0% found this document useful (0 votes)
66 views3 pages

NBCC

Uploaded by

Tanishq Bajpai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views3 pages

NBCC

Uploaded by

Tanishq Bajpai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

‭NOTICE INVITING e-TENDER (NIT)‬

‭1.‬ ‭ BCC invites online percentage rate /item rate open tenders from experienced and‬
N
‭eligible Contractors for‬‭200 Bedded General Hospital‬‭for‬‭Mahi Jain‬‭at‬‭Sector 27, Naya‬
‭Raipur‬‭and as per schedule as under:‬

‭1.1‬ ‭Tendering Document No.‬ ‭01‬

‭1.2‬ ‭Name of the Work‬ ‭200 Bedded General Hospital‬

‭1.3‬ ‭Brief Scope of Work‬ ‭ he scope of work includes the planning,‬


T
‭design, construction, supply, installation,‬
‭testing and commissioning of a fully‬
‭functional 200-bedded hospital with all‬
‭associated services, facilities and‬
‭infrastructure as per applicable national‬
‭and international healthcare standards.‬
‭The project shall comply with local‬
‭building codes, NABH guidelines, NBC,‬
‭fire safety norms and statutory health‬
‭regulations.‬

‭1.4‬ ‭Estimated Cost‬ ‭ s. 20,00,00,000 (20 Crores) only‬


R
‭through cheque.‬

‭1.5‬ ‭Period of Completion‬ ‭75 Months‬

‭1.6‬ ‭Earnest Money Deposit‬ ‭Rs 5,000 (Rupees Five Thousand) only‬

‭1.7‬ ‭ ast date & time of submission of Online‬ ‭Up to 25/08/25 by 7:00pm (IST)‬
L
‭Tender‬

‭1.8‬ ‭Date & Time of Opening of Technical Bid‬ ‭29/08/25 at 11:30am‬

‭1.9‬ ‭Date & Time of Opening of Financial Bid‬ ‭To be Intimated Later‬

‭1.10‬ ‭Minimum Eligibility Criteria‬ ‭ idders must demonstrate experience of‬


B
‭completing similar residential/ non-‬
‭residential building works within the last 7‬
‭years, supported by valid client‬
‭certificates. Joint ventures are not‬
‭allowed. Financial criteria include‬
‭average annual turnover of at least 40%‬
‭of project cost over 3 years, positive net‬
‭worth, bank solvency of 40%, and profit in‬
‭at least one of the last three years.‬

‭1.11‬ ‭Set of Contract/Tender Documents‬ ‭ he following documents will constitute‬


T
‭set of tender documents:‬
‭a)‬‭Notice Inviting e-Tender‬

‭Mahi Jain I 21122013‬ ‭1‬


‭ )‬‭Quoting Sheet for Tenderer‬
b
‭c)‬‭Instructions to Tenderers & General‬
‭Conditions of Contract‬
‭d)‬‭Technical Specifications‬
‭e)‬‭Bill of Quantities‬
‭f)‬‭List of approved makes of materials‬
‭g)‬‭Tender Drawings Signature of‬
‭Tenderer Signature of NBCC 5‬
‭h)‬‭Memorandum Annexure-I‬
‭i)‬‭Acceptance of Tender Conditions‬
‭(Annexure-II)‬
‭j)‬‭Integrity pact (Annexure-III)(To be‬
‭signed and stamped by the contractors‬
‭and scanned copy to be uploaded with‬
‭the bid)‬
‭k)‬‭Addendum/Corrigendum, if any- Duly‬
‭signed by authorized person‬
‭l)‬‭Special Conditions of Contract‬
‭m)‬‭Pre-bid clarifications, if any‬

‭1.12‬ ‭Validity of Tender‬ ‭150 Days from date of opening of tender‬

‭1.13‬ ‭Performance Guarantee‬ ‭ .00 % of contract value within 15 days‬


3
‭from the issue of Letter of Award‬

‭1.14‬ ‭Security Deposit / Retention Money‬ ‭ % of the gross value of each‬


5
‭running/final bill‬

‭1.15‬ ‭Time allowed for starting the work‬ ‭ he date of start of contract shall be‬
T
‭reckoned from 10 days after the date of‬
‭issue of letter of Award‬

‭1.16‬ ‭ ite Visit and Collecting Local‬


S ‭ enderer shall be deemed to have‬
T
‭Information‬ ‭considered site conditions whether he‬
‭has inspected it or not and to have‬
‭satisfied himself in all respect before‬
‭quoting his rates and no claim or extra‬
‭charges whatsoever in this regard shall‬
‭be entertained / payable by the NBCC at‬
‭a later date‬

‭1.17‬ ‭Access by Road‬ ‭ ontractor, if necessary, shall build‬


C
‭temporary access roads to the actual site‬
‭of construction for the works at his own‬
‭cost to make the site accessible.‬
‭Non-availability of access roads or‬
‭approach to site, for the use of the‬
‭contractor shall in no case condone any‬
‭delay in the execution of work nor be the‬
‭cause for any claim for compensation.‬

‭Mahi Jain I 21122013‬ ‭2‬


‭1.18‬ ‭Handing over and Clearing of Site‬ ‭ he Contractor should note that area for‬
T
‭construction may be made available in‬
‭phases as per availability and in‬
‭conjunction with pace of actual progress‬
‭of work at site.‬
‭The efforts will be made by the NBCC to‬
‭handover the site to the Contractor free of‬
‭encumbrances. However, in case of any‬
‭delay in handing over of the site to the‬
‭Contractor, the NBCC shall only consider‬
‭suitable extension of time for the‬
‭execution of the work.‬