0% found this document useful (0 votes)
7 views12 pages

Hydraulic Design for Burhanpur Road

The document outlines the hydraulic discharge calculations and design proposals for the Burhanpur Ichhapur Road to Omkareshwar New Bus Block in Punasa, Khandwa. It details various chainages, catchment areas, and the proposed pipe diameters for effective drainage management. The calculations include discharge rates, required pipe sizes, and the number of pipes needed based on specific catchment areas.

Uploaded by

Tushar Umare
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views12 pages

Hydraulic Design for Burhanpur Road

The document outlines the hydraulic discharge calculations and design proposals for the Burhanpur Ichhapur Road to Omkareshwar New Bus Block in Punasa, Khandwa. It details various chainages, catchment areas, and the proposed pipe diameters for effective drainage management. The calculations include discharge rates, required pipe sizes, and the number of pipes needed based on specific catchment areas.

Uploaded by

Tushar Umare
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

Name of Road Burhanpur Ichhapur Road to Omkareshwar New Bus Block : Punasa

PWD : Khandwa

1-HP 2-HP 3-HP


S.N.
CH Catch Peri Chainage Catch Peri Catch Catch Peri
1 12080 0.07 0.6 120 0.181 0.55 9235 0.285 A
2 420 0.033 0.6 1500 0.196 0.675 B
3 720 0.034 0.6 1960 0.161 0.65 C
4 940 0.18 0.6 2740 0.181 0.7 D
5 1540 0.02 0.6 5060 0.156 0.75 E
6 1720 0.011 0.6 0
7 2050 0.051 0.6
8 3500 0.045 0.6
9 1000 0.28 0.6
10 5256 0.295 0.6
11
12
13
14
15
16 160 1 ROW HPC #1000mm DIA
17 400 1 ROW HPC #1000mm DIA
18 540 1 ROW HPC #1000mm DIA
19 700 1 ROW HPC #1000mm DIA
20 840 1 ROW HPC #1000mm DIA
21 960 2 ROW HPC #1000mm DIA
22 1400 1 ROW HPC #1000mm DIA
23 1640 2 ROW HPC #1000mm DIA
24 2000 2 ROW HPC #1000mm DIA
25 2060 2 ROW HPC #1000mm DIA
26 2300 1 ROW HPC #1000mm DIA
2760 1 ROW HPC #1000mm DIA
3020 1 ROW HPC #1000mm DIA
3280 1 ROW HPC #1000mm DIA
3540 2 ROW HPC #1000mm DIA
3700 2 ROW HPC #1000mm DIA
3900 1 ROW HPC #1000mm DIA
4180 1 ROW HPC #1000mm DIA
12080 m. 0.07 [Link].
420 m. 0.033 [Link].
720 m. 0.034 [Link]. 0
940 m. 0.18 [Link].
1540 m. 0.02 [Link].
1720 m. 0.011 [Link].
2050 m. 0.051 [Link].
3500 m. 0.045 [Link].
1000 m. 0.28 [Link].
5256 m. 0.295 [Link].
m. [Link].
m. [Link].
m. [Link].
m. [Link].
m. [Link].
m. [Link].
m. [Link].
m. [Link].
m. [Link].
m. [Link].
m. [Link].
m. [Link].
m. [Link].
m. [Link].
m. [Link].
m. [Link].
CALCULATION OF HYDRAULIC DISCHARGE AND DESIGN OF OPENING

Burhanpur Ichhapur Road to Omkareshwar New Bus Stand


Road Name : Block : Punasa
Road
PWD : Khandwa
1 Chainage of C.D.:- 12080
2 Description of catchments: 0.070 [Link] Acre. 17.29
3 Hight of fill permitted :- 0.6 Mtr Hectares 7
4 Pipe Diameter proposed:- 1 Mtr No 1
Catchment Area
Diameter of pipe(mm)
(Heactares)
PROCEDURE ADOPTED: - Up to 10Hect 1000 Single Row

10 to 20 1200 Single Row

A- For finding discharge dicken’s formula is adopted. (For M.P. Plain Terrain) 20 to 50 1000 or1200 (2to3R)

B- For M.P. Terrain Coefficient of discharge =14 to 19 50 to 60 1000 or1200 (4R)

Q = CM¾
= 16*( 0.070 )¾
= 1.90524822 cum/sec
PROPOSAL :- 1 Mtr dia NP-4 Hume pipe is proposed to provide
Length of pipe L= 10
For Squar entry Ke = 1.107 ( R )^0.5 = 0.78276721 As per article 32 (22.5e) of IRC SP 13
Kf = 0.00394 L/ R^1.2 = 0.0394 Kf as per fig [Link] IRC SP 13
Velocity v =4.43*(H/1+Ke+Kf)^0.5 = 2.54205673
Area of one pipe A= πd^2/4 = 0.785 Up to 7Hect 1 No
Discharge by one pipe Q = A*v = 1.99551453 8 to 18 2 No
No of pipe required :- 33 to 47 4 No
As per This Design
Water way required= 1.90524822 / v = 0.74949084 Sqm
Area of one 1000mm of pipe= π/4(d) 2

= ¼*3.14*(d)^2= 0.785 Sqm


No. of pipe required = total water way /area of one pipe
= 0.74949084 /0.785 0.9547654 No, Say = 1
Hence provide 1 Rows of 1 Mtr dia NP-4 pipes

Sub Engineer Sub Divisional Officer, Executive Engineer


Contractor P.W.D.(B/R) Section P.W.D.(B/R) Sub-Division P.W.D.(B/R) Division
Khandwa (M.P.) Khandwa (M.P.) Khandwa (M.P.)
CALCULATION OF HYDRAULIC DISCHARGE AND DESIGN OF OPENING

Road Name : Burhanpur Ichhapur Road to Omkareshwar New Bus Block : Punasa
1 Chainage of C.D.:- 420 PWD : Khandwa
2 Description of catchments: 0.033 [Link] Acre. 8.151
3 Hight of fill permitted :- 0.6 Mtr Hectares 3.3
4 Pipe Diameter proposed:- 1 Mtr No 1
Catchment
Area Diameter of
(Heactares) pipe(mm)

PROCEDURE ADOPTED: - Up to 10Hect 1000 Single Row

10 to 20 1200 Single Row


1000 or1200
A- For finding discharge dicken’s formula is adopted. (For M.P. Plain Terrain) 20 to 50 (2to3R)
1000 or1200
B- For M.P. Terrain Coefficient of discharge =14 to 19 50 to 60 (4R)
As per S.P.-20
Q = CM¾
= 16*( 0.033 )¾
= 1.083961 cum/sec
PROPOSAL :- 1 Mtr dia NP-4 Hume pipe is proposed to provide
Length of pipe L= 10
For Squar entry Ke = 1.107 ( R )^0.5 = 0.782767 As per article 32 (22.5e) of IRC SP 13
Kf = 0.00394 L/ R^1.2 = 0.0394 Kf as per fig [Link] IRC SP 13
Velocity v =4.43*(H/1+Ke+Kf)^0.5 = 2.542057
Area of one pipe A= πd^2/4 = 0.785 Up to 7Hect 1 No
Discharge by one pipe Q = A*v = 1.995515 8 to 18 2 No
No of pipe required :- 33 to 47 4 No
As per This Design
Water way required= 1.083961 / v = 0.426411 Sqm
Area of one 1000mm of pipe= π/4(d) 2

= ¼*3.14*(d)^2= 0.785 Sqm


No. of pipe required = total water way /area of one pipe
= 0.426411 /0.785 0.543199 No, Say = 1
Hence provide 1 rows of 1 Mtr dia NP-4 pipes

SUB-ENGINEER S.D.O. Execuive Engineer


Pubic Work Department
Khandwa
CALCULATION OF HYDRAULIC DISCHARGE AND DESIGN OF OPENING

Road Name : Burhanpur Ichhapur Road to Omkareshwar New Bus Block : Punasa
1 Chainage of C.D.:- 720 PWD : Khandwa
2 Description of catchments: 0.034 [Link] Acre. 8.398
3 Hight of fill permitted :- 0.6 Mtr Hectares 3.4
4 Pipe Diameter proposed:- 1 Mtr No 1
Catchment
Area Diameter of
(Heactares) pipe(mm)

PROCEDURE ADOPTED: - Up to 10Hect 1000 Single Row

10 to 20 1200 Single Row


1000 or1200
A- For finding discharge dicken’s formula is adopted. (For M.P. Plain Terrain) 20 to 50 (2to3R)
1000 or1200
B- For M.P. Terrain Coefficient of discharge =14 to 19 50 to 60 (4R)
As per S.P.-20
Q = CM¾
= 16*( 0.034 )¾
= 1.108504 cum/sec
PROPOSAL :- 1 Mtr dia NP-4 Hume pipe is proposed to provide
Length of pipe L= 10
For Squar entry Ke = 1.107 ( R )^0.5 = 0.782767 As per article 32 (22.5e) of IRC SP 13
Kf = 0.00394 L/ R^1.2 = 0.0394 Kf as per fig [Link] IRC SP 13
Velocity v =4.43*(H/1+Ke+Kf)^0.5 = 2.542057
Area of one pipe A= πd^2/4 = 0.785 Up to 7Hect 1 No
Discharge by one pipe Q = A*v = 1.995515 8 to 18 2 No
No of pipe required :- 33 to 47 4 No
As per This Design
Water way required= 1.108504 / v = 0.436066 Sqm
Area of one 1000mm of pipe= π/4(d) 2

= ¼*3.14*(d)^2= 0.785 Sqm


No. of pipe required = total water way /area of one pipe
= 0.436066 /0.785 0.555498 No, Say = 1
Hence provide 1 rows of 1 Mtr dia NP-4 pipes

SUB-ENGINEER S.D.O. Execuive Engineer


Pubic Work Department
Khandwa
CALCULATION OF HYDRAULIC DISCHARGE AND DESIGN OF OPENING

Road Name : Burhanpur Ichhapur Road to Omkareshwar New Bus Block : Punasa
1 Chainage of C.D.:- 940 PWD : Khandwa
2 Description of catchments: 0.180 [Link] Acre. 44.46
3 Hight of fill permitted :- 0.6 Mtr Hectares 18
4 Pipe Diameter proposed:- 1 Mtr No 2
Catchment
Area Diameter of
(Heactares) pipe(mm)

PROCEDURE ADOPTED: - Up to 10Hect 1000 Single Row

10 to 20 1200 Single Row


1000 or1200
A- For finding discharge dicken’s formula is adopted. (For M.P. Plain Terrain) 20 to 50 (2to3R)
1000 or1200
B- For M.P. Terrain Coefficient of discharge =14 to 19 50 to 60 (4R)
As per S.P.-20
Q = CM¾
= 16*( 0.180 )¾
= 3.868855 cum/sec
PROPOSAL :- 1 Mtr dia NP-4 Hume pipe is proposed to provide
Length of pipe L= 10
For Squar entry Ke = 1.107 ( R )^0.5 = 0.782767 As per article 32 (22.5e) of IRC SP 13
Kf = 0.00394 L/ R^1.2 = 0.0394 Kf as per fig [Link] IRC SP 13
Velocity v =4.43*(H/1+Ke+Kf)^0.5 = 2.542057
Area of one pipe A= πd^2/4 = 0.785 Up to 7Hect 1 No
Discharge by one pipe Q = A*v = 1.995515 8 to 18 2 No
No of pipe required :- 33 to 47 4 No
As per This Design
Water way required= 3.868855 / v = 1.521939 Sqm
Area of one 1000mm of pipe= π/4(d) 2

= ¼*3.14*(d)^2= 0.785 Sqm


No. of pipe required = total water way /area of one pipe
= 1.521939 /0.785 1.938775 No, Say = 2
Hence provide 2 rows of 1 Mtr dia NP-4 pipes

SUB-ENGINEER S.D.O. Execuive Engineer


Pubic Work Department
Khandwa
CALCULATION OF HYDRAULIC DISCHARGE AND DESIGN OF OPENING

Road Name : Burhanpur Ichhapur Road to Omkareshwar New Bus Block : Punasa
1 Chainage of C.D.:- 1540 PWD : Khandwa
2 Description of catchments: 0.020 [Link] Acre. 4.94
3 Hight of fill permitted :- 0.6 Mtr Hectares 2
4 Pipe Diameter proposed:- 1 Mtr No 1
Catchment
Area Diameter of
(Heactares) pipe(mm)

PROCEDURE ADOPTED: - Up to 10Hect 1000 Single Row

10 to 20 1200 Single Row


1000 or1200
A- For finding discharge dicken’s formula is adopted. (For M.P. Plain Terrain) 20 to 50 (2to3R)
1000 or1200
B- For M.P. Terrain Coefficient of discharge =14 to 19 50 to 60 (4R)
As per S.P.-20
Q = CM¾
= 16*( 0.020 )¾
= 0.744561 cum/sec
PROPOSAL :- 1 Mtr dia NP-4 Hume pipe is proposed to provide
Length of pipe L= 10
For Squar entry Ke = 1.107 ( R )^0.5 = 0.782767 As per article 32 (22.5e) of IRC SP 13
Kf = 0.00394 L/ R^1.2 = 0.0394 Kf as per fig [Link] IRC SP 13
Velocity v =4.43*(H/1+Ke+Kf)^0.5 = 2.542057
Area of one pipe A= πd^2/4 = 0.785 Up to 7Hect 1 No
Discharge by one pipe Q = A*v = 1.995515 8 to 18 2 No
No of pipe required :- 33 to 47 4 No
As per This Design
Water way required= 0.744561 / v = 0.292897 Sqm
Area of one 1000mm of pipe= π/4(d) 2

= ¼*3.14*(d)^2= 0.785 Sqm


No. of pipe required = total water way /area of one pipe
= 0.292897 /0.785 0.373118 No, Say = 1
Hence provide 1 rows of 1 Mtr dia NP-4 pipes

SUB-ENGINEER S.D.O. Execuive Engineer


Pubic Work Department
Khandwa
CALCULATION OF HYDRAULIC DISCHARGE AND DESIGN OF OPENING

Road Name : Burhanpur Ichhapur Road to Omkareshwar New Bus Block : Punasa
1 Chainage of C.D.:- 1720 PWD : Khandwa
2 Description of catchments: 0.011 [Link] Acre. 2.717
3 Hight of fill permitted :- 0.6 Mtr Hectares 1.1
4 Pipe Diameter proposed:- 1 Mtr No 1
Catchment
Area Diameter of
(Heactares) pipe(mm)

PROCEDURE ADOPTED: - Up to 10Hect 1000 Single Row

10 to 20 1200 Single Row


1000 or1200
A- For finding discharge dicken’s formula is adopted. (For M.P. Plain Terrain) 20 to 50 (2to3R)
1000 or1200
B- For M.P. Terrain Coefficient of discharge =14 to 19 50 to 60 (4R)
As per S.P.-20
Q = CM¾
= 16*( 0.011 )¾
= 0.475524 cum/sec
PROPOSAL :- 1 Mtr dia NP-4 Hume pipe is proposed to provide
Length of pipe L= 10
For Squar entry Ke = 1.107 ( R )^0.5 = 0.782767 As per article 32 (22.5e) of IRC SP 13
Kf = 0.00394 L/ R^1.2 = 0.0394 Kf as per fig [Link] IRC SP 13
Velocity v =4.43*(H/1+Ke+Kf)^0.5 = 2.542057
Area of one pipe A= πd^2/4 = 0.785 Up to 7Hect 1 No
Discharge by one pipe Q = A*v = 1.995515 8 to 18 2 No
No of pipe required :- 33 to 47 4 No
As per This Design
Water way required= 0.475524 / v = 0.187063 Sqm
Area of one 1000mm of pipe= π/4(d) 2

= ¼*3.14*(d)^2= 0.785 Sqm


No. of pipe required = total water way /area of one pipe
= 0.187063 /0.785 0.238296 No, Say = 1
Hence provide 1 rows of 1 Mtr dia NP-4 pipes

SUB-ENGINEER S.D.O. Execuive Engineer


Pubic Work Department
Khandwa
CALCULATION OF HYDRAULIC DISCHARGE AND DESIGN OF OPENING

Road Name : Burhanpur Ichhapur Road to Omkareshwar New Bus Block : Punasa
1 Chainage of C.D.:- 2050 PWD : Khandwa
2 Description of catchments: 0.051 [Link] Acre. 12.597
3 Hight of fill permitted :- 0.6 Mtr Hectares 5.1
4 Pipe Diameter proposed:- 1 Mtr No 1
Catchment
Area Diameter of
(Heactares) pipe(mm)

PROCEDURE ADOPTED: - Up to 10Hect 1000 Single Row

10 to 20 1200 Single Row


1000 or1200
A- For finding discharge dicken’s formula is adopted. (For M.P. Plain Terrain) 20 to 50 (2to3R)
1000 or1200
B- For M.P. Terrain Coefficient of discharge =14 to 19 50 to 60 (4R)
As per S.P.-20
Q = CM¾
= 16*( 0.051 )¾
= 1.50247 cum/sec
PROPOSAL :- 1 Mtr dia NP-4 Hume pipe is proposed to provide
Length of pipe L= 10
For Squar entry Ke = 1.107 ( R )^0.5 = 0.782767 As per article 32 (22.5e) of IRC SP 13
Kf = 0.00394 L/ R^1.2 = 0.0394 Kf as per fig [Link] IRC SP 13
Velocity v =4.43*(H/1+Ke+Kf)^0.5 = 2.542057
Area of one pipe A= πd^2/4 = 0.785 Up to 7Hect 1 No
Discharge by one pipe Q = A*v = 1.995515 8 to 18 2 No
No of pipe required :- 33 to 47 4 No
As per This Design
Water way required= 1.50247 / v = 0.591045 Sqm
Area of one 1000mm of pipe= π/4(d) 2

= ¼*3.14*(d)^2= 0.785 Sqm


No. of pipe required = total water way /area of one pipe
= 0.591045 /0.785 0.752923 No, Say = 1
Hence provide 1 rows of 1 Mtr dia NP-4 pipes

SUB-ENGINEER S.D.O. Execuive Engineer


Pubic Work Department
Khandwa
CALCULATION OF HYDRAULIC DISCHARGE AND DESIGN OF OPENING

Road Name : Burhanpur Ichhapur Road to Omkareshwar New Bus Block : Punasa
1 Chainage of C.D.:- 3500 PWD : Khandwa
2 Description of catchments: 0.045 [Link] Acre. 11.115
3 Hight of fill permitted :- 0.6 Mtr Hectares 4.5
4 Pipe Diameter proposed:- 1 Mtr No 1
Catchment
Area Diameter of
(Heactares) pipe(mm)

PROCEDURE ADOPTED: - Up to 10Hect 1000 Single Row

10 to 20 1200 Single Row


1000 or1200
A- For finding discharge dicken’s formula is adopted. (For M.P. Plain Terrain) 20 to 50 (2to3R)
1000 or1200
B- For M.P. Terrain Coefficient of discharge =14 to 19 50 to 60 (4R)
As per S.P.-20
Q = CM¾
= 16*( 0.045 )¾
= 1.367847 cum/sec
PROPOSAL :- 1 Mtr dia NP-4 Hume pipe is proposed to provide
Length of pipe L= 10
For Squar entry Ke = 1.107 ( R )^0.5 = 0.782767 As per article 32 (22.5e) of IRC SP 13
Kf = 0.00394 L/ R^1.2 = 0.0394 Kf as per fig [Link] IRC SP 13
Velocity v =4.43*(H/1+Ke+Kf)^0.5 = 2.542057
Area of one pipe A= πd^2/4 = 0.785 Up to 7Hect 1 No
Discharge by one pipe Q = A*v = 1.995515 8 to 18 2 No
No of pipe required :- 33 to 47 4 No
As per This Design
Water way required= 1.367847 / v = 0.538087 Sqm
Area of one 1000mm of pipe= π/4(d) 2

= ¼*3.14*(d)^2= 0.785 Sqm


No. of pipe required = total water way /area of one pipe
= 0.538087 /0.785 0.685461 No, Say = 1
Hence provide 1 rows of 1 Mtr dia NP-4 pipes

SUB-ENGINEER S.D.O. Execuive Engineer


Pubic Work Department
Khandwa
CALCULATION OF HYDRAULIC DISCHARGE AND DESIGN OF OPENING

Road Name : Burhanpur Ichhapur Road to Omkareshwar New Bus Block : Punasa
1 Chainage of C.D.:- 1000 PWD : Khandwa
2 Description of catchments: 0.280 [Link] Acre. 69.16
3 Hight of fill permitted :- 0.6 Mtr Hectares 28
4 Pipe Diameter proposed:- 1 Mtr No 3
Catchment
Area Diameter of
(Heactares) pipe(mm)

PROCEDURE ADOPTED: - Up to 10Hect 1000 Single Row

10 to 20 1200 Single Row


1000 or1200
A- For finding discharge dicken’s formula is adopted. (For M.P. Plain Terrain) 20 to 50 (2to3R)
1000 or1200
B- For M.P. Terrain Coefficient of discharge =14 to 19 50 to 60 (4R)
As per S.P.-20
Q = CM¾
= 16*( 0.280 )¾
= 5.388856 cum/sec
PROPOSAL :- 1 Mtr dia NP-4 Hume pipe is proposed to provide
Length of pipe L= 10
For Squar entry Ke = 1.107 ( R )^0.5 = 0.782767 As per article 32 (22.5e) of IRC SP 13
Kf = 0.00394 L/ R^1.2 = 0.0394 Kf as per fig [Link] IRC SP 13
Velocity v =4.43*(H/1+Ke+Kf)^0.5 = 2.542057
Area of one pipe A= πd^2/4 = 0.785 Up to 7Hect 1 No
Discharge by one pipe Q = A*v = 1.995515 8 to 18 2 No
No of pipe required :- 33 to 47 4 No
As per This Design
Water way required= 5.388856 / v = 2.11988 Sqm
Area of one 1000mm of pipe= π/4(d) 2

= ¼*3.14*(d)^2= 0.785 Sqm


No. of pipe required = total water way /area of one pipe
= 2.11988 /0.785 2.700484 No, Say = 3
Hence provide 3 rows of 1 Mtr dia NP-4 pipes

SUB-ENGINEER S.D.O. Execuive Engineer


Pubic Work Department
Khandwa
CALCULATION OF HYDRAULIC DISCHARGE AND DESIGN OF OPENING

Road Name : Burhanpur Ichhapur Road to Omkareshwar New Bus Block : Punasa
1 Chainage of C.D.:- 5256 PWD : Khandwa
2 Description of catchments: 0.295 [Link] Acre. 72.865
3 Hight of fill permitted :- 0.6 Mtr Hectares 29.5
4 Pipe Diameter proposed:- 1 Mtr No 3
Catchment
Area Diameter of
(Heactares) pipe(mm)

PROCEDURE ADOPTED: - Up to 10Hect 1000 Single Row

10 to 20 1200 Single Row


1000 or1200
A- For finding discharge dicken’s formula is adopted. (For M.P. Plain Terrain) 20 to 50 (2to3R)
1000 or1200
B- For M.P. Terrain Coefficient of discharge =14 to 19 50 to 60 (4R)
As per S.P.-20
Q = CM¾
= 16*( 0.295 )¾
= 5.603954 cum/sec
PROPOSAL :- 1 Mtr dia NP-4 Hume pipe is proposed to provide
Length of pipe L= 10
For Squar entry Ke = 1.107 ( R )^0.5 = 0.782767 As per article 32 (22.5e) of IRC SP 13
Kf = 0.00394 L/ R^1.2 = 0.0394 Kf as per fig [Link] IRC SP 13
Velocity v =4.43*(H/1+Ke+Kf)^0.5 = 2.542057
Area of one pipe A= πd^2/4 = 0.785 Up to 7Hect 1 No
Discharge by one pipe Q = A*v = 1.995515 8 to 18 2 No
No of pipe required :- 33 to 47 4 No
As per This Design
Water way required= 5.603954 / v = 2.204496 Sqm
Area of one 1000mm of pipe= π/4(d) 2

= ¼*3.14*(d)^2= 0.785 Sqm


No. of pipe required = total water way /area of one pipe
= 2.204496 /0.785 2.808275 No, Say = 3
Hence provide 3 rows of 1 Mtr dia NP-4 pipes

SUB-ENGINEER S.D.O. Execuive Engineer


Pubic Work Department
Khandwa