Standard Cost Data 2025-26

Uploaded by

Deepak Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views6 pages

Standard Cost Data 2025-26

Uploaded by

Deepak Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Standard Cost Data Book 2025-26

TPL Surat Distribution

Distribution Licensee is required to prepare and publish Standard Cost Data book as per “Licensee’s Power to Recover
Expenditures Incurred in Providing Supply and other Miscellaneous Charges 2005” issued by GERC. The Standard
Cost Data book is a basis of making the initial estimate for laying of electric line and /or erection of electrical plant for
extending supply to the applicant. The chapter 6 of Regulation is reproduced as under:

“The Distribution licensee and the Transmission Licensee shall prepare a cost data book covering broad specifications of
various items and materials as well as man-hours of various categories of Labour needed for providing any electric line
or electrical plant used for the purpose of giving supply of electricity based on the actual cost data of the financial year
immediately preceding the year in which the estimate is to be prepared”

The Regulation provides preparing the cost data book based on actual data of financial year immediately preceding the
year. The standard costs for various activities have been prepared based on the latest purchase order.

As per the above explained principle, the Standard Cost Data Book 2025-26 is prepared and shown in Annexure A &
B. In annexure A, Serial No. 1 to 23 represent HT activities, Serial No. 24 to 67 represent LT activities and Serial No.
68 to 95 represent EHV activities whereas annexure B represents Road Opening Charges.

Page 1 of 6
Annexure A
(Amount in ₹)

Supervision Standard Cost with


Sr. Material Labour
Description of Main Material UoM Sub Total Charges 15% Supervision
No Cost Cost
(15%) Charge
1 3/C 240MM2,11 KV XLPE(UE)[Link] (PVC) M 1728.13 826.28 2554.41 383.16 2937.57
2 3C x 300 mm2, 11 KV XLPE Aluminum Cable M 1933.14 826.28 2759.42 413.91 3173.33
3 3C x 70 mm2, 11 KV XLPE Aluminum Cable M 774.61 0.00 774.61 116.19 890.80
4 240X3C 11/11KV XLPE HS STRAIGHT JOINT EA 10273.89 7215.62 17489.51 2623.43 20112.94
5 300X3C 11/11KV XLPE HS STRAIGHT JOINT EA 10675.86 7215.62 17891.48 2683.72 20575.20
6 240X3C 11/11KV XLPE-PILC TRANSTION JOINT EA 17393.80 7215.62 24609.42 3691.41 28300.83
7 240X3C 11/11KV XLPE HS ID TERMINATION EA 5339.06 2843.80 8182.86 1227.43 9410.28
8 300X3C 11/11KV XLPE HS ID TERMINATION EA 5723.06 2843.80 8566.86 1285.03 9851.88
9 70X3C 11/11KV XLPE HS ID TERMINATION EA 4351.71 2843.80 7195.51 1079.33 8274.83
10 GI PIPE - CLASS B - 150 MM M 1790.78 113.28 1904.06 285.61 2189.67
11 HDPE pipe - 6 KG/CM2 - 160 MM OD M 813.90 40.71 854.61 128.19 982.80
12 1CX95 mm2,1.1KV PVC Alu un armor Cable M 122.09 0.00 122.09 18.31 140.40
13 240 MM2 LT HEAT SHRINKABLE SLEEVES M 135.70 0.00 135.70 20.36 156.06
14 Motorized HT RMU 3-Way (2 LBS + 1 BKR) EA 681015.08 16475.37 697490.45 104623.57 802114.02
15 11KV MOTORIZED SF6 RMU-(3ISO.) UNIT EA 616581.39 16475.37 633056.76 94958.51 728015.28
16 Motorized HT RMU 4-Way (3 LBS +1 BKR) EA 855107.94 16475.37 871583.31 130737.50 1002320.81
17 Motorized HT RMU 5-Way (3 LBS + 2 BKR) EA 1075487.33 16475.37 1091962.70 163794.41 1255757.11
18 MOTORIZED HT RMU 4-WAY (2 LBS + 2 BKR) EA 947005.27 16475.37 963480.64 144522.10 1108002.74
19 METERING CUBICAL 11 KV CT/ PT-CTR 25/5 EA 133219.47 16107.21 149326.68 22399.00 171725.69
20 11KV CT/ PT METERING CUBICLE -CTR 50/5A EA 129633.74 16107.21 145740.95 21861.14 167602.10
21 METERING CUBICAL 11KV CTR 100/5 ACC 0.2S EA 127541.49 16107.21 143648.70 21547.31 165196.01
22 METERING CUBICAL 11KV CTR 200/5 ACC 0.2S EA 127268.18 16107.21 143375.39 21506.31 164881.70
23 METERING CUBICAL 11KV CTR 300/5 ACC 0.2S EA 126508.24 16107.21 142615.45 21392.32 164007.77
24 2/C 10MM2, 1.1 KV PVC STRANDED ALU CABLE M 88.62 48.43 137.05 20.56 157.60
25 4/C 10MM2, 1.1 KV PVC STRANDED ALU CABLE M 108.58 48.43 157.01 23.55 180.56
26 2/C 25MM2, 1.1 KV PVC ALU. CABLE M 191.54 290.54 482.07 72.31 554.38

Page 2 of 6
Supervision Standard Cost with
Sr. Material Labour
Description of Main Material UoM Sub Total Charges 15% Supervision
No Cost Cost
(15%) Charge
27 4/C 25MM2, 1.1 KV PVC ALU. CABLE M 257.82 290.54 548.35 82.25 630.60
28 4/C 70MM2, 1.1 KV XLPE ALU. CABLE M 426.23 290.54 716.76 107.51 824.28
29 4/C 120MM2, 1.1 KV XLPE ALU. CABLE M 720.46 309.36 1029.82 154.47 1184.29
30 CABLE,240 SQMM, 3.5/ C 1.1 KV XLPE ALU M 1101.73 309.36 1411.09 211.66 1622.75
31 GLAND 10SQMM 4 CORE EA 165.94 170.46 336.41 50.46 386.87
32 GLAND 25SQMM 4 CORE EA 221.30 170.46 391.76 58.76 450.53
33 GLAND 70SQMM 4 CORE EA 315.59 278.23 593.82 89.07 682.89
34 GLAND 120SQMM 4 CORE EA 466.34 435.90 902.24 135.34 1037.57
35 GLAND 240SQMM 3 1/2 CORE EA 827.36 435.90 1263.26 189.49 1452.75
36 JOINT LT S3 4C/25 SQMM CABLE EA 610.28 673.66 1283.94 192.59 1476.54
37 JOINT LT SJ 45 EA 1433.99 673.66 2107.65 316.15 2423.80
38 JOINT LT SJ-10 EA 1491.93 673.66 2165.59 324.84 2490.42
39 JOINT LT SJ-11 EA 1773.17 999.08 2772.24 415.84 3188.08
40 JOINT LT SJ-12 EA 2765.83 999.08 3764.91 564.74 4329.64
41 400 A, 415V OUTDOOR MSP COMPACTED EA 15095.82 3877.83 18973.65 2846.05 21819.70
42 MSP WITH FUSEBASE AND NUTLESS BUSBAR EA 22128.01 3877.83 26005.84 3900.88 29906.72
43 H.D.G.I EARTH PLATE - FOR SUBSTATION EA 2496.50 2560.33 5056.83 758.52 5815.36
44 EARTHING SPIKE - 36" EA 343.26 356.21 699.47 104.92 804.39
45 125A, 415V DISTRI. BOARD WITH FUSE BASE EA 4819.21 364.96 5184.17 777.63 5961.80
46 125 AMP VERTICAL DIST. BOX WITH FUSEBASE EA 7142.12 304.31 7446.43 1116.97 8563.40
47 250A,433V INDUS. [Link]/OFUSE BASE EA 3069.48 1016.09 4085.57 612.84 4698.41
48 125A LT SWITCH FUSE UNIT EA 14807.38 3707.03 18514.41 2777.16 21291.57
49 250 AMP. SWITCH W/O BUS-BAR FOR RULE 50A EA 14255.29 3707.03 17962.32 2694.35 20656.66
50 250 A SWITCH WITH BUSBAR FOR 50A RULE EA 19479.71 3707.03 23186.74 3478.01 26664.75
51 400 A SWITCH W/O BUSBAR FOR RULE 50A EA 20178.86 3707.03 23885.89 3582.88 27468.77
52 400 A SWITCH WITH BUSBAR FOR 50A RULE EA 22787.06 3707.03 26494.09 3974.11 30468.20
53 1 PHASE METER BOX MCB TYPE EA 698.26 258.26 956.52 143.48 1100.00
54 3 PHASE METER BOX MCB TYPE EA 2000.81 423.97 2424.78 363.72 2788.50

Page 3 of 6
Supervision Standard Cost with
Material Labour
r. No Description of Main Material UoM Sub Total Charges 15% Supervision
Cost Cost
(15%) Charge
55 METERBOX THREE PHASE MOTIVE POWER EA 3874.95 800.21 4675.16 701.27 5376.43
56 3 PH. SINTEX SMC METER BOX FOR 4 METERS EA 3987.21 794.75 4781.97 717.29 5499.26
57 3 PH. SINTEX SMC METER BOX FOR 3 METERS EA 3353.36 588.63 3941.99 591.30 4533.29
58 3 PHASE LTP METERBOX WITH FUSEBASE EA 5391.26 571.79 5963.05 894.46 6857.50
59 G.I METER BOX FOR LTMD METER (BIG) EA 11720.77 1135.30 12856.07 1928.41 14784.48
60 400A LTMD SWITCH W/O BUSBAR FOR 50A RULE EA 26820.84 1135.30 27956.14 4193.42 32149.56
61 400 A, 415V O/D MSP FOR TEMPERORY SUPPLY EA 13236.51 3747.33 16983.84 2547.58 19531.42
62 LT XLPE Insulated Cable 300 [Link] x 3.5C M 1415.17 309.36 1724.53 258.68 1983.20
63 GLAND 300 SQMM 3.5 CORE EA 878.93 435.90 1314.83 197.22 1512.05
64 1-PH METERBOX WITH REMOVABLE COVER (NEW) EA 928.02 258.26 1186.28 177.94 1364.22
65 THREE PHASE METERBOX WITH REMOVABLE COVE (NEW) EA 2111.73 423.97 2535.70 380.35 2916.05
66 1-PHASE PRESS FIT METER BOX SMALL (Incl. Cover) EA 685.94 337.09 1023.03 153.45 1176.49
67 FUSE TYPE MSP WITH NUTLESS BUSBAR (NEW) EA 26460.36 3877.83 30338.19 4550.73 34888.92
68 Supply & Installation of S/C 66kV x 1200 x Al Cable in Pakka Road M 19031.47 6050.10 25081.57 3762.23 28843.80
69 Supply & Installation of D/C 66kV x 1200 x Al Cable in Pakka Road M 37013.87 9593.40 46607.27 6991.09 53598.36
70 Supply & Installation of S/C 66kV x 1200 x Al Cable in Kutchha Road M 19031.47 6238.90 25270.37 3790.55 29060.92
71 Supply & Installation of D/C 66kV x 1200 x Al Cable in Kutchha Road M 37013.87 9475.40 46489.27 6973.39 53462.66
72 Supply & Installation of S/C 66kV x 1200 x Al Cable in HDPE Pipes M 20910.32 8946.41 29856.72 4478.51 34335.23
73 Supply & Installation of D/C 66kV x 1200 x Al Cable in HDPE Pipes M 41485.46 15491.75 56977.21 8546.58 65523.79
74 Supply & Installation of S/C 66kV x 1200 x Al Cable in Khadi crossing M 20964.31 16195.15 37159.46 5573.92 42733.37
75 Supply & Installation of D/C 66kV x 1200 x Al Cable in Khadi crossing M 41615.28 17902.49 59517.77 8927.66 68445.43
76 Supply & Installation of S/C 66kV x 1200 x Al Cable in RCC Cable trench M 19022.62 1181.42 20204.04 3030.61 23234.64
77 Supply & Installation of D/C 66kV x 1200 x Al Cable in RCC Cable trench M 36433.90 2132.26 38566.16 5784.92 44351.08
78 Supply & Installation of Straight joint for 66kV x 1200 x Al Cable EA 80036.12 24288.33 104324.46 15648.67 119973.12
79 Supply & Installation of Cross-bonding joint for 66kV x 1200 x Al Cable EA 179596.66 45726.57 225323.23 33798.48 259121.71

Page 4 of 6
Supervision Standard Cost with
Sr. Material Labour
Description of Main Material UoM Sub Total Charges 15% Supervision
No Cost Cost
(15%) Charge
80 Supply & Installation of GIS Termination for 66kV x 1200 x Al Cable EA 253574.13 45941.33 299515.47 44927.32 344442.79
81 Supply & Installation of AIS Outdoor Termination for 66kV x 1200 x Al Cable EA 130264.13 29421.33 159685.47 23952.82 183638.29
82 Supply & Installation of S/C 66kV x 630 x Al Cable in Pakka Road M 15677.04 6092.22 21769.26 3265.39 25034.65
83 Supply & Installation of D/C 66kV x 630 x Al Cable in Pakka Road M 30305.00 9677.65 39982.65 5997.40 45980.05
84 Supply & Installation of S/C 66kV x 630 x Al Cable in Kutchha Road M 15677.04 6281.02 21958.06 3293.71 25251.77
85 Supply & Installation of D/C 66kV x 630 x Al Cable in Kutchha Road M 30305.00 9559.65 39864.65 5979.70 45844.35
86 Supply & Installation of S/C 66kV x 630 x Al Cable in HDPE Pipes M 17555.88 8326.55 25882.43 3882.37 29764.80
87 Supply & Installation of D/C 66kV x 630 x Al Cable in HDPE Pipes M 34776.59 14252.04 49028.63 7354.29 56382.93
88 Supply & Installation of S/C 66kV x 630 x Al Cable in Khadi crossing M 17609.88 15575.29 33185.17 4977.78 38162.94
89 Supply & Installation of D/C 66kV x 630 x Al Cable in Khadi crossing M 34906.41 16662.78 51569.19 7735.38 59304.57
90 Supply & Installation of S/C 66kV x 630 x Al Cable in RCC Cable trench M 15668.19 1043.00 16711.19 2506.68 19217.87
91 Supply & Installation of D/C 66kV x 630 x Al Cable in RCC Cable trench M 29725.03 1855.43 31580.46 4737.07 36317.53
92 Supply & Installation of Straight joint for 66kV x 630 x Al Cable EA 61156.12 24288.33 85444.46 12816.67 98261.12
93 Supply & Installation of Cross-bonding joint for 66kV x 630 x Al Cable EA 155996.66 45726.57 201723.23 30258.48 231981.71
94 Supply & Installation of GIS Termination for 66kV x 630 x Al Cable EA 251214.13 45941.33 297155.47 44573.32 341728.79
95 Supply & Installation of AIS Outdoor Termination for 66kV x 630 x Al Cable EA 109024.13 29421.33 138445.47 20766.82 159212.29

GST will be charged additionally wherever applicable.

Page 5 of 6
Annexure B
Road Opening Charges

(Amount in ₹)

Sr. No. Type of Surface Rate/Meter


1 ASPHALT ROAD 1257.81
2 METAL - WBM ROAD 779.48
3 KACCHA ROAD - EARTH ROAD 88.58
4 FOOTPATH 1576.70
5 CEMENT CONCRETE ROAD 1594.41
6 ASPHALT ROAD NEW BEFORE 6 MON 2515.61
7 METAL - WBM ROAD NEW BEFORE 6 MON 1558.96
8 FOOTPATH NEW BEFORE 6 MON 3153.38
9 CEMENT CONCRETE ROAD NEW BEFOR 6MON 3188.81