0% found this document useful (0 votes)
273 views1 page

Tank Process Control Plan Overview

Uploaded by

kchandan7415
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
273 views1 page

Tank Process Control Plan Overview

Uploaded by

kchandan7415
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

7 TANK PROCESS

CONTROL PLAN
[Link]. Process Name Control Parameter Testing Method
Free Alkalinity – 18-21ml Test concentration using titration.
1 Degreasing-1 Temp= RT Inspect visually for grease or oil residue.

Free Alkalinity – 15-18ml Test concentration using titration.


2 Degreasing-2 Temp= RT Inspect visually for grease or oil residue.

Water Quality: Fresh, clean water.


3 Water Rinse I Total Alkali <5
(PH Paper)

Chemical Concentration: 0.5-1% (as per supplier


4 Activation PH = 9-11
recommendation).

Total acid = 20-25ml Measure phosphate coating weight (e.g., 2-3 g/m² for
Accl. = 4-6 ml zinc phosphate).
5 Phosphate
Temp = RT
Conduct a visual inspection for uniform coating.

Water Quality: Fresh, clean water.


6 Water Rinse 2 Total Alkali <2
(PH Paper)

Inspect visually for a clear or light protective film.


7 Passivation pH- 8-10