Flowline Installation
Flowline Installation
Overall input
Design gas production flowrate 80.00 MMscf/day Reserves 441.00 Bscf
Design associated liquids flowrate 5.49 Mbbl/day Terrain Swamp
Design gross liquids flowrate 5.54 Mbbl/day Elevation 164.00 ft
Water injection No Reservoir depth 8210.00 ft
Water injection capacity factor - Reservoir pressure 3830.00 psia
Design water injection flowrate - Reservoir length 4.13 mile
Gas injection No Reservoir width 2.06 mile
Design gas injection rate -
Condensate gas ratio 68.60 bbl/MMscf
Swing factor 1.30
Distance to operations base 62.10 mile
Distance to delivery point 62.10 mile
Fluid characteristics
Oil density @ STP 48.60 lb/ft³ H2S content 0.00 ppm
CO2 content 1.39 % Gas molecular weight 19.30
Waxy crude No Initial water cut 1.00 %
Number of wells
Production wells 2 Gas injection wells -
Water injection wells - Maximum well deviation 60.00
Item name Metric name Metric value Metric units Metric description
Project
Total project CAPEX (including project costs) / BOE recoverable reserves (based
Total project CAPEX/BOE of recoverable reserves 0.395 $/BOE
on field level inputs)
Components
Onshore drilling
Onshore drilling 1
Cost/well 6,540,000 $/well Total cost / total number of wells
Cost/foot 731 $/ft Total cost / sum of the measured depths
Wellpad groups
Wellpad group 1
Cost/BOE/day hydrocarbon throughput 317 $/BOE/day Total cost / total design oil and gas throughput in BOE/day
Cost/well 2,930,000 $/well Total cost / total number of wells
Production facilities
Production facility 1
Cost/BOE/day hydrocarbon throughput 245 $/BOE/day Total cost / total design oil, gas and gas injection throughput in BOE/day
Cost/ton 107,000 $/t Total cost / total dry weight
Onshore pipelines
Two phase pipeline (onshore 1)
Cost/mile length.inch diameter 114,000 $/mile.in Total cost / sum of the length times diameter for each section
Cost/BOE/day hydrocarbon throughput 739 $/BOE/day Total cost / total design oil and gas throughput in BOE/day
PRODUCTION PROFILE REPORT
Onshore drilling 1 13,073,000 988,000 3,752,000 4,944,000 393,000 500,000 317,000 2,179,000
Wellpad group 1 5,850,000 201,000 463,000 54,000 3,742,000 257,000 222,000 148,000 763,000
Production facility 1 4,528,000 1,225,000 338,000 130,000 1,811,000 207,000 111,000 115,000 591,000
Two phase pipeline (onshore 1) 13,645,000 4,554,000 5,564,000 650,000 751,000 346,000 1,780,000
CAPEX TOTALS 40,264,000 2,414,000 11,366,000 184,000 16,061,000 1,644,000 1,751,000 1,003,000 5,841,000
Decommissioning
Cost centre Totals Scrap
/ removal
E & A cost 0.00 Drilling cost 13.07 Facilities cost 27.20 Operating cost 178.94 Decommission cost 7.53
Cost/BOE 0.00 Cost/BOE 0.13 Cost/BOE 0.27 Cost/BOE 1.76 Cost/BOE 0.07
Design production
1.92 28.00
471.71 101.898181
EXPLORATION & APPRAISAL PROD. DRILLING FACILITIES COSTS OPERATING COSTS CO2 emitted PRODUCTION
PROJECT
Year Production Wellpad Infra- Other Variable DECOMM. Cond.
COSTS Expl. Seismic Apprsl. Tangible Intangible Terminals Pipelines Fixed OPEX Tariffs Leases CO2 tax 000s t/yr Oil MMbbl/yr Gas Bscf/yr
facilities groups structure facilities OPEX MMbbl/yr
0 30.28 441.43
TOTAL 0.00 0.00 0.00 0.00 5.86 7.21 4.53 5.85 0.00 13.65 3.17 0.00 54.36 14.24 110.34 0.00 0.00 7.53 4.89 0.00 30.28 441.43
1 5.86 7.21 1.74 2.54 0.27 3.17
2 2.79 3.31 13.38 1.09 0.14 1.15 0.08 0.32 4.62
3 2.64 0.47 3.92 0.21 1.08 15.70
4 2.69 0.77 6.70 0.27 1.84 26.78
5 2.72 0.94 8.31 0.31 2.28 33.25
6 2.77 1.03 8.31 0.31 2.28 33.25
7 2.79 1.06 8.31 0.31 2.28 33.25
8 2.73 1.03 8.31 0.31 2.28 33.25
9 2.74 1.06 8.31 0.31 2.28 33.25
10 2.72 0.94 8.31 0.31 2.28 33.25
11 2.98 1.00 8.06 0.30 2.21 32.23
12 3.07 0.95 7.24 0.28 1.99 28.95
13 2.69 0.80 6.20 0.26 1.70 24.79
14 2.68 0.74 5.31 0.24 1.46 21.23
15 2.65 0.53 4.55 0.22 1.25 18.18
16 2.69 0.55 3.89 0.21 1.07 15.57
17 2.70 0.52 3.33 0.19 0.91 13.33
18 2.63 0.44 2.85 0.18 0.78 11.42
19 2.63 0.43 2.45 0.17 0.67 9.78
20 2.61 0.27 2.09 0.17 0.57 8.37
21 2.61 0.32 1.79 0.16 0.49 7.17
22 1.53 0.25 0.95 0.09 0.26 3.81
23 2.09
24 5.02
25 0.42
True
Component values
Infrastructure 1
Terrain Swamp
Two phase pipeline (onshore 1)
Nominal diameter 12.00 in
Fixed pressure when sizing Inlet pressure
Pipeline sections 1
Section a
Nominal diameter 12.00 in
Production facility 1
Control and comms
Control system Distributed
False
Message list
Warning Field level: Maximum flowline length before manifolding
Flowline lengths shorter than 2.485 mile may result in a large number of manifolds.
Onshore drilling input report
Component name Onshore drilling 1
Well Well type TVD Kick Horizontal Profile Horizontal Measured Maximum Rig class Completion Duration
off shift type section depth deviation Drilling Completion type Drilling Completion
(degrees from
ft ft ft ft ft vertical) days days
1 Production 8,210 0 0 Vertical 0 8,200 0 C C Cased hole 39.9 13.9
2 Production 8,210 984 4,750 BH 0 9,680 35 C C Cased hole 44.4 16.5
Total depth Total duration
ft days
17,880 115
Onshore drilling 1 Name Onshore drilling 1
EQUIPMENT
CAPITAL COST % COST
Equipment 988,000 0 0
Total Equipment $ 0
MATERIALS
CAPITAL COST % COST
Materials 3,752,000 0 0
Total Materials $ 0
CONSTRUCTION
CAPITAL COST % COST
Construction 4,944,000 20 989,000
Total Construction $ 989,000
DESIGN & PROJECT MANAGEMENT
CAPITAL COST % COST
Design & Project management 893,000 0 0
Total Design & project management $ 0
INSURANCE & CERTIFICATION
CAPITAL COST % COST
Insurance & certification 317,000 0 0
Total Insurance & certification $ 0
CONTINGENCY
CAPITAL COST % COST
Contingency 2,179,000 0 0
Total Contingency $ 0
SCRAP MATERIAL
QUANTITY UNIT RATE COST
Scrap material 0 t -218 0
Total Scrap material $ 0
Onshore pipeline input report
Component name Two phase pipeline (onshore 1)
Fixed diameter No
Fixed pressure Inlet pressure
Pipeline sections
Section Inlet Oulet Inlet Oulet Length Nominal Wall Corrosion Cladding Insulation Coating + Corrosion
pressure pressure elevation elevation diameter thickness allowance thickness U value wrapping protection
psia psia ft ft mile in in in Btu/hr.ft².°F
Section A 2,400 2,330 164 164 10 12 0.675 0.118 - None Yes Yes
MATERIALS
CAPITAL COST % COST
Materials 4,554,000 35 1,594,000
Total Materials $ 1,594,000
CONSTRUCTION
CAPITAL COST % COST
Construction 5,564,000 35 1,947,000
Total Construction $ 1,947,000
DESIGN & PROJECT MANAGEMENT
CAPITAL COST % COST
Design & Project management 1,401,000 0 0
Total Design & project management $ 0
INSURANCE & CERTIFICATION
CAPITAL COST % COST
Insurance & certification 346,000 0 0
Total Insurance & certification $ 0
CONTINGENCY
CAPITAL COST % COST
Contingency 1,780,000 0 0
Total Contingency $ 0
SCRAP MATERIAL
QUANTITY UNIT RATE COST
Scrap material 2,054 t -218 -448,000
Total Scrap material $ -448,000
Production facility input report
Component name Production facility 1
Fluid capacities
Inlet high pressure fluids Inlet medium pressure fluids
Arrival temperature 174 °F Arrival temperature 32 °F
Arrival pressure 2400 psia Arrival pressure 0 psia
Prefabrication Winterisation
Type Other - Increased foundation No
Piping spools Yes 75% Winterisation of facilities No
Steelwork Yes 75%
Oil processing Trains Des. cap./train Pressure Temp. out Wt / train Duty Type
Separator 1 - - - - - -
Separator 2 - - - - - -
Separator 3 - - - - - -
Test separator - - - - - -
Dehydrator - - - - - - -
Desalter - - - - - - -
Stabiliser - - - - -
Heat exchanger 1 - - - - - -
Heat exchanger 2 - - - - - -
Heat exchanger 3 - - - - - - -
Heat exchanger 4 - - - - - - -
Product storage Oil Oil and water NGL LPG Gasoline Water
Number of days storage - - - - - -
Storage capacity - - - - - -
Pressure vessel type - - - - - -
Number of vessels - - - - - -
Vapour space - - - - - -
Design capacity / vessel - - - - - -
Number of tanks - - - - - -
Design capacity / tank - - - - - -
Diameter - - - - - -
Height - - - - - -
Length - - - - - -
Product export Oil Oil and water NGL LPG Gasoline Water
Export rate - - - - - -
Pump differential pressure - - - - - -
Total pump power - - - - - -
Metering - - - - - -
Driver type - - - - - -
Derating factor - - - - - -
Derating based on - - - - - -
Derated power - - - - - -
Elevation - - - - - -
Training - - - - - -
Sparing % - - - - - -
Driver model - - - - - -
Driver rating - - - - - -
Pump weight - - - - - -
Pump driver weight - - - - - -
Metering capacity - - - - - -
Metering weight - - - - - -
Pipeline length Oil Oil and water NGL LPG Gasoline Water
Length - - - - - -
Power generation
Wellpads 0 hp Water injection 0 hp
Export pumping 0 hp Custom equipment 0 hp
Oil processing Produced water treatment 0 hp
Oil pumps 0 hp Utilities 7.75 hp
Oil and water pumps 0 hp Controls and comms 134 hp
NGL pumps 0 hp Base load 14.2 hp
LPG pumps 0 hp Emergency power 140 hp
Gasoline pumps 0 hp
Water pumps 0 hp Type Power distribution only
Gas processing Ambient temperature -
Gas cooling - Derating factor -
Gas dehydration - Total power 156 hp
Acid gas removal - Power factor 0.83
Dewpoint control - Design power 188 hp
NGL production - Number of generators -
LPG production - Design duty/generator % -
Compressors Driver type -
Flash gas 0 hp Model -
Export 0 hp Driver power -
Gas lift 0 hp Generator set weight 0t
Gas injection 0 hp Distribution weight 3.04 t
Emergency power weight 1.8 t
Civils area
Manifolding 0 ft² Export pumping
Oil processing Oil 0 ft²
Separation / stabilisation 0 ft² Oil and water 0 ft²
Heating 0 ft² NGL 0 ft²
Cooling 0 ft² LPG 0 ft²
Dehydration (vessels...) 0 ft² Gasoline 0 ft²
Dehydration tankage 0 ft² Water 0 ft²
Desalting 0 ft² Metering
Gas processing Oil 0 ft²
Cooling 0 ft² Oil and water 0 ft²
Gas dehydration - NGL 0 ft²
Acid gas removal - LPG 0 ft²
Dewpoint control 0 ft² Gasoline 0 ft²
NGL production - Water 0 ft²
LPG production - Gas -
Others Storage
Gas compression - Atmospheric 0 ft²
Water injection - Pressurised 0 ft²
Custom equipment 0 ft²
Produced water - Total foundation area 403 ft²
Utilities 305 ft² Total plot area 2560 ft²
Power generation 85.6 ft² Vehicular access 262 ft²
Power distribution 12.1 ft² Buildings 80.6 ft²
Production facility 1 Name Production facility 1
PREFABRICATION DETAIL
QUANTITY MAN HOURS MAN HOURS COST UNIT RATE COST
PER PER
UNIT MAN HOUR
Equipment 0 t 29 0 45 1,310 0
Steelwork 6 t 119 714 45 5,360 32,000
Piping 4 t 420 1,680 45 18,900 76,000
Electrical 0 t 596 0 45 26,800 0
Instruments 0 t 894 0 45 40,200 0
Others 0 t 298 0 45 13,400 0
Production facility 1 construction detail US Dollars
CONSTRUCTION DETAIL
QUANTITY PRODUCTIVITY MAN HOURS MAN HOURS MAN HOURS COST UNIT RATE COST
TERRAIN PER COST TERRAIN PER
FACTOR UNIT FACTOR MAN HOUR
Site preparation 2559 ft² 2.5 0.07 178 1.2 72 5 13,000
Civils
General 2559 ft² 1.3 0.24 618 1.2 79 19 49,000
Foundations 403 ft² 1.3 1.81 730 1.2 82 148 60,000
Roads 262 ft² 1.3 1.33 348 1.2 79 105 28,000
Buildings 81 ft² 1.3 4.23 342 1.2 80 340 28,000
Skid / spool erection 10 t 1.3 66 660 1.2 86 5,700 57,000
Equipment installation 18 t 1.3 67 1,213 1.2 86 5,790 104,000
Tank erection 0 bbl 1.3 0.41 0 1.2 86 35 0
Steelwork 2 t 1.3 432 864 1.2 84 36,300 73,000
Piping 2 t 1.3 936 1,873 1.2 74 69,600 139,000
Electrical 4 t 1.3 1849 7,397 1.2 80 149,000 596,000
Instruments 3 t 1.3 1849 5,548 1.2 80 149,000 447,000
Others 3 t 1.3 936 2,809 1.2 78 73,000 219,000
Process utilities
EQUIPMENT
CAPITAL COST % COST
Equipment 1,225,000 60 735,000
Total Equipment $ 735,000
MATERIALS
CAPITAL COST % COST
Materials 338,000 0 0
Total Materials $ 0
PREFABRICATION
CAPITAL COST % COST
Prefabrication 130,000 0 0
Total Prefabrication $ 0
CONSTRUCTION
CAPITAL COST % COST
Construction 1,811,000 60 1,087,000
Total Construction $ 1,087,000
DESIGN & PROJECT MANAGEMENT
CAPITAL COST % COST
Design & Project management 318,000 0 0
Total Design & project management $ 0
INSURANCE & CERTIFICATION
CAPITAL COST % COST
Insurance & certification 115,000 0 0
Total Insurance & certification $ 0
CONTINGENCY
CAPITAL COST % COST
Contingency 591,000 0 0
Total Contingency $ 0
SCRAP MATERIAL
QUANTITY UNIT RATE COST
Scrap material 42 t -218 -9,000
Total Scrap material $ -9,000
Production facility 1 equipment list
Pressure Temperature Dimensions (ft)
Duty (MMBtu/hr)
Number of items
Capacity / item
(°F) L W H
Operating
Operating
Equipment description Remarks
Capacity
H (t / t) ID V (t / t)
Design
Design
(psig)
(psia)
(%)
Manifolding
Manifolding 1.57
Control package 1 100 0.984
Hydraulic power unit 1 100 0.591
Process support utilities
Flare and vent 0.939 0.984
HP flare tip 1 100
HP flare drum 1 100
HP flare drum pump 2 100
HP ignition system 1 100
LP flare tip 1 100
LP flare drum 1 100
LP flare drum pump 2 100
LP ignition system 1 100
Vent tip 1 100
Vent KO drum 1 100
Halon snuffing system 1 100
Chemical injection and storage 0.104 4.38
Chemical injection pumps Chemical injection is provided to the wellheads, oil and gas
processing, gas compression and water injection systems.
Chemical storage tanks
General utilities
Closed drains 2.68 0.984
Closed drain vessel 1 100
Closed drain pump 2 100
Reclaimed oil tank 1 100
Reclaimed oil return pump 2 100
Open drains 2.68 0.984
Oily water tank 1 100
Oily water return pump 2 100
Non-hazardous open drains tank 1 100
Non-hazardous open drains tank return pump 2 100
Hazardous open drains tank 1 100
Hazardous open drains tank return pump 2 100
Oily water separation tank 1 100
Diesel system
Diesel storage tank 1 100
Diesel transfer pump 2 100
Diesel filter 1 100
Plant steam 1.34 0.984
Steam generation system 1 100
Steam distribution system 1 100
Firefighting
Firewater pump 2 100
Foam unit
Firewater storage tank
Hose reels
Monitors
Hydrants
Control and communications
Control and communications 134 2.95
Cable / fibre
Distributed 134
Power generation
Power generation 4.83
Power distribution 3.04 Includes transformers, buses, power cabling between switchboards,
switchboards and ancillary controls
Emergency power generator 1.8
Wellpad group input report
Component name Wellpad group 1
Location
Terrain Swamp
Elevation 164 ft
Wells summary
Count Flowrate
Production Natural 2 80 MMscf/day
Pumped - -
Gas lifted - -
Water injection 0 -
Gas injection 0 -
Gas lift rate -
Wellpad group configuration edited No
Prefabrication
Type Other Module percent %
Steelwork Yes Steelwork percent 75 %
Piping spools Yes Piping spools percent 75 %
Winterisation
Increased depth of gravel base No
Winterisation of facilities (e.g. prefabrication modules ) including HVAC and No
insulation of piping system
Flowlines Civils
Production material Carbon steel Total foundations 703.9 ft²
Water injection material Carbon steel Buildings 0 ft²
Gas injection material Carbon steel Vehicular access 457.6 ft²
Gas lift material Carbon steel Total facilities plot area 7145 ft²
Production insulation U value None Total drilling plot area 195300.4 ft²
Water injection insulation U value None
Construction type Surface
Routing Corridor Installation
Coating Yes Number of spreads 1
Cathodic protection No Mob / demob per spread 15 day
Control systems
Control system Basic local
Wellpad details
Wellpad Manifolding and equipment weights Utilities Power Civils
Production Test Gas lift Water Gas Test Utilities Safety Generation Distribution Foundations Drilling
separator injection injection facilities plot area
Wellpad 1 3.7 t - - - - 0t 1t 1t 0.5 t 0.2 t 703.9 ft² 195300.4 ft²
Wellpad group 1 Name Wellpad group 1
PREFABRICATION DETAIL
QUANTITY MAN HOURS MAN HOURS COST UNIT RATE COST
PER PER
UNIT MAN HOUR
Equipment 0 t 29 0 45 1,310 0
Steelwork 2 t 119 233 45 5,360 11,000
Piping 1.8 t 420 770 45 18,900 34,000
Electrical 0 t 596 0 45 26,800 0
Instruments 0 t 894 0 45 40,200 0
Others 0 t 298 0 45 13,400 0
Wellpad group 1 construction detail US Dollars
CONSTRUCTION DETAIL
QUANTITY PRODUCTIVITY MAN HOURS MAN HOURS MAN HOURS COST UNIT RATE COST
TERRAIN PER COST TERRAIN PER
FACTOR UNIT FACTOR MAN HOUR
Site preparation 195300 ft² 2.5 0.07 13,608 1.2 72 5 984,000
Civil construction
General 7145 ft² 1.3 0.24 1,726 1.2 79 19 136,000
Foundations 704 ft² 1.3 1.81 1,275 1.2 82 148 104,000
Roads 458 ft² 1.3 1.33 608 1.2 79 105 48,000
Buildings 0 ft² 1.3 4.23 0 1.2 80 340 0
Skid/spool erection 3.8 t 1.3 66 250 1.2 86 5,700 22,000
Equipment erection 7.1 t 1.3 67 478 1.2 86 5,790 41,000
Steelwork 0.7 t 1.3 432 282 1.2 84 36,300 25,000
Piping 0.6 t 1.3 936 572 1.2 74 69,600 42,000
Electrical 0.5 t 1.3 1849 855 1.2 80 149,000 75,000
Instruments 0.6 t 1.3 1849 1,027 1.2 80 149,000 89,000
Others 1.2 t 1.3 936 1,079 1.2 78 73,000 88,000
DECOMMISSIONING
Wellpad group 1 Name Wellpad group 1
EQUIPMENT
CAPITAL COST % COST
Equipment 201,000 30 60,000
Total Equipment $ 60,000
MATERIALS
CAPITAL COST % COST
Materials 463,000 30 139,000
Total Materials $ 139,000
PREFABRICATION
CAPITAL COST % COST
Prefabrication 54,000 0 0
Total Prefabrication $ 0
CONSTRUCTION
CAPITAL COST % COST
Construction 3,742,000 30 1,123,000
Total Construction $ 1,123,000
DESIGN & PROJECT MANAGEMENT
CAPITAL COST % COST
Design & Project management 479,000 0 0
Total Design & project management $ 0
INSURANCE & CERTIFICATION
CAPITAL COST % COST
Insurance & certification 148,000 0 0
Total Insurance & certification $ 0
CONTINGENCY
CAPITAL COST % COST
Contingency 763,000 0 0
Total Contingency $ 0
SCRAP MATERIAL
QUANTITY UNIT RATE COST
Scrap material 152 t -218 -33,000
Total Scrap material $ -33,000
Infrastructure input report
Component name Infrastructure 1
Location
Terrain Swamp
Field in existing oil or gas producing area Yes
Production facility access is good Yes
Terminal facility access is good Yes
Airstrip
Number of airstrips -
Operations camp
Number of operations personnel -
Permanent housing
Number of administration personnel -
Number of projects personnel -
Total permanent housing -
Power transmission
Lines to production facilities 4.97 mile
Lines to terminal facilities 0 mile
Lines to regasification facilities 0 mile
Total power line length 4.97 mile
Infrastructure 1 Name Infrastructure 1
MATERIALS
CAPITAL COST % COST
Materials 2,259,000 15 339,000
Total Materials $ 339,000
DESIGN & PROJECT MANAGEMENT
CAPITAL COST % COST
Design & Project management 304,000 0 0
Total Design & project management $ 0
INSURANCE & CERTIFICATION
CAPITAL COST % COST
Insurance & certification 77,000 0 0
Total Insurance & certification $ 0
CONTINGENCY
CAPITAL COST % COST
Contingency 528,000 0 0
Total Contingency $ 0
SCRAP MATERIAL
QUANTITY UNIT RATE COST
Scrap material 0 t -218 0
Total Scrap material $ 0
Operating personnel
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Personnel count
Expatriates 0 0 0 0 0 0 0 0 0 0
Management 0 0 0 0 0 0 0 0 0 0
Other 20 20 20 20 20 20 20 20 20 20
Wellpad & production facilities $ 20,060,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000
Pipelines $ 2,220,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000
Total operating personnel cost $ 22,280,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000
Management personnel
Annual unit cost $/yr 84,000
Days on days 30
Days off days 14
Percentage of staff % 12
Operating personnel
Annual unit cost $/yr 38,000
Days on days 30
Days off days 14
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Total expatriates 0 0 0 0 0 0 0 0 0 0
Total management 0 0 0 0 0 0 0 0 0 0
Total other 18 18 18 18 18 18 18 18 18 18
Wellpad groups
Wellpad group 1 (Linked to Production facility 1)
Day Operators 1 1 1 1 1 1 1 1 1 1
Maintenance 1 1 1 1 1 1 1 1 1 1
Night Operators 1 1 1 1 1 1 1 1 1 1
Maintenance 0 0 0 0 0 0 0 0 0 0
Cost $ 3,340,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000
Total wellpad group costs $ 3,340,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000
Production facilities
Production facility 1
Others - day Operators 5 5 5 5 5 5 5 5 5 5
Maintenance 5 5 5 5 5 5 5 5 5 5
Base personnel 2 2 2 2 2 2 2 2 2 2
Catering / cleaning 0 0 0 0 0 0 0 0 0 0
Others - night Operators 3 3 3 3 3 3 3 3 3 3
Maintenance 0 0 0 0 0 0 0 0 0 0
Base personnel 0 0 0 0 0 0 0 0 0 0
Catering / cleaning 0 0 0 0 0 0 0 0 0 0
Management 0 0 0 0 0 0 0 0 0 0
Expatriates 0 0 0 0 0 0 0 0 0 0
Cost $ 16,720,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000
Total production facilities costs $ 16,720,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000
Total $ 20,060,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000
Operating personnel - pipelines
Management personnel
Annual unit cost $/yr 84,000
Days on days 30
Days off days 14
Percentage of staff % 12
Operating personnel
Annual unit cost $/yr 38,000
Days on days 30
Days off days 14
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Total management 0 0 0 0 0 0 0 0 0 0
Total other 2 2 2 2 2 2 2 2 2 2
Total pipelines cost $ 2,220,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Wellpad groups
Labour rate $/hr 80
Maintenance hrs per t hr/t 4.57
Multiphase meter op. cost $ 21,500
Spares % of equip & matl cost % 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Wellpad group 1
Equipment weight t 8
Manhours for specialist maint. hrs 36 36 36 36 36 36 36 36 36 36
Labour cost $ 2,880 2,880 2,880 2,880 2,880 2,880 2,880 2,880 2,880 2,880
Equip & matl spares $ 6,640 6,640 6,640 6,640 6,640 6,640 6,640 6,640 6,640 6,640
Multiphase meters $ 0 0 0 0 0 0 0 0 0 0
Costs $ 200,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000
Total cost wellpad groups $ 200,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000
Production facilities
Labour rate $/hr 80
Maintenance hrs per t hr/t 4.57
Multiphase meter op. cost $ 21,500
Spares % of equip & matl cost % 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Production facility 1
Equipment weight t 19
Manhours for specialist maint. hrs 86 86 86 86 86 86 86 86 86 86
Labour cost $ 6,840 6,840 6,840 6,840 6,840 6,840 6,840 6,840 6,840 6,840
Equip & matl spares $ 15,630 15,630 15,630 15,630 15,630 15,630 15,630 15,630 15,630 15,630
Multiphase meters $ 0 0 0 0 0 0 0 0 0 0
Costs $ 440,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000
Total cost production facilities $ 440,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000
Pipelines
Intelligent pigging
Pig rate mile/day 6.21
Day rate $/day 10,000
Min crew days days 7
Mob demob days days 3
Analysis cost $/mile 2,012
Total cost inspection & maintenance $ 1,374,000 32,000 32,000 32,000 32,000 122,000 32,000 32,000 32,000 32,000 586,000
Consumables
Power generation
Wellpad groups
Wellpad group 1
Electrical load Diesel hp 53.6
Production facilities
Production facility 1
Electrical load From grid hp 188
Compressor load Own gas hp 0
Water injection load Own gas hp 0
Export pump load Own gas hp 0
Heating medium load Own gas hp 0
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Oil production MMbbl/yr 0.76 1.52 2.28 2.28 2.28 2.28 2.28 2.28 2.28 2.11
Gas production Bscf/yr 11.08 22.16 33.25 33.25 33.25 33.25 33.25 33.25 33.25 30.80
Water production MMbbl/yr 0.01 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
Water injection MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Diesel
Unit cost $/bbl 97.00 97.00 97.00 97.00 97.00 97.00 97.00 97.00 97.00 97.00
Quantity bbl/yr 415 555 696 696 696 696 696 696 696 665
Cost $ 1,079,000 40,000 54,000 68,000 68,000 68,000 68,000 68,000 68,000 68,000 65,000
Power
Unit cost $/MW.hr 47.00 47.00 47.00 47.00 47.00 47.00 47.00 47.00 47.00 47.00
Quantity MW.hr/yr 628 903 1,178 1,178 1,178 1,178 1,178 1,178 1,178 1,117
Cost $ 843,000 30,000 42,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 52,000
Chemicals
Total wellpads chemicals $ 10,885,000 273,000 547,000 820,000 820,000 820,000 820,000 820,000 820,000 820,000 759,000
Total cost $ 12,807,000 343,000 643,000 943,000 943,000 943,000 943,000 943,000 943,000 943,000 876,000
Expatriates
Distance mile 3,107
Frequency days 90
Method Air
Number of men 0 0 0 0 0 0 0 0 0 0
Transportation cost $ 0 0 0 0 0 0 0 0 0 0 0
Management
Distance mile 62
Frequency days 30
Method Road
Number of men 0 0 0 0 0 0 0 0 0 0
Transportation cost $ 0 0 0 0 0 0 0 0 0 0 0
Other labour
Distance mile 62
Frequency days 30
Method Road
Number of men 20 20 20 20 20 20 20 20 20 20
Transportation cost $ 40,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
Messing
Cost per man per day $/man/d 44
Total men on site 20 20 20 20 20 20 20 20 20 20
Cost $ 6,160,000 308,000 308,000 308,000 308,000 308,000 308,000 308,000 308,000 308,000 308,000
Consumables
Transportation (% of consumable costs) % 7
Cost of consumables (excluding fuel gas) $ 313,000 601,000 888,000 888,000 888,000 888,000 888,000 888,000 888,000 824,000
Transportation cost $ 839,000 22,000 42,000 62,000 62,000 62,000 62,000 62,000 62,000 62,000 58,000
Vehicles
Car lease rate / vehicle $/yr 6,800
Number of cars 0 0 0 0 0 0 0 0 0 0
Pick-up / 4WD lease rate / vehicle $/yr 10,600
Number of pick-ups / 4WD 0 0 0 0 0 0 0 0 0 0
Truck lease rate / vehicle $/yr 16,000
Number of trucks 1 1 1 1 1 1 1 1 1 1
Cost $ 320,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000
Total cost $ 7,359,000 348,000 368,000 388,000 388,000 388,000 388,000 388,000 388,000 388,000 384,000
Consumables cost $ 12,807,000 343,000 643,000 943,000 943,000 943,000 943,000 943,000 943,000 943,000 876,000
Logistics and vehicles cost $ 7,359,000 348,000 368,000 388,000 388,000 388,000 388,000 388,000 388,000 388,000 384,000
Consumables, logistics & vehicles cost $ 20,166,000 691,000 1,011,000 1,331,000 1,331,000 1,331,000 1,331,000 1,331,000 1,331,000 1,331,000 1,260,000
Well maintenance
Production wells
Workover frequency years 5
Duration per well days 9
Material cost per well $ 84,000
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Production wells
Workover rig dayrate $ 13,700
Number of onstream wells 1 1 2 2 2 2 2 2 2 2
Number of new wells onstream this year 1 0 1 0 0 0 0 0 0 0
Wells worked over in the year 0 0 0 0 1 0 1 0 0 1
Maintenance duration days 63 0 0 0 0 9 0 9 0 0 9
Materials cost $ 588,000 0 0 0 0 84,000 0 84,000 0 0 84,000
Rig cost $ 863,100 0 0 0 0 123,300 0 123,300 0 0 123,300
Total cost $ 1,449,000 0 0 0 0 207,000 0 207,000 0 0 207,000
Insurance
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Drilling
Onshore drilling 1 $ 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000
Total CAPEX $ 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 2,100,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000
Wellpad group
Wellpad group 1 $ 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000
Total CAPEX $ 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 940,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000
Production facilities
Production facility 1 $ 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000
Total CAPEX $ 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 720,000 36,000 36,000 36,000 36,000 36,000 36,000 36,000 36,000 36,000 36,000
Infrastructure
Infrastructure 1 $ 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000
Total CAPEX $ 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 500,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000
Pipelines
Two phase pipeline (onshore 1) $ 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000
Total CAPEX $ 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 2,180,000 109,000 109,000 109,000 109,000 109,000 109,000 109,000 109,000 109,000 109,000
Total insurance cost $ 6,440,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Administration $ 1,120,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000
Warehousing $ 1,120,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000
Operations support $ 5,175,000 216,000 248,000 280,000 280,000 310,000 280,000 301,000 280,000 280,000 349,000
Infrastructure support $ 9,500,000 475,000 475,000 475,000 475,000 475,000 475,000 475,000 475,000 475,000 475,000
Land costs
Production facilities and wellsites $ 0 0 0 0 0 0 0 0 0 0 0
Pipeline booster stations $ 0 0 0 0 0 0 0 0 0 0 0
Special items $ 0 0 0 0 0 0 0 0 0 0 0
Total cost $ 16,915,000 803,000 835,000 867,000 867,000 897,000 867,000 888,000 867,000 867,000 936,000
Tariffs paid
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Oil production rate MMbbl/yr 0.76 1.52 2.28 2.28 2.28 2.28 2.28 2.28 2.28 2.11
Gas production profile Bscf/yr 11.08 22.16 33.25 33.25 33.25 33.25 33.25 33.25 33.25 30.80
NGL production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LPG production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gasoline production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tariff rate
-- Oil / condensate -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Total oil / condensate $ 0 0 0 0 0 0 0 0 0 0 0
-- Gas -- $/Mscf
Pipeline No $ 0.2000 0 0 0 0 0 0 0 0 0 0
Processing Yes $ 0.2500 2,770,000 5,540,000 8,312,500 8,312,500 8,312,500 8,312,500 8,312,500 8,312,500 8,312,500 7,700,000
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Total gas $ 110,363,000 2,770,000 5,540,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 7,700,000
-- NGL -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1500 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Total NGL $ 0 0 0 0 0 0 0 0 0 0 0
-- LPG -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Total LPG $ 0 0 0 0 0 0 0 0 0 0 0
-- Gasoline -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Total gasoline $ 0 0 0 0 0 0 0 0 0 0 0
Total tariffs paid $ 110,363,000 2,770,000 5,540,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 7,700,000
Tariffs received
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Oil production rate MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gas production profile Bscf/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
NGL production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LPG production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gasoline production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tariff rate
-- Oil / condensate -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Total oil / condensate $ 0 0 0 0 0 0 0 0 0 0 0
-- Gas -- $/Mscf
Pipeline No $ 0.2000 0 0 0 0 0 0 0 0 0 0
Processing No $ 0.2500 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Total gas $ 0 0 0 0 0 0 0 0 0 0 0
-- NGL -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1500 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Total NGL $ 0 0 0 0 0 0 0 0 0 0 0
-- LPG -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Total LPG $ 0 0 0 0 0 0 0 0 0 0 0
-- Gasoline -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Total gasoline $ 0 0 0 0 0 0 0 0 0 0 0
Tariffs
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Tariffs paid $ 110,363,000 2,770,000 5,540,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 7,700,000
Tariffs received $ 0 0 0 0 0 0 0 0 0 0 0
Tariffs total $ 110,363,000 2,770,000 5,540,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 7,700,000
CO2 Emissions
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Total volume CO2 released Mscf/y 3,518 4,704 5,900 5,900 5,900 5,900 5,900 5,900 5,900 5,637
Total mass CO2 released t/yr 182 244 305 305 305 305 305 305 305 292
Leases
Totals Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
Lease cost 1 $ 0 0 0 0 0 0 0 0 0 0 0
Lease cost 2 $ 0 0 0 0 0 0 0 0 0 0 0
Lease cost 3 $ 0 0 0 0 0 0 0 0 0 0 0
Lease cost 4 $ 0 0 0 0 0 0 0 0 0 0 0
Lease cost 5 $ 0 0 0 0 0 0 0 0 0 0 0
Total lease cost $ 0 0 0 0 0 0 0 0 0 0 0
Grand total operating cost $ 178,987,000 5,732,000 8,854,000 11,979,000 11,979,000 12,306,000 11,979,000 12,207,000 11,979,000 11,979,000 12,125,000
Direct costs
Operating personnel $ 22,280,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000
Inspection and maintenance $ 1,374,000 32,000 32,000 32,000 32,000 122,000 32,000 32,000 32,000 32,000 586,000
Logistics and consumables $ 20,166,000 691,000 1,011,000 1,331,000 1,331,000 1,331,000 1,331,000 1,331,000 1,331,000 1,331,000 1,260,000
Wells $ 1,449,000 0 0 0 0 207,000 0 207,000 0 0 207,000
Insurance $ 6,440,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000
Direct costs total $ 51,709,000 2,159,000 2,479,000 2,799,000 2,799,000 3,096,000 2,799,000 3,006,000 2,799,000 2,799,000 3,489,000
Field / project costs $ 16,915,000 803,000 835,000 867,000 867,000 897,000 867,000 888,000 867,000 867,000 936,000
Tariff costs $ 110,363,000 2,770,000 5,540,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 8,313,000 7,700,000
CO2 emissions tax $ 0 0 0 0 0 0 0 0 0 0 0
Lease costs $ 0 0 0 0 0 0 0 0 0 0 0
Operating personnel
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Personnel count
Expatriates 0 0 0 0 0 0 0 0 0 0
Management 0 0 0 0 0 0 0 0 0 0
Other 20 20 20 20 20 20 20 20 20 20
Wellpad & production facilities $ 20,060,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000
Pipelines $ 2,220,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000
Total operating personnel cost $ 22,280,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000
Management personnel
Annual unit cost $/yr 84,000
Days on days 30
Days off days 14
Percentage of staff % 12
Operating personnel
Annual unit cost $/yr 38,000
Days on days 30
Days off days 14
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Total expatriates 0 0 0 0 0 0 0 0 0 0
Total management 0 0 0 0 0 0 0 0 0 0
Total other 18 18 18 18 18 18 18 18 18 18
Wellpad groups
Wellpad group 1 (Linked to Production facility 1)
Day Operators 1 1 1 1 1 1 1 1 1 1
Maintenance 1 1 1 1 1 1 1 1 1 1
Night Operators 1 1 1 1 1 1 1 1 1 1
Maintenance 0 0 0 0 0 0 0 0 0 0
Cost $ 3,340,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000
Total wellpad group costs $ 3,340,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000 167,000
Production facilities
Production facility 1
Others - day Operators 5 5 5 5 5 5 5 5 5 5
Maintenance 5 5 5 5 5 5 5 5 5 5
Base personnel 2 2 2 2 2 2 2 2 2 2
Catering / cleaning 0 0 0 0 0 0 0 0 0 0
Others - night Operators 3 3 3 3 3 3 3 3 3 3
Maintenance 0 0 0 0 0 0 0 0 0 0
Base personnel 0 0 0 0 0 0 0 0 0 0
Catering / cleaning 0 0 0 0 0 0 0 0 0 0
Management 0 0 0 0 0 0 0 0 0 0
Expatriates 0 0 0 0 0 0 0 0 0 0
Cost $ 16,720,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000
Total production facilities costs $ 16,720,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000 836,000
Total $ 20,060,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000 1,003,000
Operating personnel - pipelines
Management personnel
Annual unit cost $/yr 84,000
Days on days 30
Days off days 14
Percentage of staff % 12
Operating personnel
Annual unit cost $/yr 38,000
Days on days 30
Days off days 14
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Total management 0 0 0 0 0 0 0 0 0 0
Total other 2 2 2 2 2 2 2 2 2 2
Total pipelines cost $ 2,220,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000 111,000
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Wellpad groups
Labour rate $/hr 80
Maintenance hrs per t hr/t 4.57
Multiphase meter op. cost $ 21,500
Spares % of equip & matl cost % 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Wellpad group 1
Equipment weight t 8
Manhours for specialist maint. hrs 36 36 36 36 36 36 36 36 36 36
Labour cost $ 2,880 2,880 2,880 2,880 2,880 2,880 2,880 2,880 2,880 2,880
Equip & matl spares $ 6,640 6,640 6,640 6,640 6,640 6,640 6,640 6,640 6,640 6,640
Multiphase meters $ 0 0 0 0 0 0 0 0 0 0
Costs $ 200,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000
Total cost wellpad groups $ 200,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000 10,000
Production facilities
Labour rate $/hr 80
Maintenance hrs per t hr/t 4.57
Multiphase meter op. cost $ 21,500
Spares % of equip & matl cost % 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Production facility 1
Equipment weight t 19
Manhours for specialist maint. hrs 86 86 86 86 86 86 86 86 86 86
Labour cost $ 6,840 6,840 6,840 6,840 6,840 6,840 6,840 6,840 6,840 6,840
Equip & matl spares $ 15,630 15,630 15,630 15,630 15,630 15,630 15,630 15,630 15,630 15,630
Multiphase meters $ 0 0 0 0 0 0 0 0 0 0
Costs $ 440,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000
Total cost production facilities $ 440,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000
Pipelines
Intelligent pigging
Pig rate mile/day 6.21
Day rate $/day 10,000
Min crew days days 7
Mob demob days days 3
Analysis cost $/mile 2,012
Total cost inspection & maintenance $ 1,374,000 32,000 32,000 32,000 32,000 122,000 32,000 32,000 32,000 32,000 32,000
Consumables
Power generation
Wellpad groups
Wellpad group 1
Electrical load Diesel hp 53.6
Production facilities
Production facility 1
Electrical load From grid hp 188
Compressor load Own gas hp 0
Water injection load Own gas hp 0
Export pump load Own gas hp 0
Heating medium load Own gas hp 0
0 0
Ignore cost of own fuel gas No
0 0
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Oil production MMbbl/yr 1.81 1.55 1.33 1.14 0.97 0.83 0.71 0.61 0.52 0.45
Gas production Bscf/yr 26.37 22.58 19.34 16.56 14.18 12.14 10.40 8.91 7.63 6.53
Water production MMbbl/yr 0.02 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.00
Water injection MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Diesel
Unit cost $/bbl 97.00 97.00 97.00 97.00 97.00 97.00 97.00 97.00 97.00 97.00
Quantity bbl/yr 609 560 519 484 454 428 406 387 371 357
Cost $ 1,079,000 59,000 54,000 50,000 47,000 44,000 42,000 39,000 38,000 36,000 35,000
Power
Unit cost $/MW.hr 47.00 47.00 47.00 47.00 47.00 47.00 47.00 47.00 47.00 47.00
Quantity MW.hr/yr 1,007 913 833 764 705 654 611 574 542 515
Cost $ 843,000 47,000 43,000 39,000 36,000 33,000 31,000 29,000 27,000 25,000 24,000
Chemicals
Total wellpads chemicals $ 10,885,000 650,000 557,000 477,000 408,000 350,000 299,000 256,000 220,000 188,000 161,000
Total cost $ 12,807,000 756,000 654,000 566,000 491,000 427,000 372,000 324,000 285,000 249,000 220,000
Expatriates
Distance mile 3,107
Frequency days 90
Method Air
Number of men 0 0 0 0 0 0 0 0 0 0
Transportation cost $ 0 0 0 0 0 0 0 0 0 0 0
Management
Distance mile 62
Frequency days 30
Method Road
Number of men 0 0 0 0 0 0 0 0 0 0
Transportation cost $ 0 0 0 0 0 0 0 0 0 0 0
Other labour
Distance mile 62
Frequency days 30
Method Road
Number of men 20 20 20 20 20 20 20 20 20 20
Transportation cost $ 40,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000 2,000
Messing
Cost per man per day $/man/d 44
Total men on site 20 20 20 20 20 20 20 20 20 20
Cost $ 6,160,000 308,000 308,000 308,000 308,000 308,000 308,000 308,000 308,000 308,000 308,000
Consumables
Transportation (% of consumable costs) % 7
Cost of consumables (excluding fuel gas) $ 709,000 611,000 527,000 455,000 394,000 341,000 295,000 258,000 224,000 196,000
Transportation cost $ 839,000 50,000 43,000 37,000 32,000 28,000 24,000 21,000 18,000 16,000 14,000
Vehicles
Car lease rate / vehicle $/yr 6,800
Number of cars 0 0 0 0 0 0 0 0 0 0
Pick-up / 4WD lease rate / vehicle $/yr 10,600
Number of pick-ups / 4WD 0 0 0 0 0 0 0 0 0 0
Truck lease rate / vehicle $/yr 16,000
Number of trucks 1 1 1 1 1 1 1 1 1 1
Cost $ 320,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000 16,000
Total cost $ 7,359,000 376,000 369,000 363,000 358,000 354,000 350,000 347,000 344,000 342,000 340,000
Consumables cost $ 12,807,000 756,000 654,000 566,000 491,000 427,000 372,000 324,000 285,000 249,000 220,000
Logistics and vehicles cost $ 7,359,000 376,000 369,000 363,000 358,000 354,000 350,000 347,000 344,000 342,000 340,000
Consumables, logistics & vehicles cost $ 20,166,000 1,132,000 1,023,000 929,000 849,000 781,000 722,000 671,000 629,000 591,000 560,000
Well maintenance
Production wells
Workover frequency years 5
Duration per well days 9
Material cost per well $ 84,000
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Production wells
Workover rig dayrate $ 13,700
Number of onstream wells 2 2 2 2 2 2 2 2 2 2
Number of new wells onstream this year 0 0 0 0 0 0 0 0 0 0
Wells worked over in the year 0 1 0 0 1 0 1 0 0 1
Maintenance duration days 63 0 9 0 0 9 0 9 0 0 9
Materials cost $ 588,000 0 84,000 0 0 84,000 0 84,000 0 0 84,000
Rig cost $ 863,100 0 123,300 0 0 123,300 0 123,300 0 0 123,300
Total cost $ 1,449,000 0 207,000 0 0 207,000 0 207,000 0 0 207,000
Insurance
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Drilling
Onshore drilling 1 $ 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000
Total CAPEX $ 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000 13,073,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 2,100,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000
Wellpad group
Wellpad group 1 $ 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000
Total CAPEX $ 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000 5,850,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 940,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000 47,000
Production facilities
Production facility 1 $ 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000
Total CAPEX $ 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000 4,528,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 720,000 36,000 36,000 36,000 36,000 36,000 36,000 36,000 36,000 36,000 36,000
Infrastructure
Infrastructure 1 $ 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000
Total CAPEX $ 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000 3,168,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 500,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000 25,000
Pipelines
Two phase pipeline (onshore 1) $ 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000
Total CAPEX $ 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000 13,645,000
Insurance rate % of CAPEX % 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80
Insurance cost $ 2,180,000 109,000 109,000 109,000 109,000 109,000 109,000 109,000 109,000 109,000 109,000
Total insurance cost $ 6,440,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Administration $ 1,120,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000
Warehousing $ 1,120,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000 56,000
Operations support $ 5,175,000 260,000 270,000 240,000 232,000 255,000 219,000 235,000 210,000 206,000 224,000
Infrastructure support $ 9,500,000 475,000 475,000 475,000 475,000 475,000 475,000 475,000 475,000 475,000 475,000
Land costs
Production facilities and wellsites $ 0 0 0 0 0 0 0 0 0 0 0
Pipeline booster stations $ 0 0 0 0 0 0 0 0 0 0 0
Special items $ 0 0 0 0 0 0 0 0 0 0 0
Total cost $ 16,915,000 847,000 857,000 827,000 819,000 842,000 806,000 822,000 797,000 793,000 811,000
Tariffs paid
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Oil production rate MMbbl/yr 1.81 1.55 1.33 1.14 0.97 0.83 0.71 0.61 0.52 0.45
Gas production profile Bscf/yr 26.37 22.58 19.34 16.56 14.18 12.14 10.40 8.91 7.63 6.53
NGL production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LPG production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gasoline production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tariff rate
-- Oil / condensate -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Total oil / condensate $ 0 0 0 0 0 0 0 0 0 0 0
-- Gas -- $/Mscf
Pipeline No $ 0.2000 0 0 0 0 0 0 0 0 0 0
Processing Yes $ 0.2500 6,592,500 5,645,000 4,835,000 4,140,000 3,545,000 3,035,000 2,600,000 2,227,500 1,907,500 1,632,500
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Total gas $ 110,363,000 6,593,000 5,645,000 4,835,000 4,140,000 3,545,000 3,035,000 2,600,000 2,228,000 1,908,000 1,633,000
-- NGL -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1500 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Total NGL $ 0 0 0 0 0 0 0 0 0 0 0
-- LPG -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Total LPG $ 0 0 0 0 0 0 0 0 0 0 0
-- Gasoline -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Total gasoline $ 0 0 0 0 0 0 0 0 0 0 0
Total tariffs paid $ 110,363,000 6,593,000 5,645,000 4,835,000 4,140,000 3,545,000 3,035,000 2,600,000 2,228,000 1,908,000 1,633,000
Tariffs received
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Oil production rate MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gas production profile Bscf/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
NGL production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
LPG production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Gasoline production profile MMbbl/yr 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Tariff rate
-- Oil / condensate -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Total oil / condensate $ 0 0 0 0 0 0 0 0 0 0 0
-- Gas -- $/Mscf
Pipeline No $ 0.2000 0 0 0 0 0 0 0 0 0 0
Processing No $ 0.2500 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Total gas $ 0 0 0 0 0 0 0 0 0 0 0
-- NGL -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1500 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Total NGL $ 0 0 0 0 0 0 0 0 0 0 0
-- LPG -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.7000 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Total LPG $ 0 0 0 0 0 0 0 0 0 0 0
-- Gasoline -- $/bbl
Pipeline No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Processing No $ 1.5000 0 0 0 0 0 0 0 0 0 0
Storage No $ 0.1000 0 0 0 0 0 0 0 0 0 0
Transport - road No $ 1.2500 0 0 0 0 0 0 0 0 0 0
Transport - rail No $ 1.2000 0 0 0 0 0 0 0 0 0 0
Transport - marine No $ 1.0000 0 0 0 0 0 0 0 0 0 0
Total gasoline $ 0 0 0 0 0 0 0 0 0 0 0
Tariffs
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Tariffs paid $ 110,363,000 6,593,000 5,645,000 4,835,000 4,140,000 3,545,000 3,035,000 2,600,000 2,228,000 1,908,000 1,633,000
Tariffs received $ 0 0 0 0 0 0 0 0 0 0 0
Tariffs total $ 110,363,000 6,593,000 5,645,000 4,835,000 4,140,000 3,545,000 3,035,000 2,600,000 2,228,000 1,908,000 1,633,000
CO2 Emissions
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Total volume CO2 released Mscf/y 5,162 4,747 4,399 4,103 3,848 3,628 3,441 3,280 3,145 3,026
Total mass CO2 released t/yr 267 246 228 212 199 188 178 170 163 157
Leases
Totals Year 11 Year 12 Year 13 Year 14 Year 15 Year 16 Year 17 Year 18 Year 19 Year 20
Lease cost 1 $ 0 0 0 0 0 0 0 0 0 0 0
Lease cost 2 $ 0 0 0 0 0 0 0 0 0 0 0
Lease cost 3 $ 0 0 0 0 0 0 0 0 0 0 0
Lease cost 4 $ 0 0 0 0 0 0 0 0 0 0 0
Lease cost 5 $ 0 0 0 0 0 0 0 0 0 0 0
Total lease cost $ 0 0 0 0 0 0 0 0 0 0 0
Grand total operating cost $ 178,987,000 10,040,000 9,200,000 8,059,000 7,276,000 6,933,000 6,031,000 5,768,000 5,122,000 4,760,000 4,679,000
Direct costs
Operating personnel $ 22,280,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000 1,114,000
Inspection and maintenance $ 1,374,000 32,000 32,000 32,000 32,000 122,000 32,000 32,000 32,000 32,000 32,000
Logistics and consumables $ 20,166,000 1,132,000 1,023,000 929,000 849,000 781,000 722,000 671,000 629,000 591,000 560,000
Wells $ 1,449,000 0 207,000 0 0 207,000 0 207,000 0 0 207,000
Insurance $ 6,440,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000 322,000
Direct costs total $ 51,709,000 2,600,000 2,698,000 2,397,000 2,317,000 2,546,000 2,190,000 2,346,000 2,097,000 2,059,000 2,235,000
Field / project costs $ 16,915,000 847,000 857,000 827,000 819,000 842,000 806,000 822,000 797,000 793,000 811,000
Tariff costs $ 110,363,000 6,593,000 5,645,000 4,835,000 4,140,000 3,545,000 3,035,000 2,600,000 2,228,000 1,908,000 1,633,000
CO2 emissions tax $ 0 0 0 0 0 0 0 0 0 0 0
Lease costs $ 0 0 0 0 0 0 0 0 0 0 0
Decommissioning scenario name: Onshore decommissioning scenario
Production Onshore Onshore drilling Wellpad group Terminal Infrastructure User defined
facilities pipelines