Gac BGC Restroom

This document is a cost proposal for repair works at the GAC BGC Showroom in Taguig, submitted by PSMB Construction. The total cost for the project is PHP 413,000, which includes various demolition, supply, and installation works, with a completion time of 4 to 6 weeks. Payment terms include a 60% downpayment and 40% progress billing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views3 pages

Gac BGC Restroom

This document is a cost proposal for repair works at the GAC BGC Showroom in Taguig, submitted by PSMB Construction. The total cost for the project is PHP 413,000, which includes various demolition, supply, and installation works, with a completion time of 4 to 6 weeks. Payment terms include a 60% downpayment and 40% progress billing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Address: 191 Pasig City, Metro Manila, Philippines, 1611 | Contact Number: 09171121092 | psmb.construction@gmail.

com
PROJECT REPAIR WORKS
LOCATION GAC BGC Showroom, 32
nd
Street, Rizal Drive, BGC, Taguig.
OWNER/THRU Engr. Sherwin Santos
CONTRACTOR PSMB CONSTRUCTION
SUBJECT
DATE NOVEMBER 26 2024

Dear Ma'am/Sir:
We are pleased to submit to you the Cost Proposal for the following Scope of Works
Attached herewith:

ITEM NO. Item (Scope of Work) Qty UNIT MATERIALS LABOR TOTAL TOTAL COST

1.00 GENERAL REQUIREMENTS


1.01 Mobilization 1 lot 7,000.00 7,000.00

1.02 Hauling & Delivery of Construction Materials 1 lot 10,500.00 10,500.00


1.03 Admin Permit 1 lot - -
1.04 Site Preparation and Safety Covers 1 lot 3,500.00 3,500.00
1.05 Demobilization 1 lot 7,000.00 7,000.00
SUBTOTAL 28,000.00
2.00 DEMOLITION WORKS
Existing Cubicle Part/itions, Male Urinal,
Water Closet, Lavatory, Faucet, Plumbing
Accessories, Outlets, Lightings, Exhaust Fan,
2.01 Wall and Floor Tiles 1 lot - 45,000 45,000 45,000.00
2.02 Damaged tiles at the staircase 17 steps - 1,800 1,800 30,600.00
2.03 New tiles for staircase (Supply and Install) 17 steps 2,800 2,100 4,900 83,300.00

SUBTOTAL 158,900.00

3.00 SUPPLY AND INSTALLATION WORKS


Restroom Wall -
3.01 CHB Works 3.3 sqm 2100 1,800 3,900.00 12,870.00
Plastering Works 3.3 sqm 2100 1,800 3,900.00 12,870.00
Painting Works (Ceiling) 9 sqm 2100 1,800 3,900.00 35,100.00
Standard Phenolic Partition Cubicle (To
specify design) 1 lot - -
800mm PVC Door louver 1 pc 4500 2,355 6,855.00 6,855.00
700mm PVC Door louver 2 pc 4500 2,355 6,855.00 13,710.00
SUBTOTAL 81,405.00

4.00 INSTALLATION WORKS ONLY (OWNER SUPPLIED MATERIALS)


30x30 Floor and Wall tiles (includes
adhesives, consumables) 57.12 sqm 850 700 1,550.00 88,536.00
Waterproofing Works 9.8 sqm 1,200.00 800 2,000.00 19,600.00
Installation of Watercloset , fittings and
accessories (Sealant and consumables) 2 set 1,200.00 1,200 2,400.00 4,800.00
Lavatories basin-type 2 set 1200 1,200 2,400.00 4,800.00
Faucets & Fittings 2 pc 0 1,200 1,200.00 2,400.00
Bidet & Fittings 2 pc 1,200 1,200.00 2,400.00
Floor drain (to check quantity) 1 pc 1,200 1,200.00 1,200.00
Mirrors (to check dimension) 1 unit - -
Installation only 6"Recessed Downlight (15W) 2 pc 1,200 1,200.00 2,400.00
Installation only4 Downlight (10W) 2 pc 1,200 1,200.00 2,400.00

Page 1 of 3
Ceiling Exhaust fan (Install only) 2 pc 1,200 1,200.00 2,400.00
2 gang outlet (Install only) 2 pc 1,200 1,200.00 2,400.00
Switch (Install only) 2 pc 1200 1,200.00 2,400.00
Wiring Works 1 lot 8500 3500 12,000.00 12,000.00
SUBTOTAL 147,736.00
TOTAL COST 416,041.00
DISCOUNT PRICE 3,041.00
GRAND TOTAL (VAT Ex.) 413,000.00
NOTE: Permit, other fees and not mentioned on the proposal are excluded.
All items are quoted as per plan/scope of work stated above and is valid until November 2024
TARGET TIME OF COMPLETION: 4 to 6 Weeks

PAYABLE TO:

BANK ACCOUNT NAME ACCOUNT NO. PAYMENT TERMS


EASTWEST BANK PSMB CONSTRUCTION 200033353676 60% DOWNPAYMENT
BDO BANK JONALYN B. BERNARDO 011440075229 40% PROGRESS BILLING

Prepared Approved By:

Engr Jaspher Alberto Sho Bernardo


Project Engineer General Manager CONFORME
PSMB CONSTRUCTION PSMB CONSTRUCTION

Page 1 of 2

SITE CONDITION:

Page 2 of 3
RESTROOM DIMENSIONS

STAIRS

Page 2 of 2

Page 3 of 3