c d c d c d c d
a b a b a b a b
c d c d c d c d
a b a b a b a b
a) #3 @ 4'' c/c alt. ckd.
b) 2 #4 Extra Top in Between alt. ckd. bars
c) #3 @ 6'' c/c alt. ckd.
d) 2 #4 Extra Top in Between alt. ckd. bars
Reinforcement Detailing of GF (Long Direction)
DWG TITLE
PROJECT.
JOB DESIGN TEAM: Reinforcement
Development of a Vocational Detailing of GF
Leather Training Institute and Five-Storey Institutional Building Group-01 A1 (Long Direction) SUBMISSION DATE
12 November, 2024
Research Center at Hazaribagh (1904029, 1904011, 1904009, 1904012,
1904018, 1904007, 1904023)
N
d
b
b
a
a
c
c
a
a
c
a
c
a) #3 @ 6.5'' c/c alt. ckd.
b
b
b
b
b) 3 #4 Extra Top in Between alt. ckd. bars
c) #3 @ 9'' c/c alt. ckd.
d) 1 #4 Extra Top in Between alt. ckd. bars
Reinforcement Detailing of GF (Short Direction)
DWG TITLE
PROJECT.
JOB DESIGN TEAM: Reinforcement
Development of a Vocational Detailing of GF
Leather Training Institute and Five-Storey Institutional Building Group-01 A1 (Short Direction) SUBMISSION DATE
12 November, 2024
Research Center at Hazaribagh (1904029, 1904011, 1904009, 1904012,
1904018, 1904007, 1904023)