0% found this document useful (0 votes)
32 views57 pages

G+2 Residential Building Cost Breakdown

Uploaded by

lijieyasu510
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views57 pages

G+2 Residential Building Cost Breakdown

Uploaded by

lijieyasu510
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

SUMMARY

Client:
Project: G+0 RESUDENCE Building
Location: Dessie

ITEM DESCRIPTION AMOUNT


A. SUB STRUCTURE
1 EXCAVATION AND EARTH WORK 296,686.79
2 CONCRETE WORK 415,029.05
3 MASONRY WORK 237,191.67
SUB TOTAL-A 948,907.51
B. SUPER STRUCTURE
1 CONCRETE WORK 471,465.07
2 BLOCK AND MASONRY WORK 133,316.75
3 ROOFING WORK 206,453.28
4 CARPENTARY WORK 305,037.36
5 METAL WORKS 245,475.20
6 FINISHING 175,413.94
7 GLAZING 43,696.56
8 PAINTING 24,126.62
9 SANITARY INSTALLATION 102,967.12
10 ELECTRICAL INSTALLATION 165,201.75
SUB TOTAL-B 1,873,153.66
TOTAL ( A + B ) 2,822,061.17
15% vate 423,309.18
GRAND TOTAL ( A + B ) 3,245,370.34
OWNER:-
LOCATION :- DESSIE KEB. ……….
PROJECT:- FENCE
[Link] Description Unit Quty Rate
A. Sub Structure
1. Excavation & Earth Work
1.1 Site clearing to remove top soil to an average depth of 20 cm M2 46.5 32.87
1.2 Excavation for trench foundation not exceeding 150cm M 3
21.7 238.65
1.3 Back fill selected material from site & well compacted to an average
depth of around the trench M3 11.625 598.27
1.4 Cart away (Remove) surplus excavated material and spread
on a chosen site at a distance not exceeding 2 km from site. M3 15.5 321.16
Total carried To Summary
2. Masonry Work
2.1 50 cm thick stone masonry foundation wall bedded in cement & sand
below NGL M3 10.85 2065.97
2.2 Ditto but above NGL M 3
13.175 2208.67
2.3 20x20x40 pointed HCB wall bedded in cement & sand mortar of 1:3
M2 31 442.10879
Total carried To Summary
3. Concret Work
3.1 5cm thick lean concrete under masonary wall & footing pad M2 15.5 30
3.2 Rainforced concrete field in to form work & vibrated around
reinfrocement steel & form work measured separetly
A. Grade beam, M3 3.1 4101.73
B. In elevation columns M 3
0.96 4101.73
C. Intamediate beam M 3
2.325 4101.73
3.3 Provide cut & fix in position to zigba wood form work
A. Grade beam, M2 12.4 250
B. In elevation columns M2 19.2 250
C. Intamediate beam M 3
12.4 250
3.4 Steel reinforcement according to drawing price shall include cutting
bending placing in position & tying wires
A. Dia 6mm deformed bars Kg 97.483 67
B. Dia 12 mm deformed bars Kg 195.36 66
3.5 Concrete copping on concrete column Pcs 8 50
Total carried To Summary
4. Metal work
4.1 Metal door fabricated from 50x30x1.00 RHS & 1mm flatmetal sheet

D1= 300x250 Pc 1 15000


4.2 Dour grill M 2
0 700
Total carried To Summary
5. Finishing
5.1 Pointing for masonary wall with cement sand mortar 1:2 M2 109 143
5.2 Ditto but to HCB wall M 2
62 143
5.3 3coats of plastesing in cement sand mortar 1:3 to columns, beams &
copping M2 45 143
Total carried To Summary
Grand Total
Amount

1528.455
5178.705

6954.88875

4977.98
18,640.03

22415.7745
29099.22725

13705.37245342
65,220.37

465

12715.363
3937.6608
9536.52225

3100
4800 15 108
3100
155 139.5 247.5

6531.338666667
12893.76 28
400 124 54
57479.64471667 96 48 102
220

12000
0
12000
15587
8866
6435

30,888.00
###
Specification & Bill of Quantities
FOR G+2+T

[Link] DESCRIPTION Unit Qty Unit Price Amount


A. SUB STRUCTURE
[Link] AND EARTH WORK
1.1 Clear off the site to remove top soil to an average depth of 20 cm. m2 99.00 88.66 8777.46
Bulk excavation to reduce level from the the striped level to an
average depth of 150cm, cut the earth including compacting and
1.2 leveling with spreaking [Link] in ordinary soil m3 80.00 492.56 39405.00
Excavation for trench foundation, to adepth not exceeding150cm
1.3 from stripped level. m 3
46.65 312.88 14594.73
Back fill around footing& masonery Foundation with selected
material brought from approved source and well ram in layers
1.6 every 20cm thick with a compactor of capacity 2.5ton. m3 30.88 1789.76 55267.87
Back fill under hard-core with selected material brought from
approved source and well ram in layers every 20cm thick with 5-
1.7 10 ton capacity roller. m3 26.00 1789.76 46533.83
Cart away (Remove) surplus excavated material and spread on a
1.8 chosen site at a distance not exceeding 2 km from site. m3 120.45 466.88 56233.41
Basaltic or equivalent stone hard core well rolled consolidated and
1.9 blinded with crushed stone to a finished thickness of 25 cm m2 65.00 1167.30 75874.50
carried to summary 296,686.79
2. CONCRETE WORK
2.1 5cm lean concrete in C-5,150kg cement /m3 under
a) Footing pads m2 15.97 429.79 6863.73
b) Stone Masonery and Grade Beam m2 49.00 429.79 21059.65
Reinforced concrete in C-25, 360 kg/m3 filled in to form works and vibrated
around rod reinforcement.(form works and reinforcement bar measured
separately & labortaory test should be taken ). Type ppc cement
2.2
c) Grade beam floor beams m3 4.46 12906.07 57559.45
D) 10 cm thick Graound floor slab m2 65.00 1290.61 83889.44
Provide, cut and fix in position Wooden (sawn zigba) or metal form work for:
2.3
c) Grade beam floor beams m2 35.68 1005.89 35888.97
Steel reinforcement bars according to structural drawings. Price includes
2.4 cutting, bending, placing in position and tying wires.
a) Diam.8mm deformed bar kg 338.97 303.23 102783.41
d) Diam.14mm deformed bar kg 392.17 272.80 106984.40
carried to summary 415,029.05
3. MASONRY WORKS
Masonry wall under grade beams bedded on cement sand mortar of mix
ratio1:3. below ground level. (Laboratory test should be taken and the
3.1 proportions will be determined by laboratory test ) m3 28.54 7825.24 223357.39
3.4 Ditto But steps m3 1.50 9222.85 13834.28
carried to summary 237,191.67
[Link] DESCRIPTION Unit Qty Unit Price Amount
B. SUPER STRUCTURE
1. CONCRETE WORK
Reinforced concrete C-25, 360 Kg/m3 filled into form work and vibrated
around steel reinforcement. Steel reinforcement and form-work measured
1.1 [Link] cement type
a. Elevation [Link] shearwall m3 3.15 14536.98 45791.49
[Link] floor beams,roof beam m3 5.05 14536.98 73469.90
1.2 Provide, cut and fix in position Wooden or metal form work for:
a) Elevation Column and shearwall m2 27.00 1130.76 30530.52
b) In floor beams m2 29.60 1130.76 33472.76
Steel reinforcement bars according to structural drawings. Price includes
1.3 cutting, bending, placing in position and tying wires.
a) Diam. 8 mm deformed bar kg 245.97 333.70 82081.55
d) Diam.14mm deformed bar kg 611.11 337.29 206118.86
carried to summary 471,465.07
2. BLOCK AND MASONRY WORK
20 cm thick class "A" H.C.B wall bedded on cement sand mortar of ratio 1:3,
2.1 for external wall m2 49.10 1360.46 66798.50
2.3 Ditto 2.1 but 15 cm for internal wall m2 52.96 1255.96 66518.25
carried to summary 133,316.75
3. Roofing and Water Proofing Works
3.1 Galvanized,Corrugated steel sheet G-28 m2 66.14 1805.93 119440.34
3.3 Roof ridge caps ml 39.00 1794.51 69985.94
3.4 Ø110mm PVC down pipe fixed on column with metal strupps. ml 23.40 727.65 17027.01
carried to summary 206,453.28
4. CARPENTRY AND JOINERY
Supply & fix 40mm thick solid wooden door with hard wood frames and both
side coveerd with 4mm thick ply wood. Price shall include door handles,
hinges, door stopper, three coats varnish paint and the accessories to
4.1 complete the [Link] of the door

A. D1 Size 85*210 Pcs 3.00 17526.67 52580.00


B. D2 Size 90*210 Pcs 4.00 19717.50 78870.00

All structural member shall be well seasoned, Stright , free of any harm full
defects each truss joint shall be connected with band iron and truss shall be
4.2 firmly fixed to concrete top tile beam with 6mm plane bar 0.00
[Link] 12 cm lower & upper member / Eucalyptus / ml 68.05 352.07 23958.51
[Link] 8cm vertical & inclined member / Eucalyptus / ml 47.64 331.38 15785.62
c. 5X7 cm Zigeba wooden purline C/C 90 cm ml 58.40 286.86 16752.84
4.3 plastic ceiling m2 65.00 1801.39 117090.38
carried to summary 305,037.36
5. Aluminium& Metal Works
Supply and fix door & window made up of 38mm Aluminium profile section
and 1.5mm thick with the necessary iron mongery , accessories and all
5.1 according the given drawing .
A. Window
Type W1 ( 125x155)cm Pcs 1 38,430.9 38430.89
Type W2 ( 130x160)cm Pcs 1 41,257.4 41257.42
Type W3 ( 110x135)cm Pcs 1 29,520.9 29520.88
[Link]
A.D1 size 90x220 Pcs 1.00 33508.04 33508.04
B.D2 Size 85x220 Pcs 1.00 53612.86 53612.86
C.D3 Size 120x220 Pcs 1.00 49145.12 49145.12
carried to summary 245,475.20
[Link] DESCRIPTION Unit Qty Unit Price Amount
6. Finishing:-
Finishing works shall include all surface pre-cleaning, preparation and
6.1 application of finishing and clearing at the end of finishing works
[Link] coats of plastering in cement mortar mortar of ratio 1:3 internal &
external HCB walls, coulumns and beams,randerd wall surface. m2 204.12 149.10 30434.60
[Link] (fine)coat of Gypsum plaster to all plasterd m2 155.02 411.09 63729.34
6.2 Floor finshing price should be include 3cm thick cement sand mortar
Tiles
A/60*60 porceline floor tile m2 65.00 1250.00 81250.00
carried to summary 175,413.94
7. Glazing
Supply and fix 4 mm thick clear sheet glass to metal beads and puttied with
7.1 approved quality of putty m2 11.82 3697.88 43696.56
carried to summary 43,696.56
8. Painting
Prepare the surface and apply three coats of plastic emulsion paint to all
plastered & rendered wall surface , columns & beams
8.1 To all internal wall surface m2 105.92 155.63 16485.11
8.2 plastic paint to external wall surfaces m2 49.10 155.63 7641.51
24,126.62
[Link] enstalation
A. WATER SUPPLY SYSTEM
GS PIPE :- Supply , lay and connect galvanized steel pipe (GS - PN16) for
cold and hot water supply as per the drawing shown, complete with all the
necessary connecting pieces such as bends, unions Tees, etc. Unit price
9.1 shall include all the necessary as
Diameter 20 ml 6.00 231.28 1387.68
Diameter 15 ml 6.00 186.22 1117.32
GATE VALVE :- Supply and fix bronze gate valves (PN16) , Complete with
9.2 all accessories.
Diameter 15 No 2.00 163.30 326.60
B. SANITARY FIXTURES
HAND WASH BASIN :- Supply and fix hand wash basin with pedstal,
complete with faucet, chain plug, trap and all accessories
9.3 Size:- 410x510mm No 1.00 14673.04 14673.04
WATER CLOSET :- Supply and fix wash down water closet made of white
vitreous china, including plastic seat and cover, low flush cistern and stop
9.4 cock on the water supply line. Complete with all the necessary accessories No 1.00 5021.78 5021.78
SHOWER Box :- Supply and install shower tray, made of enemelled cast
iron, complete with adjustable mixing head, traps glazed box and all other
9.5 accessories No 1.00 9731.50 9731.50
C. WASTE WATER DRAINAGE
SEWAGE PIPE :- Supply and lay uPVC pipe for waste water drainage.
9.6 Complete with all the necessary accessories
Diameter 110mm ml 44.00 306.45 13483.80
Diameter 65mm ml 23.00 187.67 4316.41
FLOOR DRAIN :- Supply and fix floor drains, made of enamelled cast iron
9.7 with smell trap, complete with all the necessary accessories.
Diameter 50mm No 2.00 581.45 1162.91
VENT CAP :- Supply and fix vent cap made of PVC, at terminal points of
9.8 vertical stacks 0.00
Diameter 50mm No 2.00 346.28 692.55
D. MISCELLANEOUS SANITARY SUPPLIMENTS
SOAP TRAY:- Supply and fix soap holder in white vitreous china
9.9 150x150mm, near to hand wash basin, bath room and Kitchen sink. No 1.00 426.00 426.00
TOILET PAPER HOLDER:- Supply and fix toilet paper holder with synthetic
9.10 roler 150x150x25mm. Complete with fastening screws No 1.00 627.54 627.54
Roto price shall include outomatic level switch control /galvanaized/
mesh cover manhole over flow include in outside tank and a capacity
9.11 of 5000 litter No 55202.02 0.00
9.13 Construct a rectangular man hole. No 2.00 25000.00 50000.00
carried to summary 102,967.12
[Link] DESCRIPTION Unit Qty Unit Price Amount
10. Electrical Installation
A. ELECTRICAL SYSTEM
10.1 UTILITY
supply and fix flush mounted sub distribution board (SDB-GF) with loccable
door bus bar system,earthing lead and complete with all other necessary
10.4 accessaries and consisting of
3pc ACB of 10A, 1phase
1pc ACB of 16A, 3phase
3pcs ACB of 25A, 3phase No 1 60000.00 60000.00
1pcs ACB of 6A, 3phase
10.3 LIGHT POINTS AND SWITCHES

Light point fed through PVC insulated copper conductor of 2x2.5 sq. mm in
PVC conduit of 16 mm diameter including junction boxes with covers
insulated screw cap connectors, and all other necessary accessoris No 16.00 1399.72 22395.52
Supply and Installing socket outlets legrand type or approved
10.4 equivalent
10/16 Ampere,220 Volt, 1 Phase single socket outlet fed through PVC
insulated copper conductors of 3x2.5 sq. mm in PVC conduit of 16 mm
diameter including junction boxes with covers, insulated screw cap
connectors and all other necessary accessories. No 15.00 2201.85 33027.75
10.5 Ditto, as item 2.2 but for flush mounted (LEGRAND SALBEI) Twin socket
10.6 outlet point 16A/1Ph
TELEPHONE SYSTEM with grounding through PVC conductor of [Link]
wire, through conduits of 19mm diameter and including with all accessories. (For
supply and install tele data flush mounted tele outlet point fed through
Office).
TELE TERMINAL BOX inside PVC conduit ofdiameter 19mm complet with
oll connction accessories No. 5.00 593.10 2965.50
10.7 TV (ANTENNA- SATELLITE DISH) SYSTEM
TV antenna outlets only conduits wth RF of 29/50 mm diameter including
pull guy wire or cord inside and tap off boxes with covers and other
necessary accessories, as per TV system installer requirements. No. 9.00 593.10 5337.90
Supply and Install Switch flush mounted type legrand or approved
10.8 equivalent
Flush fixed single pole Switch No. 18.00 130.11 2341.98
10.9 LIGHTING FITTINGS AND LAMPS
LED Spot light 220v-240v with 12 W No. 10.00 1,230.0 12300.00
massive 41809/11/10with 11xE14/max 40 w OR EQVALENT No. 6.00 1,463.9 8783.10
applquses wall lamo aurgi 200x270x90xfsq36w No. 19.00 950.00 18050.00
carried to summary 165,201.75
Project: SNNPRG S4 Sub STRUCTURE

No. of
Dwg Ref. Length No. of memb
No. Member No Dia. (m) bars ers 6 8 10
Footing
F1 12 1.7 7.5 0
F2 12 2.45 11.2778 0
F3 14 1.9 14 0
12 1.9 8.22222 0
F4 14 2.2 15 0
12 2.2 15 3

[Link] 14 8.12 6 0

8 1.1 55.13333 0 0
OOTING COLOMEN
C1',C1 14 2.92 14 0
0 0 20 0
st 8 1.3 13 0 0
C3,2 14 2.92 10 0
st 8 1.3 13 0 0
C4 14 2.92 8 0
st 8 1.3 13 0 0
LIFT SHEAR WALL 16 116.48 1 0
14 113.92 1 0
12 3.80 32.66667 0
10 2.60 20 0 0
10 1.76 20 0 0
12 1.12 21 0

GRADE BEAM
GB1 14 57.852 1 3
st 8 1.1 38.35 3 126.555
GB2 14 50.364 1 3
st 8 1.2 39 3 140.4
GB3 14 28.5 1 0
st 8 1.2 26 0 0
GB4 14 56.1 1 0
st 8 1.2 39 0 0
GB5 14 60.9 1 0
st 8 1.2 26 0 0
GB6 14 58.5 1 0
st 8 1.2 39 0 0
Y-AXIS 8 9.12 32.48 1 296.2176
8 7.87 37.48 1 294.9676
10 4 12.74286 0 0
8 8.599 6.1 0 0
10 7.989 26.67857 0 0
10 10.155 14.17143 0 0
8 5.133 9 0 0

NEGTIV 12 3.123 34.25714 0

12 4.191 26.64286 0
12 3.545 386.7143 0
Total Length (m) 0 858 0
Weight per m 0.222 0.395 0.617
Total Weigth (Kg) 0 338.9654 0
1 0 338.9654 0

bar size 8
total
length 858
wasege 6 percent
51.488412

total
length
include
d 910

number
of
beraga 75.8024

Final
[Link]
barga 182
RUCTURE Location: Expansive

No. of
Length No. of membe
12 14 16 20 24 Dia. (m) bars rs
14 2.8 13.5 2
0 14 2.2 10.412 6
0 14 2.9 12.3333 4

0 14 3.1 4 2

0
0
0

173.556

151.092

0
0.33333 0.66667 -0.33333
0

0
0.33333 0.66667 -0.33333
0
0
0
0
0 325 0 0 0 14 8
0.888 1.208 1.578 2.468 3.551 14 9
0 392.175 0 0
0 392.175 0 0

12 14 16 20

0 325 0 0
6 percent 6 percent6 percen10 percent
0 19.47888 0 0

0 344 0 0

0 28.677 0 0

545 107 0 283


Project: University Sub STRUCTURE

No. of
Dwg Ref. Length No. of membe
No. Member No Dia. (m) bars rs 6 8 10
Elevation column
C-1 14 21.36 1 3
16 0.00 1 3
0 0.00 1 3
st 8 1.30 23.33333 3 91
C-2 14 21.36 1 4
0 0.00 1 4
st 8 1.30 20 4 104
C-1' 14 21.36 1 1
0 0.00 1 1
st 8 1.30 40 1 52
C-2' 14 21.36 1 1
0 0.00 1 1
st 8 1.30 40 1 52
LIFT SHEAR WALL 16 116.48 1 0
14 113.92 1 0
12 3.80 32.66667 0
10 2.60 140 0 0
10 1.76 140 0 0
12 1.12 141 0
Floor Beams

TOTAL
FROM 1-3 LENGTH
FB1 16 0 1 1
14 80.493 1 1
st 8 1.2 57.46667 1 68.96
FB1' 14 59.622 1 1
16 0 1 1
st 8 1.2 52.46667 1 62.96
FB2 14 65.315 1 1
16 0 1 1
st 8 1.3 37.6 1 48.88
RB1 14 57.852 1 1
st 8 1.3 57.46667 1 74.70667
RB2 14 50.364 1 1
st 8 1.3 52.46667 1 68.20667

[Link] 10 12 9.571429 0 0
X-AXIS 10 11.17 19 0 0
10 11.117 26.57857 0 0
NGTIV 10 2.557 9.571429 0 0
10 2.557 26.57857 0

Y-AXIS 10 12 53.375 0 0

10 10.572 15.61176 0 0
10 2.632 37.95294 0 0

WATER
TANKER
SLAB
X 8 4.48 16 0 0
8 3.2 26.33333 0 0
10 9.34 11.61111 0 0
10 8.94 12.66667 0 0
10 3.72 12.86667 0 0
10 3.72 15 0 0
10 3.32 28.86667 0 0
Y 8 2.34 9.45 0 0
8 2.34 9.45 0 0
10 9.54 32.66667 0 0
8 4.54 7.4 0 0
12 3.92 44.84615 0
STAIRE 14 13.99 9.4 0

12 11.89 9.4 0

8 3.32 19 0 0

8 6.67 19 0 0

8 0.00 7 0 0

8 0.00 23 0 0

[Link] 14 13.77 1 0

14 15.16 1 0

st 8 1.50 26.66667 0 0
Total Length (m) 0 622.713 0
Weight per m 0.222 0.395 0.617
Total Weigth (Kg) 0 245.972 0
1 0 245.972 0
ub STRUCTURE Location: Adama

12 14 16 20 24

64.08
0

85.44

21.36

21.36

0
0
0

0
80.493

59.622
0

65.315
0
0.33333333 0.66667
57.852 0.66666667
0.33333333 0.66667
50.364
0.33333333 0.66667

0
0

0 505.886 0 0 0 14 8
0.888 1.208 1.578 2.468 3.551 14 9
0 611.1103 0 0 0
0 611.1103 0 0 857.082
-0.333333333333333
-0.333333333333333

-0.333333333333333
No Length Width Height Total Remark
A. SUB STRUCTURE

1. EXCAVATION & EARTHWORK

I) Site Clearing

1 0.00 1.00 1.00 -


-
-

Total Sum - m2
II) Bulk Excavation to reduce levels

a) Bulk excavation up to 1500mm

1 0.00 1.00 1.20 -


-
-
Total Sum - m3
b)Pit excavation up to 1500mm

2 1 1 0 1.18 F-1
5 1 1 1.50 14.70 F-3
1 2 2 1.50 3.38 F-4
0 2 14 1.50 - [Link]
0 3 3 1.50 - F-6
0 3 5 1.50 - F-7
0 2 3 1.50 - F-8
0 3 5 1.50 - CF1
0 3.00 6.36 1.50 - CF2
Total Sum 19.25 m3
b)Pit excavation up to 3000mm

2 1 1 0.70 2.74 F1
5 1 1 0.70 6.86 F2
1 2 2 0.70 1.58 F3
0 2 14 0.70 - F4
0 3 3 0.70 -
0 3 5 0.70 -
0 2 3 0.70 -
0 3.30 5.60 0.70 -
0 3.00 6.36 0.70 -
Total Sum 11.18 m3

c) Back fill around footing and building

0 273.00 1.00 0.80 - around the bldg


30.43
(9.61) DDT footing
(3.00) DDT column

Total Sum 17.82 m3

e) Back fill under slabs


d) Back fill under HARD CORE

0 1841.00 1.00 0.40 - ax 1-1'


0 236.91 1.00 0.40 -
0 0.40 -
0 0.40 -
0 0.40 -
0 0.40 -
0.40 -
0.40 -
0.40 -
0.40 -
0.40 -
0.40 -
0.40 -
0.40 -
Total Sum - m3

f) Cartaway excavated materials


1.00 0.20 -
-
30.43
(17.82)
-
Total Sum 15.76 m2

g) Hard core
1.00 - block1-& 2
0 1841.00 1.00 1.00 -
0 236.91 1.00 1.00 -
0 1.00 -
1.00 -
1.00 - block 3
1.00 -
1.00 -
1.00 -
1.00 -
Total Sum - m2

2. CONCRETE WORK
I) Lean Concrete

a) Under beams & slabs

0 1841.00 1.00 1 - block 1& 2


1 - block 3
1 -
1 -
1 -
1 -
1 -
Total Sum - m2

b) Under footing

2 1 1 1.00 3.92 F1
5 1 1 1.00 9.80 F2
1 2 2 1.00 2.25 F3
0 2 14 1.00 - F4
0 3 3 1.00 - F5
0 3 5 1.00 - F6
0 2 3 1.00 - F7
0 3 5 1.00 - F8
0 3 6 1.00 - F9
Total Sum 15.97 m2
c) Under masonry wall

0 14.81 0.40 1.00 - GFB 1


0 15.01 0.40 1.00 - GFB 2
0 8.30 0.40 1.00 - GFB 3
0 18.56 0.40 1.00 - GFB 4
0 20.99 0.40 1.00 - GFB 5
0 18.56 0.40 1.00 - GFB 6
0 10.70 0.40 1.00 - GFB 7
0

Total Sum - m2
Material Density kg/m3 Mixing rate m3 Shrinkage Wastage
Cement 1400 1 0.80 1.33 1.05
Sand 1840 4 0.80 1.33 1.15
Gravel 2250 8 0.80 1.33 1.15

II) Reinforced Concrete in


a) Footing
-
2 1.40 1.40 0.30 1.18 F-1
1 1.65 1.65 0.40 1.09 F-2
5 1.40 1.40 0.60 5.88 F-3
1 1.50 1.50 0.65 1.46 F-4
0 1.80 14.00 0.50 - [Link]
0 3.10 3.10 0.75 - F-6
0 3.00 4.90 1.00 - F-7
0 1.80 2.80 0.60 - F-8

0 2.80 5.10 1.20 - CF1


0 2.50 5.86 0.70 - CF2
0 5.86 0.60 0.60 - CF2 BEAM
0 2.50 0.60 0.60 - CF2 BEAM
0 3.00 4.40 0.80 - CF3
0 2.70 3.80 0.60 - MF-1
Total Sum 9.61 m3

b) Foundation Columns
Block-1
12 0.40 0.25 2.50 3.00 C1
0 0.40 0.25 5.50 - C2
0 0.40 0.20 5.66 - C3
0 0.40 0.20 5.66 - C4
0 0.50 0.25 2.66 - C5
0 0.30 0.20 2.66 - C6
0 0.19 1.00 2.50 - C7
0 0.30 0.50 2.50 - C8
0 0.50 0.20 2.50 - C9
0 - C10
0 - C11
0 - C12
0 - C13

Total Sum 3.00 m3

c) BASEMENTfloor beam
block -1
3 9.12 0.35 0.25 2.39 2BB 1
3 7.87 0.35 0.25 2.07 2BB 2
0 4.15 0.35 0.25 - 2BB 3
0 8.75 0.35 0.25 - 2BB 4
0 9.55 0.35 0.25 - 2BB 5
0 9.15 0.35 0.25 - 2BB 6
0 2.87 0.30 0.25 - BB 7
0 2.48 0.30 0.25 -
0 0.00 0.30 0.25 -
Total Sum 4.46 m3
c) Ground floor beam
0 7.55 0.50 0.30 - BB 1
0 5.65 0.50 0.30 - BB 2
0 12.02 0.50 0.30 - BB 3
0 2.36 0.50 0.30 - BB 4
0 6.42 0.50 0.30 - BB 5
0 9.59 0.50 0.30 - BB 6
0
0 8.74 0.45 0.30 - GB 1
0 10.87 0.45 0.30 - GB 2
0 5.77 0.45 0.30 - GB 3
0 6.35 0.45 0.30 - GB 4
0 15.59 0.45 0.30 - GB 5
0 7.91 0.45 0.30 - GB 6
0 0.00 0.45 0.30 - GB 13
0 0.00 0.45 0.30 - GB 14

Total Sum - m3

d) 100mm thick Ground floor slabs

1 225.00 1.00 1.00 225.00


-
-
-
-

Total Sum 225.00 m2


Material Density kg/m3 Mixing rate m 3
Shrinkage Wastage
Cement 1400 1 35.11 1.33 1.05
Sand 1840 2 35.11 1.33 1.15
Gravel 2250 3 35.11 1.33 1.15

c) Form work

a) Footing

2 1.40 4.00 0.30 3.36 F1


1 1.65 4.00 0.60 3.96 F2
5 2.80 2.00 0.65 18.20 F3
1 3.00 2.00 0.50 3.00 F4
0 15.80 2.00 0.75 - F5
0 6.20 2.00 1.00 - F6
0 1.80 4.00 0.60 - F7
0 2.80 4.00 1.20 - F8
0 2.50 4.00 0.70 - F9
Total Sum 28.52 m2

b) Foundation Columns
12 0.40 0.25 2.50 26.40 C1
0 0.40 0.25 5.50 0.00 C2
0 0.40 0.20 5.66 0.00 C3
0 0.40 0.20 5.66 0.00 C4
0 0.50 0.25 2.66 0.00 C5
0 0.30 0.20 2.66 0.00 C6
0 0.19 1.00 2.50 0.00 C7
0 0.30 0.50 2.50 0.00 C8
0 0.50 0.20 2.50 0.00 C9
0 0.00 0.00 0.00 0.00 C10
0.00
Total Sum 26.40 m2

c) BASEMENT floor beam

3 9.12 0.70 0.25 19.15 2BB 1


3 7.87 0.70 0.25 16.53 2BB 2
0 4.15 0.70 0.25 - 2BB 3
0 8.75 0.70 0.25 - 2BB 4
0 9.55 0.70 0.25 - 2BB 5
0 9.15 0.70 0.25 - 2BB 6
Total Sum 35.68 m3
c) Ground floor beam
0 7.55 1.00 0.30 - BB 1
0 5.65 1.00 0.30 - BB 2
0 12.02 1.00 0.30 - BB 3
0 2.36 1.00 0.30 - BB 4
0 6.42 1.00 0.30 - BB 5
0 9.59 1.00 0.30 - BB 6
0 8.74 0.90 0.30 - GB 1
0 10.87 0.90 0.30 - GB 2
0 5.77 0.90 0.30 -
0 6.35 0.90 0.30 -
0 15.59 0.90 0.30 -
0 7.91 0.90 0.30 -
0 0.00 0.90 0.30 -
0 0.00 0.90 0.30 -
Total Sum - m3

MASONRY WALL (BNGL)

3 9 0.60 1.40 22.98 2BB 1


3 8 0.60 1.40 19.83 2BB 2
0 4 0.60 1.40 - 2BB 3
0 9 0.60 1.40 - 2BB 4
0 10 0.60 1.40 - 2BB 5
0 9 0.60 1.40 - 2BB 6
0 0.80 0.60 - m3
0.00
Total Sum 42.81 m3
Material Unit Vol./ m3 m3 Total
Stone m3 1.10 42.81 47.10
Cement Qtl 1.50 42.81 64.22
Sand m3 0.37 42.81 15.84
water Lit. 68.00 42.81 2911.41

MASONRY WALL (ANGL)

3 9.12 0.60 0.50 8.21 GFB 1


3 7.87 0.60 0.50 7.08 GFB 2
0 4.15 0.60 0.50 - GFB 3
0 8.75 0.60 0.50 - GFB 4
0 9.55 0.60 0.50 - GFB 5
0 9.15 0.60 0.50 - GFB 6
0 0.00 0.80 0.50 - GFB 7
0 0.00 -
0 -

Total Sum 15.29 m3


Material Unit Vol./ m3 m3 Total
Stone m3 1.10 15.29 16.82
Cement Qtl 1.50 15.29 22.94
Sand m3 0.37 15.29 5.66
water Lit. 68.00 15.29 1039.79

EXPANSION JOINT

0 14.81 1.00 1.00 0.00 2


0 15.01 2.00 1.00 0.00 4
0 8.30 2.00 1.00 0.00 2
0 18.56 1.00 1.00 0.00 3
0 20.99 1.00 1.00 0.00 3
0 18.56 2.00 1.00 0.00
0 10.70 2.00 1.00 0.00
0 0.00
0 0.00
0 0.00

Total Sum - m

B. SUPER STRUCTURE
1. CONCRETE WORK
I) Reinforced Concrete in
a) In elevation columns
block-1
7 0.40 0.25 3.50 2.45 C1
2 0.40 0.25 3.50 0.70 C2
0 0.35 0.25 6.40 - C3
0 0.35 0.25 9.45 - C4 1.44
0 1.20 0.15 9.45 - C5
0 0.50 0.40 9.45 - C6
0.50 9.45
0 0.40 0.50 9.45 - C7
0 2.00 0.15 9.45 - sw3
0 8.20 0.15 9.45 - sw1
0 7.10 0.15 9.45 - sw2
0 9.45 - C-16
-
Total Sum 3.15 m3

b)Floor beams

Block-1
0 9.12 0.35 0.25 - FB 1
0 7.87 0.35 0.25 - FB 2
0 6.64 0.35 0.25 - FB 3
0 9.55 0.35 0.25 - FB 4
0 8.05 0.35 0.25 - FB 5
0 4.45 0.35 0.25 -
0 1.75 0.35 0.25 - FB 7
0 0.00 0.40 0.25 - WB 1
0 0.00 0.40 0.25 - WB 2
0 0.00 0.40 0.25 - FB 10
0 0.00 0.40 0.25 - FB 11
0

Total Sum - m3
b)roof beams
Bloock -1
1 7.55 0.35 0.20 0.53 WTB1
2 8.05 0.35 0.20 1.13 WTB2
1 8.75 0.35 0.20 0.61 WTB3
2 9.55 0.35 0.20 1.34 WTB4
2 5.20 0.35 0.20 0.73 WTB5
2 5.15 0.35 0.20 0.72 WTB6
0 3.39 0.50 0.30 - WTB7
0.00 9.20 0.50 0.25 - RB 8
0.00 0.00 0.40 0.25 - RB 9
0.00 0.00 0.40 0.25 - RB 10
0.00 0.00 0.40 0.25 - RB 11
0.00 0.00 0.40 0.25 - RB 12
0.00 0.00 0.40 0.25 - RB 13
0.00 0.00 0.40 0.25 - RB 14
0.00 0.00 0.40 0.25 - RB 15
0.00 0.00 0.40 0.25 - RB 16
0.00 0.00 0.40 0.25 -
0.00 0.00 0.40 0.25 -
Total Sum 5.05 m3

C) floor slab 150mm

0 68.00 1.00 1 - 1&2


0 25.00 1.00 1 - r00f
0 278.00 1.00 1 - wt
0 185.20 1.00 1 -
0 13.85 1.00 1 -
0 1 - 3rd floor
0 72.35 1.00 1 -
0 1 -
1 -
Total Sum - m3
1.00 - 1st-6th
1.00 -
1.00 -
1.00 -
1.00 -
1.00 -
1.00 -
1.00 -
Total Sum - m3
C)160mm thick roof slab

1.00 - 1st-6th
1.00 -
1.00 -
1.00 -
1.00 -
Total Sum - m3

C)Stair

7 8.80 3.20 0.16 31.54


0 2.60 1.55 0.16 -
0 2.26 1.32 0.16 -
0 1.50 0.15 0.30 -
0 -
Total Sum 31.54 m3
I) form work
a) In elevation columns

7 0.40 0.25 3.50 21.00 C1


2 0.40 0.25 3.50 6.00 C2
0 0.35 0.25 6.40 0.00 C3
0 0.35 0.25 9.45 0.00 C4
0 1.20 0.15 9.45 0.00 C5
0 0.50 0.40 9.45 0.00 C6
0 0.40 0.50 9.45 0.00 C7
0 2.00 0.15 9.45 0.00 sw3
0 8.20 0.15 9.45 0.00 sw1
0 7.10 0.15 9.45 0.00 sw2
0 0.00 0.00 9.45 0.00
0
Total Sum 27.00 m2
b)Floor beams

0 9 1 0 - FB 1
0 8 1 0 - FB 2
0 7 1 0 - FB 3
0 10 1 0 - FB 4
0 8 1 0 - FB 5
0 4 1 0 -
0 2 1 0 - FB 7
0 0 1 0 - WB 1
0 0 1 0 - WB 2
0 0 1 0 - FB 10
0 0 1 0 - FB 11
Total Sum - m2
b) roof beams

- 0.00
1 7.55 0.35 0.20 3.10 WTB1
2 8.05 0.35 0.20 6.60 WTB2
1 8.75 0.35 0.20 3.59 WTB3
2 9.55 0.35 0.20 7.83 WTB4
2 5.20 0.35 0.20 4.26 WTB5
2 5.15 0.35 0.20 4.22 WTB6
0 3.39 0.00 0.30 - WTB7
0 9.20 0.50 0.00 - RB 8
0 0.00 0.40 0.00 - RB 9
0 0.00 0.40 0.00 - RB 10
0 0.00 0.40 0.00 - RB 11
0 0.00 0.40 0.25 - RB 12
0 0.00 0.40 0.25 - RB 13
0.00 -
0.00 -
Total Sum 29.60 m2

b) Stair seat

-
-
-
- 92
-

Total Sum - m3
2) steel structure size 40x40x2.5 rafter 3
3
2.82 0.00 T-1
2.82 0.00 T-2
2.82 0.00 T-3
2.82 0.00 T-4
2.82 0.00 T-5
2.82 0.00 T-6
2.82 0.00 T-7
2.82 0.00 T-8
Total Sum 0.00 kg

2) steel structure size 50x50x3 rafter


block -1
5.19 0.00 T-1
5.19 0.00 T-2
5.19 0.00 T-3
5.19 0.00 T-4
5.19 0.00 block -2
5.19 0.00 T-1
5.19 0.00 T-2
5.19 0.00 T-3
5.19 0.00 T-4
0.00 T-5
5.19 0.00 block 3
5.19 0.00 T-1
5.19 0.00 T-2
5.19 0.00 T-3
5.19 0.00 T-4
5.19 0.00 T-5
5.19 0.00 T-6
5.19 0.00
5.19 0.00
Total Sum 0.00 kg
2) steel structure size25x25x2.5 PURLIN
block-1
1.64 1 0.00 p-1
1.64 1 0.00 p-2
1.64 1 0.00 p-3
1 0.00 block-1
1.64 1 0.00 p-1
1.64 1 0.00 p-2
1.64 1 0.00 p-3
1.64 1 0.00 p-4
1.64 1 0.00
1 0.00 block-3
1.64 1 0.00 p-1
1.64 1 0.00 p-2
1.64 1 0.00 p-3
1.64 1 0.00 p-4
1.64 1 0.00 p-5
1.64 1 0.00
Total Sum 0.00 kg
2) ANGLE IRON
0.00 p-1
0.00 p-2
0.00 p-3
0.00 p-4
0.00
0.00
0.00 p-5
0.00 p-6
Total Sum 0.00 kg
9.2 Bolts diam. 16mm L = 400mm

0.00 Pcs T-1


0.00 " T-2
0.00 T-3
0.00 T-5
0.00 " T-6
0.00
Total Sum 0.00 pcs
9.2 Bolts diam. 20mm L = 400mm

0.00 Pcs T-1


0.00 " T-2
0.00 T-4
0.00 " T-6
0.00
Total Sum 0.00 pcs

Metal Plat size 200x200x5mm

0.00 Pcs T-1


0.00 " T-2
0.00 T-3
0.00 T-4
0.00 " T-5
-
-
Total Sum 0.00 pcs
Metal Plat size 200x200x5mm

0.00 Pcs T-1


0.00 " T-2
0.00 T-4

Total Sum 0.00 pcs

2869 2.3 6599.344

324 13.7 4434.69


549 13.7 7516.642
311 50 15547.5
474 40 18944.8
1446 16 23139.52
76182.496
2197 16 35155.2
220 540 118605.6
1682 81 136238.76
1404 40 56175.2
4475 7 31321.92
11269 7 78882.72
20084 7 140591.36
10911 7 76375.04
4388 7 30717.12 704062.92

79 540 42422.4
68 540 36957.6
13 540 7257.6
18 540 9849.6
1689 85 143575.2
681 40 27225.6
378 40 15104
264 40 10547.2
7275 7 50925.84
1663 7 11640.16
3204 7 22431.36
14911 7 104378.4
10074 7 70517.02
736 187 137632
128 81 10368 700831.98
0
5580 60 334788
0 334788
2465 70 172569.6
517 30 15513.6
0 188083.2
1230 13.6 16728
820 100.8 82656
718 51.2 36736
0 136120
504 163.2 82252.8
108 54.4 5875.2
1155 25.6 29568
589 25.6 15078.4
0 132774.4
1063 14 14880.88
9688 14 135629.76
20 5500 110000
0 260510.64
9698 10 96979.2
1825 27 49269.6
4370 25 109256
2082 18 37478.16
318 150 47679
373 150 55900.5
282 40 11264
0 407826.46
610 13 7936.11
0 7936.11
1016 28 28448
25 18 441
30 28 840
23 36 828
0 30557
211 14.06 2969.472
96 6.49 623.04
54 8.65 470.56
94 75.7 7121.856
13 14.06 188.9664
10 21.63 207.648
13 22.71 305.2224 11,886.76 11,886.76
2,979,673.21

855 2.3 1967.604


57 13.7 779.256
156 13.7 2136.515
76 50 3808.5
137 40 5484
381 16 6096.16 20272.035

566 16 9051.84
55 540 29646
457 65 29710.2
352 40 14088
1137 7 7958.16
5644 7 39508.56
3742 7 26194.98 156157.74
0
34 540 18500.4
8 540 4082.4
0 22582.8
5 18.56 0.30 1.00 27.84
10 20.99 0.30 1.00 62.97
5 18.56 0.30 1.00 27.84
5 10.70 0.30 1.00 16.05
134.70
5 14.81 0.30 1.00 22.21
15 15.01 0.30 1.00 67.55
5 8.30 0.30 1.00 12.45
5 18.56 0.30 1.00 27.84
10 20.99 0.30 1.00 62.97
5 18.56 0.30 1.00 27.84
5 10.70 0.30 1.00 16.05
236.91

0.076923
147
18.75 2.94
168.75 60.2
0.42
188.75 0.84
5 18.56 0.30 1.00 27.84
10 20.99 0.30 1.00 62.97
5 18.56 0.30 1.00 27.84
5 10.70 0.30 1.00 16.05
134.70

5 18.56 0.30 1.00 27.84


10 20.99 0.30 1.00 62.97
5 18.56 0.30 1.00 27.84
5 10.70 0.30 1.00 16.05
134.70
3.75 3.95
3.70 3.75
3.67 3.75
3.75 3.96
3.75 3.76

0.2826

1
295

2160.00

272
48

1.10
2.10
0.225

207
3.75 3.96
3.75 3.76

2.76 8.0656
1.38 2.84

92 552
24
344
156
4941019226428011PPPPPPPPPP///////

pppp"pppppppp
7.77778E+13
77
Chemical Store TAKEOFF SHEET

No Length Width Height Total Remark


Block work
20 cm Block work External

2 31.00 1.00 1.00 62.00 Ground floor 49.61


2 29.00 1.00 1.00 58.00 1&3
0 76 1.00 1.00 0.00 wd-1 #REF! 129.86
-1 70.90 1.00 1.00 -70.90
0 498.20 1.00 1.00 0.00
0 38.25 1.00 1.00 0.00
0 64.80 1.00 3.00 0.00
0 140.98 1.00 3.00 0.00
0 117.00 1.00 3.00 0.00
0 102.00 1.00 1.00 0.00
0 93.00 1.00 1.00 0.00 84
0 13.00 1.00 1.00 0.00 42
0 12.00 1.00 1.00 0.00
0 6.40 6.00 1.00 0.00
0 7.60 27.00 1.00 0.00
0 0.83 35.00 1.00 0.00

0.00
0.00
49.10
20 cm Block work internal
0.00 Ground floor
0 5.00 1.00 2.80 0.00 GF
0 18.64 1.00 2.80 0.00 FF
0 16.26 1.00 2.80 0.00 SF
0 3.06 1.00 2.80 0.00 TF
0 14.01 1.00 2.80 0.00
0 5.60 1.00 2.80 0.00
0 14.86 1.00 1.00 0.00
0 8.44 1.00 1.00 0.00 1st -2nd
0 6.75 1.00 1.00 0.00
0 16.96 1.00 1.00 0.00 1st-6th
0 14.88 1.00 1.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 5.25
15 cm Block work internal
Ground
0.00 power data
1 14.55 1.00 2.80 40.74 itc
0 24 1.00 2.80 0.00
0 19.68 1.00 2.80 0.00
0 55.97 1.00 2.80 0.00
0 43.24 1.00 2.80 0.00 LI
0 46.22 1.00 3.00 0.00
0.00
0.00
0.00
40.74
10 cm Block work internal

1 6.00 1.00 2.85 17.10 toilet


0 5.54 1.00 3.85 0.00
0 1.50 1.00 2.85 0.00
0.00
0.00
0.00
17.10
ceramic floor
n a m
1 75.00 1.00 1.00 75.00 toile
3 76.00 1.00 1.00 228.00 toile
248.00 1.00 1.00 0.00 toile
0 1.58 2.07 1.00 0.00 toile
0 1.80 1.70 1.00 0.00 toile
0 3.08 0.00 0.00 toile

303.00
terrazo floor
n a m
0 4 4 0.00
0 2 2 0.00 toile
0 3 3 0.00 toile
0 3 3 0.00 toile
0 2 1 0.00 toile
0 3 0 0.00 toile
0
0
0.00

woodn parqute
0.00 ground
0 5.09 3.74 1.00 0.00 corridor
0 2.13 3.80 1.00 0.00
0 2.01 1.69 1.00 0.00 lobby
0 3.06 3.73 1.00 0.00 3rd corr
0 3.79 2.41 1.00 0.00
0 6.72 5.78 1.00 0.00
0 3.82 2.48 1.00 0.00
0 2.58 3.19 2.00 0.00
0 0.00
0.00
0.00
0.00
pvc floor tile

0.00 Ground floor


0 5.15 4.52 0.00 0.00 ax a-b
0 5.15 2.28 0.00 0.00
0 5.15 2.89 0.00 0.00
0 5.15 4.90 0.00 0.00 1700
0 5.15 4.90 0.00 0.00
0 5.15 4.60 0.00 0.00
0 5.15 5.37 0.00 0.00
0 4.80 5.00 0.00 0.00
0 4.80 4.80 0.00 0.00 ax c-d
0 4.80 4.90 0.00 0.00
0 4.80 4.90 0.00 0.00
0 4.80 2.10 0.00 0.00
0 4.80 4.90 0.00 0.00
0 5.15 4.52 0.00 0.00 ax e-f
0 5.15 2.28 0.00 0.00
0 5.15 2.90 0.00 0.00
0 5.15 4.90 0.00 0.00
0 5.15 4.90 0.00 0.00
0 5.15 7.20 0.00 0.00
0 4.80 5.00 0.00 0.00 g-h
0 4.80 4.90 0.00 0.00
0 4.80 4.90 0.00 0.00
0 4.80 4.90 0.00 0.00
0 4.80 4.65 0.00 0.00
0 161.00 1.00 0.00 0.00 cafteria
0 168.00 1.00 0.00 0.00 office pool
0 122.67 1.00 0.00 0.00 office pool
0 1.00 0.00 0.00 3rd
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Pvc skirting
0 5.15 4.52 0.00 0.00 ax a-b
0 5.15 2.28 0.00 0.00
0 5.15 2.89 0.00 0.00
0 5.15 4.90 0.00 0.00 1700
0 5.15 4.90 0.00 0.00
0 5.15 4.60 0.00 0.00
0 5.15 5.37 0.00 0.00
0 4.80 5.00 0.00 0.00
0 4.80 4.80 0.00 0.00 ax c-d
0 4.80 4.90 0.00 0.00
0 4.80 4.90 0.00 0.00
0 4.80 2.10 0.00 0.00
0 4.80 4.90 0.00 0.00
0 5.15 4.52 0.00 0.00 ax e-f
0 5.15 2.28 0.00 0.00
0 5.15 2.90 0.00 0.00
0 5.15 4.90 0.00 0.00
0 5.15 4.90 0.00 0.00
0 5.15 7.20 0.00 0.00
0 4.80 5.00 0.00 0.00 g-h
0 4.80 4.90 0.00 0.00
0 4.80 4.90 0.00 0.00
0 4.80 4.90 0.00 0.00
0 4.80 4.65 0.00 0.00
0 58.00 1.00 0.00 0.00 cafteria
0 58.00 1.00 0.00 0.00 office pool
0 41.00 1.00 0.00 0.00 office pool
0 29.00 1.00 0.00 0.00 dressig
0 0.00 0.00
0 0.00 0.00
0.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
marble skirting
0 34.84 1.55 3.00 0.00 corridor
0 14.86 1.76 3.00 0.00
0 41.26 1.00 1.00 0.00 lobby
0 20.45 1.80 1.00 0.00 3rd corr
0 6.00 1.55 1.00 0.00
0 3.12 2.00 1.00 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0 0.00
0.00
Ceramic wall
0 10.03 1.80 1.00 0.00 corridor
0 29.20 1.80 1.00 0.00
0 5.18 1.80 3.00 0.00 lobby
0 3.84 1.80 3.00 0.00 3rd corr
0 5.94 1.80 3.00 0.00
0 2.29 1.80 3.00 0.00
0 9.48 1.80 1.00 0.00
0 5.22 1.80 1.00 0.00
0 7.86 1.80 1.00 0.00
0.00
0.00
0.00
Roofing CIS
0.00
0 1.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
Flat roof
0 1.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
gutter

0 26.99 1.00 0.00 W-1


0 25.30 1.00 0.00 W-2
0 0.00 W-3 84
0 0.00 W-4 42
0 0.00 W-5

0.00
Glazing 4mm thick cear glass

0.00 W-1
0.00 W-2
0.00 W-3 84
0.00 W-4 42
0.00 W-5

0.00
window cill TERAZO
0.00 W-1
0.00 W-1
0.00 W-2
0.00 W-3 84
0.00 W-4 42
0.00 W-5
0.00 W-7
0.00 W-8
0.00 TW-1 -2.8
0.00
0.00
Total 0.00
Gutter develop 1340mm
0.00
0.00
0.00
0.00
0.00
1.5mm thick sheet metal faciabord
0.00
0.00
0.00
0.00
0.00
copping 400

0.00
0.00
0.00
Concrete roof

0.00
0.00
0.00
0.00
cis -32

0.00
0.00
0.00
0.00
152.42