0% found this document useful (0 votes)
83 views11 pages

Water Treatment Plant Design Guide

Uploaded by

Parth Jondhale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views11 pages

Water Treatment Plant Design Guide

Uploaded by

Parth Jondhale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Parameter Unit Example Notes

WTP CapacMLD 5 1–100 MLD


Available Am² 3000 Max site area
Source WatSurface/GrSurface Determines treatment process
Raw Watermg/L 150 Influences sedimentation
Raw WaterNTU 50 Flocculation & filter sizing
Raw Watermg/L as Ca200 Chemical dosing
Raw Water- 7.5 Adjusts chemical dosing
Raw Watermg/L as Ca180 Required for coagulant calculation
Desired Tr - Drinking S CPHEEO 2024 norms
Process
Required?
Unit Area
(Yes/No)
Factor (m²/MLD)
Retention
Notes
Time
/ CPHEEO 2024
Screening Yes 5- Mechanical bar screens
Rapid MixeYes 1.5 1–2 min CPHEEO rapid mix
FlocculatorYes 3 20–30 minRectangular tanks, multi-stage
SedimentatYes 10 2–4 hr Surface overflow 1–2 m³/m²/hr
Filters Yes 5- Sand / Multimedia, 5–6 m²/MLD
Clear WateYes 30 4 hr Storage for peak demand
DisinfectioYes - - Chlorination / UV
Sludge HanOptional - - Based on settled TSS
Unit Flow (m³/s)
Detention Time
Volume (m³)
Length (m)
Width (m)Height (m) Notes
Screening 0.05787 - - - - - -
Rapid Mixe 0.05787 - - - - - -
Flocculator 0.05787 - - - - - -
Sedimentat 0.05787 - - - - - -
Filters 0.05787 - - - - - -
Clear Wate 0.05787 - - - - - -
Chlorinatio 0.05787 - - - - - -
Unit L×W×H (m) Area (m²)
Volume (m³)
Retention TimeNotes
Screening 5×3×3 15 - - Bar screen
Rapid Mixe6×4×3 24 72 2 min -
Flocculator12×4×3 48 144 30 min Multi-stage
Sedimentat20×10×3 200 600 3 hr Rectangular
Filters 10×5×1.5 50 - - Sand / Multimedia
Clear Wate15×10×4 150 600 4 hr Storage
Chlorinatio3×3×3 9- - Dose auto-calculated
WTP Layout - Rectangular Units (Scalable)

Screening

Units arranged left to right: Flow path from Raw Water → Screening → Rapid Mixer → Flocculator → Sedimentatio
Rapid Mixer

→ Flocculator → Sedimentation → Filters → Clear Water Tank → Disinfection


Flocculator
Sedimentation Tank
Filters
Clear Water Tank
Chlorination