Kanda Structural1
Kanda Structural1
70
1.50
0.67 0.37 0.67
0.59 0.33 0.59
8 - 16mmØ DRB MATTING 7 - 16mmØ DRB MATTING
EACH WAY FOR BOTH WAYS EACH WAY FOR BOTH WAYS PROVIDE NON-SKID
BRASS NOSING
0.67
0.59
370mm X 370mm COLUMN 330mm X 330mm COLUMN
0.33
1.70
1.50
0.37
50MMØ STAINLESS
STEEL HANDRAIL
0.59
0.67
LANDING 9
30MMØ STAINLESS
C2F2 PLAN
C1F1 PLAN STEEL RAILINGS
8
7
12-25mmØ GRADE 40 DRB WITH 10mmØ RINGS SPACED
370mm X 370mm 2@50mm, 4@75mm, 6@100mm, 330mm X 330mm
CONCRETE COLUMN AND REST @ 200mm TOWARDS MIDHEIGHT CONCRETE COLUMN 6
SECONDARY RINGS SPACED 300mm
NATURAL GRADE LINE NATURAL GRADE LINE
5-10mmØ CHAIN BARS
5
0.30
1.67
10mmØ TEMP. BARS @ 0.20m
5 - 16mmØ Top 4
1.25
1.25
Continuous Rebar
0.185
THICKNESS=180CM
8
0.1
3
0.35
0.35
TIE BEAM TIE BEAM 2
9-PCS 16mm MAIN BAR SPACED @ 0.12m
0.50
0.50
100mm THK. SLAB ON FILL W/ 10mm Ø 1
BARS SPACE @ .50m OCBW 10mm NOZING BAR
3 - 16mmØ Bottom
100mm THICK GRAVEL BED
0.10
Continuous Rebar FFL
C1F1 SECTION C2F2 SECTION
0.54
S1 SCALE 1:30 METERS
1 FOUNDATION PLAN
5-16mmØ DOWEL
S1 SCALE 1:100 METERS
0.25
3-16mmØ LONG BARS X 1.0 M.L.
SCHEDULE OF BEAMS FOR SECOND FLOOR
SECTION 0.50
MARK SPACING OF TIES STAIRS & STAIR FOOTING DETAIL
@ SUPPORT @ MIDSPAN @ END 3
SCHEDULE OF TIE BEAM 0.30 0.30
S1 SCALE 1:20 METERS
6-20mmØ 2-20mmØ
SECTION USE 10mm Ø TIES SPACED
MARK SPACING OF TIES
@ SUPPORT @ MIDSPAN 2B1 2 @ 50, 4 @ 75, 6 @ 100, AND REST
0.60
0.60
@ 150mm FROM SUPPORT 10 mmØ VERT. BAR 150MM THK. CHB W/ 10MM DIA.
0.25 0.25
TOWARDS MIDSPAN @ EVERY 600 mm O.C. VERT. & HORT. BAR SPACED @
6-20mmØ 6-20mmØ 600MM O.C. RESPECTIVELY
USE 10mm Ø TIES SPACED 3-20mmØ 3-20mmØ
10mmØ HORIZONTAL BAR
TB1 2 @ 50, 4 @ 75, 6 @ 100, AND REST
0.35
0.35
0.60
0.60
0.60
@ 150mm FROM SUPPORT
MIN.DEPTH OF EXCAVATION
TOWARDS MIDSPAN
0.40
3-20mmØ 3-20mmØ 3-20mmØ 3-10mØ LONG BARS 3-10MM DIA. CONT. BAR
0.60
W/ 10mmØ TIE BARS SPACED 0.30m W/ 10MM DIA CUT BAR
2" 2" 2" SPACED @ 300MM O.C.
0.15
0.20 0.20
0.25
5-20mmØ 2-20mmØ
USE 10mm Ø TIES SPACED
2LB
0.50
0.50
2 @ 50, 4 @ 75, 6 @ 100, AND REST
0.40 0.40
@ 200mm FROM SUPPORT
3-20mmØ 3-20mmØ TOWARDS MIDSPAN WF-1 SECTION WF-2 SECTION
2" 2"
L1 L2 L3
Engineer: Architects: Project Title: Contents Concurred: Republic Act No. 9266 Engineer: Designed By: Job No.:
DRAWINGS AND SPECIFICATIONS AND OTHER CONTRACT
PROPOSED TWO STOREY DOCUMENTS DULY SIGNED, STAMPED OR SEALED, AS Sheet No.:
INSTRUMENTS OF SERVICE, ARE THE INTELLECTUAL
CADD By:
RESIDENTIAL BUILDING PROPERTY AND DOCUMENTS OF THE ARCHITECT WHETHER
THE OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
S-1
NOT. IT SHALL BE UNLAWFUL FOR ANY PERSON TO
SANDIALEN A. KANDA III DUPLICATE OR TO MAKE COPIES OF SAID DOCUMENTS FOR
USE IN THE REPETITION OF AND FOR OTHER PROJECTS OR
SANDIALEN A. KANDA III
Engineer Architect Location: BUILDINGS, WHETHER EXECUTED PARTLY OR IN WHOLE, Engineer
MARK RANIEL D. HERRERA WITHOUT THE WRITTEN CONSENT OF ARCHITECT OF SAID
Checked By:
San Miguel Village, Kalayaan Ave. Makati City Owner DOCUMENTS.
Date: