0% found this document useful (0 votes)
27 views8 pages

Optical Fiber Project Manager Resume

Dilip Kumar is a seasoned professional with over 12 years of experience in optical fiber communication and production engineering, specializing in project execution and maintenance. He has held various positions, including Assistant Manager at HFCL, where he managed significant projects for Gram Panchayat connectivity and maintained high service levels. His educational background includes an MBA and M.Tech, with a focus on communication systems, and he has received multiple accolades for his contributions to the field.

Uploaded by

ramanravi1993
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views8 pages

Optical Fiber Project Manager Resume

Dilip Kumar is a seasoned professional with over 12 years of experience in optical fiber communication and production engineering, specializing in project execution and maintenance. He has held various positions, including Assistant Manager at HFCL, where he managed significant projects for Gram Panchayat connectivity and maintained high service levels. His educational background includes an MBA and M.Tech, with a focus on communication systems, and he has received multiple accolades for his contributions to the field.

Uploaded by

ramanravi1993
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

DILIP KUMAR

S/o: - Ram Narayan Yadav, Vill+po- Gangapur, PS-Lakhanaur, Email: dilip4032@[Link]


Via-Jhanjharpur, Dist-Madhubani Pin-847403 Mobile: - +91 7018726065
Bihar

Objective:

To work with an Organization this provides me scope to update my Knowledge and Skills using the latest
Technologies and to be a part of a team that dynamically works towards the progressive growth of the
organization.
Professional Background:
Total professional Experience 12 year and 7-months

A. Experience in OFC Project execution & Operation and maintenance


9 year and 7-month experience in NLD, NLD Last mile and Intercity/ Intra-city and BBNL/JCNL Optical fiber
OSP network construction as a Project Manager and O&M Manager.


Site surveys of optical fiber Network layout of both overhead, underground and BBNL Project.

Site surveys of Infra GPON network and OLT & ONT installation for the project of BBNL/JCNL.

Preparation of KMZ and Site survey Report for the Planning of New fiber Network BBNL/JCNL, NLD,
NLD Last mile, Intra-city, FTTH and GPON network.


Work of ROW permission of authority Railway, IOCL, ONGC, NHAI/NH, SH, PMGSY/MMGSY and RCD.

Experience in proper listening and coordination with administration while smooth Project execution.

Experience in Vendor Management, Team deployment and Vendor deployment as per scope wise.

Experience of resources deployment and team deployment to maximize the output for finish the project
within given timeline of Project and also focus on Quality norms of project and health & safety.

Experience of installation and commissioning of OLT & ONT for the GPON & FTTH Network.

Experience of Testing and installation of FTTH components and FTTX Network with the Different types
Topology.

Experience of Fault detection in OLT & ONT for the GPON network to maintain the healthy services in
Gram panchayat SLA of 95% to 100%.

Experience of Fiber Maintenance network for the BBNL, RJIL and Airtel O&M in different location.

Trained in IPMPLS- Basic call flow and IMS core network and also Trained of GPON technology.

Experience of Documentation for the Billing and HOTO of completed different types of project.

B. Experience as production Engineer in Tele-Communication product.


3-year experience in production of optical fiber components. Team management for every shift and increased
the production efficiency.


Production planning to achieve the optimal production targets by keeping in view the sales forecasts.


Planning for production control to completing production well in time and also with lesser costs. It is
also maintaining the minimization of wastages.

Always looking the quality control in the concern work station and to remove the negative variables
which affect the ultimate quality of product and use all the ways to maintain the quality standards.

Always analysis and seeking the methods for improving the productivity and minimize the cost of
production.

To exercise regularly for control over the inventory which is helpful to determine economic order size,
maximum, minimum, average and dander levels of materials so that problems of overstocking and
understocking do not arise. This is also help in minimizing wastages of materials.

Always used to proper arrangement and use of available resources viz., men, money, machine,
materials and methods of production inside the factory. It helpful to concerned with maximum and
effective utilization of available resources at minimum operating costs.

Monitoring the performance management of manpower and machine which is helpful to measurement
the time and motion studies techniques can be used for worker works below the level fixed by work-
measurement techniques to measure the positive or negative incentives.

Production of different type patch cord, Connectors, pigtails, PLB, FDMS/FMS, Joint closer and different
types of Splitter box and DP box.

Professional Experience:

Company Position Date of Joining Last working day

Himachal futuristic communication Limited Assistant Manager


17-April-2019 Present
(HFCL, Limited), Jharkhand (Project & Maintenance)

Vindhya Telelinks Limited, Bihar Senior Engineer(Projects) 22-Feb-2018 12-April-2019

Reliance Jio Infocom Ltd, Shimla HP


Fiber Engineer 7-Aug-2015 21-Feb-2018
( Payrole of Kutumbh care Pvt. Ltd.)
Assistant Manager
NAV FIBRO PLASTICS, Kolkatta In Production Department 14-Feb-2012 13-April-2013

Technical Manager
NAV FIBRO PLASTICS, Kolkatta In Production Department 15-Feb-2011 14-Feb-2012

NAV FIBRO PLASTICS, PUNE ProductionEngineer 19-Feb-2010 18-Feb-2011

Educational background:

Qualification Institute /Board Year Percentage

M.B.A In Production & operation Swami Vivekananda Subharti University,


2016-2018 61%
Management and Finance Meerut (UP)

[Link] in
S. R. M University Chennai (E & T) 2013-2015 74%
Communication System

[Link] in
MITS RAYAGADA Orissa (BPUT, Orissa) 2005-2009 66%
Electronic & Communication Engineering

Intermediate Y.S.M COLLEGE RANCHI-4 2004 55%

Matriculation HINOO UNITED HINOO RANCHI-2 2001 56%


Area of interest in Teaching
• Optical Fiber Communication

• MIMO-OFDM Communication

• Electromagnetic Theory

• Electrical Network Theory

• Electronic Devices & circuit

Career Profile: (HFCL, Limited)


Bharat Net (BBNL) project of Gram panchayat connectivity with OLT to provide
the high-speed internet of gram panchayat level. Himachal Futuristic
Project profile Communication limited (HFCL), Jharkhand location. As an Assistant Manager.

Team size 14
Work on ONT and ONT equipment of Alphion technology, Splitter & FDMS used of HTL
Tools technology. LCT used for OLT & ONT integration and commissioning under GPON technology.
OCLAN connectivity for BSNL media.

In This OFC Project completed under 3-district (Dumka, Jamtara & Pakur) in this project 476
Gram Panchayat connectivity completed. Under this Project Total 1860 Km T&D and 1978 km
Blowing work and 31-OLT & 476-ONT installation & commissioning completed as an Assistant
Manager. Under the project Planning, ROW, execution and Billing documentation prepared.
After competition of project working as O&M manger those Blocks which is Completed and
O&M work is maintaining the SLA of more than 95% of all OLT & ONT from Last 2 year & 6
Project details month.

Responsibilities • Survey of Gram Panchayat & BSNL exchange for the Infra and OFC route feasibility.
• GP Connectivity planning with google earthpro and KMZ for the shortest path
planning and feasibility.
• Link budget calculation for high speed internet services in Gram panchayat.
• Working for ROW permission of authority Railway, IOCL, NHAI/NH, SH & PMGSY.
• Project execution of T&D, Blowing, splicing work, ONT & OLT installation and
integration work.
• Team deployment and Resources deployment for fiber route execution and GPON.
• Always focus on Maximum output with quality norms and end to end connectivity.
• Billing documents preparation MB, HDD graph, AT schedule for OLT&ONT, OFC table
& Depth AT.
• Vendor Management resources deployment and Vendor billing provide.
• OLT & ONT installation, commissioning and BB test, FTTH connectivity of GP.
• O&M work to maintain the 95% SLA of every GP and OFC route to maintenance.
Career Profile: (Vindhya Telelink, Limited)
BBNL project for Gram Panchayat connectivity & IP1 Project for Bharti Airtel
Project profile Limited for NLD & Last mile of node connectivity.

Team size 11
Work on ONT and ONT equipment of Tejas Network, Splitter & FDMS used of GPON
Tools technology. LCT used for OLT & ONT installation and commissioning.
For IP1 project also completed 450 KM T&D routes with the 57 no. nodes connected.

In this OFC Project completed under 3-district (Supaul, Saharsa & Madhepura Bihar) 225 GP
connectivity completed. Total 955 Km T&D and 1155 km Blowing work completed as a
Senior Engineer (project). Under the project Planning, ROW, execution and parallel O&M
work also progress those Block is Completed. Experience of OFC maintenance 1687 km under
9-Block of 3-district. IP1 Project work done in the district of Madhubani, Darbhanga
and Samastipur whereas 450 Km Project completed with 57 nodes connectivity.
After that project Maintenance of same route 3-FRT team and 2- Engineers.
Project details

Responsibilities • Gram Panchayat (GP) & BSNL exchange survey for infra feasibility.
• GP planning with google Map and KMZ for the shortest path planning and feasibility.
• OFC planning and link budget calculation for high speed gram panchayat.
• Looking for ROW permission of authority Railway, IOCL, NHAI/NH, SH & PMGSY.

• Project execution of T&D, Blowing, splicing work, ONT & OLT installation and
integration.
• Total 1405 Km T&D work complete and parallel O&M work is in progress.
• Operation & Maintenance of IP1 project network done of 1-year.
• Fiber Taping for Last Mile connectivity.
• Billing documents preparation like AT schedule, OFC table & Depth AT, ABD & RID
preparation.
• Focus on efficient resources deployment and team movement to follow the quality
norms of project.
Career Profile: Realiance Jio Infocom Limited, Shimla HP
National long distance (NLD), NLD-Last mile & ILA site construction Project of
Reliance Jio Infocomm Ltd. (Payroll of Kutubhcare Pvt. Ltd.) work Location
Project profile Shimla, Kinnaur & Mandi district. As a Fiber Engineer (Project)

Team size 9
CISCO, SAMSUNG, Fujikura Splicing machine, JDSU OTDR meter, Power meter, Fiber
Tools termination, Fiber
Taping, 48F Fiber cable SM with PLB-HDPE Duct protection. Duct integrated Test and
calibration Test.
National Long Distance (NLD) and Last Mile (ML) connectivity Intracity/Intercity. Shimla-
Narkanda-Rampur (135 km), Rampur-Tapri (110 km), Tapri-Recongpeo (65 km), Luhri-
Karsog aerial Route (55 KM), Karsog- Tattapani aerial Route (45 KM) and Tattapani- Dhali
Project details (42 Km)
Devices used Splicing machine fujikura, OTDR JDSU, LSPM, Different Type
Of Fiber protection used of Duct laying.

Responsibilities • Supervision of Underground & aerial 48F Fiber Network Laying.


• Preparing Billing documents of ITP both offline and online.
• Duct integrated Test for Remove the bending losses.
• Overhead fiber using of ADSS cable
• Duct protection using DWC, PCC, Red stones tiles.
• Installation of splice chamber.
• Underground Fiber using PLB-HDPE duct.
• Link budget calculation using power meter.
• Fiber jointing using FJIKURA machine.
• JDSU OTDR meter Testing.
• Duct locator using for depth.
• Fiber Taping for Last Mile Tower connectivity.
• Fault management using visual fault locator
• Team leading and vender management.
Career Profile: Nav Fibro plastic, Puna, Mumbai and Kolkatta.

Production of different types of Patch cord & Pigtel, Assembling & Testing of
different types of Splitter Bo, Production of different types of Branch joint closer,
Marketing & supply of Splicing tool. Stablish the new plant for the production of
Production profile patch cord & Pigtel in Kolkatta and provided training to BSNL employee.

Team size 17
Sikogaiken policing machine, JGR & JDSU for testing of IL & RL, Sumix & JGR machine use
for testing of offset, ROC & undercut. Visual fault locator, centrifuge machine, automatic loop
Tools cutter. DBM optics for splitter test.

1. Production of different types of patch cord- SC-PC, SC-APC, FC-PC, FC-APC, LC-PC,
Project details MTRJ.
2. Different types of Branch Joint closer (24F, 48F & 96F) production.
3. Assembling & Testing of different types of splitter (1X2,1X4, 1X8, 1X16 & 2X32)
4. Assembling of FDMS of different Size. Supply for BSNL, BBNL and MTNL project.
Responsibilities • Supervision of Production of Patch cord, BJC & Splitter.
• Preparing Billing documents of ITP both offline and online.
• Duct integrated Test for Remove the bending losses.
• Overhead fiber using of ADSS cable
• Duct protection using DWC, PCC, Red stones tiles.
• Installation of splice chamber.
• Underground Fiber using PLB-HDPE duct.
• Link budget calculation using power meter.
• Fiber jointing using FJIKURA machine.
• JDSU OTDR meter Testing.
• Duct locator using for depth.
• Fiber Taping for Last Mile Tower connectivity.
• Fault management using visual fault locator
• Team leading and vender management.

Technical workshop attended:


• Photonic & photovoltaic devices organized by supreme scientific corporation
• MATLAB application computation by IIIT Jabalpur.
• Advance in Cognitive Radio and its Hardware implementation
conducted by NIT Tiruchirappalli and HERIOT-WATT University
Edinburgh, UK.
• Trained in IPMPLS- Basic call flow and IMS core network.
• Trained in installation and commissioning of GPON equipment’s.
Academic projects:
• Receiver multiplexing through improve equalizer detection algorithm for MIMO-OFDM.

• Comparison of Improved Equalizer Detection Algorithm at higher order modulation for MIMO-
OFDM Systems

• Access control system for strong room.

• Sound operating circuit control.

Appreciation in Reliance Jio projects:

• Appreciation Certificate for integration of Kinnaur region site in minimum possible time, where the
world most treacherous road.

• Appreciation Certificate for integration of 1020 sites and launch of Jio in Himachal Pradesh in
minimum possible time.

Appreciation in HFCL Limited for BBNL projects:

• Ace Alliance Team Award for the completing T&D of 1662 Km, 13 blocks and AT of 430 GP in difficult
terrains of Jharkhand in Last 6 month.

• Ace Alliance Team Award for the team has together ensured to maintain SLA in JCNL project even in
the adverse conditions prevailing in Jharkhand State.

Research Paper publication


• [Link] project “Receiver multiplexing through improve equalizer detection
Algorithms for MIMO-OFDM” in International Conference on Electrical, Electronics &
Computer Engineering (ICEECE-15) on 11th & 12th March [Link]-978-9381830-95-
6.
• “Comparison of Improved Equalizer Detection Algorithm at higher order modulation for MIMO-OFDM
Systems” in ICECS 2015 Paper on IEEE Explore-Conference.

Vocational training:
• C & C++ in Lakshya Bhubaneswar on May, 2007.
• Vocational Training in Prasar Bharti DDK, Patna on TV broadcasting.
Strengths:
• Proactive Team player
• Willingness to learn
• Persistence towards completing a task
Leisure Pursuits:
• Passionate about cricket
• Enjoy Reading newspaper, cooking, watching movies
• Chase, cricket
General Information:
• Date of Birth : 5 JUNE 1986
• Nationality : Indian
• Languages : English, Hindi, Oriya, Bengali, Maithili, Marathi, Bhojpuri

Declaration:

I hereby declare that the above-mentioned information is correct to the best of my knowledge and I bear
the responsibility for the correctness of the above-mentioned particulars.

Place: Dumka, Jharkhand DILIP KUMAR

You might also like