NATIONAL HIGHWAY AUTHORITY OF INDIA
Development of Delhi-Meerut Expressway From KM 0.000 To KM 27.500 including 6/8
Laning of NH-24 From KM 0.000 To KM 49.346 (Hapur Bypass) in the state of Delhi and
Name of the Project :
Uttar Pradesh under on DBFOT Basis- Package-II From Existing KM 8.360 To Existing KM
27.740 (UP Border To Dasna) in the state of Uttar Pradesh- Hybrid Annuity Model.
Client : National Highway Authority of India
Gentisa-Payma, S.L. in association with Segmental Consulting & Infrastructure Advisory
Independent Engineer :
(P) Ltd.
Concessionaire : APCO Chetak Ultraway [Link].
EPC Contractor : APCO Infratech Pvt. Ltd.
SPECIFIC GRAVITY OF BITUMEN
Laboratory No. Date of Sampling
Type of Material Sampled By
Location/Source Date of Testing
Grade of Bitumen Test Conducted By
Proposed Use
Test
Description
1 2 3
Pycnometer Bottle Number
Wt. of Pycnometer and Water, (A) gm
Wt. of Pycnometer, Sample and Water (B) gm
Wt. of Sample (C) gm
Bulk Specific Gravity (GB) = C/((C - (B-A))
Average
Remarks :- ----------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------
EPC Contractor's Concessionaire's IE's
Representative Representative Representative