NMI-001 Partnership Details
NMI-001 Partnership Details
: AAA-2650
PARTNERSHIP WITH LIMITED LIABILITY
PUNE OFFICE
SAI RADHE,OFFICE NO 201,2ND FL.,100 KENNEDY ROAD,
BEHIND HOTEL SHERATON GRAND, PUNE - 411001.
Tel. +91 20 66449100
JW CONSULTANTS LLP
[Link]
design@[Link]
NOTES
4.
MANAGER
THE CONTRACTOR MUST CHECK ALL DIMENSIONS AND
2000
THK
HOTEL GROUND FLOOR
AMSL +9.65m EL.±0.0m. (RL+9.05m) (Road Level) AMSL +9.05m
DETAILS AND BE RESPONSIBLE FOR THE SAME. ANY
DISCREPANCY SHALL BE BOUGHT TO THE NOTICE OF THE
300
EL.±0.0m. (RL+9.05m) (Road Level) AMSL +9.05m
EL.-2.0m. Wall Top
FILL CONSULTANT / PROJECT MANAGER
EL.±0.0m. to -1.0m. 1
5. THIS DRAWING IS TO BE READ AND NOT SCALED.
3000m
RCC Wall 1 6. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL
HARD ROCK RELEVANT BUILDING DESIGN, INTERIOR, STRUCTURAL AND
3rd BASEMENT FLOOR Main Steel T25 @ 200mm C/C(Uniform) Main Steel T20 @RETAINING
200mm WALL
C/C(Uniform) EL.-2.0m. SERVICES DRAWINGS. DISCREPANCIES, IF ANY, NOTICED
AMSL -6.20m
Dist. Steel BY THE CONTRACTOR SHALL BE BROUGHT TO THE
T10 @ 200mm C/C EL.-3.0m. ATTENTION OF THE CONSULTANT / PROJECT MANAGER
1 150
900
RETAINING WALL
PLUM CONCRETE(M10) PLUM CONCRETE(M10) PLUM CONCRETE(M10) AND GOT RESOLVED WITHIN DAYS OF ISSUE OF THIS
76mm Dia Weep Holes @1.5m.
1st BASEMENTC/C
DRAWING OR PRIOR TO SEVEN (7) WORKING
1 RETAINING WALL
FILL FLOOR
AMSL +4.05m
PROCUREMENT / EXECUTION OF WORKS AT SITE,
FILL WITH Current Excavation Profile WHICHEVER IS EARLIER.
7. DRAWING APPROVAL IS FOR THE CONFORMITY WITH
FOOTING FOOTING
BOULDERS
D
D
PCC 1st BASEMENT FLOOR
AMSL +4.05m OUTLINE DESIGN INTENT AND DOES NOT RELIEVE THE
BLOCK EXCAVATION LEVEL
300
300
300
RAFT SLAB RAFT SLAB RAFT SLAB CONTRACTOR/ SUBCONTRACTOR FROM FULL
-7.6M 1st BASEMENT FLOOR Main Steel RESPONSIBILITY FOR THE TECHNICAL ACCURACY,
AMSL +4.05m
T32 @ 200mm C/C(Extra) INTEGRATION AND FITNESS FOR THE PURPOSE OF
Geo membrane (From -4.0m to -12.0m) Approx. 200mm DESIGN.
100MM THK 8. THE ABOVE NOTES FORM THE ESSENTIAL INSTRUCTIONS
Graded sand 75mm EL.-8.0m. TO INFORMATION PROVIDED IN THIS DRAWING. THE
PCC(M10)
SUB SURFACE DRAINAGE SYSTEM RETAINING WALL NON-CONFORMITY TO THESE WOULD CONSTITUTE TO THE
50MM THK CONSTRUCTION NOT BEING CARRIED OUT AS PER THE
WATER PROOFING EL.-9.0m.(RL-0.05m.)(Current Exc. Level) DESIGN INTENT. THE CONSULTANT / PROJECTMANAGER IS
200
in.)
60°
(M AT LIBERTY TO INSTRUCT THE CONTRACTORS TO
SECTION -2 EL.-6.5m.(Current Exc. Level)
6.0
m WATER PROOFING
RETAINING WALL
WATER PROOFING
EL.-11.0m. 2nd BASEMENT FLOOR
AMSL -1.075m KEY PLAN:
(M in.)
WATER PROOFING
5.0m
2nd BASEMENT FLOOR
AMSL -1.075m
Free Length
HARD SOUND ROCK
75°
RETAINING WALL
Fixed
(In Hard Rock)8.0m
Length
Near Vertical Cut Open Links T10 @600mm C/C NEAR VERTICAL CUT
STAGGERED ANCHOR RETAINING WALL
250
Fixed
(In Hard Rock)10.0m
Length
HARD SOUND ROCK RETAINING WALL
1M
225
PLUM CONCRETE(M10) HILTI RE-500 V3 GROUT RAFT SLAB BLOCK EXCAVATION LEVEL
EL.-16.65m. (RL.-7.6m.)([Link].)
-7.6M GOOD FOR CONSTRUCTION
150
EL.-16.65m. (RL.-7.6m.)([Link].)
RAFT SLAB BLOCK EXCAVATION LEVEL
-7.6M
STITCH SLAB
100MM THK
PCC(M10)
800MM
50MM THK
WATER PROOFING
SECTION -1
NOS DESCRIPTION DRW CHK DATE
SCALE 1:50
NOTE:- 1) ROCK BREAKING ALONG THE PERIMETER (5.0m) OF THE BASEMENT EXCAVATION TO BE DONE NOTE:- 1) ROCK BREAKING ALONG THE PERIMETER (5.0m) OF THE BASEMENT EXCAVATION TO BE DONE R0 GOOD FOR CONSTRUCTION Sumeet Saurabh 21.03.2025
WITH DIAMOND CUTTING OR CONVENTIONAL ROCK BREAKERS. WITH DIAMOND CUTTING OR CONVENTIONAL ROCK BREAKERS. R1 CLOUDED PORTION REVISED Sumeet Saurabh 24.04.2025
CLOUDED PORTION REVISED Sumeet Saurabh 21.05.2025
2) EXCAVATION AND BASEMENT CONSTRUCTION TO BE COMPLETED IN DRY SEASON 2) EXCAVATION AND BASEMENT CONSTRUCTION TO BE COMPLETED IN DRY SEASON R2
AMSL +9.05m
ZONE-1A
DESIGNERS GROUP
300 6.0m #2 Sumeet Sadan, Bhagoji Keer Marg, Mahim, Mumbai, Maharashtra
HOTEL GROUND FLOOR
AMSL +9.65m 400016 Ph: +91-9594882000; admin@[Link]
PAPL CORP
EL.±0.0m. to -7.5m. Plot no 414/4, Door no 389, 2nd Floor, 1st Main Road, 1st Link Rd,
Nehru Nagar, Kottivakkam, Chennai 600041, +91-44-42613912
SKIN WALL
RETAINING WALL
LIGHTING EXECUTIVE CONSULTANT
MODERATELY / SLIGHTLY
400 WEATHERED ROCK WATER PROOFING
2nd BASEMENT FLOOR BRAINWAVE DESIGNS
AMSL -1.075m
Vile Parle East, d/1, Near garware, Parle Colony, Mumbai, Maharashtra
EL.±0.0m. to -10.5m. 400057; [Link]; Tel: +91-7071111182;
200MM THK EL.-11.0m
RETAINING WALL
LINER WALL FACADE ENGINEERING CONSULTANT
WATER PROOFING
2nd BASEMENT FLOOR
TRAFFIC CONSULTANT
AMSL -1.075m
HARD SOUND ROCK GMD CONSULTANTS PVT LTD
3rd BASEMENT FLOOR
AMSL -6.20m
503-504, Mayuresh Chambers, Plot No. 60, Sector 11,
CBD Belapur, Navi Mumbai - 400 614
PLUM CONCRETE(M10)
Tel: +91 22 2756 4586 / 2756 5313
[Link]
RAFT SLAB BLOCK EXCAVATION LEVEL
EL.-16.65m. (RL.-7.6m.)([Link].)
-7.6M
RETAINING WALL
NOTE:- 1) ROCK BREAKING ALONG THE PERIMETER (5.0m) OF THE BASEMENT EXCAVATION TO BE DONE STRUCTURAL CONSULTANT
WITH DIAMOND CUTTING OR CONVENTIONAL ROCK BREAKERS.
JW CONSULTANTS LLP
2) EXCAVATION AND BASEMENT CONSTRUCTION TO BE COMPLETED IN DRY SEASON Ruparel Iris, 6th Floor, Near Big Bazaar, Tulsi Pipe Road,
Matunga (W), Mumbai, Maharashtra - 400 016 India
3) THIS ZONE TO BE REVIEWED FOLLOWING COMPLETION OF EXCAVATION FOR REQUIREMENT OF SHOTCRETING / NAILING. Ph: +91-22-24397400 [Link]
(AS PER GEOTECHNICAL CONSULTANTS DRAWING)
MEP & SUSTAINABILITY CONSULTANT:
ECOFIRST SERVICES LIMITED
15th floor, Empire Tower, Cloud City Campus GUT NO
31, Village Elthan, Kalwa Industrial Estate, Thane -
Belapur Rd, Airoli, Navi Mumbai, Maharashtra 400708
3rd BASEMENT FLOOR pH: +91-22-6114-8181 [Link]
AMSL -6.20m
BLDG PLANNING, LANDSCAPE & INTERIORS EXECUTIVE CONSULTANT
450
-6.275 m -6.275 m
2. Due care shall be taken to ascertain that requisite strength of concrete is gained [Link]
300
1700.000
1700.000
Plum Concrete
1500 Footing 1500 Footing 3. Nominal covers Mild Moderate Severe
300 mm Thk Stitch RAFT 300 mm Thk Stitch RAFT
200mm NSW
300 mm Thk Stitch RAFT CLIENT:
STITCH SLAB
Waterproofing-50mm
100MM THK
2000.000 Waterproofing-50mm
II Columns & walls with width 200mm & above
PCC-100mm Waterproofing-50mm SFR SFR 40 40 45
PCC(M10) (to column/wall links)
4825.000
100 mm PCC
Waterproofing-50mm 100 mm PCC 1500 Footing III Wall width below 200mm
50MM THK 30 30 45
(to wall links)
3500.000
WATER PROOFING
IV Beams
30 30 45
SECTION -1 100 mm PCC Waterproofing-50mm
(to beam stirrups)
SCALE 1:50 V Slabs
25 30 45
VI Lift & staircase walls 40 40 45 COPYRIGHT:
SECTION S-S (to links of column & wall) The concepts, diagrams and information contained in this document are the sole property
and copyright of Adani Airport Holdings Ltd. Any use, copying, reproduction or disclosure
300 mm Thk Stitch RAFT
S VII Staircase & Lift m/c room top and btm slabs 30 30 45 of the document, whether directly or indirectly, or in whole or in part without the prior
1 : 50 SECTION M-M written permission of Adani Airport Holdings Ltd is prohibited
M 1 : 50
4. Beams with depth more than 750mm, provide side-face reinforcement.
5. Substratum shall be approved from our office before laying P.C.C.
6. Minimum clear spacing between any two longitudinal bars in beam= 50mm. PROJECT NAME:
7. All laps (Ld) shall be staggered & not more than 50% bars to be lapped
at any given section.
GRADE OF REINF. M20 M25 M30 M35 M40 & ABOVE CSD - ADANI - NAVI MUMBAI
Fe 500D 57 X D 49 X D 46 X D 40 X D 36 X D
Fe 550D 63 X D 54 X D 50 X D 44 X D 40 X D
For bundled bars, Ld shall be increased by 10% for 2 bars in contact, SCALE: 1:100 DATE: 21.05.2025
20% for 3 bars in contact and 33% for 4 bars in contact.
8. All buildings shall have tie beams/plinth beams at ground/plinth level. DESIGNED BY: T.P. DRAWN BY: Sumeet
9. If footings overlap with each other, necessary revision shall be obtained from our office.
10. Design is valid for number of floors as indicated in the drawing.
11. At any level where column size gets reduced in either dimension CHECKED BY: Saurabh APPROVED BY: R.A.W.
tie beams/plinth beams are essential.
12. For cantilevers, top bars to be anchored behind from external face of support for - Ld or SHEET TITLE
span of cantilever - whichever is greater.
O-LW6 O-LW8 O-LW13 O-LW15 O-LW17
O-C33 O-C36 O-LW25
600X5750 200X3050 500X4420
400X2700 200X2700 400X3000 200X2700 400X2700
BASEMENT 03-SSL
13. Fire rating considered:- 2 Hour.
BASEMENT 03-SSL
-6.275 m -6.275 m 14. Any Water used in construction including for mixing concrete, mortar, curing, finishing
purposes or any other miscellaneous purposes must comply with requirements of
Plum Concrete Plum Concrete Plum Concrete Plum Concrete
SECTIONAL DETAILS FOR BLOCK EXCAVATION
1300.000
IS 456 : 2000 at all times. Ascertaining the quality and source of water is the sole
1700.000