The document outlines the terms and conditions for a construction project consisting of a coffee shop on the ground floor and an office on the second floor, with a total contract amount of P1,100,000. It details the payment schedule, site preparation, structural works, architectural finishes, electrical and plumbing installations, and additional features included and excluded from the contract. The project is prepared by Samuel A. Arcibal, Foreman/Contractor, and is confirmed by the owner, Baby Diane Tan Toan.

Uploaded by

chris diaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views4 pages

Project Sammy

The document outlines the terms and conditions for a construction project consisting of a coffee shop on the ground floor and an office on the second floor, with a total contract amount of P1,100,000. It details the payment schedule, site preparation, structural works, architectural finishes, electrical and plumbing installations, and additional features included and excluded from the contract. The project is prepared by Samuel A. Arcibal, Foreman/Contractor, and is confirmed by the owner, Baby Diane Tan Toan.

Uploaded by

chris diaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Project

2 Story Structure (28 sqm.)

Ground floor coffee shop

2nd floor office

(Lanai and garage)

I. TERMS AND CONDITIONS

The total contract is ONE MILLION ONE HUNDRED PESOS ONLY (P


1,1,000,000.00)only
The schedule of payment shall be as follows:

A. Down payment = 30% of the contract amount

B. Monthly = 300k

II. ) SITE CLEARING

The project site should be demolished and cleared of debris and other undesirable
matter to a suitable subgrade condition.

LAYOUT AND STAKING


The building lines and grades as shown in the drawing shall be established before
and excavation is to be started.

Batter boards and reference marks shall be erected in areas where they are not an
obstruction when excavation works take place.

C. EXCAVATION WORKS

All excavation to be done shall be at the depth indicated in the drawing.

D. BACKFILLING AND COMPACTION

Backfilling works shall be done only when all concrete foundation members are
cured enough to withstand soil pressure resulting from this.

III.) STRUCTURAL WORKS

CONCRETE WORKS
Concreting of all structural members such as footing columns, tie beams, floor slabs,
lintel beams, and foot beams as required.
B. REINFORCING STEEL WORKS

Fabrication and installation of required reinforcing steel bars for all above-mentioned
reinforced concrete structural members, set to be specified and elevated. Details
and schedule of reinforcing bars shall be as specified in the plans.

SIZES AND DETAILS OF BARS


12mm R-bar
- Footing

- Column

- Tie beam

- Beam second floor

- Roof beam

10mm R-Bar
- Dowels

- Horizontal/CHB Laying

- Floor Slab

- All stirrups

C. FORMWORKS AND SCAFFOLDINGS

Fabrication and installation of the form and scaffolding are set to their proper
alignment and elevation in connection with the concreting of all reinforced concrete
structural members as required by the plans.

½ ½-thick phenolic on 2x2 lumber and ½-thick steel tubing for scaffolding for all
required form and frame, respectively, for column and roof beam.

D. MANSORY WORKS

CHB laying all exterior walls, as required, including reinforcement, in areas specified
in the plans.
Exterior concrete hollow blocks #4
Interior concrete hollow blocks #4
CHB reinforcement shall be 10 mm in diameter; deformed bars shall be .80mm and
.60mm on center for vertical and horizontal spacing.
Class B mixture for cement
PLASTERING WORKS
Plastering of all walls is required from floor to ceiling.
Plain cement plastered finishes shall be plain and smooth.

E. ROOF FRAMING WORKS

Construction of structural roof framing for the main roof as required by the plan. See
plans for details.

STRUCTURAL STEEL SPECIFICATION


2x4x1.5 Tubular/Rafter
2x4x1.5 C-purlins Cenepa
2x3x1.5 C-purlins

ROOFING MATERIALS
0.4 long span painted
½ Insulation single foil

IV. ARCHITECTURAL WORKS

Flooring finishing works


60x60 Ceramic Glossy Tiles
Ground & second floor & mini counter bar

CR - 30x60 wall ceramic tiles


CR - flooring 30x30 ceramic tiles
Toilet and lavatory faucet & bidet

WALL FINISHING WORKS


Exterior and interior walls plain cement finish

CEILING WORKS
Plain paint and feat gypsum board or hardiflex panels on metal furrings; exterior
ceilings are spandrel or PVC panels.

DOORS AND WINDOWS


Ground & second floor steel door jamb and panel door
CR - steel door jamb & flash door
All windows are sliding aluminum, glass, & grills.

PAINTING WORKS
Ground & second floor—interior & exterior—all painted finish.
V. ELECTRICAL WORKS

Circuit breakers
Outlet and lighting
Pin light and strip light

VI. PLUMBING WORKS

Installation of water and waste lines as required and specified in the plans, including
installation of plumbing fixtures and other related accessories.
Water lines
Waste lines

INCLUDED:

Roll-up cafeteria (front)


Tiles (lanai & garage)
NEW GATE (FODABLE)
CANOPY AT ENTRANCE DOOR OF THE HOUSE
PLASTERING AND PAINTING OF CONCRETE FENCE AND FENCE GRILL

NOT INCLUDED:
(But with insulation)
Ceiling (lanai & garage)

Prepared by: SAMUEL A. ARCIBAL


Foreman/Contractor

Conforme:

BABY DIANE TAN TOAN


Owner