SAP QM Online Quiz



Following quiz provides Multiple Choice Questions (MCQs) related to SAP QM. You will have to read all the given answers and click over the correct answer. If you are not sure about the answer then you can check the answer using Show Answer button. You can use Next Quiz button to check new set of questions in the quiz.

Questions and Answers

Q 1 - Under quality control, you have quality notifications, standard reports and Quality notification system. What actions has to be taken as per defect finding?

A - True

B - False

Answer : A

Q 2 - You can assign an inspection method to master inspection charactertics or directly to an inspection charactertics in an inspection plan?

A - True

B - False

Answer : A

Explanation

You can use inspection method to perform the inspection. An inspection method can be assigned to master inspection charactertics or directly to an inspection charactertics in an inspection plan.

An Inspection method can be created in one plant same method can be used in other plant.

Q 5 - If you want that the sample size will not be dynamically modified, which of the following should be used?

A - Enter a sampling scheme

B - Inspection Stage Change

C - Multiple Samples

D - All of the above

Answer : B

Explanation

By setting the indicator "No stage change" you can prevent an inspection stage change from taking place. This means that the sample size will not be dynamically modified.

Q 6 - What is SAP inspection type used for in process material inspection?

A - 01

B - 02

C - 03

D - 04

Answer : C

Q 7 - Which of the following Transaction is used to create a usage decision against inspection lot?

A - QA32

B - QS21

C - QS31

D - QDV1

Answer : A

Q 8 - To release and complete quality notification in SAP system, which of the following T-code is used?

A - QM01

B - QM02

C - QM03

D - QM04

Answer : B

Explanation

To release and complete quality notification in SAP system, use T-Code: QM02

Q 9 - As part of Quality Management process, which of the following parameter can be set for Material master?

A - Material Requirement Planning run

B - Material Type

C - Purchase Order

D - Inspection Method & Sample Procedure

Answer : D

Q 10 - In a Quality Info Record, it is possible to that inspection is required when it is procured from vendor A and is not required if you procure from Vendor B?

A - True

B - False

Answer : A

sap_qm_questions_answers.htm
Advertisements