0% found this document useful (0 votes)
30 views3 pages

Airtel Uganda Solar Panel Design Specs

The document outlines the specifications for a solar panel installation project for Airtel Uganda, including panel size, wind and snow standards, and design codes. It details the necessary materials and construction guidelines for the foundation, emphasizing concrete reinforcement and embedded screw placement. The project adheres to the EURO CODE and includes specific measurements for components such as clamps and bolts.

Uploaded by

nadiope mark
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views3 pages

Airtel Uganda Solar Panel Design Specs

The document outlines the specifications for a solar panel installation project for Airtel Uganda, including panel size, wind and snow standards, and design codes. It details the necessary materials and construction guidelines for the foundation, emphasizing concrete reinforcement and embedded screw placement. The project adheres to the EURO CODE and includes specific measurements for components such as clamps and bolts.

Uploaded by

nadiope mark
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

2278 3900 3900 3900

2278 2278
1400
898 1400 1400
898 898
1400
20 1400 1400 20
20
705

500
I

705
705

705

135
235

705
705
608

550
556

705
517
705

705
15°

10°

365
365


2500

2500
2500

0
230
0

230
230

1800

3080
1800

1800

2820
2750
II

700
1000
3090 3160 3190

Column Diagonal support


2278mm End clamp

M8*40 Anti-theft bolt

Panel clip
M10*40 Hex bolt
(2 flat washers. 1
spring washer, 1
nut) Rail

Clip

Foundation

II I
1:2 1:2

Customer: Airtel Uganda Panel size: 2278*1134*30 Layout:

Standard wind: 40m/s Foundation:


Project name: Own Build 0cm
Standard snow: Design standard: EURO CODE LP20241126A-2
7100(3400+3700)

650 650

0 36
335 50

1000

2900 2900
2278 End clamp 80 Mid clamp 2278 Mid clamp

6934
6-1134

83 26 83

80
2278

2278
I

I
1 : 25

Customer: Airtel Uganda


Panel size: 2278*1134*30 Layout: 2-6
Standard wind: 40m/s Foundation:
Project name: Own Build
Standard snow: 0cm Design standard: EURO CODE LP20241126A-2
940
194.4 940(640)
30

30
640
700

Note:
Suggested reinforcement for concrete: HPB300, concrete: C25;
The thickness of the concrete protective layer is 30mm. If the foundation is poured on site, C10 mortar should
be used as a base on the foundation ground.

30

30
1000

1000

30
30

700
30
M16
140
φ8 Rebar HPB300

100 0
0 100
1000

940
140

Schematic diagram of the position of


the embedded screw M16*500), with a
recommended burial depth of 400mm

Embedded bolt
1:10
30

Concrete base
1:10

Customer: Airtel Uganda


Panel size: Layout: Concrete base
Standard wind: 40m/s Foundation:
Project name: Own Build
Standard snow: 0cm Design standard: NB⁄T 10115-2018