0% found this document useful (0 votes)
61 views1 page

BMC Construction Site Inspection Checklist

The inspection report from the Brihanmumbai Municipal Corporation's Environment & Climate Change Department outlines a checklist for assessing compliance with environmental guidelines at construction sites. It includes various inspection items related to pollution control measures, site management, and waste handling practices. The report requires signatures from both the site in-charge and the inspecting officer, indicating the completion of the inspection process.

Uploaded by

Vishal Chaugule
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views1 page

BMC Construction Site Inspection Checklist

The inspection report from the Brihanmumbai Municipal Corporation's Environment & Climate Change Department outlines a checklist for assessing compliance with environmental guidelines at construction sites. It includes various inspection items related to pollution control measures, site management, and waste handling practices. The report requires signatures from both the site in-charge and the inspecting officer, indicating the completion of the inspection process.

Uploaded by

Vishal Chaugule
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Brihanmumbai Municipal Corporation

Environment & Climate Change Department


INSPECTION REPORT
Report no: -
1. Details
Name of the ward: Date and Time of inspection:
Name of the project inspected: Location Address:

Name of the Contractor/ Developer Company / Firm: Name of the Contractor/ Developer Representative:

2. Checklist
Clause Inspection Items as per 27 points & 28 points Guidelines issued by Hon. M.C.
YES NO N/A
No. (1) No. MGC/F/1102 dt. 25.10.2023 (2) No. MGC/A/6976 dt. 15.10.2024
1 35-foot tin/metal sheet erected around construction sites over 70 meters in height?
a. 35-foot tin/metal sheet erected around construction sites larger than 1 acre?
2
b. 25-foot tin/metal sheet erected around construction sites smaller than 1 acre?
3 Buildings under construction enclosed with green cloth, jute, or tarpaulin on all sides?
a. Structures under demolition covered from top to bottom?
4
b. Continuous sprinkling/spraying of water during demolition?
5 Water fogging carried out during loading and unloading of materials at the site?
6 Water sprinkling done on debris/earth materials prone to generating airborne dust?
7 Are all vehicles carrying construction materials fully covered and not overloaded?
Have CCTV cameras been installed along the periphery of the work site for cleanliness /
8
overload?
a. Is air pollution monitoring being carried out at site?
9
b. Are air pollution monitoring records available for BMC inspection upon request?
Is all grinding, cutting, drilling, sawing, and trimming work carried out in an enclosed
a.
10 area?
b. Continuous water sprinkling/water fogging to avoid fugitive dust?
Is the Construction and Demolition (C&D) waste generated on-site transported to
a. designated unloading sites? - (Compliance status to BMC's C&D Waste Management
11
Plan)
b. Are vehicles cleaned / washed thoroughly after unloading debris?
12 Do all vehicles carrying materials have valid PUC certificates available for inspection?
14 25-foot-high barricade erected at BMC worksites like bridges and flyovers etc.?
For metro works above ground,
a. Construction site covered with a 25-foot-high barricade?
15 Along with tarpaulin/green cloth/jute sheet cover for demolition, excavation,
b.
storage etc.?
c. Are smog guns/water sprinklers in use during construction activities?
21 Are vehicles carrying C&D material waste observed being covered properly?
24 Whether C&D waste carrying vehicle possess vehicle tracking system installed on them?
a. Is loose soil, sand, or debris stored in a designated, barricaded area?
25
b. Fully covered/enclosed/protected with tarpaulin?
a. Tyre washing facility provided at all exit points of construction sites?
26
b. Access road to the construction site maintained and kept free of dust, debris etc.?
28 Arrangements for worker's meal at the site by developer to avoid burning of wood etc.?
*Clause Nos. 13, 16 to 20, 22, 23 & 27 are directions.
3. Remarks, if any:

Name & Signature of Site In-charge Name & Signature of Inspecting Officer

1. For BMC works - 2. For other than BMC works –


Cc to site in charge / S.E of the project CC to A.E (Env. & CC) Zone
CC to A.E (Env. & CC) Zone

You might also like