Mechanical Work Status for Structures

The document outlines the pending mechanical work for various structures, including installations and pipeworks for tanks, pumps, and compressors across multiple buildings. Specific tasks include the erection of dosing and backwash pumps, air compressors, and various piping works. Additionally, it notes material and team requirements for completing these tasks, highlighting the need for foundations and dewatering in several areas.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views6 pages

Mechanical Work Status for Structures

The document outlines the pending mechanical work for various structures, including installations and pipeworks for tanks, pumps, and compressors across multiple buildings. Specific tasks include the erection of dosing and backwash pumps, air compressors, and various piping works. Additionally, it notes material and team requirements for completing these tasks, highlighting the need for foundations and dewatering in several areas.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

S.

No Name of structure Mechanical work pending


1)8000 L syntex tank instlation.
2) Dosing
pump erection 3)Dosing pump
1 Chemical House inlet & outlet pipeing works

2 Annexure Building Air compressor erection 2nos

1)Backwash pump erection. 2)


Backwash pump inlet & outlet
pipeing works. 3)sampling pump
erection 4) sampling pump
3 CWPH
inlet & outlet pipeing works.
5)Air compressor erection &
pipeing works. 6)Drain
pump erection & pipeing works.

4 CLF -2

1)Submersable mixcers erection.


2)Sludge pump
5 Sludge well
erection. 3)sludge pump delivery
line pipeing up to sludge thickner.
1)Wash water recycling pump
erection. 2)wwrp
delivery line pipenig up to
aericator. 3)350 mm
sluice valve fixing 2 nos.
6 Wash water recycling/recovery tank 4)700mm*1100mm sluice gate
fixing 2 nos. 5)2oo
mm KGV fixing 2 nos. 6)sludge
pump erection 2 nos. 7)sludge
pump delivery line pipe up to
sludge well

7 Sludge thickner

1)submersable mixcers erection.


2)screw pumps
8 Sludge collection chamber erection 2 nos. 3)sludge
collection chamber to SDB
pipeing works

1)Filterate transfer pump


erection 2 nos. 2)FTP
9 Sludge drying beds delivery line up to aericator.
3)150 KGV fixing 14
nos with pipeing works

1)Backwash tank to filter house


700 mm DI pipeing works. 2)BWT
to chemical house 100 mm
10 Backwash tank
pipeing works. 3)BWT
overflow & drain line connection
up to drain

1)filter house to WWRCT back


wash 800mm drain line
11 Filter house
connection. 2)Drain
pump erection & pipeing works
800 mm over flow line to nearest
12 Raw water channel
drain
Material pending Team required Remarks

1)syntex tank,U-pvc pipe & fittings Dosing pump foundation pending.

Air compressor foundation pending

Back wash pump,sampling


Drain pumps Team required pump,air compressor foundation
pending

De watering required

Submersable mixers Team required


Team required

Team required De watering required

Team required screw pump foundation pending

Team required

Team required De watering required

Drain pumps Team required


800 mm pipe Team required