0% found this document useful (0 votes)
1K views1 page

JKR SWK Approval Chit

The document is an approval chit used by the Jabatan Kerja Raya Sarawak for requesting inspection and permission to proceed with various construction works. It includes sections for the contractor to submit requests, for consulting engineers to provide comments, and for the resident engineer to approve or disapprove the work. The form emphasizes that its endorsement does not imply final approval and that the contractor remains responsible for quality compliance.

Uploaded by

petramakmur1978
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

JKR SWK Approval Chit

The document is an approval chit used by the Jabatan Kerja Raya Sarawak for requesting inspection and permission to proceed with various construction works. It includes sections for the contractor to submit requests, for consulting engineers to provide comments, and for the resident engineer to approve or disapprove the work. The form emphasizes that its endorsement does not imply final approval and that the contractor remains responsible for quality compliance.

Uploaded by

petramakmur1978
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Project :

Jabatan Kerja Raya SARAWAK


Contract No. :

APPROVAL CHIT IT NO. :


(EARTH WORKS / PAVEMENT WORKS / DRAINAGE WORKS / BRIDGE WORKS / OTHER WORKS)*

PART A : (To be filled by Contractor)

From : PROJECT MANAGER / CONSTRUCTION MANAGER / SITE AGENT * (Contractor)

To : RESIDENT ENGINEER / ASSISTANT RESIDENT ENGINEERQUALITY ASSURANCE ENGINEER *

We request for inspection and permission to proceed with the following


work;

Submitted by :- Signature : Checked by :- Signature :


( ) Project Manager/Construction Manager/Site Agent*

Time : Date : / /

PART B : (To be filled by Consulting Engineer/Engineer's Staff)*

Received by:- Signature : Time : Date : / /

Name :

Comments :-

Survey & Setting Out : Inspection of Prior Work : Testing of Prior Work :

Signature : Signature : Signature :


(Survey Technician/COW) (Clerk of Works) (Laboratory Technician)

PART C : (To be filled by Engineer / Quality Assurance Engineer)*

From : RESIDENT ENGINER/ASSISTENT RESIDENT ENGINEER / QUALITY ASSURANCE ENGINEER *

To : PROJECT MANAGER / CONSTRUCTION MANAGER / SITE AGENT * (Contractor)

Your request to proceed with the above mentioned work IS APPROVED


*
IS NOT APPROVED

Remarks :

Received for Contractor ; Signature :


PM/RE/ARE/QAE *

Time : Date : / /
Signature :
Project Manager/Construction Manager/Site Agent*
Neither the endorsement of this Form nor anything written on it is intended to convey final approval for
Time : Date : / / any part of the Works, nor does it relieves the Contractor of his responsibility to comply with the quality
requirements of the Works.

* select as appropriate