S.
No Name of structure Mechanical work pending
1)8000 L syntex tank instlation.
2) Dosing
pump erection 3)Dosing pump
1 Chemical House inlet & outlet pipeing works
2 Annexure Building Air compressor erection 2nos
1)Backwash pump erection. 2)
Backwash pump inlet & outlet
pipeing works. 3)sampling pump
erection 4) sampling pump
3 CWPH
inlet & outlet pipeing works.
5)Air compressor erection &
pipeing works. 6)Drain
pump erection & pipeing works.
4 CLF -2
1)Submersable mixcers erection.
2)Sludge pump
5 Sludge well
erection. 3)sludge pump delivery
line pipeing up to sludge thickner.
1)Wash water recycling pump
erection. 2)wwrp
delivery line pipenig up to
aericator. 3)350 mm
sluice valve fixing 2 nos.
6 Wash water recycling/recovery tank 4)700mm*1100mm sluice gate
fixing 2 nos. 5)2oo
mm KGV fixing 2 nos. 6)sludge
pump erection 2 nos. 7)sludge
pump delivery line pipe up to
sludge well
7 Sludge thickner
1)submersable mixcers erection.
2)screw pumps
8 Sludge collection chamber erection 2 nos. 3)sludge
collection chamber to SDB
pipeing works
1)Filterate transfer pump
erection 2 nos. 2)FTP
9 Sludge drying beds delivery line up to aericator.
3)150 KGV fixing 14
nos with pipeing works
1)Backwash tank to filter house
700 mm DI pipeing works. 2)BWT
to chemical house 100 mm
10 Backwash tank
pipeing works. 3)BWT
overflow & drain line connection
up to drain
1)filter house to WWRCT back
wash 800mm drain line
11 Filter house
connection. 2)Drain
pump erection & pipeing works
800 mm over flow line to nearest
12 Raw water channel
drain
Material pending Team required Remarks
1)syntex tank,U-pvc pipe & fittings Dosing pump foundation pending.
Air compressor foundation pending
Back wash pump,sampling
Drain pumps Team required pump,air compressor foundation
pending
De watering required
Submersable mixers Team required
Team required
Team required De watering required
Team required screw pump foundation pending
Team required
Team required De watering required
Drain pumps Team required
800 mm pipe Team required