Maintenance Contract

This document describes a preventive and corrective maintenance contract for the equipment of a medium voltage/low voltage electrical transformer station and a generator set. It defines the quarterly preventive maintenance services for the station and the generator, as well as the supply of spare parts.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views4 pages

Maintenance Contract

This document describes a preventive and corrective maintenance contract for the equipment of a medium voltage/low voltage electrical transformer station and a generator set. It defines the quarterly preventive maintenance services for the station and the generator, as well as the supply of spare parts.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Contract for preventive and corrective maintenance of the equipment of the station

MT/BT electrical transformation and the generator set


CONSISTENCY AND DESCRIPTION OF SERVICES
The entrepreneur must establish a diagnostic and assessment report on the condition of all the
equipment of the MT/BT transformation station mentioning all failures and anomalies
noted. This report must also propose appropriate solutions to address any
abnormal situation.
Great visits:
The major visit will be carried out without power and will include services for both posts.
following:
a)-Medium Voltage Part:
General condition of the premises:
.Cleaning and dusting of the premises

Medium voltage equipment:


.Cleaning of surge protectors or lightning arresters,

.Measuring and adjusting the gap of the spark gaps or checking the surge protectors, replacement
eventual

.Checking the status of the end boxes,

.Dusting, cleaning, blowing, and greasing of the cells,


.Verification of connections and tightening of joints,

.Operation and verification of the state of the HT switches,

.Checking the status of the MT fuses and possible replacement,

.Checking the status of the trolley supports,

.Verification of the locking system and operation of the mechanism for the cells
prefabricated,

.Verification of the proper functioning of the heating elements and possible repairs.
prefabricated cells.

Transformer:
.Cleaning and dusting of the transformer,
.Cleaning and checking the insulation of the MV and LV terminals of the transformer.
.Checking the tightness and tightening of the transformer connections (elimination of leaks)
possible oil),
.Checking the oil level, possible top-up and sampling of an oil sample for
analyze.
.Control of temperature protection and gas release (Alarm and triggering)

b) Part BT:
Electrical equipment :
.Maneuver and check the status of the Circuit Breaker,
.Checking the connections and tightening the connections,
.Checking the status of the public lighting cabinet (contactor, isolator, etc.)
.Verification of the capacitor battery status and possible replacement.

Statistical counting:
.Verification of the status of the counting system (Current transformers, meter, box,
wiring...etc.).

c) Grounding:
.Verification of the state of the grounding circuit and possible restoration.
.Measurement and improvement of the resistances of ground mass, the neutral of the substation, and the lightning arresters or
surge protectors,

d) Generator
A list of essential spare parts should be made available to address the
extended stops, the price of these parts made available must be included in the package,
The supplier is solely responsible for the content of the list of spare parts and must add
all the parts he deems useful to keep in stock.
The recommended list of pieces:
Water pump
Preheating resistance
Automation card
Sector detection card
Solenoid valve
Injector
Battery Charger
Diode game
Voltage regulator
Automatic diesel filling kit
Internal tank level gauge
Relay 4RT24 Vcc
Relay 4RT 220V
12V 210 A/h battery
Batteryvoltagemeter
Oil pressure indicator
Water temperature indicator
Diesel level indicator
Hour Counter
Reverse switch for generator
Execution of work:
The project owner can call on the company to carry out repair work,
replacement of the MT/BT station equipment and the generator or replacement or
oil regeneration. These works will be recommended either by the project owner following a failure
of one or more equipment either by the REDAL.
Description of the preventive maintenance operation
a)-on the position every quarter
Coordination of loop cuts with LYDEC
Sampling and analysis of transformer oil (provision of a test certificate and quotation
Possible replacement of the dielectric
Cleaning of MT cells from the outside and the inside 15
Dusting and general cleaning of the workstation.
Cleaning of insulators and dry crossings.
Visit and cleaning of the cutting rooms
Control and adjustment of mobile contacts
Testing, cleaning and lubrication of the joints of the various controls
Verification of operation
Locking system.
Phase balancing verification
Verification of the proper functioning of the heating resistors
Control and tightening of connections and links
Verification of the proper functioning of the earth fault detection relay
Verification of the presence and condition of all safety equipment
Checking the presence of three spare MT fuses
Verification of the presence of regulatory posters
Checking the operation of the transformer temperature indicator
Examination of the state of the grounding circuit (neutral and mass)
Examination of the medium voltage connection status
Verification of equipotential connections of various metal masses
Relay purger
b) - on the Generator every quarter
Oil level check
Cooling water level check
Air filter check
Oil filter verification
Verification of diesel filters, checking for leaks (water, oil, diesel), dry run test of the unit.
Trial in charge of the group
Verification of automatic permutations
Verification of time delays
Tightening of the bolts
Verification of the group's safety sensors
oil pressure
water temperature
super speed
Measurement of tensions
Frequency measurement 50 HZ
Measurement of intensities
Insulation measurement
Measurement of ground connections
All consumables without exception such as: Batteries, Oils, Filters... are the responsibility of the company.
the transformer station
Supply and installation of:
a) Dielectric oil for transformer and all other consumables:
Batteries and others...
II-The generator group
a) Oil filter
b) Air filter
c) Diesel filter
d) Cooling oil and any other consumables: Batteries and others