INSPECTION AND TEST PLAN STEEL DISCIPLINE = ALL
STRUCTURE ITP N = PP-0512-GN-GG-004-0
"A" = APPROVAL DOCUMENT "R" = REVIEW AND COMMENT "I" = INFORMATION
QUALITY INSPECTION ACTIVITIES
QUALITY CONTROL
ACTIVITY/PROCESS DESCRIPTION CONTROL ACCEPTANCE CRITERIA VERIFYING DOCUMENT
PROCEDURE REFERENCE
ACTIVITY TJE CPI OTHERS
1. DOCUMENT REVIEW
1.1. Contract Documents, Tech. Specification, Procedures Review Verify Contract Document Contract Document Contract Documents R A N/A
Review Client's or Owners approved technical specification,
1.2.
project procedures, Procedure and vendor
Verify Standard & Code Contract Documents R R/A N/A
vendor manual, drawings or other documents as the reference to manual
be followed
Finalise deviation, amendments or queries and generate new Technical Specification &
1.3. Verify Approval sheet Contract Documents R R/A N/A
procedure as required Proc., Contract Documents
2. STRUCTURAL STEEL WORK
Technical Specification &
2.1. Material verification; visual Verify A36 or eq IR-009 R R N/A
Proc., Contract Documents
Technical Specification &
2.2. Anchor bolt alignment / center line verification Visual Inspection AISC-ASD IR-009 SW R N/A
Proc., Contract Documents
Technical Specification &
2.3. Padding plate elevation check Visual Inspection AISC-ASD IR-009 SW R N/A
Proc., Contract Documents
Technical Specification &
2.4. Alignment check / Verticality Visual Inspection SP-CI-SS-001 IR-009 SW R N/A
Proc., Contract Documents
Technical Specification &
2.5. Bolt Tightening check Visual Inspection AISC-ASD IR-009 SW R N/A
Proc., Contract Documents
2.6. Grouting ( Follow ITP Grouting)
3. WELDING ACTIVITY
Technical Specification &
3.1. Welding Visual inspection Visual Inspection AWS D1.1 IR-009 SW R N/A
Proc., Contract Documents
INSPECTION AND TEST PLAN STEEL DISCIPLINE = ALL
STRUCTURE ITP N = PP-0512-GN-GG-004-0
"A" = APPROVAL DOCUMENT "R" = REVIEW AND COMMENT "I" = INFORMATION
QUALITY INSPECTION ACTIVITIES
QUALITY CONTROL
ACTIVITY/PROCESS DESCRIPTION CONTROL ACCEPTANCE CRITERIA VERIFYING DOCUMENT
PROCEDURE REFERENCE
ACTIVITY TJE CPI OTHERS
4. PAINTING WORK
Project Specification, Vendor Project Specification SP-ME-
4.1. Surface preparation ( check surface material ) Visual Inspection IR-006 W SW N/A
Manual ME-025, SSPC
Project Specification SP-ME- Primer, second and finish
4.2. Check DFT and visual appearance Visual Inspection IR-006 W SW N/A
ME-025, Vendor Manual coat
TING
Technical Specification &
5. FINAL INSPECTION AND PUNCH LISTING Visual Inspection Approved drawing PL-008 W W N/A
Proc., Contract Documents
6. DOCUMENTATION
Contract Documents
6.1 QA/QC Review of site generated handover document Verify Site Instruction Form Scope of Approved Documents Turn-over Documents P/R R/A N/A
Work