0% found this document useful (0 votes)
22 views8 pages

Workplace Safety Inspection Report

The document is a Workplace Safety Inspection Report conducted by Kumar Sathiesh Kanna for the WSHMCI course, detailing unsafe conditions and corrective actions taken at a construction site in Yishun, Singapore. Five findings were reported, including unsafe acts related to fall protection and inadequate barricades, with specific corrective actions and deadlines for rectification. Recommendations for future safety improvements include ensuring only certified personnel perform high-risk tasks and implementing comprehensive fall prevention measures.

Uploaded by

rajsanjay1090
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views8 pages

Workplace Safety Inspection Report

The document is a Workplace Safety Inspection Report conducted by Kumar Sathiesh Kanna for the WSHMCI course, detailing unsafe conditions and corrective actions taken at a construction site in Yishun, Singapore. Five findings were reported, including unsafe acts related to fall protection and inadequate barricades, with specific corrective actions and deadlines for rectification. Recommendations for future safety improvements include ensuring only certified personnel perform high-risk tasks and implementing comprehensive fall prevention measures.

Uploaded by

rajsanjay1090
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

WSHMCI Project Assignment

Participants Name: KUMAR SATHIESH KANNA

Course Name:
Workplace Safety and Health Management in Construction Industry (WSHMCI)
(SCW/BCSS)
Facilitator Name:[Link] FOOK HONG

Batch ID:2354 Submission Date26.12.2025

WORKPLACE SAFETY INSPECTION REPORT

A). Purpose of Safety Inspection carried out

(State the reason(s) why this safety inspection is carried out)


[Link] the Accidents and injuries

[Link] Hazard

[Link] unsafe condition, unsafepracties& unsafe equipment

[Link] the safe work place and ensure safe work procedure

B). Inspection Findings – Workplace Unsafe conditions / Unsafe acts FINDING 1:

WSHMCI-PROJ-Ver2.03 -Rev03 01.08.2025 Copyright © Eversafe Academy Page 1of 8


WSHMCI Project Assignment

Date, Time & Location of Incident Description of Incident

22,12,2025,10am,Yishun road, Singapore.

(Explain what is the unsafe condition or the unsafe act in the picture)
[Link] is unsafe act(fall from heightworker not wearing fall arrest system)

[Link] from height not wearing(PPE)safety harness,safety helmet.

[Link] object

[Link] standing working

Corrective Actions for Rectification

(State the actions taken to prevent the incident from happening again)

[Link] and height scaffolding platform use (100%)body harness.


[Link](PPE) apply to (PTW)

[Link] platform must (100%)secured.

[Link] and height well trained and certificate person only can work.

To rectify by (Deadline) 22,12,2025.10am

Action by Safety supervisor

Re-inspection on (Date /Time) 23,12,2025.1pm

Re-inspection status: Rectified and closed

FINDING 2:

WSHMCI-PROJ-Ver2.03 -Rev03 01.08.2025 Copyright © Eversafe Academy Page 2of 8


WSHMCI Project Assignment

Date, Time & Location of Incident Description of Incident

23.12.2025 11am,Yishun road.

(Explain what is the unsafe condition or the unsafe act in the picture)
[Link] is unsafe act

[Link] not wear body harness and not guardrail

[Link] object and not ladder access.

[Link] risk activities worker standing on construction level edge.

Corrective Actions for Rectification

(State the actions taken to prevent the incident from happening again)
[Link] the proper ladder access

[Link] body harness,to prevent falling object.

[Link] edge protection and guardrail

[Link] danger signage board

To rectify by (Deadline) 23.12.2025 1pm

WSHMCI-PROJ-Ver2.03 -Rev03 01.08.2025 Copyright © Eversafe Academy Page 3of 8


WSHMCI Project Assignment

Action by Safety supervisor

Re-inspection on (Date /Time) 23.12.2025

Re-inspection status: Rectified and closed

Finding:3

Date, Time & Location of Incident Description of Incident

23.12.2025 1pm Yishun road

(Explain what is the unsafe condition or the unsafe act in the picture)
[Link] is unsafe act

[Link] barricade, don't cover opening.

[Link] object, don't have signage board

[Link] scaffolding platform.

Corrective Actions for Rectification

(State the actions taken to prevent the incident from happening again)
[Link] adequate barricade and toe board.

[Link] make proper access,and cover the all opening area.

[Link] make well trained person erect by platform scaffolding.

[Link] danger signage.

WSHMCI-PROJ-Ver2.03 -Rev03 01.08.2025 Copyright © Eversafe Academy Page 4of 8


WSHMCI Project Assignment

To rectify by (Deadline) 22.12.2025 1pm

Action by Site supervisor

Re-inspection on (Date /Time) 23.12.2025 3pm

Re-inspection status: Rectified and closed

FINDING 4:

Date, Time & Location of Incident Description of Incident

23.12.2025 [Link] road

(Explain what is the unsafe condition or the unsafe act in the picture)
[Link] is unsafe act.

[Link]'t have barricade.

[Link] housekeeping,trip and fall

[Link] falling from height,near edge stock materials.

Corrective Actions for Rectification

(State the actions taken to prevent the incident from happening again)
[Link] provide barricade and toe board netting.

[Link] housekeeping,to prevent trip and slip falling object.

WSHMCI-PROJ-Ver2.03 -Rev03 01.08.2025 Copyright © Eversafe Academy Page 5of 8


WSHMCI Project Assignment

3.1 meter away from stock materials.

[Link] make (100%) implement in safety procedure.

To rectify by (Deadline) 23.12.2025 .9am

Action by Safety supervisor

Re-inspection on (Date /Time) 24.12.2025.1pm

Re-inspection status: Rectified and closed

FINDING 5:

Date, Time & Location of Incident Description of Incident

23.12.2025.10am yishun road.

(Explain what is the unsafe condition or the unsafe act in the picture)
[Link] is unsafe act.

[Link] cover rebar protection.

WSHMCI-PROJ-Ver2.03 -Rev03 01.08.2025 Copyright © Eversafe Academy Page 6of 8


WSHMCI Project Assignment

[Link] wear safety body harness.

[Link]'t have barricade.

Corrective Actions for Rectification

(State the actions taken to prevent the incident from happening again)
[Link] the rebar protection and prevent to injury.

2. wear (100%)body safety harness.(to prevent falling object).

[Link] the barricade and toe board netting.

[Link] trained and experience worker can allow the high risk activities.

To rectify by (Deadline) 23.12.2025.4pm

Action by Safety supervisor

Re-inspection on (Date /Time) 24.12.2025

Re-inspection status: Rectified and closed

C). Recommendations to prevent the repeat of the similar findings

(Propose to Management on improvements to safety and health for whole organization


etc.)
[Link] person only can erect scaffolding platform and 100% wear PPE and body harness
PTW.

[Link] provide ladder access and ensure make 100% implements fall prevention.

[Link] the hazard and adequate barricade cover the all floor opening.

[Link] to make safe work and working place and prevent to falling object.

[Link] to (PTW) and well trained and certificate worker can allow work.

D). DECLARATION BY THE CANDIDATE


I, the undersigned, declare that the project report titled INSPECTION REPORT based
on my own work carried out during the course, and not plagiarised from other
candidates completed work, or wholesale copy material.

WSHMCI-PROJ-Ver2.03 -Rev03 01.08.2025 Copyright © Eversafe Academy Page 7of 8


WSHMCI Project Assignment

Name:[Link] KANNA Signature

~~~~~~~~ End of Report ~~~~~~~~

WSHMCI-PROJ-Ver2.03 -Rev03 01.08.2025 Copyright © Eversafe Academy Page 8of 8

You might also like