Bar Chart, S-Curve-01242025

The document outlines a construction project with a duration of 45 calendar days, detailing various work items including mobilization, site construction, structural works, roofing, architectural works, plumbing, and electrical works. It includes a construction bar chart and S-curve for housing construction, along with a projected cash flow and accomplishment metrics. The document is prepared and reviewed by multiple engineers associated with the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views2 pages

Bar Chart, S-Curve-01242025

The document outlines a construction project with a duration of 45 calendar days, detailing various work items including mobilization, site construction, structural works, roofing, architectural works, plumbing, and electrical works. It includes a construction bar chart and S-curve for housing construction, along with a projected cash flow and accomplishment metrics. The document is prepared and reviewed by multiple engineers associated with the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PROJECT NAME :

LOCATION :
CONTRACT DURATION : 45 CD
CONSTRUCTION BARCHART & S-CURVE
(Housing Construction)

#
1

9
1st 2nd 3rd 4th 5th 6th 7th
ITEMS OF WORKS AMOUNT WTD % CD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

A. MOBILIZATION / DEMOBILIZATION
MOBILIZATION/DEMOBILIZATION #DIV/0! 3 ##### ##### #####

I. SITE CONSTRUCTION
1.1 EARTHWORKS
1.1.1 Structure Excavation #DIV/0! 3.00 ##### ##### #####
1.1.2 Embankment from Structure Excavation #DIV/0! 1.00 #####
1.1.3 Gravel Bedding #DIV/0! 1.00 #####

II. STRUCTURAL WORKS


2.1 CAST-IN PLACE CONCRETE
2.1.1 Footing, 3000 psi #DIV/0! 1.00 #####
2.1.2 Wall Footing, 3000 psi #DIV/0! 1.00 ##### #####
2.1.3 Slab on Grade/Slab on Fill, 3000 psi #DIV/0! 2.00 ##### ##### #####
2.1.4 Columns, 3000 psi #DIV/0! 1.00 #####
2.1.5 Lintel Beams, 3000 psi #DIV/0! 1.00 #####
2.2 STEEL REINFORCEMENT
2.2.1 Footing #DIV/0! 1.00 #####
2.2.2 Wall Footing #DIV/0! 1.00 #####
2.2.3 Slab on Grade/Slab on Fill #DIV/0! 2.00 #####
2.2.4 Columns #DIV/0! 1.00 ##### ##### #####
2.2.5 Lintel Beams #DIV/0! 1.00 #####
2.3 MASONRY WORKS
2.3.1 4" CHB with Steel Reinforcement #DIV/0! 3.00 ##### ##### ##### ##### ##### #####
0 6" CHB with Steel Reinforcement
2.3.2 Kitchen Counter Top #DIV/0! 1.00 #####
2.3.3 Plastering #DIV/0! 2.00 ##### ##### ##### #####
2.4 FORMWORKS AND SCAFFOLDING
2.4.1 Forms, Scaffoldings and Accessories #DIV/0! 2.00 ##### #####
III. ROOFING WORKS
3.1 STRUCTURAL STEEL FRAMING
3.1.1 Structural Steel Roof Framing Including Accessories #DIV/0! 2.00 ##### #####
3.2 TINSMITHRY
3.2.1 Roofing Sheet with Fabricated Metal Roof Accessories #DIV/0! 5.00 ##### ##### ##### ##### ##### ##### ##### #####
IV. ARCHITECHTURAL WORKS
4.1 DOORS
D-1: 50mm thk Single-Leaf Single- Action Solid Wood Panel Swing Door on ##### #####
4.1.1
50mm x 150mm thk wooden door jambs #DIV/0! 4.00
D-2: 50mm thk Single-leaf Single-action Hollow core flush swing door with 6mm ##### #####
4.1.2 thk marine plywood facing on exterior side and 6mm thk ordinary plywood facing
on interior side, on 50mm x 100mm thk wooden door jambs #DIV/0! #REF!
D-3: 40mm thk Single Leaf Single Action PVC Swing Door with PVC Louvers, on #####
4.1.3
PVC Door Jambs #DIV/0! #REF!
4.2 WINDOWS
W1- 1.2m x 1.17m x 4.5mm thk. Glass Blades on Dual Control Aluminum #####
4.2.1
Jalousie Frame #DIV/0! #REF!
W2 - 0.6m x 1.17m x 4.5mm thk. Glass Blades on Dual Control Aluminum #####
4.2.2
Jalousie Frame #DIV/0! #REF!
W3 - 0.6m x 1m x 4.5mm thk. Glass Blades on Dual Control Aluminum Jalousie #####
4.2.3
Frame #DIV/0! #REF!
W4 - 0.5m x 0.378m x 4.5mm thk. Glass Blades on Dual Control Aluminum #####
4.2.4
Jalousie Frame #DIV/0! #REF!
4.3 CARPENTRY WORKS
4.3.1 Sawali (Woven Bamboo Material) #DIV/0! #REF! ##### ##### #####
4.4 TILE WORKS
4.4.1 Ceramic Glazed Tiles #DIV/0! #REF!
0 Ceramic Unglazed Tiles 0.00% 0.00 #####
4.5 PAINTING WORKS
4.5.1 Painting - Metal #DIV/0! #REF! #####
V. PLUMBING WORKS
5.1 PIPE AND FITTINGS
5.1.1 50mm dia. PVC Pipes with Fittings for Vent Pipes #DIV/0! #REF! #####
5.1.2 100mm dia. PVC Pipes with Fittings for Waste Pipes #DIV/0! #REF! #####
5.1.3 19mm dia. uPVC Pipes with Fittings for Waterlines #DIV/0! #REF! #####
5.2 PLUMBING FIXTURES
5.2.1 Water Closet with Complete Accessories #DIV/0! #REF! #####
5.2.2 Kitchen Sink (Stainless) with Complete Accessories #DIV/0! #REF! #####
5.2.3 Floor Drain plate (Stainless), 100mm #DIV/0! #REF! #####
5.2.4 Faucets & Hose Bibb #DIV/0! #REF! #####
5.3 SEPTIC TANK
5.3.1 Polyethylene Septic Tank #DIV/0! #REF! #####
VI ELECTRICAL WORKS
6.1 Roughing-Ins (Supply and Installation of raceways inc. fittings & connectors) #DIV/0! #REF! #####
6.2 Wires and Cables #DIV/0! #REF! #####
6.3 Wiring Devices and Lighting Fixtures #DIV/0! #REF! ##### #####
6.4 Panel Board #DIV/0! #REF! #####

TOTAL - #DIV/0!
##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### ##### #####
MONTHLY PROJECTED ACCOMPLISHMENT % #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
CUMULATIVE MONTHLY PROJECTED ACCOMPLISHMENT % #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
MONTHLY PROJECTED CASH FLOW PHP #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
CUMULATIVE MONTHLY PROJECTED CASH FLOW PHP #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Prepared by: Checked by: Reviewed by: Submitted by: Recommending Approval:

ENGR. ROSELLE JOIE L. DULAY ENGR. CHARMAINE CLAIRE P. ROSALIA ENGR. MARK ROBERT A. MARTER ENGR. SHARIFFUDDIN I. NAMI ENGR. CLEMENTE A. DAYOT
Senior Engineer A Principal Engineer A Principal Engineer A/Technical Unit Head District Manager - Designate Regional Manager
Davao City/Digos City/IS Garden Samal/ Davao City/Digos City/IS Garden Samal/ Davao City/Digos City/IS Garden Samal/ Davao City/Digos City/IS Garden Samal/ NHA Region XI
Davao del Sur/Davao del Norte District Office Davao del Sur/Davao del Norte District Office Davao del Sur/Davao del Norte District Office Davao del Sur/Davao del Norte District Office
48 49

##### #####
/0!
/0!
/0!
/0!