Customer Service departement
Installation Sections
BUILDING PERMIT APPLICATION (ELECTRICAL)
Municipality Service No N/2022/0003832 Municiality Office 9
Owner QID Num 16927600 Owner Name ΓέΎΟΗϠϟίϛέϣΔϛέη
Street No 1200 Plot
Main Consultant Conseil Engineering Consultants Tel: 66628918
Elec. Consultant Al-Fereej Consulting & Design Tel: 33126991
Old Building Permit Number (If any) Date: 16-May-2022
Type of Project 4 Bulk Coordinates
Expected date of completion 12/15/2022 [Link] AM
(Date Supply Required)
Energy Conservation Checklist Submitted Lighting and Power HVAC
Area PIN 71830047 Grid Ref:
MOC Direction Nb. AC WH Cooker General Others Total Max Cut out Size Trans Size Trans Trans ACB LVPane
Meters load Deman type By Size l
d
EMV Panel 1 1 692.4 34.2 9 232.6 86.2 1054.4 821 1600 3 Custo
mer
TOTAL - 1 692.4 34.2 9 232.6 86.2 #Error 821 0 1600 - - 0
Civil Engineer Remarks: Installation Engineer's Remarks:
06/10/2022 approved from installation and follow up new Regulations for the
Installation of Electrical Wiring 2010
Approved, Ref # 366/22. All equipment¶s/materials to as per KM standard and
specifications .
Engr, Bashir Applicant to first submit material submittal before manufacture of
LVP To Take Approval From KAHRAMAA
Planning Engineer Remarks:
- this BP for plot no. 16 of (Jerry Al Samur Logistics Ph-2).
-Supply subject to scheme 18-888-2022 and infrastructure scheme 18-28-2017 (Jerry Al Samur Logistics Ph-2).
-All cost (including supply of materials + labor) by client. No cost to KM.
-Transformers is (1x1600KVA Oil type). Singles between Tx & LVP.
-S/S no. (39962).
-Any works near KM EHV/HV/MV/LV cables, customer to obtain SIS from KM Trans.&Dist. O&M sections.
-civil approval ref. 366/22.
-MD= 821.4 KW
-CL= 1053.8 KW
9Oct2022HH
Electrical supply to the plot is subject to the following conditions
- Availability of generation transmission capacity
- Availability of sufficient funds in the relevant budget
- Availability of sufficient roads in the area to permit the laying of necessary cables for power supply
- Upgrading of existing distribution network
- Applicant should construct a sub-station in his premises
- Kahramaa reserves the right to use the Substation and Transformer(s) in applicant's plot to supply electricity to other
customers
- Related Schema number : 18-888-2022 & infra 18-28-2017
Additional Conditions to the B.P.
ΝΫϭϣϧϟΫϫϲϓέϭϛΫϣϟϝϳλϭΗϠϟϊϗϭΗϣϟΦϳέΎΗϟϥϣΔϧγΓΩϣϟΔΣϟΎλΔλΧέϟϩΫϫ
˯ΎϧΑϟϲϓ˯ΩΑϟϝΑϗϥϳϛέΗηϣϟΕΎϣΩΧΓέΩ·έΎρΧ·ϙϟΎϣϟϰϠϋ
˯ΎϧΑϟ˯ΎϬΗϧΦϳέΎΗϥϣέϬηΔΗγϝΑϗϝϳλϭΗϟΏϠρΑϡΩϘΗϟϭϝϳλϭΗϟΔρϘϧΔϳϬΗωϭέηϣϠϟΔϳΎΑέϬϛϟΕΩϳΩϣΗϟϝϭΎϘϣϰϠϋ
2009Δϧγϟ4ϡϗέϥϭϧΎϘϟϡΎϛΣϭϥϭϧΎϘϟϊοΧΗΔλΧέϟ
CSD-CSI-P1/F1 Issue:2 21-06-2011