CALCULATION OF HYDRAULIC DISCHARGE AND DESIGN OF OPENING
Name of Project :IMPROVEMENT OF SH 57 TO TINTRAJ DHANDEGAON DEVGAON GOSAVIWADI
KHANDESHWARWADI RATANAPUR ANALA KANDARI KUMBEPHAL PACHPIMPALA PARANDA MUNGHSHI
ROAD KM 0+00 TO 65+00 (TINTRAJ SH 57 TO PARANDA KURDUWADI (PALKHI MARG) (TOTAL LENGTH 38.250
KM)
1 Chainage of H.P.C : 0+926
2 Description of Catchments : 0.086 [Link] or Acre : 21.25
3 Height of Fill permitted : 0.6 Mtr
4 Pipe Daimeter Proposed : 1.2 Mtr No : 1
5 Length of pipe : 12 Mtr
PROCEDURE ADOPTED :-
For finding discharge dickens's formula adopted
for coefficient of discharge for plain terrain = 14 to 19
Q= CM¾
Q= 17 x ( 0.086 )¾
Discharge by Dickens's formula Q= 2.7 cum/sec
PROPOSAL :- 1.2 Mtr Dia NP-4 Hume Pipe is proposed to provide
Length of Pipe L = 12
For Square entry Ke = 1.107 (R)^0.5 = 0.86 As per Table 19.1 Values of Ke and Kf of IRC SP13
Kf = 0.00394L/R^1.2 = 0.07 Kf as per Table 19.1 Values of Ke and Kf of IRC SP13
0.5
H
Velocity V = 4.43 X
1+Ke+Kf
V= 2.47 m/Sec
Area of 1200mm one Pipe =A ∏d^2
= 1.13 Sqr. Mtr
4
Discharge by one Pipe Q = A X v = 2.791 cum / sec
No of Pipe Required :-
Water way required = 2.7 /v
= 1.093 Sqm
Area of 1200mm one Pipe =A ∏d^2
= 1.13 Sqr. Mtr
4
No of Pipe required = Total water way / area of one pipe
= 0.967
Say = 1 No of Pipe
Hence provide 1 row of 1.2 Mtr dia NP-4 Pipes