Maximum
M
S6 5% 0.234 352.250 17.613 19.104 8.901 0.122 262.501 Maximum
P7 52% 2.576 345.540 179.681 29.556 -8.889 1.328 262.501 Maximum
C7 5% 0.305 584.761 29.228 28.806 0.029 0.151 1272.241 Maximum
S7 52% 2.571 345.540 179.681 29.556 8.891 1.328 262.501 Maximum
P8 5% 0.860 136.119 6.757 35.834 -8.883 1.380 187.489 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
LOR 1 63.980 63.980 42.172 -1.924 9.753 0.000 0.000 User Specified
LOB 1 73.130 73.130 39.920 -1.924 9.753 0.000 0.000 User Specified
Total 265.110 23.735 -0.995 8.073 0.000
E
KG fluid m 7.040
BMt m 29.158
BML m 279.549
GMt corrected m
GML corrected m
23.048
PL
273.438
KMt m 30.088
KML m 280.478
Immersion (TPc) tonne/cm 18.874
MTc tonne.m 102.766
M
RM at 1deg = [Link](1) tonne.m 1290.112
Max deck inclination deg 0.0
Trim angle (+ve by stern) deg 0.0
SA
S/L Description m
E
PL
M
SA
Ballast Calculation - Yew Choon Marine 11
Step 4 – Line 8 on Hinge
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
P4 35% 1.709 402.572 140.895 -4.573 -8.889 0.853 300.002 Maximum
C4 5% 0.245 681.275 34.049 -4.580 0.017 0.122 1453.990 Maximum
S4 45% 2.194 402.572 181.161 -4.573 8.891 1.097 300.002 Maximum
P5 5% 0.246 402.572 20.123 7.612 -8.884 0.122 300.002 Maximum
C5
S5
5%
5%
0.245
0.243
PL
681.275
402.572
34.049
20.123
7.612
7.612
0.017
8.896
0.122
0.122
1453.990
300.002
Maximum
Maximum
P6 5% 0.246 352.250 17.613 19.044 -8.884 0.122 262.502 Maximum
C6 5% 0.245 596.116 29.794 19.044 0.017 0.122 1272.242 Maximum
S6 5% 0.243 352.250 17.613 19.044 8.896 0.122 262.502 Maximum
P7 47.5% 2.368 345.540 164.132 29.535 -8.889 1.220 262.501 Maximum
M
C7 5% 0.293 584.761 29.201 28.765 0.015 0.151 1272.241 Maximum
S7 47.5% 2.365 345.540 164.132 29.535 8.891 1.220 262.501 Maximum
P8 5% 0.860 136.119 6.734 35.829 -8.886 1.379 187.489 Maximum
C8 5% 0.859 230.355 11.399 35.829 0.010 1.379 908.684 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
LOR 1 50.270 50.270 42.172 -1.924 9.753 0.000 0.000 User Specified
LOB 1 146.270 146.270 36.920 -1.924 9.753 0.000 0.000 User Specified
Total 324.540 25.251 -1.165 8.380 0.000
E
BML m 276.001
GMt corrected m 22.538
GML corrected m 269.861
KMt m 29.625
KML m
PL
276.948
Immersion (TPc) tonne/cm 18.910
MTc tonne.m 103.314
RM at 1deg = [Link](1) tonne.m 1285.123
Max deck inclination deg 0.0
M
Trim angle (+ve by stern) deg 0.0
S/L Description m
E
PL
M
SA
Ballast Calculation - Yew Choon Marine 11
Step 5 – Line 12 on Hinge
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S3 5% 0.244 352.250 17.612 -16.003 8.890 0.122 262.501 Maximum
P4 35% 1.707 402.572 140.897 -4.572 -8.890 0.853 300.002 Maximum
C4 5% 0.244 681.275 34.063 -4.574 0.000 0.122 1453.990 Maximum
S4
P5
45%
5%
2.195
0.244
PL
402.572
402.572
181.153
20.128
-4.572
7.618
8.890
-8.890
1.097
0.122
300.002
300.002
Maximum
Maximum
C5 5% 0.244 681.275 34.063 7.618 0.000 0.122 1453.990 Maximum
S5 5% 0.244 402.572 20.128 7.618 8.890 0.122 300.002 Maximum
P6 5% 0.244 352.250 17.602 19.049 -8.890 0.122 262.501 Maximum
C6 5% 0.244 596.116 29.806 19.049 0.000 0.122 1272.241 Maximum
M
S6 5% 0.244 352.250 17.602 19.049 8.890 0.122 262.501 Maximum
P7 47.5% 2.366 345.540 164.132 29.535 -8.890 1.220 262.501 Maximum
C7 5% 0.292 584.761 29.222 28.769 0.000 0.151 1272.241 Maximum
S7 47.5% 2.366 345.540 164.132 29.535 8.890 1.220 262.501 Maximum
P8 5% 0.859 136.119 6.756 35.833 -8.890 1.380 187.489 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
LOR 1 0.000 0.000 42.172 -1.924 9.753 0.000 0.000 User Specified
LOB 1 219.400 219.400 33.920 -1.924 9.753 0.000 0.000 User Specified
Total 347.400 23.364 -1.215 8.471 0.000
E
GMt corrected m 22.370
GML corrected m 269.189
KMt m 29.475
KML m 276.294
Immersion (TPc) tonne/cm
MTc tonne.m
18.939
PL
103.782
RM at 1deg = [Link](1) tonne.m 1284.500
Max deck inclination deg 0.0
Trim angle (+ve by stern) deg 0.0
M
Key point Type Freeboar
dm
Margin Line (freeboard pos = -42.655 m) 2.923
SA
S/L Description m
E
PL
M
SA
Ballast Calculation - Yew Choon Marine 11
Step 6 – Final Position
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S3 5% 0.247 352.250 17.613 -16.006 8.878 0.122 262.502 Maximum
P4 44% 2.178 402.572 177.132 -4.586 -8.881 1.073 300.013 Maximum
C4 5% 0.239 681.275 34.064 -4.578 -0.034 0.122 1453.991 Maximum
S4
P5
45%
5%
2.198
0.242
PL
402.572
402.572
181.130
20.129
-4.573
7.614
8.889
-8.902
1.097
0.122
300.002
300.002
Maximum
Maximum
C5 5% 0.239 681.275 34.064 7.614 -0.034 0.122 1453.991 Maximum
S5 5% 0.247 402.572 20.129 7.614 8.878 0.122 300.002 Maximum
P6 5% 0.242 352.250 17.613 19.046 -8.902 0.122 262.502 Maximum
C6 5% 0.239 596.116 29.806 19.046 -0.034 0.122 1272.243 Maximum
M
S6 5% 0.247 352.250 17.613 19.046 8.878 0.122 262.502 Maximum
P7 74.5% 3.655 345.540 257.428 29.601 -8.891 1.869 262.502 Maximum
C7 5% 0.287 584.761 29.183 28.766 -0.030 0.151 1272.241 Maximum
S7 74.5% 3.660 345.540 257.428 29.601 8.889 1.869 262.502 Maximum
P8 5% 0.856 136.119 6.754 35.833 -8.897 1.380 187.489 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
LOR 1 0.000 0.000 42.172 -1.924 9.753 0.000 0.000 User Specified
LOB 1 219.400 219.400 -23.570 0.168 9.753 0.000 0.000 User Specified
Total 347.400 -12.943 0.106 8.471 0.000
E
BMt m 28.277
BML m 273.640
GMt corrected m 22.109
GML corrected m
KMt m
PL
267.472
29.239
KML m 274.603
Immersion (TPc) tonne/cm 18.962
MTc tonne.m 104.140
RM at 1deg = [Link](1) tonne.m 1282.080
M
Max deck inclination deg 0.2
Trim angle (+ve by stern) deg 0.1
dm
Margin Line (freeboard pos = -42.655 m) 2.803
Deck Edge (freeboard pos = -42.655 m) 2.879
TANK SCHEDULE
LOAD OUT DATE: 10th August 2008 (1200 hrs)
Time Step Tank no P2 Ulg Tank no S2 Ulg Tank no P4 Ulg Tank no S4 Ulg Tank no P7 Ulg Tank no S7 Ulg
In Out Cont m In Out Cont m In Out Cont m In Out Cont m In Out Cont m In Out Cont m
12:00 1 88 3.66 88 3.66 161 2.93 161 2.93 242 1.47 242 1.47
12:10 2 32 120 3.22 32 120 3.22 12 149 3.08 12 173 2.79 31 211 1.90 31 211 1.90
12:20 3 32 152 2.77 32 152 2.77 4 145 3.12 4 177 2.74 31 180 2.34 31 180 2.34
12:25 4 15 167 2.56 15 167 2.56 4 141 3.17 4 181 2.69 16 164 2.57 16 164 2.57
12:30 5 0 167 2.56 0 167 2.56 0 141 3.17 0 181 2.69 0 164 2.57 0 164 2.57
13:00 6 95 72 3.88 95 72 3.88 36 177 2.74 0 181 2.69 94 258 1.24 94 258 1.24
SA
M
Non-active Tanks during cross over (but with initial pre-ballast water)
12:25 4 0 328
E2.19
Murphy West
Name of Client Africa
Date of Operation 11/8/2008
Job Title Murphy Ballast Calculation - F94
Nos. of lines in Trailer 12
E
Barge 0.5 metres
S/L Description m
E
PL
M
SA
Ballast Calculation – Yew Choon Marine 11
Step 1 – Line 1 on Ramp - Preballast
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S4 45% 2.195 402.572 181.157 -4.572 8.890 1.097 300.002 Maximum
P5 5% 0.244 402.572 20.129 7.620 -8.890 0.122 300.002 Maximum
C5 5% 0.244 681.275 34.064 7.620 0.000 0.122 1453.990 Maximum
S5
P6
5%
5%
0.244
0.244
PL
402.572
352.250
20.129
17.613
7.620
19.050
8.890
-8.890
0.122
0.122
300.002
262.501
Maximum
Maximum
C6 5% 0.244 596.116 29.806 19.050 0.000 0.122 1272.241 Maximum
S6 5% 0.244 352.250 17.613 19.050 8.890 0.122 262.501 Maximum
P7 70% 3.443 345.540 241.878 29.595 -8.889 1.761 262.502 Maximum
C7 5% 0.293 584.761 29.238 28.770 0.000 0.151 1272.241 Maximum
M
S7 70% 3.438 345.540 241.878 29.595 8.891 1.761 262.502 Maximum
P8 5% 0.859 136.119 6.806 35.847 -8.890 1.382 187.489 Maximum
C8 5% 0.859 230.355 11.518 35.847 0.000 1.382 908.684 Maximum
S8 5% 0.859 136.119 6.806 35.847 8.890 1.382 187.489 Maximum
Total 1646.133 0.678 0.022 1.117 14377.785
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
F91 1 115.000 115.000 -23.570 0.168 9.753 0.000 0.000 User Specified
LOR 1 0.000 0.000 42.172 -1.924 11.950 0.000 0.000 User Specified
LOB 1 0.000 0.000 42.172 -1.924 11.950 0.000 0.000 User Specified
Total 243.000 -8.378 0.080 7.920 0.000
E
GMt corrected m 23.192
GML corrected m 274.949
KMt m 30.277
KML m 282.035
Immersion (TPc) tonne/cm
MTc tonne.m
18.864
PL
102.585
RM at 1deg = [Link](1) tonne.m 1288.769
Max deck inclination deg 0.1
Trim angle (+ve by stern) deg 0.0
M
Key point Type Freeboar
dm
Margin Line (freeboard pos = -42.655 m) 2.954
SA
S/L Description m
E
PL
M
SA
Ballast Calculation – Yew Choon Marine 11
Step 2 – Line 1 on Hinge
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S3 5% 0.245 352.250 17.613 -16.030 8.901 0.122 262.502 Maximum
P4 41% 2.006 402.572 165.015 -4.577 -8.889 1.000 300.002 Maximum
C4 5% 0.244 681.275 34.066 -4.609 0.032 0.122 1453.991 Maximum
S4
P5
48%
5%
2.343
0.251
PL
402.572
402.572
193.266
20.129
-4.576
7.583
8.891
-8.879
1.171
0.122
300.002
300.002
Maximum
Maximum
C5 5% 0.244 681.275 34.066 7.583 0.032 0.122 1453.991 Maximum
S5 5% 0.246 402.572 20.129 7.583 8.901 0.122 300.002 Maximum
P6 5% 0.250 352.250 17.613 19.022 -8.879 0.122 262.502 Maximum
C6 5% 0.244 596.116 29.807 19.022 0.032 0.122 1272.242 Maximum
M
S6 5% 0.245 352.250 17.613 19.022 8.901 0.122 262.502 Maximum
P7 56.5% 2.792 345.540 195.230 29.568 -8.889 1.437 262.501 Maximum
C7 5% 0.292 584.761 29.228 28.750 0.029 0.151 1272.241 Maximum
S7 56.5% 2.789 345.540 195.230 29.568 8.891 1.437 262.501 Maximum
P8 5% 0.862 136.119 6.726 35.826 -8.883 1.379 187.489 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
F91 1 115.000 115.000 -23.570 0.168 9.753 0.000 0.000 User Specified
LOR 1 94.330 94.330 42.172 -1.924 11.950 0.000 0.000 User Specified
LOB 1 26.950 26.950 42.172 -1.924 11.950 0.000 0.000 User Specified
Total 364.280 8.452 -0.588 9.261 0.000
E
BML m 274.313
GMt corrected m 22.137
GML corrected m 268.059
KMt m 29.348
KML m
PL
275.270
Immersion (TPc) tonne/cm 18.948
MTc tonne.m 103.869
RM at 1deg = [Link](1) tonne.m 1277.574
Max deck inclination deg 0.1
M
Trim angle (+ve by stern) deg 0.1
S/L Description m
E
PL
M
SA
Ballast Calculation - Yew Choon Marine 11
Step 3 – Line 4 on Hinge
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S3 5% 0.247 352.250 17.613 -16.039 8.898 0.122 262.501 Maximum
P4 40% 1.958 402.572 161.013 -4.578 -8.889 0.975 300.002 Maximum
C4 5% 0.241 681.275 34.026 -4.621 0.024 0.122 1453.990 Maximum
S4
P5
49%
5%
2.394
0.252
PL
402.572
402.572
197.272
20.129
-4.577
7.572
8.891
-8.882
1.195
0.122
300.002
300.002
Maximum
Maximum
C5 5% 0.241 681.275 34.026 7.571 0.024 0.122 1453.990 Maximum
S5 5% 0.248 402.572 20.129 7.572 8.898 0.122 300.002 Maximum
P6 5% 0.251 352.250 17.613 19.013 -8.882 0.122 262.501 Maximum
C6 5% 0.242 596.116 29.792 19.013 0.024 0.122 1272.241 Maximum
M
S6 5% 0.247 352.250 17.613 19.013 8.898 0.122 262.501 Maximum
P7 47.5% 2.372 345.540 164.132 29.531 -8.889 1.220 262.501 Maximum
C7 5% 0.290 584.761 29.232 28.744 0.022 0.151 1272.241 Maximum
S7 47.5% 2.369 345.540 164.132 29.531 8.891 1.220 262.501 Maximum
P8 5% 0.862 136.119 6.749 35.830 -8.885 1.380 187.489 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
F91 1 115.000 115.000 -23.570 0.168 9.753 0.000 0.000 User Specified
LOR 1 94.330 94.330 42.172 -1.924 11.950 0.000 0.000 User Specified
LOB 1 107.800 107.800 39.920 -1.924 11.950 0.000 0.000 User Specified
Total 445.130 14.031 -0.830 9.750 0.000
E
BML m 269.926
GMt corrected m 21.452
GML corrected m 263.597
KMt m 28.761
KML m
PL
270.906
Immersion (TPc) tonne/cm 19.001
MTc tonne.m 104.672
RM at 1deg = [Link](1) tonne.m 1268.735
Max deck inclination deg 0.1
M
Trim angle (+ve by stern) deg 0.1
S/L Description m
E
PL
M
SA
Ballast Calculation - Yew Choon Marine 11
Step 4 – Line 8 on Hinge
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S3 5% 0.252 352.250 17.613 -16.055 8.886 0.122 262.501 Maximum
P4 37% 1.803 402.572 148.942 -4.573 -8.892 0.902 300.002 Maximum
C4 5% 0.234 681.275 34.064 -4.641 -0.011 0.122 1453.990 Maximum
S4
P5
52%
5%
2.540
0.251
PL
402.572
402.572
209.344
20.129
-4.573
7.551
8.889
-8.894
1.268
0.122
300.002
300.002
Maximum
Maximum
C5 5% 0.234 681.275 34.064 7.551 -0.011 0.122 1453.990 Maximum
S5 5% 0.253 402.572 20.129 7.551 8.886 0.122 300.002 Maximum
P6 5% 0.250 352.250 17.613 18.997 -8.894 0.122 262.501 Maximum
C6 5% 0.235 596.116 29.806 18.997 -0.011 0.122 1272.241 Maximum
M
S6 5% 0.252 352.250 17.613 18.997 8.886 0.122 262.501 Maximum
P7 43% 2.156 345.540 148.582 29.510 -8.890 1.111 262.501 Maximum
C7 5% 0.283 584.761 29.219 28.733 -0.010 0.151 1272.241 Maximum
S7 43% 2.158 345.540 148.582 29.510 8.890 1.111 262.501 Maximum
P8 5% 0.860 136.119 6.770 35.833 -8.892 1.380 187.489 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
F91 1 115.000 115.000 -23.570 0.168 9.753 0.000 0.000 User Specified
LOR 1 74.110 74.110 42.172 -1.924 11.950 0.000 0.000 User Specified
LOB 1 215.600 215.600 36.920 -1.924 11.950 0.000 0.000 User Specified
Total 532.710 16.988 -1.010 10.112 0.000
E
GMt corrected m 20.735
GML corrected m 259.060
KMt m 28.162
KML m 266.486
Immersion (TPc) tonne/cm
MTc tonne.m
19.059
PL
105.557
RM at 1deg = [Link](1) tonne.m 1258.348
Max deck inclination deg 0.0
Trim angle (+ve by stern) deg 0.0
M
Key point Type Freeboar
dm
Margin Line (freeboard pos = -42.655 m) 2.83
SA
S/L Description m
E
PL
M
SA
Ballast Calculation - Yew Choon Marine 11
Step 5 – Line 12 on Hinge
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S3 5% 0.245 352.250 17.610 -16.010 8.890 0.122 262.501 Maximum
P4 37% 1.806 402.572 148.955 -4.573 -8.890 0.902 300.002 Maximum
C4 5% 0.243 681.275 34.058 -4.583 0.000 0.122 1453.990 Maximum
S4
P5
52%
5%
2.537
0.245
PL
402.572
402.572
209.351
20.126
-4.573
7.609
8.890
-8.890
1.268
0.122
300.002
300.002
Maximum
Maximum
C5 5% 0.243 681.275 34.058 7.609 0.000 0.122 1453.990 Maximum
S5 5% 0.245 402.572 20.126 7.609 8.890 0.122 300.002 Maximum
P6 5% 0.245 352.250 17.610 19.042 -8.890 0.122 262.501 Maximum
C6 5% 0.243 596.116 29.802 19.042 0.000 0.122 1272.241 Maximum
M
S6 5% 0.245 352.250 17.610 19.042 8.890 0.122 262.501 Maximum
P7 43% 2.151 345.540 148.582 29.515 -8.890 1.111 262.501 Maximum
C7 5% 0.291 584.761 29.195 28.764 0.000 0.151 1272.241 Maximum
S7 43% 2.151 345.540 148.582 29.515 8.890 1.111 262.501 Maximum
P8 5% 0.860 136.119 6.795 35.841 -8.890 1.382 187.489 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
F91 1 115.000 115.000 -23.570 0.168 9.753 0.000 0.000 User Specified
LOR 1 0.000 0.000 42.172 -1.924 11.950 0.000 0.000 User Specified
LOB 1 323.400 323.400 33.920 -1.924 11.950 0.000 0.000 User Specified
Total 566.400 15.773 -1.064 10.221 0.000
E
GMt corrected m 20.491
GML corrected m 257.978
KMt m 27.961
KML m 265.448
Immersion (TPc) tonne/cm
MTc tonne.m
19.095
PL
106.135
RM at 1deg = [Link](1) tonne.m 1255.613
Max deck inclination deg 0.0
Trim angle (+ve by stern) deg 0.0
M
Key point Type Freeboar
dm
Margin Line (freeboard pos = -42.655 m) 2.799
SA
S/L Description m
E
PL
M
SA
Ballast Calculation - Yew Choon Marine 11
Step 6 – Final Position
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S3 5% 0.248 352.250 17.613 -16.014 8.879 0.122 262.502 Maximum
P4 50% 2.477 402.572 201.286 -4.585 -8.880 1.219 300.022 Maximum
C4 5% 0.238 681.275 34.065 -4.588 -0.033 0.122 1453.991 Maximum
S4
P5
52%
5%
2.541
0.243
PL
402.572
402.572
209.361
20.129
-4.574
7.604
8.889
-8.901
1.268
0.122
300.002
300.002
Maximum
Maximum
C5 5% 0.238 681.275 34.065 7.604 -0.033 0.122 1453.991 Maximum
S5 5% 0.248 402.572 20.129 7.604 8.879 0.122 300.002 Maximum
P6 5% 0.243 352.250 17.613 19.038 -8.901 0.122 262.502 Maximum
C6 5% 0.238 596.116 29.806 19.038 -0.033 0.122 1272.242 Maximum
M
S6 5% 0.248 352.250 17.613 19.038 8.879 0.122 262.502 Maximum
P7 70% 3.478 345.540 241.878 29.587 -8.882 1.761 262.520 Maximum
C7 5% 0.286 584.761 29.180 28.761 -0.029 0.151 1272.241 Maximum
S7 70% 3.432 345.540 241.878 29.587 8.898 1.761 262.520 Maximum
P8 5% 0.856 136.119 6.782 35.841 -8.897 1.381 187.489 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
F91 1 115.000 115.000 -23.570 0.168 9.753 0.000 0.000 User Specified
LOR 1 0.000 0.000 42.172 -1.924 11.950 0.000 0.000 User Specified
LOB 1 323.400 323.400 0.539 -0.161 11.950 0.000 0.000 User Specified
Total 566.400 -3.287 -0.058 10.221 0.000
E
BML m 261.872
GMt corrected m 20.184
GML corrected m 255.441
KMt m 27.642
KML m
PL
262.899
Immersion (TPc) tonne/cm 19.121
MTc tonne.m 106.548
RM at 1deg = [Link](1) tonne.m 1253.908
Max deck inclination deg 0.0
M
Trim angle (+ve by stern) deg 0.0
Time Step Tank no P2 Ulg Tank no S2 Ulg Tank no P4 Ulg Tank no S4 Ulg Tank no P7 Ulg Tank no S7 Ulg
In Out Cont m In Out Cont m In Out Cont m In Out Cont m In Out Cont m In Out Cont m
12:00 1 70 3.91 70 3.91 177 2.74 181 2.69 242 1.47 242 1.47
12:15 2 48 118 3.24 48 118 3.24 12 165 2.88 12 193 2.54 47 195 2.13 47 195 2.13
12:25 3 32 150 2.80 32 150 2.80 4 161 2.93 4 197 2.49 31 164 2.57 31 164 2.57
12:30 4 16 166 2.58 16 166 2.58 12 149 3.08 12 209 2.35 15 149 2.78 15 149 2.78
12:35 5 0 166 2.58 0 166 2.58 0 149 3.08 0 209 2.35 0 149 2.78 0 149 2.78
SA
13:05 6 95 71 3.90 95 71 3.90 51 200 2.46 0 209 2.35 93 242 1.47 93 242 1.47
M
Non-active Tanks during cross over (but with initial pre-ballast water)
12:25 3 0
E
328 2.19
E
Load per Trailer Line 19.12 Tons
Length of Barge
Loadout over
PL
85.34
Bow
metres
S/L Description m
E
PL
M
SA
Ballast Calculation – Yew Choon Marine 11
Step 1 – Line 1 on Ramp - Preballast
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S3 5% 0.244 352.250 17.613 -16.002 8.890 0.122 262.501 Maximum
P4 50% 2.438 402.572 201.286 -4.572 -8.890 1.219 300.002 Maximum
C4 5% 0.244 681.275 34.064 -4.572 0.000 0.122 1453.990 Maximum
S4
P5
52%
5%
2.536
0.244
PL
402.572
402.572
209.337
20.129
-4.572
7.620
8.890
-8.890
1.268
0.122
300.002
300.002
Maximum
Maximum
C5 5% 0.244 681.275 34.064 7.620 0.000 0.122 1453.990 Maximum
S5 5% 0.244 402.572 20.129 7.620 8.890 0.122 300.002 Maximum
P6 5% 0.244 352.250 17.613 19.050 -8.890 0.122 262.501 Maximum
C6 5% 0.244 596.116 29.806 19.050 0.000 0.122 1272.241 Maximum
M
S6 5% 0.244 352.250 17.613 19.050 8.890 0.122 262.501 Maximum
P7 70% 3.442 345.540 241.878 29.594 -8.890 1.761 262.501 Maximum
C7 5% 0.293 584.761 29.238 28.770 0.000 0.151 1272.241 Maximum
S7 70% 3.442 345.540 241.878 29.594 8.890 1.761 262.501 Maximum
P8 5% 0.859 136.119 6.806 35.847 -8.890 1.382 187.489 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
F91 1 115.000 115.000 -23.570 0.168 9.753 0.000 0.000 User Specified
F94 1 227.000 227.000 0.539 -0.161 11.950 0.000 0.000 User Specified
LOR 1 0.000 0.000 42.172 -1.924 11.580 0.000 0.000 User Specified
LOB 1 0.000 0.000 42.172 -1.924 11.580 0.000 0.000 User Specified
Total 470.000 -4.071 -0.037 9.866 0.000
E
GMt corrected m 20.933
GML corrected m 260.229
KMt m 28.266
KML m 267.562
Immersion (TPc) tonne/cm
MTc tonne.m
19.060
PL
105.618
RM at 1deg = [Link](1) tonne.m 1265.394
Max deck inclination deg 0.1
Trim angle (+ve by stern) deg 0.0
M
Key point Type Freeboar
dm
Margin Line (freeboard pos = -42.655 m) 2.803
SA
S/L Description m
E
PL
M
SA
Ballast Calculation – Yew Choon Marine 11
Step 2 – Line 1 on Hinge
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
C4 5% 0.242 681.275 34.066 -4.614 0.027 0.122 1453.990 Maximum
S4 55% 2.687 402.572 221.436 -4.575 8.890 1.341 300.002 Maximum
P5 5% 0.251 402.572 20.129 7.578 -8.880 0.122 300.002 Maximum
C5
S5
5%
5%
0.242
0.247
PL
681.275
402.572
34.066
20.129
7.578
7.578
0.027
8.900
0.122
0.122
1453.990
300.002
Maximum
Maximum
P6 5% 0.250 352.250 17.613 19.018 -8.880 0.122 262.502 Maximum
C6 5% 0.243 596.116 29.807 19.018 0.027 0.122 1272.242 Maximum
S6 5% 0.246 352.250 17.613 19.018 8.900 0.122 262.502 Maximum
P7 61% 3.018 345.540 210.780 29.573 -8.889 1.545 262.501 Maximum
M
C7 5% 0.291 584.761 29.229 28.748 0.024 0.151 1272.241 Maximum
S7 61% 3.013 345.540 210.780 29.573 8.891 1.545 262.501 Maximum
P8 5% 0.861 136.119 6.766 35.836 -8.884 1.380 187.489 Maximum
C8 5% 0.857 230.355 11.453 35.836 0.017 1.380 908.684 Maximum
S8 5% 0.857 136.119 6.769 35.837 8.896 1.380 187.489 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
F91 1 115.000 115.000 -23.570 0.168 9.753 0.000 0.000 User Specified
F94 1 227.000 227.000 0.539 -0.161 11.950 0.000 0.000 User Specified
LOR 1 66.920 66.920 42.172 -1.924 11.580 0.000 0.000 User Specified
LOB 1 19.120 19.120 42.172 -1.924 11.580 0.000 0.000 User Specified
Total 556.040 3.084 -0.329 10.131 0.000
E
BML m 263.130
GMt corrected m 20.329
GML corrected m 256.756
KMt m 27.728
KML m
PL
264.154
Immersion (TPc) tonne/cm 19.135
MTc tonne.m 106.821
RM at 1deg = [Link](1) tonne.m 1259.667
Max deck inclination deg 0.1
M
Trim angle (+ve by stern) deg 0.0
S/L Description m
E
PL
M
SA
Ballast Calculation - Yew Choon Marine 11
Step 3 – Line 4 on Hinge
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S3 5% 0.243 352.250 17.613 -16.030 8.913 0.122 262.502 Maximum
P4 47% 2.308 402.572 189.209 -4.584 -8.888 1.146 300.002 Maximum
C4 5% 0.248 681.275 34.065 -4.609 0.065 0.122 1453.995 Maximum
S4
P5
55%
5%
2.692
0.253
PL
402.572
402.572
221.391
20.129
-4.582
7.583
8.891
-8.867
1.341
0.122
300.002
300.003
Maximum
Maximum
C5 5% 0.248 681.275 34.065 7.583 0.065 0.122 1453.995 Maximum
S5 5% 0.243 402.572 20.129 7.583 8.913 0.122 300.003 Maximum
P6 5% 0.253 352.250 17.613 19.022 -8.867 0.122 262.502 Maximum
C6 5% 0.248 596.116 29.807 19.022 0.065 0.122 1272.245 Maximum
M
S6 5% 0.243 352.250 17.613 19.022 8.913 0.122 262.502 Maximum
P7 52% 2.590 345.540 179.681 29.548 -8.888 1.328 262.502 Maximum
C7 5% 0.296 584.761 29.189 28.750 0.058 0.151 1272.241 Maximum
S7 52% 2.580 345.540 179.681 29.548 8.892 1.328 262.502 Maximum
P8 5% 0.864 136.119 6.775 35.839 -8.875 1.381 187.489 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
F91 1 115.000 115.000 -23.570 0.168 9.753 0.000 0.000 User Specified
F94 1 227.000 227.000 0.539 -0.161 11.950 0.000 0.000 User Specified
LOR 1 66.920 66.920 42.172 -1.924 11.580 0.000 0.000 User Specified
LOB 1 76.470 76.470 39.920 -1.924 11.580 0.000 0.000 User Specified
Total 613.390 6.458 -0.478 10.267 0.000
E
GMt corrected m 19.890
GML corrected m 253.124
KMt m 27.333
KML m 260.568
Immersion (TPc) tonne/cm
MTc tonne.m
19.151
PL
107.048
RM at 1deg = [Link](1) tonne.m 1252.806
Max deck inclination deg 0.1
Trim angle (+ve by stern) deg 0.1
M
Key point Type Freeboar
dm
Margin Line (freeboard pos = -42.655 m) 2.678
SA
S/L Description m
E
PL
M
SA
Ballast Calculation - Yew Choon Marine 11
Step 4 – Line 8 on Hinge
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S3 5% 0.255 352.250 17.613 -16.086 8.890 0.122 262.501 Maximum
P4 46% 2.249 402.572 185.153 -4.583 -8.893 1.122 300.002 Maximum
C4 5% 0.230 681.275 34.035 -4.682 0.000 0.122 1453.990 Maximum
S4
P5
56%
5%
2.746
0.257
PL
402.572
402.572
225.467
20.129
-4.581
7.510
8.889
-8.890
1.366
0.122
300.002
300.002
Maximum
Maximum
C5 5% 0.230 681.275 34.035 7.510 0.000 0.122 1453.990 Maximum
S5 5% 0.257 402.572 20.129 7.510 8.890 0.122 300.002 Maximum
P6 5% 0.255 352.250 17.613 18.966 -8.890 0.122 262.501 Maximum
C6 5% 0.232 596.116 29.801 18.966 0.000 0.122 1272.241 Maximum
M
S6 5% 0.255 352.250 17.613 18.966 8.890 0.122 262.501 Maximum
P7 47.5% 2.377 345.540 164.132 29.526 -8.890 1.220 262.501 Maximum
C7 5% 0.279 584.761 29.224 28.712 0.000 0.151 1272.241 Maximum
S7 47.5% 2.377 345.540 164.132 29.526 8.890 1.220 262.501 Maximum
P8 5% 0.862 136.119 6.784 35.837 -8.890 1.381 187.489 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
F91 1 115.000 115.000 -23.570 0.168 9.753 0.000 0.000 User Specified
F94 1 227.000 227.000 0.539 -0.161 11.950 0.000 0.000 User Specified
LOR 1 52.580 52.580 42.172 -1.924 11.580 0.000 0.000 User Specified
LOB 1 152.930 152.930 36.920 -1.924 11.580 0.000 0.000 User Specified
Total 675.510 8.808 -0.611 10.388 0.000
E
BML m 251.473
GMt corrected m 19.282
GML corrected m 245.022
KMt m 26.791
KML m
PL
252.531
Immersion (TPc) tonne/cm 19.059
MTc tonne.m 105.423
RM at 1deg = [Link](1) tonne.m 1235.640
Max deck inclination deg 0.1
M
Trim angle (+ve by stern) deg 0.1
S/L Description m
E
PL
M
SA
Ballast Calculation - Yew Choon Marine 11
Step 5 – Line 12 on Hinge
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S3 5% 0.256 352.250 17.613 -16.077 8.881 0.122 262.501 Maximum
P4 45% 2.203 402.572 181.128 -4.583 -8.892 1.097 300.002 Maximum
C4 5% 0.229 681.275 34.065 -4.670 -0.026 0.122 1453.990 Maximum
S4
P5
57%
5%
2.797
0.254
PL
402.572
402.572
229.496
20.129
-4.581
7.522
8.888
-8.899
1.390
0.122
300.002
300.002
Maximum
Maximum
C5 5% 0.229 681.275 34.065 7.522 -0.026 0.122 1453.990 Maximum
S5 5% 0.258 402.572 20.129 7.522 8.881 0.122 300.002 Maximum
P6 5% 0.252 352.250 17.613 18.975 -8.899 0.122 262.501 Maximum
C6 5% 0.230 596.116 29.807 18.975 -0.026 0.122 1272.241 Maximum
M
S6 5% 0.256 352.250 17.613 18.975 8.881 0.122 262.501 Maximum
P7 47.5% 2.374 345.540 164.132 29.527 -8.891 1.220 262.501 Maximum
C7 5% 0.277 584.761 29.210 28.718 -0.024 0.151 1272.241 Maximum
S7 47.5% 2.378 345.540 164.132 29.527 8.889 1.220 262.501 Maximum
P8 5% 0.859 136.119 6.784 35.840 -8.896 1.381 187.489 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
F91 1 115.000 115.000 -23.570 0.168 9.753 0.000 0.000 User Specified
F94 1 227.000 227.000 0.539 -0.161 11.950 0.000 0.000 User Specified
LOR 1 0.000 0.000 42.172 -1.924 11.580 0.000 0.000 User Specified
LOB 1 229.400 229.400 33.920 -1.924 11.580 0.000 0.000 User Specified
Total 699.400 8.390 -0.656 10.428 0.000
E
GMt corrected m 19.297
GML corrected m 249.696
KMt m 26.833
KML m 257.232
Immersion (TPc) tonne/cm
MTc tonne.m
19.219
PL
108.131
RM at 1deg = [Link](1) tonne.m 1244.614
Max deck inclination deg 0.1
Trim angle (+ve by stern) deg 0.1
M
Key point Type Freeboar
dm
Margin Line (freeboard pos = -42.655 m) 2.635
SA
S/L Description m
E
PL
M
SA
Ballast Calculation - Yew Choon Marine 11
Step 6 – Final Position
Free to Trim
Relative Density (specific gravity) = 1.025; (Density = 1.0252 tonne/m^3)
Fluid analysis method: Use corrected VCG
Item Name Quantit Soundin Unit Total [Link] [Link] [Link] Unit Total FSM FSM Type
y gm Mass Mass mm mm m FSM tonne.m
tonne tonne tonne.m
Lightship 1 1295.000 1295.000 0.217 0.000 3.414 0.000 0.000 User Specified
Total 1295.000 0.217 0.000 3.414 0.000
E
S3 5% 0.256 352.250 17.630 -16.080 8.884 0.122 262.501 Maximum
P4 54% 2.665 402.572 217.389 -4.576 -8.879 1.317 300.029 Maximum
C4 5% 0.229 681.275 34.059 -4.674 -0.017 0.122 1453.990 Maximum
S4
P5
48%
5%
2.320
0.255
PL
402.572
402.572
193.234
20.145
-4.576
7.518
8.902
-8.896
1.171
0.122
300.029
300.002
Maximum
Maximum
C5 5% 0.229 681.275 34.059 7.518 -0.017 0.122 1453.990 Maximum
S5 5% 0.258 402.572 20.145 7.518 8.884 0.122 300.002 Maximum
P6 5% 0.253 352.250 17.630 18.972 -8.896 0.122 262.501 Maximum
C6 5% 0.231 596.116 29.801 18.972 -0.017 0.122 1272.241 Maximum
M
S6 5% 0.256 352.250 17.630 18.972 8.884 0.122 262.501 Maximum
P7 56.5% 2.805 345.540 195.230 29.557 -8.891 1.437 262.501 Maximum
C7 5% 0.279 584.761 29.287 28.717 -0.015 0.151 1272.241 Maximum
S7 56.5% 2.808 345.540 195.230 29.557 8.889 1.437 262.501 Maximum
P8 5% 0.860 136.119 6.793 35.841 -8.894 1.381 187.489 Maximum
SA
Pumps 6 2.000 12.000 0.000 0.000 5.900 0.000 0.000 User Specified
Ramps 4 4.000 16.000 42.172 0.000 5.130 0.000 0.000 User Specified
Grillage 1 100.000 100.000 0.000 0.000 6.500 0.000 0.000 User Specified
F91 1 115.000 115.000 -23.570 0.168 9.753 0.000 0.000 User Specified
F94 1 227.000 227.000 0.539 -0.161 11.950 0.000 0.000 User Specified
LOR 1 0.000 0.000 42.172 -1.924 11.580 0.000 0.000 User Specified
LOB 1 229.400 229.400 23.380 0.638 11.580 0.000 0.000 User Specified
Total 699.400 4.933 0.185 10.428 0.000
E
GMt corrected m 19.297
GML corrected m 249.940
KMt m 26.845
KML m 257.488
Immersion (TPc) tonne/cm
MTc tonne.m
19.224
PL
108.208
RM at 1deg = [Link](1) tonne.m 1244.301
Max deck inclination deg 0.1
Trim angle (+ve by stern) deg 0.0
M
Key point Type Freeboar
dm
Margin Line (freeboard pos = -42.655 m) 2.682
SA
Time Step Tank no P2 Ulg Tank no S2 Ulg Tank no P4 Ulg Tank no S4 Ulg Tank no P7 Ulg Tank no S7 Ulg
In Out Cont m In Out Cont m In Out Cont m In Out Cont m In Out Cont m In Out Cont m
13:00 1 70 3.91 70 3.91 201 2.45 209 2.35 242 1.47 242 1.47
13:10 2 32 102 3.47 32 102 3.47 12 189 2.59 12 221 2.20 31 211 1.90 31 211 1.90
13:20 3 32 134 3.02 32 134 3.02 0 189 2.59 0 221 2.20 31 180 2.34 31 180 2.34
13:25 4 16 150 2.80 16 150 2.80 4 185 2.64 4 225 2.16 16 164 2.57 16 164 2.57
13:30 5 0 150 2.80 0 150 2.80 4 181 2.69 4 229 2.11 0 164 2.57 0 164 2.57
SA
13:40 6 32 118 3.24 32 118 3.24 37 218 2.24 37 192 2.56 31 195 2.13 31 195 2.13
M
Non-active Tanks during cross over (but with initial pre-ballast water)
13:20 3 0
E
328 2.19