G+2 Residential Building Cost Breakdown
G+2 Residential Building Cost Breakdown
Client:
Project: G+0 RESUDENCE Building
Location: Dessie
1528.455
5178.705
6954.88875
4977.98
18,640.03
22415.7745
29099.22725
13705.37245342
65,220.37
465
12715.363
3937.6608
9536.52225
3100
4800 15 108
3100
155 139.5 247.5
6531.338666667
12893.76 28
400 124 54
57479.64471667 96 48 102
220
12000
0
12000
15587
8866
6435
30,888.00
###
Specification & Bill of Quantities
FOR G+2+T
All structural member shall be well seasoned, Stright , free of any harm full
defects each truss joint shall be connected with band iron and truss shall be
4.2 firmly fixed to concrete top tile beam with 6mm plane bar 0.00
[Link] 12 cm lower & upper member / Eucalyptus / ml 68.05 352.07 23958.51
[Link] 8cm vertical & inclined member / Eucalyptus / ml 47.64 331.38 15785.62
c. 5X7 cm Zigeba wooden purline C/C 90 cm ml 58.40 286.86 16752.84
4.3 plastic ceiling m2 65.00 1801.39 117090.38
carried to summary 305,037.36
5. Aluminium& Metal Works
Supply and fix door & window made up of 38mm Aluminium profile section
and 1.5mm thick with the necessary iron mongery , accessories and all
5.1 according the given drawing .
A. Window
Type W1 ( 125x155)cm Pcs 1 38,430.9 38430.89
Type W2 ( 130x160)cm Pcs 1 41,257.4 41257.42
Type W3 ( 110x135)cm Pcs 1 29,520.9 29520.88
[Link]
A.D1 size 90x220 Pcs 1.00 33508.04 33508.04
B.D2 Size 85x220 Pcs 1.00 53612.86 53612.86
C.D3 Size 120x220 Pcs 1.00 49145.12 49145.12
carried to summary 245,475.20
[Link] DESCRIPTION Unit Qty Unit Price Amount
6. Finishing:-
Finishing works shall include all surface pre-cleaning, preparation and
6.1 application of finishing and clearing at the end of finishing works
[Link] coats of plastering in cement mortar mortar of ratio 1:3 internal &
external HCB walls, coulumns and beams,randerd wall surface. m2 204.12 149.10 30434.60
[Link] (fine)coat of Gypsum plaster to all plasterd m2 155.02 411.09 63729.34
6.2 Floor finshing price should be include 3cm thick cement sand mortar
Tiles
A/60*60 porceline floor tile m2 65.00 1250.00 81250.00
carried to summary 175,413.94
7. Glazing
Supply and fix 4 mm thick clear sheet glass to metal beads and puttied with
7.1 approved quality of putty m2 11.82 3697.88 43696.56
carried to summary 43,696.56
8. Painting
Prepare the surface and apply three coats of plastic emulsion paint to all
plastered & rendered wall surface , columns & beams
8.1 To all internal wall surface m2 105.92 155.63 16485.11
8.2 plastic paint to external wall surfaces m2 49.10 155.63 7641.51
24,126.62
[Link] enstalation
A. WATER SUPPLY SYSTEM
GS PIPE :- Supply , lay and connect galvanized steel pipe (GS - PN16) for
cold and hot water supply as per the drawing shown, complete with all the
necessary connecting pieces such as bends, unions Tees, etc. Unit price
9.1 shall include all the necessary as
Diameter 20 ml 6.00 231.28 1387.68
Diameter 15 ml 6.00 186.22 1117.32
GATE VALVE :- Supply and fix bronze gate valves (PN16) , Complete with
9.2 all accessories.
Diameter 15 No 2.00 163.30 326.60
B. SANITARY FIXTURES
HAND WASH BASIN :- Supply and fix hand wash basin with pedstal,
complete with faucet, chain plug, trap and all accessories
9.3 Size:- 410x510mm No 1.00 14673.04 14673.04
WATER CLOSET :- Supply and fix wash down water closet made of white
vitreous china, including plastic seat and cover, low flush cistern and stop
9.4 cock on the water supply line. Complete with all the necessary accessories No 1.00 5021.78 5021.78
SHOWER Box :- Supply and install shower tray, made of enemelled cast
iron, complete with adjustable mixing head, traps glazed box and all other
9.5 accessories No 1.00 9731.50 9731.50
C. WASTE WATER DRAINAGE
SEWAGE PIPE :- Supply and lay uPVC pipe for waste water drainage.
9.6 Complete with all the necessary accessories
Diameter 110mm ml 44.00 306.45 13483.80
Diameter 65mm ml 23.00 187.67 4316.41
FLOOR DRAIN :- Supply and fix floor drains, made of enamelled cast iron
9.7 with smell trap, complete with all the necessary accessories.
Diameter 50mm No 2.00 581.45 1162.91
VENT CAP :- Supply and fix vent cap made of PVC, at terminal points of
9.8 vertical stacks 0.00
Diameter 50mm No 2.00 346.28 692.55
D. MISCELLANEOUS SANITARY SUPPLIMENTS
SOAP TRAY:- Supply and fix soap holder in white vitreous china
9.9 150x150mm, near to hand wash basin, bath room and Kitchen sink. No 1.00 426.00 426.00
TOILET PAPER HOLDER:- Supply and fix toilet paper holder with synthetic
9.10 roler 150x150x25mm. Complete with fastening screws No 1.00 627.54 627.54
Roto price shall include outomatic level switch control /galvanaized/
mesh cover manhole over flow include in outside tank and a capacity
9.11 of 5000 litter No 55202.02 0.00
9.13 Construct a rectangular man hole. No 2.00 25000.00 50000.00
carried to summary 102,967.12
[Link] DESCRIPTION Unit Qty Unit Price Amount
10. Electrical Installation
A. ELECTRICAL SYSTEM
10.1 UTILITY
supply and fix flush mounted sub distribution board (SDB-GF) with loccable
door bus bar system,earthing lead and complete with all other necessary
10.4 accessaries and consisting of
3pc ACB of 10A, 1phase
1pc ACB of 16A, 3phase
3pcs ACB of 25A, 3phase No 1 60000.00 60000.00
1pcs ACB of 6A, 3phase
10.3 LIGHT POINTS AND SWITCHES
Light point fed through PVC insulated copper conductor of 2x2.5 sq. mm in
PVC conduit of 16 mm diameter including junction boxes with covers
insulated screw cap connectors, and all other necessary accessoris No 16.00 1399.72 22395.52
Supply and Installing socket outlets legrand type or approved
10.4 equivalent
10/16 Ampere,220 Volt, 1 Phase single socket outlet fed through PVC
insulated copper conductors of 3x2.5 sq. mm in PVC conduit of 16 mm
diameter including junction boxes with covers, insulated screw cap
connectors and all other necessary accessories. No 15.00 2201.85 33027.75
10.5 Ditto, as item 2.2 but for flush mounted (LEGRAND SALBEI) Twin socket
10.6 outlet point 16A/1Ph
TELEPHONE SYSTEM with grounding through PVC conductor of [Link]
wire, through conduits of 19mm diameter and including with all accessories. (For
supply and install tele data flush mounted tele outlet point fed through
Office).
TELE TERMINAL BOX inside PVC conduit ofdiameter 19mm complet with
oll connction accessories No. 5.00 593.10 2965.50
10.7 TV (ANTENNA- SATELLITE DISH) SYSTEM
TV antenna outlets only conduits wth RF of 29/50 mm diameter including
pull guy wire or cord inside and tap off boxes with covers and other
necessary accessories, as per TV system installer requirements. No. 9.00 593.10 5337.90
Supply and Install Switch flush mounted type legrand or approved
10.8 equivalent
Flush fixed single pole Switch No. 18.00 130.11 2341.98
10.9 LIGHTING FITTINGS AND LAMPS
LED Spot light 220v-240v with 12 W No. 10.00 1,230.0 12300.00
massive 41809/11/10with 11xE14/max 40 w OR EQVALENT No. 6.00 1,463.9 8783.10
applquses wall lamo aurgi 200x270x90xfsq36w No. 19.00 950.00 18050.00
carried to summary 165,201.75
Project: SNNPRG S4 Sub STRUCTURE
No. of
Dwg Ref. Length No. of memb
No. Member No Dia. (m) bars ers 6 8 10
Footing
F1 12 1.7 7.5 0
F2 12 2.45 11.2778 0
F3 14 1.9 14 0
12 1.9 8.22222 0
F4 14 2.2 15 0
12 2.2 15 3
[Link] 14 8.12 6 0
8 1.1 55.13333 0 0
OOTING COLOMEN
C1',C1 14 2.92 14 0
0 0 20 0
st 8 1.3 13 0 0
C3,2 14 2.92 10 0
st 8 1.3 13 0 0
C4 14 2.92 8 0
st 8 1.3 13 0 0
LIFT SHEAR WALL 16 116.48 1 0
14 113.92 1 0
12 3.80 32.66667 0
10 2.60 20 0 0
10 1.76 20 0 0
12 1.12 21 0
GRADE BEAM
GB1 14 57.852 1 3
st 8 1.1 38.35 3 126.555
GB2 14 50.364 1 3
st 8 1.2 39 3 140.4
GB3 14 28.5 1 0
st 8 1.2 26 0 0
GB4 14 56.1 1 0
st 8 1.2 39 0 0
GB5 14 60.9 1 0
st 8 1.2 26 0 0
GB6 14 58.5 1 0
st 8 1.2 39 0 0
Y-AXIS 8 9.12 32.48 1 296.2176
8 7.87 37.48 1 294.9676
10 4 12.74286 0 0
8 8.599 6.1 0 0
10 7.989 26.67857 0 0
10 10.155 14.17143 0 0
8 5.133 9 0 0
12 4.191 26.64286 0
12 3.545 386.7143 0
Total Length (m) 0 858 0
Weight per m 0.222 0.395 0.617
Total Weigth (Kg) 0 338.9654 0
1 0 338.9654 0
bar size 8
total
length 858
wasege 6 percent
51.488412
total
length
include
d 910
number
of
beraga 75.8024
Final
[Link]
barga 182
RUCTURE Location: Expansive
No. of
Length No. of membe
12 14 16 20 24 Dia. (m) bars rs
14 2.8 13.5 2
0 14 2.2 10.412 6
0 14 2.9 12.3333 4
0 14 3.1 4 2
0
0
0
173.556
151.092
0
0.33333 0.66667 -0.33333
0
0
0.33333 0.66667 -0.33333
0
0
0
0
0 325 0 0 0 14 8
0.888 1.208 1.578 2.468 3.551 14 9
0 392.175 0 0
0 392.175 0 0
12 14 16 20
0 325 0 0
6 percent 6 percent6 percen10 percent
0 19.47888 0 0
0 344 0 0
0 28.677 0 0
No. of
Dwg Ref. Length No. of membe
No. Member No Dia. (m) bars rs 6 8 10
Elevation column
C-1 14 21.36 1 3
16 0.00 1 3
0 0.00 1 3
st 8 1.30 23.33333 3 91
C-2 14 21.36 1 4
0 0.00 1 4
st 8 1.30 20 4 104
C-1' 14 21.36 1 1
0 0.00 1 1
st 8 1.30 40 1 52
C-2' 14 21.36 1 1
0 0.00 1 1
st 8 1.30 40 1 52
LIFT SHEAR WALL 16 116.48 1 0
14 113.92 1 0
12 3.80 32.66667 0
10 2.60 140 0 0
10 1.76 140 0 0
12 1.12 141 0
Floor Beams
TOTAL
FROM 1-3 LENGTH
FB1 16 0 1 1
14 80.493 1 1
st 8 1.2 57.46667 1 68.96
FB1' 14 59.622 1 1
16 0 1 1
st 8 1.2 52.46667 1 62.96
FB2 14 65.315 1 1
16 0 1 1
st 8 1.3 37.6 1 48.88
RB1 14 57.852 1 1
st 8 1.3 57.46667 1 74.70667
RB2 14 50.364 1 1
st 8 1.3 52.46667 1 68.20667
[Link] 10 12 9.571429 0 0
X-AXIS 10 11.17 19 0 0
10 11.117 26.57857 0 0
NGTIV 10 2.557 9.571429 0 0
10 2.557 26.57857 0
Y-AXIS 10 12 53.375 0 0
10 10.572 15.61176 0 0
10 2.632 37.95294 0 0
WATER
TANKER
SLAB
X 8 4.48 16 0 0
8 3.2 26.33333 0 0
10 9.34 11.61111 0 0
10 8.94 12.66667 0 0
10 3.72 12.86667 0 0
10 3.72 15 0 0
10 3.32 28.86667 0 0
Y 8 2.34 9.45 0 0
8 2.34 9.45 0 0
10 9.54 32.66667 0 0
8 4.54 7.4 0 0
12 3.92 44.84615 0
STAIRE 14 13.99 9.4 0
12 11.89 9.4 0
8 3.32 19 0 0
8 6.67 19 0 0
8 0.00 7 0 0
8 0.00 23 0 0
[Link] 14 13.77 1 0
14 15.16 1 0
st 8 1.50 26.66667 0 0
Total Length (m) 0 622.713 0
Weight per m 0.222 0.395 0.617
Total Weigth (Kg) 0 245.972 0
1 0 245.972 0
ub STRUCTURE Location: Adama
12 14 16 20 24
64.08
0
85.44
21.36
21.36
0
0
0
0
80.493
59.622
0
65.315
0
0.33333333 0.66667
57.852 0.66666667
0.33333333 0.66667
50.364
0.33333333 0.66667
0
0
0 505.886 0 0 0 14 8
0.888 1.208 1.578 2.468 3.551 14 9
0 611.1103 0 0 0
0 611.1103 0 0 857.082
-0.333333333333333
-0.333333333333333
-0.333333333333333
No Length Width Height Total Remark
A. SUB STRUCTURE
I) Site Clearing
Total Sum - m2
II) Bulk Excavation to reduce levels
2 1 1 0 1.18 F-1
5 1 1 1.50 14.70 F-3
1 2 2 1.50 3.38 F-4
0 2 14 1.50 - [Link]
0 3 3 1.50 - F-6
0 3 5 1.50 - F-7
0 2 3 1.50 - F-8
0 3 5 1.50 - CF1
0 3.00 6.36 1.50 - CF2
Total Sum 19.25 m3
b)Pit excavation up to 3000mm
2 1 1 0.70 2.74 F1
5 1 1 0.70 6.86 F2
1 2 2 0.70 1.58 F3
0 2 14 0.70 - F4
0 3 3 0.70 -
0 3 5 0.70 -
0 2 3 0.70 -
0 3.30 5.60 0.70 -
0 3.00 6.36 0.70 -
Total Sum 11.18 m3
g) Hard core
1.00 - block1-& 2
0 1841.00 1.00 1.00 -
0 236.91 1.00 1.00 -
0 1.00 -
1.00 -
1.00 - block 3
1.00 -
1.00 -
1.00 -
1.00 -
Total Sum - m2
2. CONCRETE WORK
I) Lean Concrete
b) Under footing
2 1 1 1.00 3.92 F1
5 1 1 1.00 9.80 F2
1 2 2 1.00 2.25 F3
0 2 14 1.00 - F4
0 3 3 1.00 - F5
0 3 5 1.00 - F6
0 2 3 1.00 - F7
0 3 5 1.00 - F8
0 3 6 1.00 - F9
Total Sum 15.97 m2
c) Under masonry wall
Total Sum - m2
Material Density kg/m3 Mixing rate m3 Shrinkage Wastage
Cement 1400 1 0.80 1.33 1.05
Sand 1840 4 0.80 1.33 1.15
Gravel 2250 8 0.80 1.33 1.15
b) Foundation Columns
Block-1
12 0.40 0.25 2.50 3.00 C1
0 0.40 0.25 5.50 - C2
0 0.40 0.20 5.66 - C3
0 0.40 0.20 5.66 - C4
0 0.50 0.25 2.66 - C5
0 0.30 0.20 2.66 - C6
0 0.19 1.00 2.50 - C7
0 0.30 0.50 2.50 - C8
0 0.50 0.20 2.50 - C9
0 - C10
0 - C11
0 - C12
0 - C13
c) BASEMENTfloor beam
block -1
3 9.12 0.35 0.25 2.39 2BB 1
3 7.87 0.35 0.25 2.07 2BB 2
0 4.15 0.35 0.25 - 2BB 3
0 8.75 0.35 0.25 - 2BB 4
0 9.55 0.35 0.25 - 2BB 5
0 9.15 0.35 0.25 - 2BB 6
0 2.87 0.30 0.25 - BB 7
0 2.48 0.30 0.25 -
0 0.00 0.30 0.25 -
Total Sum 4.46 m3
c) Ground floor beam
0 7.55 0.50 0.30 - BB 1
0 5.65 0.50 0.30 - BB 2
0 12.02 0.50 0.30 - BB 3
0 2.36 0.50 0.30 - BB 4
0 6.42 0.50 0.30 - BB 5
0 9.59 0.50 0.30 - BB 6
0
0 8.74 0.45 0.30 - GB 1
0 10.87 0.45 0.30 - GB 2
0 5.77 0.45 0.30 - GB 3
0 6.35 0.45 0.30 - GB 4
0 15.59 0.45 0.30 - GB 5
0 7.91 0.45 0.30 - GB 6
0 0.00 0.45 0.30 - GB 13
0 0.00 0.45 0.30 - GB 14
Total Sum - m3
c) Form work
a) Footing
b) Foundation Columns
12 0.40 0.25 2.50 26.40 C1
0 0.40 0.25 5.50 0.00 C2
0 0.40 0.20 5.66 0.00 C3
0 0.40 0.20 5.66 0.00 C4
0 0.50 0.25 2.66 0.00 C5
0 0.30 0.20 2.66 0.00 C6
0 0.19 1.00 2.50 0.00 C7
0 0.30 0.50 2.50 0.00 C8
0 0.50 0.20 2.50 0.00 C9
0 0.00 0.00 0.00 0.00 C10
0.00
Total Sum 26.40 m2
EXPANSION JOINT
Total Sum - m
B. SUPER STRUCTURE
1. CONCRETE WORK
I) Reinforced Concrete in
a) In elevation columns
block-1
7 0.40 0.25 3.50 2.45 C1
2 0.40 0.25 3.50 0.70 C2
0 0.35 0.25 6.40 - C3
0 0.35 0.25 9.45 - C4 1.44
0 1.20 0.15 9.45 - C5
0 0.50 0.40 9.45 - C6
0.50 9.45
0 0.40 0.50 9.45 - C7
0 2.00 0.15 9.45 - sw3
0 8.20 0.15 9.45 - sw1
0 7.10 0.15 9.45 - sw2
0 9.45 - C-16
-
Total Sum 3.15 m3
b)Floor beams
Block-1
0 9.12 0.35 0.25 - FB 1
0 7.87 0.35 0.25 - FB 2
0 6.64 0.35 0.25 - FB 3
0 9.55 0.35 0.25 - FB 4
0 8.05 0.35 0.25 - FB 5
0 4.45 0.35 0.25 -
0 1.75 0.35 0.25 - FB 7
0 0.00 0.40 0.25 - WB 1
0 0.00 0.40 0.25 - WB 2
0 0.00 0.40 0.25 - FB 10
0 0.00 0.40 0.25 - FB 11
0
Total Sum - m3
b)roof beams
Bloock -1
1 7.55 0.35 0.20 0.53 WTB1
2 8.05 0.35 0.20 1.13 WTB2
1 8.75 0.35 0.20 0.61 WTB3
2 9.55 0.35 0.20 1.34 WTB4
2 5.20 0.35 0.20 0.73 WTB5
2 5.15 0.35 0.20 0.72 WTB6
0 3.39 0.50 0.30 - WTB7
0.00 9.20 0.50 0.25 - RB 8
0.00 0.00 0.40 0.25 - RB 9
0.00 0.00 0.40 0.25 - RB 10
0.00 0.00 0.40 0.25 - RB 11
0.00 0.00 0.40 0.25 - RB 12
0.00 0.00 0.40 0.25 - RB 13
0.00 0.00 0.40 0.25 - RB 14
0.00 0.00 0.40 0.25 - RB 15
0.00 0.00 0.40 0.25 - RB 16
0.00 0.00 0.40 0.25 -
0.00 0.00 0.40 0.25 -
Total Sum 5.05 m3
1.00 - 1st-6th
1.00 -
1.00 -
1.00 -
1.00 -
Total Sum - m3
C)Stair
0 9 1 0 - FB 1
0 8 1 0 - FB 2
0 7 1 0 - FB 3
0 10 1 0 - FB 4
0 8 1 0 - FB 5
0 4 1 0 -
0 2 1 0 - FB 7
0 0 1 0 - WB 1
0 0 1 0 - WB 2
0 0 1 0 - FB 10
0 0 1 0 - FB 11
Total Sum - m2
b) roof beams
- 0.00
1 7.55 0.35 0.20 3.10 WTB1
2 8.05 0.35 0.20 6.60 WTB2
1 8.75 0.35 0.20 3.59 WTB3
2 9.55 0.35 0.20 7.83 WTB4
2 5.20 0.35 0.20 4.26 WTB5
2 5.15 0.35 0.20 4.22 WTB6
0 3.39 0.00 0.30 - WTB7
0 9.20 0.50 0.00 - RB 8
0 0.00 0.40 0.00 - RB 9
0 0.00 0.40 0.00 - RB 10
0 0.00 0.40 0.00 - RB 11
0 0.00 0.40 0.25 - RB 12
0 0.00 0.40 0.25 - RB 13
0.00 -
0.00 -
Total Sum 29.60 m2
b) Stair seat
-
-
-
- 92
-
Total Sum - m3
2) steel structure size 40x40x2.5 rafter 3
3
2.82 0.00 T-1
2.82 0.00 T-2
2.82 0.00 T-3
2.82 0.00 T-4
2.82 0.00 T-5
2.82 0.00 T-6
2.82 0.00 T-7
2.82 0.00 T-8
Total Sum 0.00 kg
79 540 42422.4
68 540 36957.6
13 540 7257.6
18 540 9849.6
1689 85 143575.2
681 40 27225.6
378 40 15104
264 40 10547.2
7275 7 50925.84
1663 7 11640.16
3204 7 22431.36
14911 7 104378.4
10074 7 70517.02
736 187 137632
128 81 10368 700831.98
0
5580 60 334788
0 334788
2465 70 172569.6
517 30 15513.6
0 188083.2
1230 13.6 16728
820 100.8 82656
718 51.2 36736
0 136120
504 163.2 82252.8
108 54.4 5875.2
1155 25.6 29568
589 25.6 15078.4
0 132774.4
1063 14 14880.88
9688 14 135629.76
20 5500 110000
0 260510.64
9698 10 96979.2
1825 27 49269.6
4370 25 109256
2082 18 37478.16
318 150 47679
373 150 55900.5
282 40 11264
0 407826.46
610 13 7936.11
0 7936.11
1016 28 28448
25 18 441
30 28 840
23 36 828
0 30557
211 14.06 2969.472
96 6.49 623.04
54 8.65 470.56
94 75.7 7121.856
13 14.06 188.9664
10 21.63 207.648
13 22.71 305.2224 11,886.76 11,886.76
2,979,673.21
566 16 9051.84
55 540 29646
457 65 29710.2
352 40 14088
1137 7 7958.16
5644 7 39508.56
3742 7 26194.98 156157.74
0
34 540 18500.4
8 540 4082.4
0 22582.8
5 18.56 0.30 1.00 27.84
10 20.99 0.30 1.00 62.97
5 18.56 0.30 1.00 27.84
5 10.70 0.30 1.00 16.05
134.70
5 14.81 0.30 1.00 22.21
15 15.01 0.30 1.00 67.55
5 8.30 0.30 1.00 12.45
5 18.56 0.30 1.00 27.84
10 20.99 0.30 1.00 62.97
5 18.56 0.30 1.00 27.84
5 10.70 0.30 1.00 16.05
236.91
0.076923
147
18.75 2.94
168.75 60.2
0.42
188.75 0.84
5 18.56 0.30 1.00 27.84
10 20.99 0.30 1.00 62.97
5 18.56 0.30 1.00 27.84
5 10.70 0.30 1.00 16.05
134.70
0.2826
1
295
2160.00
272
48
1.10
2.10
0.225
207
3.75 3.96
3.75 3.76
2.76 8.0656
1.38 2.84
92 552
24
344
156
4941019226428011PPPPPPPPPP///////
pppp"pppppppp
7.77778E+13
77
Chemical Store TAKEOFF SHEET
0.00
0.00
49.10
20 cm Block work internal
0.00 Ground floor
0 5.00 1.00 2.80 0.00 GF
0 18.64 1.00 2.80 0.00 FF
0 16.26 1.00 2.80 0.00 SF
0 3.06 1.00 2.80 0.00 TF
0 14.01 1.00 2.80 0.00
0 5.60 1.00 2.80 0.00
0 14.86 1.00 1.00 0.00
0 8.44 1.00 1.00 0.00 1st -2nd
0 6.75 1.00 1.00 0.00
0 16.96 1.00 1.00 0.00 1st-6th
0 14.88 1.00 1.00 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 5.25
15 cm Block work internal
Ground
0.00 power data
1 14.55 1.00 2.80 40.74 itc
0 24 1.00 2.80 0.00
0 19.68 1.00 2.80 0.00
0 55.97 1.00 2.80 0.00
0 43.24 1.00 2.80 0.00 LI
0 46.22 1.00 3.00 0.00
0.00
0.00
0.00
40.74
10 cm Block work internal
303.00
terrazo floor
n a m
0 4 4 0.00
0 2 2 0.00 toile
0 3 3 0.00 toile
0 3 3 0.00 toile
0 2 1 0.00 toile
0 3 0 0.00 toile
0
0
0.00
woodn parqute
0.00 ground
0 5.09 3.74 1.00 0.00 corridor
0 2.13 3.80 1.00 0.00
0 2.01 1.69 1.00 0.00 lobby
0 3.06 3.73 1.00 0.00 3rd corr
0 3.79 2.41 1.00 0.00
0 6.72 5.78 1.00 0.00
0 3.82 2.48 1.00 0.00
0 2.58 3.19 2.00 0.00
0 0.00
0.00
0.00
0.00
pvc floor tile
0.00
Glazing 4mm thick cear glass
0.00 W-1
0.00 W-2
0.00 W-3 84
0.00 W-4 42
0.00 W-5
0.00
window cill TERAZO
0.00 W-1
0.00 W-1
0.00 W-2
0.00 W-3 84
0.00 W-4 42
0.00 W-5
0.00 W-7
0.00 W-8
0.00 TW-1 -2.8
0.00
0.00
Total 0.00
Gutter develop 1340mm
0.00
0.00
0.00
0.00
0.00
1.5mm thick sheet metal faciabord
0.00
0.00
0.00
0.00
0.00
copping 400
0.00
0.00
0.00
Concrete roof
0.00
0.00
0.00
0.00
cis -32
0.00
0.00
0.00
0.00
152.42