0% found this document useful (0 votes)
102 views90 pages

Bill 01

The document outlines a detailed bill of quantities for a construction project involving road widening and improvements, including various pay items such as mobilization, earthworks, road surfacing, and culvert enhancements. It includes descriptions, units, quantities, and rates for each item, along with a summary of costs and payment applications. The total amount payable and variations are also noted, indicating the financial aspects of the project.

Uploaded by

anne
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views90 pages

Bill 01

The document outlines a detailed bill of quantities for a construction project involving road widening and improvements, including various pay items such as mobilization, earthworks, road surfacing, and culvert enhancements. It includes descriptions, units, quantities, and rates for each item, along with a summary of costs and payment applications. The total amount payable and variations are also noted, indicating the financial aspects of the project.

Uploaded by

anne
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

ITEM NO.

PAY ITEM DESCRIPTIONS UNIT QTY

1.0 PRELMINARIES:
1.1 P(01) Mobilization and demobilization L.S. item
1.2 119(1) Provide all necessary Insurancee L.S. item
1.3 119(2) Provide all necessary Bonds L.S. item
1.4 103(1) Traffic safety and control Months 6.00
Surveying, levelling and submission of CS and LS
1.5 103(1) drawings as per Engineer's instruction. Km 4.00
1.6 Allow for quality control special tests PS item
EARTH WORKS AND CORRECTIONS TO EXISTING
2.0 SURFACE
2.1 Scarifging Road Surface 50mm Depth Sq.m 12,700.00
2.2 Excavation of soil for road widening Cu.m 840.00
3.0 CONSTRUCTION OF BASE:
Trimming, levelling and compaction of Dense
3.1 ground to 100% standard density Sq.m 5,600.00

Supplying spreading and compaction of Dense


graded aggregate base course of nominal
maximum size of 37.5 mm (ABC) including
3.2 transport of 35Km distance Cu.m 3,585.00

4.0 ROAD SURFACING:

Prime coat with emulsion CSS - 1 using 1 ltr,/sqm


4.1 501(2) including blinding with sand and transport. Sq.m 18,300.00
Tack coat using emulsion CSS - 1 @ of 0.5 ltr./sq.m
4.2 501(2) including transport Sq.m 18,300.00
Asphalt Concrete surfacing (Wearing Course, 19
4.3 506(1) mm) including transport of 30 KM distance MT 2,242.00
5.0 ROAD MARKING:

Road marking and standared pedestrian crossing


marking using thermoplstic ( 3mm thick
application ) material ( Yellow) including
barricading, clearing, brushing road surface and
5.1 additional glass beads at the rate of 350g/ sq.m Sq.m 36.00
Road marking and centerline, Edge lines, lane
markings, stop line and arrows markings using
thermoplastic (white) paint ( 3 mm thick
applocation ) including barricading, clearing
brushing road surface and additional glass beads
5.2 at the rate of 350/sq.m Sq.m 786.00
SUB TOTAL
Widening culvert
6.0 Widening & Improvements to Culverts
6.1 Clearing the site item
6.2 302(6) Coffer damming using sand bags item
6.3 302(7) Dewartering using water pump 2" item
6.4 Testing soil and concrete item
6.5 302(2) Excavation in medium soil m3 165.00
Mixing & Laying cement concrete [Link](37.5mm)
6.6 1001(2) For Foundation m3 12.75
Supplyin & fixing 25mm thick class II timer as
6.7 1008(2) shuttering (rough) m2 142.00
Mixing & laying cement concrete Grade 25 For
6.8 1001(2) Foundation m3 80.00
6.9 1008(2) Supply & fixing shuttering smooth finished m2 750.00
Mixing & Laying cement concrete
6.10 1001(2) [Link](37.5mm)For Supper Structure m3 240.00
6.11 706(1) Forming weepholes using PVC pipe 100mm M 178.00
6.12 705(3) Clay puddled laid behind the abutment walls m3 31.68
Supplying and packing 50 - 100mm dry Stone
6.13 705(1) linning m3 150.00
6.14 1001(2) Mixing & laying cement concrete G-25 m3 25.00
6.15 1002(1) Fabricate & lay for tor steel as reinforcement kg 2,850.00
6.16 Fabricate & lay for MS steel as reinforcement kg 1,500.00
6.17 Curing of deck slab of culvert m2/days 650.00
Approved soil filling and compact behind the
6.18 302(2) abutment including 10 Km. Transport m3 150.00
SUB TOTAL
RATE RS.
CTS. AMOUNT RS. CTS.

200,000.00
300,000.00
650,000.00
200,000.00 1,200,000.00

150,000.00 600,000.00
300,000.00

3,250,000.00
28.00 355,600.00
495.00 415,800.00
771,400.00

83.00 464,800.00

4,895.00 17,548,575.00

-
-
18,013,375.00
-

143.00 2,616,900.00

83.00 1,518,900.00

16,000.00 35,872,000.00
40,007,800.00

1,815.00 65,340.00
1,815.00 1,426,590.00
1,491,930.00

27,500.00
110,000.00
27,500.00
27,500.00
715.00 117,975.00

13,530.00 172,507.50

1,100.00 156,200.00

17,050.00 1,364,000.00
1,430.00 1,072,500.00

13,530.00 3,247,200.00
1,650.00 293,700.00
2,200.00 69,696.00

4,400.00 660,000.00
17,050.00 426,250.00
176.00 501,600.00
176.00 264,000.00
110.00 71,500.00

1,430.00 214,500.00
8,824,128.50

3,250,000.00
771,400.00
18,013,375.00
40,007,800.00
1,491,930.00
8,824,128.50
72,358,633.50
82,488,842.19
ISURU ENGINEERING (PTE) LTD.
CIVIL, ELECTRICAL, MECHANICAL ENGINEERS & CONTRACTORS
No. 983, Pannipitiya Rd, Tel : +94-11-2787739/40/41/42/44
Fax : +94-11-2787747
RU ENGINEERING Battaramulla. (PTE) LTD.
INTERIM
, ELECTRICAL, MECHANICAL ENGINEERS & CONTRACTORS. PAYMENT APPLICATION
Place, Colombo - 7. Tel : +94-11-2676311 Fax : +94 – 11 - 2687706.
WIDENING AND IMPROVEMENTS TO ALUTHGAMA-
Project VEGODAROAD (5+000-8+050)KM
Bill No. : 03

Contract No. :RDA/DW/WP/GOSL/2013/180 Date : 5/8/2014

Valuation of Work Completed


Bill
Description of Bill Previous This Period Total
No.
(Rs) (Rs) (Rs)

A). Value of Work Done (ANNEX A) - ### ###

B). Add :Variations (Exeed Qty ) -

C). Gross Valuation - ### ###

D). Ddt :Retention - ### ###

(10% of Work Done(3) up to 4,124,500.00) -

E). Net Valuation - ### ###

Add :Value of Material at Site 80% (ANNEX -B) #REF! #REF!

F). Add :Price Escalation (Reff. Annexure 02)

G). Gross Amount Payable - #REF! #REF!

H). Ddt :Advance Recovery From (C) (20%) ### ###

- #REF! #REF!

I). Amount Payable After Advance Recovery - #REF! #REF!

J). Net Amount Payable - #REF! #REF!

K). Ddt :Previous Payments - - -

Balance Due to Contractor - #REF! #REF!

L). Add :VAT (12%) - #REF! #REF!

Total Amount Payable - #REF! #REF!

Net Amount Payable in Words :

Site QS (IEL)

Date : …...………………...……………

Project Manager (IEL)

Date : …...………………...……………

5
PEAK ENGINEERING (PVT) LTD.
No. 9 4/2, Station Rd, Tel : +1112 553323
Bambalapitiya INTERIM PAYMENT APPLICATION

Thambi Residencies at No 40, [Link]


Project Road, Col -06
IPC No. : 01

Contract No. : Date : 7/4/2025

Valuation of Work Completed


Bill
Description of Bill Previous This Period Total
No.
(Rs) (Rs) (Rs)

A). Value of Work Done (ANNEX A) - ### ###

B). Add :Variations (Exeed Qty ) -

C). Gross Valuation - ### ###

D).

E). Add :Value of Material at Site -

F). Net Valuation - ### ###

G). Ddt :Retention - (547,041.75) (547,041.75)

H). Gross Amount Payable - ### ###

- ### ###

L). Ddt :Previous Payments ### ###

Advance payment ### ###

M). Balance Due to Contractor

N). Add :VAT

Total Amount Payable - ### ###

Date : …...………………...……………

Project Manager (IEL)

Date : …...………………...……………

6
WIDENING AND IMPROVEMENTS TO DANOWITA- MEERIGAMA (4+000-8+610)KM
-

CONTRACTOR : ISURU ENGINEERING(PTE)LTD Annex A

Original Valuation of Work Completed


Bill Contract
Description of Bill Previous This Period Total
No. Sum
(Rs) (Rs) (Rs) (Rs)

Bill no 01
01 - ### ###

02

03

04

05

06

Sub Total of Bill No 01 - 03 - ### ###


-

Value of Work Done as per Contract - ### ###

7
SUMMARY OF VARIATION

WIDENING AND IMPROVEMENTS TO DANOWITA- MEERIGAMA


(4+000-8+610)KM

BILL NO. DESCRIPTION AMOUNT Remark

See attachement, BOQ


Variation for Exceed Amount of item of item has a lump sum
1.02 210,959.96
provide Insuarance charges amount 300,000/= Actual
cost goint to 510,959.96/=

TOTAL 210,959.96 -
Thambi Residencies at No 40, [Link] Road, Col -06
IPC NO:01

Amount Remarks
ITEM DESCRIPTION
UNIT QTY. RATE Previous Current Cumulative
Transporting and mobilization of equipment and personnel to
1 Item 1 2,000,000.00 - 2,000,000.00 2,000,000.00
the site for pilling work

Bore throught any material met with , except hard rpck- Avg
2
depth 25m

2.1 600mm m 105.53 11,500.00 1,213,595.00 1,213,595.00


2.2 750mm m 288.87 14,500.00 4,188,615.00 4,188,615.00
3 Placing of grade Ready - Mix Concrete
3.1 600mm m3 31.25 9,500.00 296,875.00 296,875.00
3.2 750mm m3 132.50 9,500.00 1,258,750.00 1,258,750.00
4 Rock Socketing - -
4.1 600mm m 4.00 50,000.00 200,000.00 200,000.00
4.2 750mm m 11.00 60,000.00 660,000.00 660,000.00
5 Rainfoercement steel Fabrication work - -
5.1 Rainfoercement steel Fabrication ton 10.90 40,000.00 436,000.00 436,000.00
6 Surveyor licenced Item 0.50 150,000.00 75,000.00 75,000.00
7 Site cleaning 10000L 34.00 18,000.00 612,000.00 612,000.00

BILL NO:-01 CARRIED TO TOTAL SUMMARY - 10,940,835.00 10,940,835.00

…………………………………..
CONTRACTOR REPRESENTATIVE
0
-
IPC NO:01
BILL N
2.0 WIDENING & RECTICATION OF CARRIAGEWAY
AS PER ORIGINAL BOQ Previous Current Cumulative
ITEM DESCRIPTION
UNIT QTY. RATE Amount QTY Amount QTY Amount QTY Amount
Supplying,spreading &
2.1 Compacting approve soil m3 1,500.00 1,417.00 2,125,500.00 - - - -
including transport

Roadway Excavation for


2.2 m3 1,037.25 491.00 509,289.75 578.595 284,090.15 - 578.595 284,090.15
widening carriageway

Trimming, levelling and


2.3 compacting original m2 6,915.00 164.00 1,134,060.00 3857.30 632,597.20 - 3,857.30 632,597.20
ground

Dense graded aggregate


base course
spreading,watering &
2.4 m3 1,037.25 4,851.00 5,031,699.75 578.595 2,806,764.35 - 578.595 2,806,764.35
compacting in strips not
exceeding 1.2m
including transport

Dense graded aggregate


base course
2.5 spreading,watering & m3 3,457.50 4,851.00 16,772,332.50 398.245 1,931,886.50 - 398.245 1,931,886.50
compacting including
transport

Prime coat with emulsion


2.6 CSS - 1 including m2 29,965.00 142.00 4,255,030.00 3250.00 461,500.00 553.00 78,526.00 3,803.00 540,026.00
transport emulsion.

BILL NO:-02 CARRIED TO TOTAL SUMMARY 29,827,912.00 6,116,838.20 78,526.00 6,195,364.20

………………………………….. …………………………………….
CONTRACTOR REPRESENTATIVE CONSULTANT ENGINEER
0
-
IPC NO:01
3.0 OVERLAYING WEARING COURSE
BILL No
AS PER ORIGINAL BOQ Previous Current Cumulative Excee
ITEM DESCRIPTION d
UNIT QTY. RATE Amount QTY Amount QTY Amount QTY Amount QTY
Tack coat using emulsion
3.1 CSS - 1 @ of 0.5 ltr./sq.m m2 23,050.00 82.00 1,890,100.00 - - - -
including transport

Wearing course asphalt


3.2 concrete for overlaying to a m2 23,050.00 1,900.00 43,795,000.00 - - - -
thickness of 50mm

BILL NO:-03 CARRIED TO TOTAL SUMMARY 45,685,100.00 - - -

………………………………….. …………………………………….

CONTRACTOR REPRESENTATIVE CONSULTANT ENGINEER


0
-
IPC NO:01
BILL No4.0 CONSTRUCTION OF SOFT SHOLDERS

AS PER ORIGINAL BOQ Previous Current Cumulative Exceed


ITEM DESCRIPTION
UNIT QTY. RATE Amount QTY Amount QTY Amount QTY Amount QTY

4.1 Removing top soil m3 1,383.00 382.00 528,306.00 - - 0.0 -


Trimming, levelling and
compacting original
4.2 ground m2 5,532.00 164.00 907,248.00 - - -
Supplying,spreading &
compacting approved
4.3 soil including transport m3 1,383.00 1,417.00 1,959,711.00 - - -

BILL NO:-04 CARRIED TO TOTAL SUMMARY 3,395,265.00 - - - -

………………………………….. …………………………………….

CONTRACTOR REPRESENTATIVE CONSULTANT ENGINEER


0
-
IPC NO:01
BILL No 5.0 WIDENING CULVERT
AS PER ORIGINAL BOQ Previous Current Cumulative Exceed
ITEM DESCRIPTION
UN
QTY. RATE Amount QTY Amount QTY Amount QTY Amount QTY
IT
BILL NO:5 -
Demolishing & Dewatering -
5.1 Clearing the site item 163,500.00 0.25 40,875.00 - 0.25 40,875.00

5.2 Coffer damming using sand bags item 654,000.00 0.25 163,500.00 - 0.25 163,500.00

5.3 Dewartering using water pump 2" item 163,500.00 0.25 40,875.00 - 0.25 40,875.00

5.4 Testing soil and concrete item 109,000.00 0.25 27,250.00 - 0.25 27,250.00

5.5 Excavation in medium soil m3 330.00 709.00 233,970.00 4.37 3,098.33 - 4.37 3,098.33

Mixing & Laying cement concrete


5.6 [Link](37.5mm) For Foundation m3 29.25 13,407.00 392,154.75 0.73 9,787.11 - 0.73 9,787.11

Supplyin & fixing 25mm thick class


5.7 II timer as shuttering (rough) m2 335.91 1,090.00 366,141.90 18.84 20,535.60 - 18.84 20,535.60

Mixing & laying cement concrete


5.8 Grade 25 For Foundation m3 184.86 16,895.00 3,123,209.70 2.916 49,265.82 - 2.92 49,265.82

Supply & fixing shuttering smooth


5.9 finished m2 1,646.35 1,417.00 2,332,877.95 19.31 27,362.27 - 19.31 27,362.27

Mixing & Laying cement concrete


5.10 [Link](37.5mm)For Supper m3 589.40 13,407.00 7,902,085.80 4.39 58,856.73 - 4.39 58,856.73
Structure
Forming weepholes using PVC pipe
5.11 100mm M 405.60 1,635.00 663,156.00 - - - -

Clay puddled laid behind the


5.12 abutment walls m3 37.44 2,180.00 81,619.20 - - - -
Supplying and packing 50 - 100mm
5.13 dry Stone linning m3 266.24 4,360.00 1,160,806.40 - - - -

Mixing & laying cement concrete


5.14 G-25 m3 59.98 16,895.00 1,013,362.10 2.05 34,634.75 - 2.05 34,634.75

Fabricate & lay for tor steel as


5.15 reinforcement kg 7,174.34 174.00 1,248,335.16 224.475 39,058.65 - ### 39,058.65

Fabricate & lay for MS steel as


5.16 reinforcement kg 2,597.90 174.00 452,034.60 - - - -

5.17 Curing of deck slab of culvert m2/days 1,590.40 109.00 173,353.60 6.45 703.05 - 6.45 703.05

Approved soil filling and compact


5.18 behind the abutment including 10 m3 283.61 1,417.00 401,875.37 - - - -
Km. Transport

SUB TOTAL CARRIED FORWARD 20,634,982.53 515,802.31 - 515,802.31 -

………………………………….. ……………………………………. -
CONTRACTOR REPRESENTATIVE CONSULTANT ENGINEER -
0
-
IPC NO:01
BILL No.6.0 ROAD MARKING

AS PER ORIGINAL BOQ Previous Current Cumulative Exceed


ITEM DESCRIPTION
UNIT QTY. RATE Amount QTY Amount QTY Amount QTY Amount QTY

Road marking and


centerline, Edge lines
6.1 m2 1,030.00 1,799.00 1,852,970.00 - - 0.00 -
100mm width & 3 mm thick
(white)Heavily traffic roads

Road marking and


6.2 standared pedestrian m2 41.28 1,799.00 74,262.72 - - 0.00 -
crossing ( Yellow)

BILL NO:-06 CARRIED TO TOTAL SUMMARY 1,927,232.72 - - - -

………………………………….. …………………………………….
CONTRACTOR REPRESENTATIVE CONSULTANT ENGINEER
IMPROVEMENT TO APPROACH ROAD TO THE 5th RECONNAISANCE REGIMENT OF SRI LANKA ARMY AT PANGOLLA (0+000-4+600 Km)

Road Contract Package - DEYATA KIRULA 2014


Contra RDA/DW/NWP/GOSL/2013/170
Rate Analysis for Construction New Pipe Culvert

ITEM DESCRIPTION QTY UNIT RATE AMOUNT Qty PRIVIOUS Qty THIS Qty CUMILATIVE REMARKS

1 Construction of suitable bypass


for road & water
1.1 Road bypass 1 item 887,572.80 887,572.80 147,124.00 - - 147,124.00 Ref. Annex - 1
1.2 Water bypass 1 item 104,090.40 104,090.40 100,310.24 - - 100,310.24 Ref. Annex - 2
- -
2 Demolishing existing concrete - -

2.1 Carefully demolish existing


concrete structure 52.48 m3 3,360.00 176,332.80 12.35 41,496.00 40.13 134,836.80 52.48 176,332.80 BOQ Item No 2.3

2.2 Carefully demolish Random


Rubble work structure 7.02 m3 2,240.00 15,724.80 7.02 15,724.80 - 7.02 15,724.80 BOQ Item No 2.2
Disposal of demolished material
2.3
away from site 1 item 241,461.00 241,461.00 - - - Ref. Annex -3
- - -
3 Allow for settingout 1 item 25,000.00 25,000.00 - - -
- - -
4 Excavation & Earth work - - -
4.1 Rate from BOQ
Excavation for Base And Beam 23.175 m3 672.00 15,573.60 23.18 15,573.60 - 23.18 15,573.60 Item 3.1

4.2 Rate from BOQ


Compacted ABC in Filling 9.25 m3 5,600.00 51,800.00 9.25 51,800.00 - 9.25 51,800.00 item 4.3

4.2.2 Laying of ABC in base 5.211 2,406.00


m3 12,537.67 5.21 12,537.67 - 5.21 12,537.67

4.2.3 Compacted Gravel in Filling 11.094 1,456.00


m3 16,152.86 11.09 16,152.86 - 11.09 16,152.86
- - -
5 Allow fo dewatering 1 item 120,386.25 120,386.25 51,800.00 - - 51,800.00 Ref. Annex -4
- - -
6 Concrete work - - -
[Link] (37.5) concrete to Base, Rate from BOQ
6.1 50.35 m3 13,494.00 679,422.90 25.72 347,065.68 24.63 332,357.22 50.35 679,422.90
pavement ,Encasing & Beams item 6.1.7
Rate from BOQ
6.2 [Link] (19) concrete to Beam 9.95 m3 15,608.00 155,299.60 6.54
102,076.32 - 6.54 102,076.32 item 6.1.6
[Link] (20) concrete to RCC slab &
6.3 27.25 m3 15,009.60 409,011.60 23.38 Ref. Annex - 12
beams 350,924.45 - 23.38 350,924.45
6.4 G25 concrete to beams base 1.32 m3 17,490.00 23,086.80 4.63 80,996.19 - 4.63 80,996.19 Ref. Annex - 13
6.5
Formwork to sides of slab & beams 63.83 m2 1,456.00 92,936.48 61.57 89,640.10 - 61.57 89,640.10 BOQ rate
Fabricate & lay Tor steel as Rate from BOQ
6.6 0.90 mt 179,200.00 160,921.60 0.82
reinorcement 146,227.20 - 0.82 146,227.20 item 6.1.9
Supply & fixing mild steel as Rate from BOQ
6.8 0.06 mt 179,200.00 10,124.80 0.04
dowels 7,347.20 - 0.04 7,347.20 item 6.1.10
- - -
7 Hume pipe laying - - - -
Supply & laying 600mm dia hume
7.1 pipes 1 item 882,921.60 882,921.60 631,709.00 - - 631,709.00 Ref. Annex-5
- - - -
8 GI hand rails for sides 2 nos 318,705.00 637,410.00 - 2.00 637,410.00 2.00 637,410.00 Ref. Annex-6
- - - - -
9 Removing by pass road & site
clearing after completion 1 item 362,439.00 362,439.00 - 1.00 362,439.00 1.00 362,439.00 Ref. Annex -7
TOTAL AMOUNT 5,080,206.56 2,208,505.30 1,467,043.02 3,675,548.32
IMPROVEMENT TO APPROACH ROAD TO THE 5th RECONNAISANCE REGIMENT OF SRI LANKA ARMY AT PANGOLLA
(0+000-4+600 Km)
Road Contract Package - DEYATA KIRULA 2014 Annex -7
Contract No RDA/DW/NWP/GOSL/2013/170
Rate Analysis for Construction pipe culvert
Work Item : Removing ByPass Road & Water Bypass and Disposal unsuitable material from site
Assumed Quantity 1 item

Cost Elements Unit Quantity Rate (Rs.) Amount (Rs.)


Equipment Cost

a JCB with operator (Excavation and


loading) Day 8.00 28,500.00 228,000.00
b Tipper (Disposal at site) Load 15.00 4,500.00 67,500.00

Labour Cost

a Excavation,Demolished loading and


unloading material Skill 10.00 1,500.00 15,000.00
Excavation,Demolished loading and
b unloading material Unskill 15.00 1,200.00 18,000.00
c Allow3% on labour cost for tools 990.00
Sub Total 329,490.00
Contractor's O.H & Profit 10% 32,949.00
Unit cost per 1 item 362,439.00
Unit cost per 1 item
Say Rs. 362,439.00 per item
IMPROVEMENT TO APPROACH ROAD TO THE 5th RECONNAISANCE REGIMENT OF SRI LANKA ARMY AT
PANGOLLA (0+000-4+600 Km)
Road Contract Package - DEYATA KIRULA 2014
Contract No RDA/DW/NWP/GOSL/2013/170

Work Item : Fabricate and Fixing Handrail for sides in Culvert (17.3 m)
Assumed Quantity 1 nos

Cost Elements Unit Quantity Rate (Rs.) Amount (Rs.) Remarks


Material Cost
a 75x75x10mm L angle length 7.50 10,000.00 75,000.00 Annex 01
b 32mm Dia GI pipe(HD) length 6.00 4,500.00 27,000.00 Annex 01
c MS plate 10mm thickness (150mmx100mm) nos 13.00 195.00 2,535.00 Annex 01
d Anchour Bolt 10mm dia 75mm nos 52.00 85.00 4,420.00 Annex 02
As per BOQ
e Concrete G25(19mm) m3 0.15 17,490.00 2,589.89
item 6.1.8
As per BOQ
f 20mm dia MS dowels kg 23.14 179.20 4,146.69
item 6.1.10
As per BOQ
g Form work m2 3.51 1,456.00 5,110.56
item 6.1.11
h painting with anticorosive and enamel paint m2 15.52 850.00 13,191.32
i Welding rods pkt 7.00 1,125.00 7,875.00 Annex 04
j wastage for material 15% 21,280.27
transport cost of material to yard 15,000.00
Labour Cost
a Fabricate and fixing Hand rail item 1.00 25,000.00 25,000.00 Annex 03

Machine and Welding plant day 8.00 4,500.00 36,000.00


tools

Sub Total 239,148.72


Less BOQ Rate Amount (material e ,f & g) (11,847.13)
Amount of without BOQ items 227,301.59
Contractor's O.H & Profit for without BOQ items 35% 79,555.56
Unit cost per 1 Nos 318,704.28

Say Rs. 318,705.00 per 1 nos

TOTAL COST FOR HANDRAIL BOTH SIDES Rs. 637,410.00


MEASURMENT SHEET
IMPROVEMENT TO APPROACH ROAD TO THE 5th RECONNAISANCE REGIMENT OF SRI LANKA ARMY
AT PANGOLLA (0+000-4+600 Km)

ISURU ENGINEERING PTE LTD RDA

Item No :- ………01 & 02……………………………………………. SITE :…Abimansala 3 internal Road……………………

Length Width Depth


No Description Nos Qty Total Unit
(m) (m) (m)
Prime coat with emulsion CSS-1 at
1 the rate of 1ltr/sq.m including
blinding with sand

384.00 4.60 1,766.40


360.00 2.75 990.00 2,756.40 m2
-

2
Tack coat with emulsion CSS-1 at
the rate of 0.5ltr/sq.m including
brushing,cleaning road surface
384.00 4.60 1,766.40
360.00 2.75 990.00 2,756.40 m2

Representative contractors, Representative RDA

Name…………………………………………….. Name………………………………...…..………….

Designation………………...……...………… Designation………….…………….……...………

Signature …………………………..……..……. Signature ………………………………...………..

Page 20 of 90
Date………………………………….………...…. Date………………………………….……………….

Page 21 of 90
MEASURMENT SHEET
IMPROVEMENT TO APPROACH ROAD TO THE 5th RECONNAISANCE REGIMENT OF SRI LANKA ARMY
AT PANGOLLA (0+000-4+600 Km)

ISURU ENGINEERING PTE LTD RDA

Item No :- ………03 & 04……………………………………………. SITE :…Abimansala 3 internal Road……………………

Length Width Depth


No Description Nos Qty Total Unit
(m) (m) (m)

3
Asphalt concrete surfacing with
wearing course (40mm compacted
thickness)
384.00 4.60 0.04 70.66
360.00 2.75 0.04 39.60 110.26 m3
Asphalt Density= 2.35 ton/m3
ASPHALT QTY 259.102 Ton

4 Marking road lines 2.00 384.00 0.10 76.80


2.00 360.00 0.10 72.00 148.80 m2

Representative contractors, Representative RDA

Name…………………………………………….. Name………………………………...…..………….

Designation………………...……...………… Designation………….…………….……...………

Signature …………………………..……..……. Signature ………………………………...………..

Page 22 of 90
Date………………………………….………...…. Date………………………………….……………….

Page 23 of 90
IMPROVEMENT TO APPROACH ROAD TO THE 5th RECONNAISANCE REGIMENT OF SRI LANKA ARMY AT PANGOLLA
(0+000-4+600 Km)
Road Contract Package - DEYATA KIRULA 2014 Annex -16
Contract No RDA/DW/NWP/GOSL/2013/170
Rate Analysis for Construction pipe culvert
Work Item : Removing ByPass Road & Water Bypass and Disposal unsuitable material from site
Assumed Quantity 1 item

Cost Elements Unit Quantity Rate (Rs.) Amount (Rs.)


Equipment Cost

a JCB with operator (Excavation and


loading) Day 5.00 28,500.00 142,500.00
b Tipper (Disposal at site) Load 15.00 4,500.00 67,500.00

Labour Cost

a Excavation,Demolished loading and


unloading material Skill 10.00 1,500.00 15,000.00
Excavation,Demolished loading and
b unloading material Unskill 15.00 1,200.00 18,000.00
c Allow3% on labour cost for tools 990.00
Sub Total 243,990.00
Contractor's O.H & Profit 35% 85,396.50
Unit cost per 1 item 329,386.50
Unit cost per 1 item
Say Rs. 329,386.50 per item
IMPROVEMENT TO APPROACH ROAD TO 5TH
RECONNAISSANCE
REGIMENT OF SRILANKA ARMY AT PANGOLLA
CONTRACT NO: RDA/DW/NWP/GOSL/2013/170

IPC NO:3

BOQ ITEM 6.2 RATE BREAK DOWN


ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 5/8/2014
Bill Item : 2.2 Distribution (COPIES)
Description:-Excavation of soil for road widening 1. File
2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

LHS
5+015 5+740 Prervious Claim 54.230

5+740 5+750 10.00 0.610 0.605 0.15 0.908


5+750 5+760 10.00 0.600 0.640 0.15 0.960
5+760 5+770 10.00 0.680 0.695 0.15 1.043
5+770 5+780 10.00 0.710 0.640 0.15 0.960
5+780 5+790 10.00 0.570 0.545 0.15 0.817
5+790 5+800 10.00 0.520 0.610 0.15 0.915
5+800 5+810 10.00 0.700 0.630 0.15 0.945
5+810 5+820 10.00 0.560 0.560 0.15 0.840
5+820 5+830 10.00 0.560 0.460 0.15 0.690
5+830 5+840 10.00 0.360 0.480 0.15 0.720
5+840 5+850 10.00 0.600 0.570 0.15 0.855
5+850 5+860 10.00 0.540 0.495 0.15 0.743
5+860 5+870 10.00 0.450 0.460 0.15 0.690
5+870 5+880 10.00 0.470 0.475 0.15 0.713
5+880 5+890 10.00 0.480 0.480 0.15 0.720
5+890 5+900 10.00 0.480 0.445 0.15 0.667
5+900 5+910 10.00 0.410 0.205 0.15 0.307
5+910 5+920 10.00 0.000 0.200 0.15 0.300
5+920 5+930 10.00 0.400 0.425 0.15 0.638
5+930 5+940 10.00 0.450 0.455 0.15 0.683
5+940 5+950 10.00 0.460 0.355 0.15 0.533
5+950 5+960 10.00 0.250 0.295 0.15 0.443
5+960 5+970 10.00 0.340 0.380 0.15 0.570
5+970 5+980 10.00 0.420 0.410 0.15 0.615
5+980 5+990 10.00 0.400 0.505 0.15 0.758
5+990 6+000 10.00 0.610 0.655 0.15 0.983
6+000 6+010 10.00 0.700 0.690 0.15 1.035
6+010 6+020 10.00 0.680 0.640 0.15 0.960
6+020 6+030 10.00 0.600 0.600 0.15 0.900

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 5/8/2014
Bill Item : 2.2 Distribution (COPIES)
Description:-Excavation of soil for road widening 1. File
2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

6+030 6+040 10.00 0.600 0.460 0.15 0.690


6+040 6+050 10.00 0.320 0.410 0.15 0.615
6+050 6+060 10.00 0.500 0.600 0.15 0.900
6+060 6+070 10.00 0.700 0.850 0.15 1.275
6+070 6+080 10.00 1.000 0.875 0.15 1.313
6+080 6+090 10.00 0.750 0.535 0.15 0.803
6+090 6+100 10.00 0.320 0.160 0.15 0.240
6+100 6+110 10.00 0.000 0.000 0.15 0.000
6+110 6+120 10.00 0.000 0.285 0.15 0.427
6+120 6+130 10.00 0.570 0.485 0.15 0.727
6+130 6+140 10.00 0.400 0.450 0.15 0.675
6+140 6+150 10.00 0.500 0.500 0.15 0.750
6+150 6+160 10.00 0.500 0.460 0.15 0.690
6+160 6+170 10.00 0.420 0.460 0.15 0.690
6+170 6+180 10.00 0.500 0.600 0.15 0.900
6+180 6+190 10.00 0.700 0.800 0.15 1.200
6+190 6+200 10.00 0.900 0.900 0.15 1.350
6+200 6+210 10.00 0.900 0.950 0.15 1.425
6+210 6+220 10.00 1.000 1.000 0.15 1.500
6+220 6+230 10.00 1.000 0.850 0.15 1.275
6+230 6+240 10.00 0.700 0.800 0.15 1.200
6+240 6+250 10.00 0.900 0.900 0.15 1.350
6+250 6+260 10.00 0.900 0.825 0.15 1.238
6+260 6+270 10.00 0.750 0.825 0.15 1.238
6+270 6+280 10.00 0.900 0.800 0.15 1.200
6+280 6+290 10.00 0.700 0.800 0.15 1.200
6+290 6+300 10.00 0.900 1.000 0.15 1.500
6+300 6+310 10.00 1.100 1.000 0.15 1.500
6+310 6+320 10.00 0.900 0.900 0.15 1.350
6+320 6+330 10.00 0.900 0.950 0.15 1.425
6+330 6+340 10.00 1.000 0.900 0.15 1.350
6+340 6+350 10.00 0.800 0.900 0.15 1.350

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 5/8/2014
Bill Item : 2.2 Distribution (COPIES)
Description:-Excavation of soil for road widening 1. File
2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

6+350 6+360 10.00 1.000 1.000 0.15 1.500


6+360 6+370 10.00 1.000 0.900 0.15 1.350
6+370 6+380 10.00 0.800 0.750 0.15 1.125
6+380 6+390 10.00 0.700 0.860 0.15 1.290
6+390 6+400 10.00 1.020 0.965 0.15 1.448
6+400 6+410 10.00 0.910 0.965 0.15 1.448
6+410 6+420 10.00 1.020 0.960 0.15 1.440
6+420 6+430 10.00 0.900 0.950 0.15 1.425
6+430 6+440 10.00 1.000 0.900 0.15 1.350
6+440 6+450 10.00 0.800 0.400 0.15 0.600
6+450 6+460 10.00 0.000 0.450 0.15 0.675
6+460 6+470 10.00 0.900 1.000 0.15 1.500
6+470 6+480 10.00 1.100 1.000 0.15 1.500
6+480 6+490 10.00 0.900 0.900 0.15 1.350
6+490 6+500 10.00 0.900 0.850 0.15 1.275
6+500 6+510 10.00 0.800 0.850 0.15 1.275
6+510 6+520 10.00 0.900 0.850 0.15 1.275
6+520 6+530 10.00 0.800 0.900 0.15 1.350
6+530 6+540 10.00 1.000 0.900 0.15 1.350
6+540 6+550 10.00 0.800 0.950 0.15 1.425
6+550 6+560 10.00 1.100 1.150 0.15 1.725
6+560 6+570 10.00 1.200 1.100 0.15 1.650
6+570 6+580 10.00 1.000 0.950 0.15 1.425
6+580 6+590 10.00 0.900 0.950 0.15 1.425
6+590 6+600 10.00 1.000 0.960 0.15 1.440
6+600 6+610 10.00 0.920 0.460 0.15 0.690
6+610 6+620 10.00 0.000 0.500 0.15 0.750
6+620 6+630 10.00 1.000 0.880 0.15 1.320
6+630 6+640 10.00 0.760 0.780 0.15 1.170
6+640 6+650 10.00 0.800 0.850 0.15 1.275
6+650 6+660 10.00 0.900 0.850 0.15 1.275
6+660 6+670 10.00 0.800 0.905 0.15 1.358

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 5/8/2014
Bill Item : 2.2 Distribution (COPIES)
Description:-Excavation of soil for road widening 1. File
2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

6+670 6+680 10.00 1.010 0.505 0.15 0.758


6+680 6+690 10.00 0.000 0.000 0.15 0.000
6+690 6+700 10.00 0.000 0.550 0.15 0.825
6+700 6+710 10.00 1.100 1.150 0.15 1.725
6+710 6+720 10.00 1.200 1.100 0.15 1.650
6+720 6+730 10.00 1.000 0.990 0.15 1.485
6+730 6+740 10.00 0.980 0.990 0.15 1.485
6+740 6+750 10.00 1.000 0.950 0.15 1.425
6+750 6+760 10.00 0.900 0.850 0.15 1.275
6+760 6+770 10.00 0.800 0.850 0.15 1.275
6+770 6+780 10.00 0.900 0.800 0.15 1.200
6+780 6+790 10.00 0.700 0.700 0.15 1.050
6+790 6+800 10.00 0.700 0.750 0.15 1.125
6+800 6+810 10.00 0.800 0.775 0.15 1.162
6+810 6+820 10.00 0.750 0.675 0.15 1.013
6+820 6+830 10.00 0.600 0.550 0.15 0.825
6+830 6+840 10.00 0.500 0.700 0.15 1.050
6+840 6+850 10.00 0.900 0.780 0.15 1.170
6+850 6+860 10.00 0.660 0.730 0.15 1.095
6+860 6+870 10.00 0.800 0.775 0.15 1.162
6+870 6+880 10.00 0.750 0.825 0.15 1.238
6+880 6+890 10.00 0.900 0.800 0.15 1.200
6+890 6+900 10.00 0.700 0.775 0.15 1.162
6+900 6+910 10.00 0.850 0.825 0.15 1.238
6+910 6+920 10.00 0.800 0.900 0.15 1.350
6+920 6+930 10.00 1.000 0.975 0.15 1.463
6+930 6+940 10.00 0.950 0.875 0.15 1.313
6+940 6+950 10.00 0.800 0.825 0.15 1.238
6+950 6+960 10.00 0.850 0.425 0.15 0.638
6+960 6+970 10.00 0.000 0.375 0.15 0.563
6+970 6+980 10.00 0.750 0.825 0.15 1.238
6+980 6+990 10.00 0.900 0.800 0.15 1.200

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 5/8/2014
Bill Item : 2.2 Distribution (COPIES)
Description:-Excavation of soil for road widening 1. File
2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

6+990 7+000 10.00 0.700 0.750 0.15 1.125


7+000 7+010 10.00 0.800 0.850 0.15 1.275
7+010 7+020 10.00 0.900 0.900 0.15 1.350
7+020 7+030 10.00 0.900 0.850 0.15 1.275
7+030 7+040 10.00 0.800 0.650 0.15 0.975
7+040 7+050 10.00 0.500 0.800 0.15 1.200
7+050 7+060 10.00 1.100 1.000 0.15 1.500
7+060 7+070 10.00 0.900 0.825 0.15 1.238
7+070 7+080 10.00 0.750 0.925 0.15 1.388
7+080 7+090 10.00 1.100 0.900 0.15 1.350
7+090 7+100 10.00 0.700 0.725 0.15 1.088
7+100 7+110 10.00 0.750 0.775 0.15 1.162
7+110 7+120 10.00 0.800 0.850 0.15 1.275
7+120 7+130 10.00 0.900 0.800 0.15 1.200
7+130 7+140 10.00 0.700 0.700 0.15 1.050
7+140 7+150 10.00 0.700 0.700 0.15 1.050
7+150 0.00 0.700 0.350 0.15 0.000

RHS 5+015 5+020 5.00 0.500 0.550 0.15 0.413


5+020 5+030 10.00 0.600 0.650 0.15 0.975
5+030 5+040 10.00 0.700 0.575 0.15 0.862
5+040 5+050 10.00 0.450 0.525 0.15 0.788
5+050 5+060 10.00 0.600 0.725 0.15 1.088
5+060 5+070 10.00 0.850 0.775 0.15 1.162
5+070 5+080 10.00 0.700 0.800 0.15 1.200
5+080 5+090 10.00 0.900 0.700 0.15 1.050
5+090 5+100 10.00 0.500 0.550 0.15 0.825
5+100 5+110 10.00 0.600 0.700 0.15 1.050
5+110 5+120 10.00 0.800 0.700 0.15 1.050
5+120 5+130 10.00 0.600 0.525 0.15 0.788
5+130 5+140 10.00 0.450 0.450 0.15 0.675
5+140 5+150 10.00 0.450 0.525 0.15 0.788

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 5/8/2014
Bill Item : 2.2 Distribution (COPIES)
Description:-Excavation of soil for road widening 1. File
2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

5+150 5+160 10.00 0.600 0.650 0.15 0.975


5+160 5+170 10.00 0.700 0.700 0.15 1.050
5+170 5+180 10.00 0.700 0.650 0.15 0.975
5+180 5+190 10.00 0.600 0.600 0.15 0.900
5+190 5+200 10.00 0.600 0.650 0.15 0.975
5+200 5+210 10.00 0.700 0.750 0.15 1.125
5+210 5+220 10.00 0.800 0.800 0.15 1.200
5+220 5+230 10.00 0.800 0.800 0.15 1.200
5+230 5+240 10.00 0.800 0.725 0.15 1.088
5+240 5+250 10.00 0.650 0.700 0.15 1.050
5+250 5+260 10.00 0.750 0.750 0.15 1.125
5+260 5+270 10.00 0.750 0.750 0.15 1.125
5+270 5+280 10.00 0.750 0.625 0.15 0.938
5+280 5+290 10.00 0.500 0.570 0.15 0.855
5+290 5+300 10.00 0.640 0.700 0.15 1.050
5+300 5+310 10.00 0.760 0.830 0.15 1.245
5+310 5+320 10.00 0.900 0.755 0.15 1.132
5+320 5+330 10.00 0.610 0.680 0.15 1.020
5+330 5+340 10.00 0.750 0.775 0.15 1.162
5+340 5+350 10.00 0.800 0.775 0.15 1.162
5+350 5+360 10.00 0.750 0.650 0.15 0.975
5+360 5+370 10.00 0.550 0.565 0.15 0.847
5+370 5+380 10.00 0.580 0.590 0.15 0.885
5+380 5+390 10.00 0.600 0.550 0.15 0.825
5+390 5+400 10.00 0.500 0.560 0.15 0.840
5+400 5+410 10.00 0.620 0.660 0.15 0.990
5+410 5+420 10.00 0.700 0.875 0.15 1.313
5+420 5+430 10.00 1.050 0.975 0.15 1.463
5+430 5+440 10.00 0.900 0.850 0.15 1.275
5+440 5+450 10.00 0.800 0.740 0.15 1.110
5+450 5+460 10.00 0.680 0.515 0.15 0.773
5+460 5+470 10.00 0.350 0.485 0.15 0.727

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 5/8/2014
Bill Item : 2.2 Distribution (COPIES)
Description:-Excavation of soil for road widening 1. File
2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

5+470 5+480 10.00 0.620 0.620 0.15 0.930


5+480 5+490 10.00 0.620 0.715 0.15 1.073
5+490 5+500 10.00 0.810 0.725 0.15 1.088
5+500 5+510 10.00 0.640 0.820 0.15 1.230
5+510 5+520 10.00 1.000 1.000 0.15 1.500
5+520 5+530 10.00 1.000 0.870 0.15 1.305
5+530 5+540 10.00 0.740 0.870 0.15 1.305
5+540 5+550 10.00 1.000 0.800 0.15 1.200
5+550 5+560 10.00 0.600 0.650 0.15 0.975
5+560 5+570 10.00 0.700 0.700 0.15 1.050
5+570 5+580 10.00 0.700 0.610 0.15 0.915
5+580 5+590 10.00 0.520 0.585 0.15 0.878
5+590 5+600 10.00 0.650 0.685 0.15 1.028
5+600 5+610 10.00 0.720 0.650 0.15 0.975
5+610 5+620 10.00 0.580 0.700 0.15 1.050
5+620 5+630 10.00 0.820 0.735 0.15 1.102
5+630 5+640 10.00 0.650 0.665 0.15 0.998
5+640 5+650 10.00 0.680 0.820 0.15 1.230
5+650 5+660 10.00 0.960 0.920 0.15 1.380
5+660 5+670 10.00 0.880 0.840 0.15 1.260
5+670 5+680 10.00 0.800 0.760 0.15 1.140
5+680 5+690 10.00 0.720 0.695 0.15 1.043
5+690 5+700 10.00 0.670 0.715 0.15 1.073
5+700 5+710 10.00 0.760 0.715 0.15 1.073
5+710 5+720 10.00 0.670 0.715 0.15 1.073
5+720 5+730 10.00 0.760 0.810 0.15 1.215
5+730 5+740 10.00 0.860 0.830 0.15 1.245
5+740 5+750 10.00 0.800 0.825 0.15 1.238
5+750 5+760 10.00 0.850 0.775 0.15 1.162
5+760 5+770 10.00 0.700 0.640 0.15 0.960
5+770 5+780 10.00 0.580 0.630 0.15 0.945
5+780 5+790 10.00 0.680 0.720 0.15 1.080

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 5/8/2014
Bill Item : 2.2 Distribution (COPIES)
Description:-Excavation of soil for road widening 1. File
2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

5+790 5+800 10.00 0.760 0.785 0.15 1.178


5+800 5+810 10.00 0.810 0.655 0.15 0.983
5+810 5+820 10.00 0.500 0.555 0.15 0.832
5+820 5+830 10.00 0.610 0.605 0.15 0.908
5+830 5+840 10.00 0.600 0.600 0.15 0.900
5+840 5+850 10.00 0.600 0.605 0.15 0.908
5+850 5+860 10.00 0.610 0.600 0.15 0.900
5+860 5+870 10.00 0.590 0.607 0.15 0.911
5+870 5+880 10.00 0.625 0.668 0.15 1.001
5+880 5+890 10.00 0.710 0.720 0.15 1.080
5+890 5+900 10.00 0.730 0.665 0.15 0.998
5+900 5+910 10.00 0.600 0.655 0.15 0.983
5+910 5+920 10.00 0.710 0.605 0.15 0.908
5+920 5+930 10.00 0.500 0.450 0.15 0.675
5+930 5+940 10.00 0.400 0.450 0.15 0.675
5+940 5+950 10.00 0.500 0.550 0.15 0.825
5+950 5+960 10.00 0.600 0.760 0.15 1.140
5+960 5+970 10.00 0.920 0.795 0.15 1.193
5+970 5+980 10.00 0.670 0.615 0.15 0.923
5+980 5+990 10.00 0.560 0.530 0.15 0.795
5+990 6+000 10.00 0.500 0.500 0.15 0.750
6+000 6+010 10.00 0.500 0.575 0.15 0.862
6+010 6+020 10.00 0.650 0.700 0.15 1.050
6+020 6+030 10.00 0.750 0.725 0.15 1.088
6+030 6+040 10.00 0.700 0.700 0.15 1.050
6+040 6+050 10.00 0.700 0.350 0.15 0.525
6+050 6+060 10.00 0.000 0.000 0.15 0.000
6+060 6+070 10.00 0.000 0.270 0.15 0.405
6+070 6+080 10.00 0.540 0.600 0.15 0.900
6+080 6+090 10.00 0.660 0.705 0.15 1.058
6+090 6+100 10.00 0.750 0.680 0.15 1.020
6+100 6+110 10.00 0.610 0.545 0.15 0.817

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 5/8/2014
Bill Item : 2.2 Distribution (COPIES)
Description:-Excavation of soil for road widening 1. File
2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

6+110 6+120 10.00 0.480 0.590 0.15 0.885


6+120 6+130 10.00 0.700 0.820 0.15 1.230
6+130 6+140 10.00 0.940 0.820 0.15 1.230
6+140 6+150 10.00 0.700 0.835 0.15 1.253
6+150 6+160 10.00 0.970 0.895 0.15 1.342
6+160 6+170 10.00 0.820 0.850 0.15 1.275
6+170 6+180 10.00 0.880 0.915 0.15 1.373
6+180 6+190 10.00 0.950 0.825 0.15 1.238
6+190 6+200 10.00 0.700 0.675 0.15 1.013
6+200 6+210 10.00 0.650 0.775 0.15 1.162
6+210 6+220 10.00 0.900 0.900 0.15 1.350
6+220 6+230 10.00 0.900 0.900 0.15 1.350
6+230 6+240 10.00 0.900 1.000 0.15 1.500
6+240 6+250 10.00 1.100 1.000 0.15 1.500
6+250 6+260 10.00 0.900 0.850 0.15 1.275
6+260 6+270 10.00 0.800 0.850 0.15 1.275
6+270 6+280 10.00 0.900 1.050 0.15 1.575
6+280 6+290 10.00 1.200 1.100 0.15 1.650
6+290 6+300 10.00 1.000 0.850 0.15 1.275
6+300 6+310 10.00 0.700 0.850 0.15 1.275
6+310 6+320 10.00 1.000 0.950 0.15 1.425
6+320 6+330 10.00 0.900 1.000 0.15 1.500
6+330 6+340 10.00 1.100 1.050 0.15 1.575
6+340 6+350 10.00 1.000 0.950 0.15 1.425
6+350 6+360 10.00 0.900 0.800 0.15 1.200
6+360 6+370 10.00 0.700 0.750 0.15 1.125
6+370 6+380 10.00 0.800 0.800 0.15 1.200
6+380 6+390 10.00 0.800 0.750 0.15 1.125
6+390 6+400 10.00 0.700 0.600 0.15 0.900
6+400 6+410 10.00 0.500 0.760 0.15 1.140
6+410 6+420 10.00 1.020 1.010 0.15 1.515
6+420 6+430 10.00 1.000 0.880 0.15 1.320

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 5/8/2014
Bill Item : 2.2 Distribution (COPIES)
Description:-Excavation of soil for road widening 1. File
2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

6+430 6+440 10.00 0.760 1.130 0.15 1.695


6+440 6+450 10.00 1.500 0.750 0.15 1.125
6+450 6+460 10.00 0.000 0.650 0.15 0.975
6+460 6+470 10.00 1.300 1.150 0.15 1.725
6+470 6+480 10.00 1.000 0.950 0.15 1.425
6+480 6+490 10.00 0.900 0.950 0.15 1.425
6+490 6+500 10.00 1.000 1.100 0.15 1.650
6+500 6+510 10.00 1.200 1.100 0.15 1.650
6+510 6+520 10.00 1.000 1.100 0.15 1.650
6+520 6+530 10.00 1.200 1.100 0.15 1.650
6+530 6+540 10.00 1.000 1.000 0.15 1.500
6+540 6+550 10.00 1.000 1.050 0.15 1.575
6+550 6+560 10.00 1.100 0.950 0.15 1.425
6+560 6+570 10.00 0.800 0.900 0.15 1.350
6+570 6+580 10.00 1.000 0.950 0.15 1.425
6+580 6+590 10.00 0.900 0.800 0.15 1.200
6+590 6+600 10.00 0.700 0.705 0.15 1.057
6+600 6+610 10.00 0.710 0.710 0.15 1.065
6+610 6+620 10.00 0.710 0.755 0.15 1.132
6+620 6+630 10.00 0.800 0.900 0.15 1.350
6+630 6+640 10.00 1.000 0.950 0.15 1.425
6+640 6+650 10.00 0.900 0.950 0.15 1.425
6+650 6+660 10.00 1.000 1.000 0.15 1.500
6+660 6+670 10.00 1.000 0.900 0.15 1.350
6+670 6+680 10.00 0.800 0.400 0.15 0.600
6+680 6+690 10.00 0.000 0.000 0.15 0.000
6+690 6+700 10.00 0.000 0.500 0.15 0.750
6+700 6+710 10.00 1.000 1.000 0.15 1.500
6+710 6+720 10.00 1.000 0.950 0.15 1.425
6+720 6+730 10.00 0.900 0.800 0.15 1.200
6+730 6+740 10.00 0.700 0.850 0.15 1.275
6+740 6+750 10.00 1.000 0.750 0.15 1.125

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 5/8/2014
Bill Item : 2.2 Distribution (COPIES)
Description:-Excavation of soil for road widening 1. File
2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

6+750 6+760 10.00 0.500 0.250 0.15 0.375


6+760 6+770 10.00 0.000 0.500 0.15 0.750
6+770 6+780 10.00 1.000 0.950 0.15 1.425
6+780 6+790 10.00 0.900 1.050 0.15 1.575
6+790 6+800 10.00 1.200 0.930 0.15 1.395
6+800 6+810 10.00 0.660 0.880 0.15 1.320
6+810 6+820 10.00 1.100 0.950 0.15 1.425
6+820 6+830 10.00 0.800 0.800 0.15 1.200
6+830 6+840 10.00 0.800 0.750 0.15 1.125
6+840 6+850 10.00 0.700 0.750 0.15 1.125
6+850 6+860 10.00 0.800 0.750 0.15 1.125
6+860 6+870 10.00 0.700 0.650 0.15 0.975
6+870 6+880 10.00 0.600 0.650 0.15 0.975
6+880 6+890 10.00 0.700 0.775 0.15 1.162
6+890 6+900 10.00 0.850 0.800 0.15 1.200
6+900 6+910 10.00 0.750 0.775 0.15 1.162
6+910 6+920 10.00 0.800 0.775 0.15 1.162
6+920 6+930 10.00 0.750 0.725 0.15 1.088
6+930 6+940 10.00 0.700 0.675 0.15 1.013
6+940 6+950 10.00 0.650 0.650 0.15 0.975
6+950 6+960 10.00 0.650 0.700 0.15 1.050
6+960 6+970 10.00 0.750 0.775 0.15 1.162
6+970 6+980 10.00 0.800 0.850 0.15 1.275
6+980 6+990 10.00 0.900 0.900 0.15 1.350
6+990 7+000 10.00 0.900 0.850 0.15 1.275
7+000 7+010 10.00 0.800 0.800 0.15 1.200
7+010 7+020 10.00 0.800 0.850 0.15 1.275
7+020 7+030 10.00 0.900 0.775 0.15 1.162
7+030 7+040 10.00 0.650 0.325 0.15 0.488
7+040 7+050 10.00 0.000 0.000 0.15 0.000
7+050 7+060 10.00 0.000 0.600 0.15 0.900
7+060 7+070 10.00 1.200 1.100 0.15 1.650

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 5/8/2014
Bill Item : 2.2 Distribution (COPIES)
Description:-Excavation of soil for road widening 1. File
2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

7+070 7+080 10.00 1.000 0.950 0.15 1.425


7+080 7+090 10.00 0.900 0.850 0.15 1.275
7+090 7+100 10.00 0.800 0.850 0.15 1.275
7+100 7+110 10.00 0.900 0.800 0.15 1.200
7+110 7+120 10.00 0.700 0.750 0.15 1.125
7+120 7+130 10.00 0.800 0.775 0.15 1.162
7+130 7+140 10.00 0.750 0.775 0.15 1.162
7+140 7+150 0.00 0.800 0.400 0.15 0.000

UP TO THIS QTY 444.13 m2


ddt Previous claim Qty (54.23)
IPC No 3 Qty 389.90 m2

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.1 Distribution (COPIES)
Description:-Scarifging Road Surface 50mm Depth 1. File
2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

5+015-7+010 1995.00 4.27 8518.65

IPC NO 3 Claim 20% 1703.73


IPC NO 4 Claim 80% 6814.92 6814.92 m2

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.1 Distribution (COPIES)
Description:-Scarifging Road Surface 50mm Depth 1. File
2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 1.2 Distribution (COPIES)
Description:-Provide all necessary Insurance 1. File
2. Engineer
3. Contractor

POLICY NO KH0014C0000145

Detail Of Charges

Premium Excluding SRCC 196,305.00


SRCC Premium 196,305.00
Policy fee 300.00
Admin fee 1,374.13
NBL 8,046.55
A Total Charges 402,330.68 See Detail Annex 03

Total Charges (A) 402,330.68


Profit and OH 27% 108,629.28
510,959.96

BOQ Amount 300,000.00


Actual Amount 510,959.96
Balance Amount 210,959.96

Balance Amount Claim from variation 210,959.96

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 1.3 Distribution (COPIES)
Description:-Provide all necessary Bonds 1. File
2. Engineer
3. Contractor

ADVANCED BOND VALUE 20,872,392.45

Charge Detail

Commission 260,904.91
NBT 5,325.00
A Total Charges 266,229.91 See Detail Annex 01

PERFORMANCE BOND VALUE 20,872,392.45

Charge Detail

Commission 235,520.83
NBT 4,807.00
B Total Charges 240,327.83 See Detail Annex 02

Total BOND Charges (A+B) 506,557.74


Profit and OH 27% 136,770.59
643,328.33

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.2 Distribution (COPIES)
Description:-Roadway Excavation for widening 1. File
carriageway 2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

BOTH 5+530 7+900

Previous Qty AS PER IPC NO 02 578.60 m3

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.3 Distribution (COPIES)
Description:-Trimming, levelling and compacting 1. File
original ground 2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

BOTH
5+530 7+900 AS PER IPC NO 02 3857.30 3857.30 m2

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : -
No : /MS/
Date : 7/4/2025
Bill Item : 2.4 Distribution (COPIES)
Description:-Dense graded aggregate base course 1. File
spreading,watering & compacting in strips not 2. Engineer
exceeding 1.2m including transport
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

EDGE WIDNING
BOTH 5+530 7+900

Previous Qty AS PER IPC NO 02 578.60 m3

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 7/4/2025
Bill Item : 3.1 Distribution (COPIES)
Description:-Trimming, Levelling and compacting 1. File
original ground 2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

LHS &
RHS 5+015 7+150 Total Qty 2960.850

LHS 7+150 7+160 10.00 0.700 0.800 8.000


7+160 7+170 10.00 0.900 0.850 8.500
7+170 7+180 10.00 0.800 0.900 9.000
7+180 7+190 10.00 1.000 1.000 10.000
7+190 7+200 10.00 1.000 0.950 9.500
7+200 7+210 10.00 0.900 1.000 10.000
7+210 7+220 10.00 1.100 1.000 10.000
7+220 7+230 10.00 0.900 0.900 9.000
7+230 7+240 10.00 0.900 0.950 9.500
7+240 7+250 10.00 1.000 0.950 9.500
7+250 7+260 10.00 0.900 0.900 9.000
7+260 7+270 10.00 0.900 0.900 9.000
7+270 7+280 10.00 0.900 0.900 9.000
7+280 7+290 10.00 0.900 0.950 9.500
7+290 7+300 10.00 1.000 1.000 10.000
7+300 7+310 10.00 1.000 1.050 10.500
7+310 7+320 10.00 1.100 1.125 11.250
7+320 7+330 10.00 1.150 1.125 11.250
7+330 7+340 10.00 1.100 0.975 9.750
7+340 7+350 10.00 0.850 0.875 8.750
7+350 7+360 10.00 0.900 0.850 8.500
7+360 7+370 10.00 0.800 0.900 9.000
7+370 7+380 10.00 1.000 0.900 9.000
7+380 7+390 10.00 0.800 0.800 8.000
7+390 7+400 10.00 0.800 0.750 7.500
7+400 7+410 10.00 0.700 0.725 7.250
7+410 7+420 10.00 0.750 0.775 7.750
7+420 7+430 10.00 0.800 0.875 8.750
7+430 7+440 10.00 0.950 0.875 8.750
7+440 7+450 10.00 0.800 0.400 4.000

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 7/4/2025
Bill Item : 3.1 Distribution (COPIES)
Description:-Trimming, Levelling and compacting 1. File
original ground 2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

7+450 7+460 10.00 0.350 3.500


7+460 7+470 10.00 0.700 0.725 7.250
7+470 7+480 10.00 0.750 0.785 7.850
7+480 7+490 10.00 0.820 0.960 9.600
7+490 7+500 10.00 1.100 1.150 11.500
7+500 7+510 10.00 1.200 1.025 10.250
7+510 7+520 10.00 0.850 0.825 8.250
7+520 7+530 10.00 0.800 0.850 8.500
7+530 7+540 10.00 0.900 0.750 7.500
7+540 7+550 10.00 0.600 0.675 6.750
7+550 7+560 10.00 0.750 0.925 9.250
7+560 7+570 10.00 1.100 1.050 10.500
7+570 7+580 10.00 1.000 0.950 9.500
7+580 7+590 10.00 0.900 0.950 9.500
7+590 7+600 10.00 1.000 0.875 8.750
7+600 7+610 10.00 0.750 0.775 7.750
7+610 7+620 10.00 0.800 0.800 8.000
7+620 7+630 10.00 0.800 1.050 10.500
7+630 7+640 10.00 1.300 1.250 12.500
7+640 7+650 10.00 1.200 1.250 12.500
7+650 7+660 10.00 1.300 1.325 13.250
7+660 7+670 10.00 1.350 1.175 11.750
7+670 7+680 10.00 1.000 0.900 9.000
7+680 7+690 10.00 0.800 0.850 8.500
7+690 7+700 10.00 0.900 0.925 9.250
7+700 7+710 10.00 0.950 0.900 9.000
7+710 7+720 10.00 0.850 0.825 8.250
7+720 7+730 10.00 0.800 0.900 9.000
7+730 7+740 10.00 1.000 1.100 11.000
7+740 7+750 10.00 1.200 1.250 12.500
7+750 7+760 10.00 1.300 1.200 12.000
7+760 7+770 10.00 1.100 1.225 12.250

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 7/4/2025
Bill Item : 3.1 Distribution (COPIES)
Description:-Trimming, Levelling and compacting 1. File
original ground 2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

7+770 7+780 10.00 1.350 1.075 10.750


7+780 7+790 10.00 0.800 0.950 9.500
7+790 7+800 10.00 1.100 1.050 10.500
7+800 7+810 10.00 1.000 0.950 9.500
7+810 7+820 10.00 0.900 0.950 9.500
7+820 7+830 10.00 1.000 1.050 10.500
7+830 7+840 10.00 1.100 0.900 9.000
7+840 7+850 10.00 0.700 0.750 7.500
7+850 7+860 10.00 0.800 1.000 10.000
7+860 7+870 10.00 1.200 1.050 10.500
7+870 7+880 10.00 0.900 1.000 10.000
7+880 7+890 10.00 1.100 1.200 12.000
7+890 7+900 10.00 1.300 1.250 12.500
7+900 7+910 10.00 1.200 1.250 12.500
7+910 7+920 10.00 1.300 1.350 13.500
7+920 7+930 10.00 1.400 1.250 12.500
7+930 7+940 10.00 1.100 1.125 11.250
7+940 7+950 10.00 1.150 1.125 11.250
7+950 7+960 10.00 1.100 1.000 10.000
7+960 7+970 10.00 0.900 0.925 9.250
7+970 0.950 0.475 0.000

RHS 7+150 7+160 10.00 0.800 0.800 8.000


7+160 7+170 10.00 0.800 0.850 8.500
7+170 7+180 10.00 0.900 0.875 8.750
7+180 7+190 10.00 0.850 0.775 7.750
7+190 7+200 10.00 0.700 0.800 8.000
7+200 7+210 10.00 0.900 0.900 9.000
7+210 7+220 10.00 0.900 0.900 9.000
7+220 7+230 10.00 0.900 0.800 8.000
7+230 7+240 10.00 0.700 0.800 8.000
7+240 7+250 10.00 0.900 0.950 9.500

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 7/4/2025
Bill Item : 3.1 Distribution (COPIES)
Description:-Trimming, Levelling and compacting 1. File
original ground 2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

7+250 7+260 10.00 1.000 0.950 9.500


7+260 7+270 10.00 0.900 0.900 9.000
7+270 7+280 10.00 0.900 0.750 7.500
7+280 7+290 10.00 0.600 0.800 8.000
7+290 7+300 10.00 1.000 0.900 9.000
7+300 7+310 10.00 0.800 0.850 8.500
7+310 7+320 10.00 0.900 0.850 8.500
7+320 7+330 10.00 0.800 0.850 8.500
7+330 7+340 10.00 0.900 0.800 8.000
7+340 7+350 10.00 0.700 0.700 7.000
7+350 7+360 10.00 0.700 0.775 7.750
7+360 7+370 10.00 0.850 0.800 8.000
7+370 7+380 10.00 0.750 0.925 9.250
7+380 7+390 10.00 1.100 0.950 9.500
7+390 7+400 10.00 0.800 0.825 8.250
7+400 7+410 10.00 0.850 0.925 9.250
7+410 7+420 10.00 1.000 1.000 10.000
7+420 7+430 10.00 1.000 0.850 8.500
7+430 7+440 10.00 0.700 0.725 7.250
7+440 7+450 10.00 0.750 0.375 3.750
7+450 7+460 10.00 0.375 3.750
7+460 7+470 10.00 0.750 0.775 7.750
7+470 7+480 10.00 0.800 0.825 8.250
7+480 7+490 10.00 0.850 0.825 8.250
7+490 7+500 10.00 0.800 0.810 8.100
7+500 7+510 10.00 0.820 0.860 8.600
7+510 7+520 10.00 0.900 0.800 8.000
7+520 7+530 10.00 0.700 0.900 9.000
7+530 7+540 10.00 1.100 0.875 8.750
7+540 7+550 10.00 0.650 0.875 8.750
7+550 7+560 10.00 1.100 1.000 10.000
7+560 7+570 10.00 0.900 1.025 10.250

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 7/4/2025
Bill Item : 3.1 Distribution (COPIES)
Description:-Trimming, Levelling and compacting 1. File
original ground 2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

7+570 7+580 10.00 1.150 1.075 10.750


7+580 7+590 10.00 1.000 1.150 11.500
7+590 7+600 10.00 1.300 1.075 10.750
7+600 7+610 10.00 0.850 0.975 9.750
7+610 7+620 10.00 1.100 1.050 10.500
7+620 7+630 10.00 1.000 0.975 9.750
7+630 7+640 10.00 0.950 1.025 10.250
7+640 7+650 10.00 1.100 0.980 9.800
7+650 7+660 10.00 0.860 0.880 8.800
7+660 7+670 10.00 0.900 0.900 9.000
7+670 7+680 10.00 0.900 0.850 8.500
7+680 7+690 10.00 0.800 0.825 8.250
7+690 7+700 10.00 0.850 0.875 8.750
7+700 7+710 10.00 0.900 0.900 9.000
7+710 7+720 10.00 0.900 0.900 9.000
7+720 7+730 10.00 0.900 0.950 9.500
7+730 7+740 10.00 1.000 0.900 9.000
7+740 7+750 10.00 0.800 0.810 8.100
7+750 7+760 10.00 0.820 0.885 8.850
7+760 7+770 10.00 0.950 1.075 10.750
7+770 7+780 10.00 1.200 1.100 11.000
7+780 7+790 10.00 1.000 0.800 8.000
7+790 7+800 10.00 0.600 0.650 6.500
7+800 7+810 10.00 0.700 0.750 7.500
7+810 7+820 10.00 0.800 0.775 7.750
7+820 7+830 10.00 0.750 0.725 7.250
7+830 7+840 10.00 0.700 0.800 8.000
7+840 7+850 10.00 0.900 0.900 9.000
7+850 7+860 10.00 0.900 0.900 9.000
7+860 7+870 10.00 0.900 1.050 10.500
7+870 7+880 10.00 1.200 1.100 11.000
7+880 7+890 10.00 1.000 0.950 9.500

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/180 No : /MS/
Date : 7/4/2025
Bill Item : 3.1 Distribution (COPIES)
Description:-Trimming, Levelling and compacting 1. File
original ground 2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

7+890 7+900 10.00 0.900 0.900 9.000


7+900 7+910 10.00 0.900 0.950 9.500
7+910 7+920 10.00 1.000 1.100 11.000
7+920 7+930 10.00 1.200 1.100 11.000
7+930 7+940 10.00 1.000 0.950 9.500
7+940 7+950 10.00 0.900 0.925 9.250
7+950 7+960 10.00 0.950 0.925 9.250
7+960 7+970 10.00 0.900 1.000 10.000
7+970 1.100 0.550 0.000

UP TO THIS QTY 4470.80 m2


ddt Previous claim Qty (2,220.63)
IPC No 4 Qty 2250.17 m2

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
WIDENING AND IMPROVEMENTS TO NALLA - MEERIGAMA ROAD (0+000-4+000)KM

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/178 No : /MS/
Date : 5/8/2014
Bill Item : 3.1 Distribution (COPIES)
Description:-Trimming, Levelling and compacting 1. File
original ground 2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

LHS
5+015 5+020 5.00 0.400 0.350 1.750
5+020 5+030 10.00 0.300 0.150 1.500
5+030 5+040 10.00 0.000 0.150 1.500
5+040 5+050 10.00 0.300 0.375 3.750
5+050 5+060 10.00 0.450 0.575 5.750
5+060 5+070 10.00 0.700 0.700 7.000
5+070 5+080 10.00 0.700 0.510 5.100
5+080 5+090 10.00 0.320 0.445 4.450
5+090 5+100 10.00 0.570 0.625 6.250
5+100 5+110 10.00 0.680 0.595 5.950
5+110 5+120 10.00 0.510 0.675 6.750
5+120 5+130 10.00 0.840 0.800 8.000
5+130 5+140 10.00 0.760 0.720 7.200
5+140 5+150 10.00 0.680 0.645 6.450
5+150 5+160 10.00 0.610 0.555 5.550
5+160 5+170 10.00 0.500 0.410 4.100
5+170 5+180 10.00 0.320 0.490 4.900
5+180 5+190 10.00 0.660 0.570 5.700
5+190 5+200 10.00 0.480 0.455 4.550
5+200 5+210 10.00 0.430 0.440 4.400
5+210 5+220 10.00 0.450 0.475 4.750
5+220 5+230 10.00 0.500 0.500 5.000
5+230 5+240 10.00 0.500 0.450 4.500
5+240 5+250 10.00 0.400 0.405 4.050
5+250 5+260 10.00 0.410 0.485 4.850
5+260 5+270 10.00 0.560 0.525 5.250
5+270 5+280 10.00 0.490 0.420 4.200
5+280 5+290 10.00 0.350 0.475 4.750
5+290 5+300 10.00 0.600 0.530 5.300
5+300 5+310 10.00 0.460 0.445 4.450

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
WIDENING AND IMPROVEMENTS TO NALLA - MEERIGAMA ROAD (0+000-4+000)KM

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/178 No : /MS/
Date : 5/8/2014
Bill Item : 3.1 Distribution (COPIES)
Description:-Trimming, Levelling and compacting 1. File
original ground 2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

5+310 5+320 10.00 0.430 0.385 3.850


5+320 5+330 10.00 0.340 0.330 3.300
5+330 5+340 10.00 0.320 0.350 3.500
5+340 5+350 10.00 0.380 0.440 4.400
5+350 5+360 10.00 0.500 0.450 4.500
5+360 5+370 10.00 0.400 0.445 4.450
5+370 5+380 10.00 0.490 0.490 4.900
5+380 5+390 10.00 0.490 0.440 4.400
5+390 5+400 10.00 0.390 0.445 4.450
5+400 5+410 10.00 0.500 0.485 4.850
5+410 5+420 10.00 0.470 0.520 5.200
5+420 5+430 10.00 0.570 0.580 5.800
5+430 5+440 10.00 0.590 0.495 4.950
5+440 5+450 10.00 0.400 0.350 3.500
5+450 5+460 10.00 0.300 0.530 5.300
5+460 5+470 10.00 0.760 0.670 6.700
5+470 5+480 10.00 0.580 0.560 5.600
5+480 5+490 10.00 0.540 0.625 6.250
5+490 5+500 10.00 0.710 0.580 5.800
5+500 5+510 10.00 0.450 0.400 4.000
5+510 5+520 10.00 0.350 0.350 3.500
5+520 5+530 10.00 0.350 0.440 4.400
5+530 5+540 10.00 0.530 0.615 6.150
5+540 5+550 10.00 0.700 0.560 5.600
5+550 5+560 10.00 0.420 0.330 3.300
5+560 5+570 10.00 0.240 0.120 1.200
5+570 5+580 10.00 0.000 0.150 1.500
5+580 5+590 10.00 0.300 0.300 3.000
5+590 5+600 10.00 0.300 0.455 4.550
5+600 5+610 10.00 0.610 0.650 6.500
5+610 5+620 10.00 0.690 0.695 6.950
5+620 5+630 10.00 0.700 0.600 6.000

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
WIDENING AND IMPROVEMENTS TO NALLA - MEERIGAMA ROAD (0+000-4+000)KM

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/178 No : /MS/
Date : 5/8/2014
Bill Item : 3.1 Distribution (COPIES)
Description:-Trimming, Levelling and compacting 1. File
original ground 2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

5+630 5+640 10.00 0.500 0.635 6.350


5+640 5+650 10.00 0.770 0.685 6.850
5+650 5+660 10.00 0.600 0.570 5.700
5+660 5+670 10.00 0.540 0.535 5.350
5+670 5+680 10.00 0.530 0.480 4.800
5+680 5+690 10.00 0.430 0.525 5.250
5+690 5+700 10.00 0.620 0.610 6.100
5+700 5+710 10.00 0.600 0.595 5.950
5+710 5+720 10.00 0.590 0.600 6.000
5+720 5+730 10.00 0.610 0.655 6.550
5+730 5+740 10.00 0.700 0.655 6.550
5+740 0.610 0.305 0.000 361.5 m2

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
WIDENING AND IMPROVEMENTS TO NALLA - MEERIGAMA ROAD (0+000-4+000)KM

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/178 No : /MS/
Date : 5/8/2014
Bill Item : 3.1 Distribution (COPIES)
Description:-Trimming, Levelling and compacting 1. File
original ground 2. Engineer
3. Contractor
Avg :
Side Description T width Width H Qty Total Unit

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.5 Distribution (COPIES)
Description:-Supplying spreading and 1. File
compaction of Dense graded aggregate base 2. Engineer
course of nominal maximum size of 37.5 mm
(ABC) including transport of 35Km distance
3. Contractor

Side Description L Avg: Area Qty Total Unit

OVER LAYING 7+250-7+900 AS PER IPC NO 02 398.245 398.245 m3


ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.6 Distribution (COPIES)
Prime coat with emulsion CSS - 1 using 1 ltr,/sqm 1. File
including blinding with sand and transport. 2. Engineer
3. Contractor
AVG.
Side Description L width Width
Qty Total Unit

BOTH
7+250 7+900 AS PER IPC NO 02 3250.000 3300.00 m2

EDGE WIDING AREA PRIME COAT

LHS
5+530 5+540 10.00 0.700 0.750 7.500
5+540 5+550 10.00 0.800 0.850 8.500
5+550 5+560 10.00 0.900 0.800 8.000
5+560 5+570 10.00 0.700 0.675 6.750
5+570 5+580 10.00 0.650 0.925 9.250
5+580 5+590 10.00 1.200 1.300 13.000
5+590 5+600 10.00 1.400 1.350 13.500
5+600 5+610 10.00 1.300 1.200 12.000
5+610 5+620 10.00 1.100 1.100 11.000
5+620 5+630 10.00 1.100 1.050 10.500
5+630 5+640 10.00 1.000 1.000 10.000
5+640 5+650 10.00 1.000 0.900 9.000
5+650 5+660 10.00 0.800 0.750 7.500
5+660 5+670 10.00 0.700 0.980 9.800
5+670 5+680 10.00 1.260 1.280 12.800
5+680 5+690 10.00 1.300 1.250 12.500
5+690 5+700 10.00 1.200 1.100 11.000
5+700 5+710 10.00 1.000 1.025 10.250
5+710 5+720 10.00 1.050 0.975 9.750
5+720 5+730 10.00 0.900 0.975 9.750
5+730 5+740 10.00 1.050 1.100 11.000
5+740 5+750 10.00 1.150 1.025 10.250
5+750 5+760 10.00 0.900 1.000 10.000
5+760 5+770 10.00 1.100 0.975 9.750
5+770 5+780 10.00 0.850 0.925 9.250
5+780 5+790 10.00 1.000 0.900 9.000
5+790 5+800 10.00 0.800 0.800 8.000
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.6 Distribution (COPIES)
Prime coat with emulsion CSS - 1 using 1 ltr,/sqm 1. File
including blinding with sand and transport. 2. Engineer
3. Contractor
5+800 5+810 10.00 0.800 0.750 7.500
5+810 5+820 10.00 0.700 0.750 7.500
5+820 5+830 10.00 0.800 0.850 8.500
5+830 5+840 10.00 0.900 0.950 9.500
5+840 5+850 10.00 1.000 0.925 9.250
5+850 5+860 10.00 0.850 0.975 9.750
5+860 5+870 10.00 1.100 0.875 8.750
5+870 5+880 10.00 0.650 0.675 6.750
5+880 5+890 10.00 0.700 0.650 6.500
5+890 5+900 10.00 0.600 0.800 8.000
5+900 5+910 10.00 1.000 1.000 10.000
5+910 5+920 10.00 1.000 1.000 10.000
5+920 5+930 10.00 1.000 1.050 10.500
5+930 5+940 10.00 1.100 1.150 11.500
5+940 5+950 10.00 1.200 1.100 11.000
5+950 5+960 10.00 1.000 1.050 10.500
5+960 5+970 10.00 1.100 1.075 10.750
5+970 5+980 10.00 1.050 1.075 10.750
5+980 5+990 10.00 1.100 1.150 11.500
5+990 6+000 10.00 1.200 0.850 8.500
6+000 6+010 10.00 0.500 0.900 9.000
6+010 6+020 10.00 1.300 1.200 12.000
6+020 6+030 10.00 1.100 1.200 12.000
6+030 6+040 10.00 1.300 1.250 12.500
6+040 6+050 10.00 1.200 1.150 11.500
6+050 6+060 10.00 1.100 1.100 11.000
6+060 6+070 10.00 1.100 1.050 10.500
6+070 6+080 10.00 1.000 1.075 10.750
6+080 6+090 10.00 1.150 1.175 11.750
6+090 6+100 10.00 1.200 1.315 13.150
6+100 6+110 10.00 1.430 1.315 13.150
6+110 6+120 10.00 1.200 1.100 11.000
6+120 6+130 10.00 1.000 0.900 9.000
6+130 6+140 10.00 0.800 0.850 8.500
6+140 6+150 10.00 0.900 0.800 8.000
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.6 Distribution (COPIES)
Prime coat with emulsion CSS - 1 using 1 ltr,/sqm 1. File
including blinding with sand and transport. 2. Engineer
3. Contractor
6+150 6+160 10.00 0.700 0.700 7.000
6+160 6+170 10.00 0.700 0.800 8.000
6+170 6+180 10.00 0.900 0.850 8.500
6+180 6+190 10.00 0.800 0.900 9.000
6+190 6+200 10.00 1.000 1.000 10.000
6+200 6+210 10.00 1.000 1.100 11.000
6+210 6+220 10.00 1.200 1.100 11.000
6+220 6+230 10.00 1.000 0.950 9.500
6+230 6+240 10.00 0.900 0.800 8.000
6+240 6+250 10.00 0.700 0.700 7.000
6+250 6+260 10.00 0.700 0.750 7.500
6+260 6+270 10.00 0.800 0.900 9.000
6+270 6+280 10.00 1.000 0.850 8.500
6+280 6+290 10.00 0.700 0.700 7.000
6+290 6+300 10.00 0.700 0.700 7.000
6+300 6+310 10.00 0.700 0.950 9.500
6+310 6+320 10.00 1.200 1.100 11.000
6+320 6+330 10.00 1.000 0.900 9.000
6+330 6+340 10.00 0.800 0.750 7.500
6+340 6+350 10.00 0.700 0.650 6.500
6+350 6+360 10.00 0.600 0.600 6.000
6+360 6+370 10.00 0.600 0.700 7.000
6+370 6+380 10.00 0.800 0.750 7.500
6+380 6+390 10.00 0.700 0.725 7.250
6+390 6+400 10.00 0.750 0.875 8.750
6+400 6+410 10.00 1.000 0.900 9.000
6+410 6+420 10.00 0.800 0.650 6.500
6+420 6+430 10.00 0.500 0.600 6.000
6+430 6+440 10.00 0.700 0.700 7.000
6+440 6+450 10.00 0.700 0.650 6.500
6+450 6+460 10.00 0.600 0.750 7.500
6+460 6+470 10.00 0.900 1.050 10.500
6+470 6+480 10.00 1.200 1.250 12.500
6+480 6+490 10.00 1.300 1.000 10.000
6+490 6+500 10.00 0.700 0.950 9.500
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.6 Distribution (COPIES)
Prime coat with emulsion CSS - 1 using 1 ltr,/sqm 1. File
including blinding with sand and transport. 2. Engineer
3. Contractor
6+500 6+510 10.00 1.200 1.200 12.000
6+510 6+520 10.00 1.200 0.950 9.500
6+520 6+530 10.00 0.700 0.450 4.500
6+530 6+540 10.00 0.200 0.300 3.000
6+540 6+550 10.00 0.400 0.450 4.500
6+550 6+560 10.00 0.500 0.600 6.000
6+560 6+570 10.00 0.700 0.625 6.250
6+570 6+580 10.00 0.550 0.675 6.750
6+580 6+590 10.00 0.800 0.900 9.000
6+590 6+600 10.00 1.000 0.900 9.000
6+600 6+610 10.00 0.800 0.525 5.250
6+610 6+620 10.00 0.250 0.375 3.750
6+620 6+630 10.00 0.500 0.550 5.500
6+630 0.600 0.300 0.000
0.000
6+770 6+780 10.00 0.700 0.700 7.000
6+780 6+790 10.00 0.700 0.450 4.500
6+790 6+800 10.00 0.200 0.500 5.000
6+800 6+810 10.00 0.800 0.775 7.750
6+810 6+820 10.00 0.750 0.675 6.750
6+820 6+830 10.00 0.600 0.750 7.500
6+830 6+840 10.00 0.900 0.825 8.250
6+840 6+850 10.00 0.750 0.675 6.750
6+850 6+860 10.00 0.600 0.550 5.500
6+860 6+870 10.00 0.500 0.500 5.000
6+870 6+880 10.00 0.500 0.450 4.500
6+880 6+890 10.00 0.400 0.500 5.000
6+890 6+900 10.00 0.600 0.600 6.000
6+900 6+910 10.00 0.600 0.650 6.500
6+910 6+920 10.00 0.700 0.650 6.500
6+920 6+930 10.00 0.600 0.625 6.250
6+930 6+940 10.00 0.650 0.575 5.750
6+940 6+950 10.00 0.500 0.600 6.000
6+950 6+960 10.00 0.700 0.850 8.500
6+960 6+970 10.00 1.000 1.000 10.000
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.6 Distribution (COPIES)
Prime coat with emulsion CSS - 1 using 1 ltr,/sqm 1. File
including blinding with sand and transport. 2. Engineer
3. Contractor
6+970 6+980 10.00 1.000 1.050 10.500
6+980 6+990 10.00 1.100 1.150 11.500
6+990 7+000 10.00 1.200 1.200 12.000
7+000 7+010 10.00 1.200 0.750 7.500
7+010 7+020 10.00 0.300 0.350 3.500
7+020 7+030 10.00 0.400 0.450 4.500
7+030 7+040 10.00 0.500 0.600 6.000
7+040 7+050 10.00 0.700 0.750 7.500
7+050 7+060 10.00 0.800 0.750 7.500
7+060 7+070 10.00 0.700 0.700 7.000
7+070 7+080 10.00 0.700 0.600 6.000
7+080 7+090 10.00 0.500 0.500 5.000
7+090 7+100 10.00 0.500 0.500 5.000
7+100 7+110 10.00 0.500 0.600 6.000
7+110 7+120 10.00 0.700 1.000 10.000
7+120 7+130 10.00 1.300 0.850 8.500
7+130 7+140 10.00 0.400 0.450 4.500
7+140 7+150 10.00 0.500 0.500 5.000
7+150 7+160 10.00 0.500 0.600 6.000
7+160 7+170 10.00 0.700 0.550 5.500
7+170 7+180 10.00 0.400 0.500 5.000
7+180 7+190 10.00 0.600 0.550 5.500
7+190 7+200 10.00 0.500 0.750 7.500
7+200 7+210 10.00 1.000 0.900 9.000
7+210 7+220 10.00 0.800 0.750 7.500
7+220 7+230 10.00 0.700 0.750 7.500
7+230 7+240 10.00 0.800 0.850 8.500
7+240 7+250 10.00 0.900 0.900 9.000
7+250 7+260 10.00 0.900 0.900 9.000
7+260 7+270 10.00 0.900 0.900 9.000
7+270 7+280 10.00 0.900 0.850 8.500
7+280 7+290 10.00 0.800 0.850 8.500
7+290 7+300 10.00 0.900 0.900 9.000
7+300 7+310 10.00 0.900 0.750 7.500
7+310 7+320 10.00 0.600 0.850 8.500
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.6 Distribution (COPIES)
Prime coat with emulsion CSS - 1 using 1 ltr,/sqm 1. File
including blinding with sand and transport. 2. Engineer
3. Contractor
7+320 7+330 10.00 1.100 1.000 10.000
7+330 7+340 10.00 0.900 0.950 9.500
7+340 7+350 10.00 1.000 0.950 9.500
7+350 7+360 10.00 0.900 0.800 8.000
7+360 7+370 10.00 0.700 0.900 9.000
7+370 7+380 10.00 1.100 1.050 10.500
7+380 7+390 10.00 1.000 1.050 10.500
7+390 7+400 10.00 1.100 1.050 10.500
7+400 7+410 10.00 1.000 0.800 8.000
7+410 7+420 10.00 0.600 0.850 8.500
7+420 7+430 10.00 1.100 1.100 11.000
7+430 7+440 10.00 1.100 1.000 10.000
7+440 7+450 10.00 0.900 0.900 9.000
7+450 7+460 10.00 0.900 0.950 9.500
7+460 7+470 10.00 1.000 0.850 8.500
7+470 7+480 10.00 0.700 0.825 8.250
7+480 7+490 10.00 0.950 1.150 11.500
7+490 7+500 10.00 1.350 1.125 11.250
7+500 7+510 10.00 0.900 0.900 9.000
7+510 7+520 10.00 0.900 0.800 8.000
7+520 7+530 10.00 0.700 0.675 6.750
7+530 7+540 10.00 0.650 0.475 4.750
7+540 7+550 10.00 0.300 0.300 3.000
7+550 7+560 10.00 0.300 0.350 3.500
7+560 7+570 10.00 0.400 0.450 4.500
7+570 7+580 10.00 0.500 0.700 7.000
7+580 7+590 10.00 0.900 0.850 8.500
7+590 7+600 10.00 0.800 0.850 8.500
7+600 7+610 10.00 0.900 0.800 8.000
7+610 7+620 10.00 0.700 0.850 8.500
7+620 7+630 10.00 1.000 0.900 9.000
7+630 7+640 10.00 0.800 0.700 7.000
7+640 7+650 10.00 0.600 0.550 5.500
7+650 7+660 10.00 0.500 0.500 5.000
7+660 7+670 10.00 0.500 0.625 6.250
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.6 Distribution (COPIES)
Prime coat with emulsion CSS - 1 using 1 ltr,/sqm 1. File
including blinding with sand and transport. 2. Engineer
3. Contractor
7+670 7+680 10.00 0.750 0.675 6.750
7+680 7+690 10.00 0.600 0.600 6.000
7+690 7+700 10.00 0.600 0.725 7.250
7+700 7+710 10.00 0.850 0.750 7.500
7+710 7+720 10.00 0.650 0.675 6.750
7+720 7+730 10.00 0.700 0.675 6.750
7+730 7+740 10.00 0.650 0.750 7.500
7+740 7+750 10.00 0.850 0.875 8.750
7+750 7+760 10.00 0.900 0.925 9.250
7+760 7+770 10.00 0.950 1.125 11.250
7+770 7+780 10.00 1.300 1.150 11.500
7+780 7+790 10.00 1.000 0.950 9.500
7+790 7+800 10.00 0.900 0.825 8.250
7+800 7+810 10.00 0.750 0.875 8.750
7+810 7+820 10.00 1.000 0.850 8.500
7+820 7+830 10.00 0.700 0.975 9.750
7+830 7+840 10.00 1.250 1.225 12.250
7+840 7+850 10.00 1.200 1.200 12.000
7+850 7+860 10.00 1.200 1.150 11.500
7+860 7+870 10.00 1.100 0.900 9.000
7+870 7+880 10.00 0.700 0.750 7.500
7+880 7+890 10.00 0.800 0.650 6.500
7+890 7+900 10.00 0.500 0.500 5.000
7+900 0.500 0.250 0.000
0.000
RHS 5+530 5+540 10.00 1.600 1.450 14.500
5+540 5+550 10.00 1.300 1.350 13.500
5+550 5+560 10.00 1.400 1.400 14.000
5+560 5+570 10.00 1.400 1.370 13.700
5+570 5+580 10.00 1.340 1.220 12.200
5+580 5+590 10.00 1.100 0.950 9.500
5+590 5+600 10.00 0.800 0.715 7.150
5+600 5+610 10.00 0.630 0.815 8.150
5+610 5+620 10.00 1.000 1.000 10.000
5+620 5+630 10.00 1.000 0.950 9.500
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.6 Distribution (COPIES)
Prime coat with emulsion CSS - 1 using 1 ltr,/sqm 1. File
including blinding with sand and transport. 2. Engineer
3. Contractor
5+630 5+640 10.00 0.900 0.850 8.500
5+640 5+650 10.00 0.800 0.975 9.750
5+650 5+660 10.00 1.150 1.375 13.750
5+660 5+670 10.00 1.600 1.500 15.000
5+670 5+680 10.00 1.400 1.250 12.500
5+680 5+690 10.00 1.100 0.900 9.000
5+690 5+700 10.00 0.700 0.850 8.500
5+700 5+710 10.00 1.000 1.150 11.500
5+710 5+720 10.00 1.300 1.200 12.000
5+720 5+730 10.00 1.100 1.125 11.250
5+730 5+740 10.00 1.150 1.025 10.250
5+740 5+750 10.00 0.900 0.900 9.000
5+750 5+760 10.00 0.900 0.975 9.750
5+760 5+770 10.00 1.050 0.875 8.750
5+770 5+780 10.00 0.700 0.700 7.000
5+780 5+790 10.00 0.700 0.625 6.250
5+790 5+800 10.00 0.550 0.665 6.650
5+800 5+810 10.00 0.780 0.765 7.650
5+810 5+820 10.00 0.750 0.775 7.750
5+820 5+830 10.00 0.800 0.900 9.000
5+830 5+840 10.00 1.000 0.950 9.500
5+840 5+850 10.00 0.900 0.750 7.500
5+850 5+860 10.00 0.600 0.700 7.000
5+860 5+870 10.00 0.800 0.875 8.750
5+870 5+880 10.00 0.950 0.975 9.750
5+880 5+890 10.00 1.000 1.000 10.000
5+890 5+900 10.00 1.000 0.950 9.500
5+900 5+910 10.00 0.900 0.850 8.500
5+910 5+920 10.00 0.800 0.925 9.250
5+920 5+930 10.00 1.050 0.975 9.750
5+930 5+940 10.00 0.900 0.925 9.250
5+940 5+950 10.00 0.950 0.900 9.000
5+950 5+960 10.00 0.850 0.800 8.000
5+960 5+970 10.00 0.750 0.625 6.250
5+970 5+980 10.00 0.500 0.525 5.250
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.6 Distribution (COPIES)
Prime coat with emulsion CSS - 1 using 1 ltr,/sqm 1. File
including blinding with sand and transport. 2. Engineer
3. Contractor
5+980 5+990 10.00 0.550 0.775 7.750
5+990 6+000 10.00 1.000 1.050 10.500
6+000 6+010 10.00 1.100 1.050 10.500
6+010 6+020 10.00 1.000 1.000 10.000
6+020 6+030 10.00 1.000 0.950 9.500
6+030 6+040 10.00 0.900 0.450 4.500
6+040 6+050 10.00 0.000 0.000 0.000
6+050 6+060 10.00 0.000 0.000 0.000
6+060 6+070 10.00 0.000 0.000 0.000
6+070 6+080 10.00 0.000 0.600 6.000
6+080 6+090 10.00 1.200 1.050 10.500
6+090 6+100 10.00 0.900 0.850 8.500
6+100 6+110 10.00 0.800 0.950 9.500
6+110 6+120 10.00 1.100 0.975 9.750
6+120 6+130 10.00 0.850 0.850 8.500
6+130 6+140 10.00 0.850 0.775 7.750
6+140 6+150 10.00 0.700 0.750 7.500
6+150 6+160 10.00 0.800 0.850 8.500
6+160 6+170 10.00 0.900 0.900 9.000
6+170 6+180 10.00 0.900 1.000 10.000
6+180 6+190 10.00 1.100 1.150 11.500
6+190 6+200 10.00 1.200 1.150 11.500
6+200 6+210 10.00 1.100 1.000 10.000
6+210 6+220 10.00 0.900 0.950 9.500
6+220 6+230 10.00 1.000 0.900 9.000
6+230 6+240 10.00 0.800 0.850 8.500
6+240 6+250 10.00 0.900 0.900 9.000
6+250 6+260 10.00 0.900 0.800 8.000
6+260 6+270 10.00 0.700 0.700 7.000
6+270 6+280 10.00 0.700 0.850 8.500
6+280 6+290 10.00 1.000 1.100 11.000
6+290 6+300 10.00 1.200 1.200 12.000
6+300 6+310 10.00 1.200 1.275 12.750
6+310 6+320 10.00 1.350 1.225 12.250
6+320 6+330 10.00 1.100 1.050 10.500
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.6 Distribution (COPIES)
Prime coat with emulsion CSS - 1 using 1 ltr,/sqm 1. File
including blinding with sand and transport. 2. Engineer
3. Contractor
6+330 6+340 10.00 1.000 0.950 9.500
6+340 6+350 10.00 0.900 0.900 9.000
6+350 6+360 10.00 0.900 0.950 9.500
6+360 6+370 10.00 1.000 1.000 10.000
6+370 6+380 10.00 1.000 0.850 8.500
6+380 6+390 10.00 0.700 0.700 7.000
6+390 6+400 10.00 0.700 0.850 8.500
6+400 6+410 10.00 1.000 1.150 11.500
6+410 6+420 10.00 1.300 1.100 11.000
6+420 6+430 10.00 0.900 1.050 10.500
6+430 6+440 10.00 1.200 1.150 11.500
6+440 6+450 10.00 1.100 1.100 11.000
6+450 6+460 10.00 1.100 1.100 11.000
6+460 6+470 10.00 1.100 0.950 9.500
6+470 6+480 10.00 0.800 1.020 10.200
6+480 6+490 10.00 1.240 0.970 9.700
6+490 6+500 10.00 0.700 0.850 8.500
6+500 6+510 10.00 1.000 1.150 11.500
6+510 6+520 10.00 1.300 1.050 10.500
6+520 6+530 10.00 0.800 1.000 10.000
6+530 6+540 10.00 1.200 0.900 9.000
6+540 6+550 10.00 0.600 0.650 6.500
6+550 6+560 10.00 0.700 1.000 10.000
6+560 6+570 10.00 1.300 1.000 10.000
6+570 6+580 10.00 0.700 0.650 6.500
6+580 6+590 10.00 0.600 0.650 6.500
6+590 6+600 10.00 0.700 0.700 7.000
6+600 6+610 10.00 0.700 0.775 7.750
6+610 6+620 10.00 0.850 0.875 8.750
6+620 6+630 10.00 0.900 1.000 10.000
6+630 1.100 0.550 0.000
0.000
0.000
6+770 6+780 10.00 1.100 1.050 10.500
6+780 6+790 10.00 1.000 1.025 10.250
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.6 Distribution (COPIES)
Prime coat with emulsion CSS - 1 using 1 ltr,/sqm 1. File
including blinding with sand and transport. 2. Engineer
3. Contractor
6+790 6+800 10.00 1.050 0.950 9.500
6+800 6+810 10.00 0.850 0.850 8.500
6+810 6+820 10.00 0.850 0.800 8.000
6+820 6+830 10.00 0.750 0.725 7.250
6+830 6+840 10.00 0.700 0.775 7.750
6+840 6+850 10.00 0.850 0.900 9.000
6+850 6+860 10.00 0.950 0.850 8.500
6+860 6+870 10.00 0.750 0.725 7.250
6+870 6+880 10.00 0.700 0.900 9.000
6+880 6+890 10.00 1.100 0.900 9.000
6+890 6+900 10.00 0.700 0.850 8.500
6+900 6+910 10.00 1.000 0.950 9.500
6+910 6+920 10.00 0.900 0.800 8.000
6+920 6+930 10.00 0.700 0.800 8.000
6+930 6+940 10.00 0.900 0.775 7.750
6+940 6+950 10.00 0.650 0.575 5.750
6+950 6+960 10.00 0.500 0.500 5.000
6+960 6+970 10.00 0.500 0.650 6.500
6+970 6+980 10.00 0.800 0.700 7.000
6+980 6+990 10.00 0.600 0.700 7.000
6+990 7+000 10.00 0.800 0.900 9.000
7+000 7+010 10.00 1.000 1.000 10.000
7+010 7+020 10.00 1.000 1.050 10.500
7+020 7+030 10.00 1.100 0.950 9.500
7+030 7+040 10.00 0.800 0.700 7.000
7+040 7+050 10.00 0.600 0.700 7.000
7+050 7+060 10.00 0.800 0.750 7.500
7+060 7+070 10.00 0.700 0.750 7.500
7+070 7+080 10.00 0.800 0.900 9.000
7+080 7+090 10.00 1.000 1.150 11.500
7+090 7+100 10.00 1.300 1.250 12.500
7+100 7+110 10.00 1.200 1.100 11.000
7+110 7+120 10.00 1.000 1.000 10.000
7+120 7+130 10.00 1.000 0.900 9.000
7+130 7+140 10.00 0.800 0.800 8.000
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.6 Distribution (COPIES)
Prime coat with emulsion CSS - 1 using 1 ltr,/sqm 1. File
including blinding with sand and transport. 2. Engineer
3. Contractor
7+140 7+150 10.00 0.800 0.750 7.500
7+150 7+160 10.00 0.700 0.750 7.500
7+160 7+170 10.00 0.800 0.750 7.500
7+170 7+180 10.00 0.700 0.850 8.500
7+180 7+190 10.00 1.000 1.000 10.000
7+190 7+200 10.00 1.000 1.000 10.000
7+200 7+210 10.00 1.000 1.100 11.000
7+210 7+220 10.00 1.200 1.100 11.000
7+220 7+230 10.00 1.000 1.100 11.000
7+230 7+240 10.00 1.200 1.100 11.000
7+240 7+250 10.00 1.000 1.050 10.500
7+250 7+260 10.00 1.100 1.050 10.500
7+260 7+270 10.00 1.000 0.850 8.500
7+270 7+280 10.00 0.700 0.650 6.500
7+280 7+290 10.00 0.600 0.750 7.500
7+290 7+300 10.00 0.900 0.950 9.500
7+300 7+310 10.00 1.000 1.000 10.000
7+310 7+320 10.00 1.000 0.900 9.000
7+320 7+330 10.00 0.800 0.900 9.000
7+330 7+340 10.00 1.000 0.950 9.500
7+340 7+350 10.00 0.900 1.000 10.000
7+350 7+360 10.00 1.100 1.000 10.000
7+360 7+370 10.00 0.900 1.050 10.500
7+370 7+380 10.00 1.200 1.150 11.500
7+380 7+390 10.00 1.100 1.250 12.500
7+390 7+400 10.00 1.400 1.350 13.500
7+400 7+410 10.00 1.300 1.250 12.500
7+410 7+420 10.00 1.200 1.200 12.000
7+420 7+430 10.00 1.200 1.200 12.000
7+430 7+440 10.00 1.200 0.950 9.500
7+440 7+450 10.00 0.700 0.675 6.750
7+450 7+460 10.00 0.650 0.750 7.500
7+460 7+470 10.00 0.850 0.900 9.000
7+470 7+480 10.00 0.950 0.950 9.500
7+480 7+490 10.00 0.950 0.825 8.250
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.6 Distribution (COPIES)
Prime coat with emulsion CSS - 1 using 1 ltr,/sqm 1. File
including blinding with sand and transport. 2. Engineer
3. Contractor
7+490 7+500 10.00 0.700 0.800 8.000
7+500 7+510 10.00 0.900 0.875 8.750
7+510 7+520 10.00 0.850 0.675 6.750
7+520 7+530 10.00 0.500 0.675 6.750
7+530 7+540 10.00 0.850 0.925 9.250
7+540 7+550 10.00 1.000 0.950 9.500
7+550 7+560 10.00 0.900 0.750 7.500
7+560 7+570 10.00 0.600 0.650 6.500
7+570 7+580 10.00 0.700 0.650 6.500
7+580 7+590 10.00 0.600 0.500 5.000
7+590 7+600 10.00 0.400 0.500 5.000
7+600 7+610 10.00 0.600 0.650 6.500
7+610 7+620 10.00 0.700 0.700 7.000
7+620 7+630 10.00 0.700 0.800 8.000
7+630 7+640 10.00 0.900 0.850 8.500
7+640 7+650 10.00 0.800 0.600 6.000
7+650 7+660 10.00 0.400 0.550 5.500
7+660 7+670 10.00 0.700 0.800 8.000
7+670 7+680 10.00 0.900 0.650 6.500
7+680 7+690 10.00 0.400 0.450 4.500
7+690 7+700 10.00 0.500 0.550 5.500
7+700 7+710 10.00 0.600 0.700 7.000
7+710 7+720 10.00 0.800 0.800 8.000
7+720 7+730 10.00 0.800 0.800 8.000
7+730 7+740 10.00 0.800 0.800 8.000
7+740 7+750 10.00 0.800 0.900 9.000
7+750 7+760 10.00 1.000 0.950 9.500
7+760 7+770 10.00 0.900 0.900 9.000
7+770 7+780 10.00 0.900 0.825 8.250
7+780 7+790 10.00 0.750 0.850 8.500
7+790 7+800 10.00 0.950 1.075 10.750
7+800 7+810 10.00 1.200 1.300 13.000
7+810 7+820 10.00 1.400 1.250 12.500
7+820 7+830 10.00 1.100 0.975 9.750
7+830 7+840 10.00 0.850 0.775 7.750
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 2.6 Distribution (COPIES)
Prime coat with emulsion CSS - 1 using 1 ltr,/sqm 1. File
including blinding with sand and transport. 2. Engineer
3. Contractor
7+840 7+850 10.00 0.700 0.650 6.500
7+850 7+860 10.00 0.600 0.550 5.500
7+860 7+870 10.00 0.500 0.650 6.500
7+870 7+880 10.00 0.800 0.800 8.000
7+880 7+890 10.00 0.800 0.800 8.000
7+890 7+900 10.00 0.800 0.900 9.000
7+900 0.00 1.000 0.500 0.000
This Bill QTY 553.00 m2

Cumilative Work 3853.0 m2


ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 5.1 Distribution (COPIES)
Description:-Excavation in medium soil 1. File
2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

RHS 8/3 Culvert 7+832


2.40 1.00 0.45 1.08

RHS 8/2 Culvert 7+670


2.40 1.30 0.45 1.40

RHS 7/1 Culvert 6+430


2.10 1.00 0.45 0.95

LHS 7/1 Culvert 6+430


2.10 1.00 0.45 0.95
4.37

IPC NO 2 Claim Previous Claim 4.37 m3

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 5.6 Distribution (COPIES)
Description:-Mixing & Laying cement concrete 1. File
[Link](37.5mm) For Foundation 2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

RHS 8/3 Culvert 7+832


screed 2.40 1.00 0.075 0.18

RHS 8/2 Culvert 7+670


screed 2.40 1.30 0.075 0.23

RHS 7/1 Culvert 6+430


screed 2.10 1.00 0.075 0.16

LHS 7/1 Culvert 6+430


screed 2.10 1.00 0.075 0.16
0.73

IPC NO 2 Claim Previous Claim 0.73 m3

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 5.7 Distribution (COPIES)
Description:-Supplyin & fixing 25mm thick class II 1. File
timer as shuttering (rough) 2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

RHS 8/3 Culvert 7+832


screed+Base 1 2.40 0.3 0.72
2 1.00 0.3 0.60
wall 2 0.75 0.6 0.90
4 1.00 0.6 2.40

RHS 8/2 Culvert 7+670


screed+Base 1 2.40 0.3 0.72
2 1.30 0.3 0.78
wall 2 0.75 0.6 0.90
4 1.30 0.6 3.12

RHS 7/1 Culvert 6+430


screed+Base 1 2.10 0.3 0.63
2 1.00 0.3 0.60
wall 2 0.75 0.3 0.45
4 1.00 0.3 1.20
2 0.45 0.3 0.27
4 1.00 0.3 1.20

LHS 7/1 Culvert 6+430


screed+Base 1 2.10 0.3 0.63
2 1.00 0.3 0.60
wall 2 0.75 0.3 0.45
4 1.00 0.3 1.20
2 0.45 0.3 0.27
4 1.00 0.3 1.20
18.84

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 5.7 Distribution (COPIES)
Description:-Supplyin & fixing 25mm thick class II 1. File
timer as shuttering (rough) 2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

IPC NO 2 Claim Previous Claim 18.84 m2

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 5.8 Distribution (COPIES)
Description:-Mixing & laying cement concrete Grade 1. File
25 For Foundation 2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

RHS 8/3 Culvert 7+832


Base 2.40 1.00 0.3 0.72

RHS 8/2 Culvert 7+670


Base 2.40 1.30 0.3 0.94

RHS 7/1 Culvert 6+430


Base 2.10 1.00 0.3 0.63

LHS 7/1 Culvert 6+430


Base 2.10 1.00 0.3 0.63
2.92

IPC NO 2 Claim Previous Claim 2.92 m3

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : -
No : /MS/
Date : 7/4/2025
Bill Item : 5.9 Distribution (COPIES)
Description:-Supply & fixing shuttering smooth finished 1. File
2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

RHS 8/3 Culvert 7+832


Caping beam 2 2 1.00 0.500 2.00
side 2 2 0.45 0.300 0.54
2 2 0.20 0.150 0.12
Deck slab 1 1 0.90 1.000 0.90
1 2 1.50 0.200 0.60
1 2 1.00 0.200 0.40

RHS 8/2 Culvert 7+670


Caping beam 2 2 1.30 0.500 2.60
side 2 2 0.45 0.300 0.54
2 2 0.20 0.150 0.12
Deck slab 1 1 0.90 1.300 1.17
1 2 1.50 0.200 0.60
1 2 1.30 0.200 0.52

RHS 7/1 Culvert 6+430


Deck slab 1 1 1.50 1.000 1.50
1 2 1.50 0.200 0.60
1 2 1.00 0.200 0.40

LHS 7/1 Culvert 6+430


Deck slab 1 1 1.50 1.000 1.50
1 2 1.50 0.200 0.60
1 2 1.00 0.200 0.40

Parapet wall 4 2 1.45 0.300 3.48


4 2 0.30 0.300 0.72

IPC NO 2 Claim Previous Claim 19.31 m2

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : -
No : /MS/
Date : 7/4/2025
Bill Item : 5.9 Distribution (COPIES)
Description:-Supply & fixing shuttering smooth finished 1. File
2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 5.10 Distribution (COPIES)
Description:-Mixing & Laying cement concrete 1. File
[Link](37.5mm)For Supper Structure 2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

RHS 8/3 Culvert 7+832


wall 2 1.00 0.75 0.6 0.90

RHS 8/2 Culvert 7+670


wall 2 1.30 0.75 0.6 1.17

RHS 7/1 Culvert 6+430


wall 2 1.00 0.75 0.6 0.90

LHS 7/1 Culvert 6+430


wall 2 1.00 0.75 0.6 0.90

Parapet wall 4 1 0.30 0.30 0.52

IPC NO 2 Claim Previous Claim 4.39 m3

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 5.10 Distribution (COPIES)
Description:-Mixing & Laying cement concrete 1. File
[Link](37.5mm)For Supper Structure 2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/178 No : /MS/
Date : 7/4/2025
Bill Item : 6.11 Distribution (COPIES)
Description:-Forming weepholes using PVC pipe 1. File
100mm 2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

LHS 4/2Culvert
(A) 1 5.20 2.00 1.20 12.48
(B) 1 5.20 2.00 0.60 6.24
(C) 1 5.20 2.00 1.20 12.48

LHS 4/5 Culvert


(A) 1 4.10 1.80 1.25 9.23
(B) 1 4.10 1.80 0.60 4.43
(C) 1 4.10 1.80 1.25 9.23

IPC NO 3 Claim 54.08 m3

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 5.14 Distribution (COPIES)
Description:-Mixing & laying cement concrete G-25 1. File
2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

RHS 8/3 Culvert 7+832


Caping beam 2 1.00 0.45 0.30 0.27
2 1.00 0.15 0.20 0.06
Deck slab 1 1.50 1.00 0.20 0.30

RHS 8/2 Culvert 7+670


Caping beam 2 1.30 0.45 0.30 0.35
2 1.30 0.15 0.20 0.08
Deck slab 1 1.50 1.30 0.20 0.39

RHS 7/1 Culvert 6+430


Caping beam 0 0.00
Deck slab 1 1.50 1.00 0.20 0.30

LHS 7/1 Culvert 6+430 -


Caping beam 0 0.00
Deck slab 1 1.50 1.00 0.20 0.30

2.05

IPC NO 2 Claim Previous Claim 2.05 m3

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/178 No : /MS/
Date : 7/4/2025
Bill Item : 6.15 Distribution (COPIES)
Description:-Fabricate & lay for tor steel as 1. File
reinforcement 2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

LHS 4/2Culvert
(A) 1 5.20 2.00 1.20 12.48
(B) 1 5.20 2.00 0.60 6.24
(C) 1 5.20 2.00 1.20 12.48

LHS 4/5 Culvert


(A) 1 4.10 1.80 1.25 9.23
(B) 1 4.10 1.80 0.60 4.43
(C) 1 4.10 1.80 1.25 9.23

IPC NO 3 Claim 54.08 m3

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : RDA/DW/WP/GOSL/2013/178 No : /MS/
Date : 7/4/2025
Bill Item : 6.16 Distribution (COPIES)
Description:Fabricate & lay for MS steel as 1. File
reinforcement 2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

LHS 4/2Culvert
(A) 1 5.20 2.00 1.20 12.48
(B) 1 5.20 2.00 0.60 6.24
(C) 1 5.20 2.00 1.20 12.48

LHS 4/5 Culvert


(A) 1 4.10 1.80 1.25 9.23
(B) 1 4.10 1.80 0.60 4.43
(C) 1 4.10 1.80 1.25 9.23

IPC NO 3 Claim 54.08 m3

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
ISURU ENGINEERING(PTE)LTD
0

Measurement Sheet
Contract No : - No : /MS/
Date : 7/4/2025
Bill Item : 5.17 Distribution (COPIES)
Description:Curing of deck slab of culvert 1. File
2. Engineer
3. Contractor

Side Description T L B H Qty Total Unit

RHS 8/3 Culvert 7+832


Deck slab 1 1 1.50 1.000 1.50

RHS 8/2 Culvert 7+670


Deck slab 1 1 1.50 1.300 1.95

RHS 7/1 Culvert 6+430


Deck slab 1 1 1.50 1.000 1.50

LHS 7/1 Culvert 6+430


Deck slab 1 1 1.50 1.000 1.50

6.45

IPC NO 2 Claim 6.45 m2

………………………………………………….. …………………………………………………..
Signature of R.E./O.I.C (RDA05/19/2025B) Signature Of S.E. Contractor (IEL)
Date:- ………………………………………… Date:- …………………………………………
0
RDA/DW/WP/GOSL/2013/180
INTERIM PAYMENT APPLICATION 7/4/2025

Bill No :01

Invoice QTY AMOUNT CLAIMED


DESCRIPTION UNIT PRICE (Rs)
no BALANCE (Rs)

Dence graded aggregate (ABC


1
material )
Cube 300.00 4,400.00 1,320,000.00
1,320,000.00
TOTAL AMOUNT TO BE CLAIMED 80% 1,056,000.00

THIS MONTH MATERIAL AT SITE 1,056,000.00


PREVIOUS MATERIAL AT SITE
IPC NO 1 Claim 1,056,000.00
ISURU ENGINEERING(PTE)LTD
Reinforcement Bar Schedule

WIDENING AND IMPROVEMENTS TO


Project DANOWITA- MEERIGAMA (4+000-8+610)KM
Date 7/4/2025

Consultant RDA Page No :


Contractor IEL
TOTAL LENGTH
MEMBERS BAR NO OF BAR NO OF NO OF EACH TOTAL WEIGHT TOTAL TOTAL SHAPE AND BENDING DIMENSIONS
DIA MEMBER OF BAR BAR (m) LENGTH (m) WEIGHT (kg) (mm)

8/3 Culvert Base (RHS) Y10 5 1 5 2.550 12.750 0.617 7.867


Y10 12 1 12 1.150 13.800 0.617 8.515

8/3 Culvert Caping Beam(RHS) Y10 12 2 24 0.950 22.800 0.617 14.068

Y10 5 2 10 1.500 15.000 0.617 9.25

8/3 Culvert deck(RHS) Y10 6 1 6 1.650 9.900 0.617 6.108


Y10 8 1 8 1.150 9.200 0.617 5.676
Y12 8 1 8 1.650 13.200 0.888 11.722
Y12 6 1 6 1.150 6.900 0.888 6.127

8/2Culvert Base (RHS) Y10 6 1 6 2.550 15.300 0.617 9.440


Y10 12 1 12 1.450 17.400 0.617 10.736

8/2 Culvert Caping Beam(RHS) Y10 12 2 24 1.250 30.000 0.617 18.510


Y10 6 2 12 1.500 18.000 0.617 11.11

8/2 Culvert deck(RHS) Y10 7 1 7 1.650 11.550 0.617 7.126


Y10 8 1 8 1.400 11.200 0.617 6.910
Y12 11 1 11 1.650 18.150 0.888 16.117
Y12 8 1 8 1.400 11.200 0.888 9.946

7/1 Culvert deck(RHS) Y10 5 1 5 1.650 8.250 0.617 5.090


Y10 8 1 8 1.150 9.200 0.617 5.676
Y12 8 1 8 1.650 13.200 0.888 11.722
Y10 8 1 8 1.150 9.200 0.617 5.676

dowel Y20 3 2 6 0.300 1.800 2.484 4.471

7/1 Culvert deck(LHS) Y10 5 1 5 1.650 8.250 0.617 5.090


Y10 8 1 8 1.150 9.200 0.617 5.676
Y12 8 1 8 1.650 13.200 0.888 11.722
Y10 8 1 8 1.150 9.200 0.617 5.676

dowel Y20 3 2 6 0.300 1.800 2.484 4.471

224.501
IPC NO 2 Claim Previous Claim 224.475
Balance Qty 0.026
Cumilative Qty 224.501
11,019,361.00