Lifting Analysis Sleeper Foundations

analysis under working

Uploaded by

Sana Ullah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
2K views28 pages

Lifting Analysis Sleeper Foundations

analysis under working

Uploaded by

Sana Ullah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

K075 - NAUGP A Project

LIFTING CHECKS FOR PRECAST PIPE


Civil Dwg No.
Sleeper ID:

SECTION

Elevation:
Top of Pedestal
Ground level:
Top of footing:
Bottom of footing:
Ground Water Level:

100.680
100.000
99.700
99.400
89.000

m
m
m
m
m

Dimension:
Wx =

1000

mm

Wy =

2500

mm

Lc1 =

375

mm

Lc2 =

375

mm

Lc3 =

100

mm

Lc4 =

100

mm

Concrete Unit Weight


Concrete Volume:
Concrete Weight:

Wx1 =

500

mm

Wx2 =

500

mm

Wy1 =

1250

mm

Wy2 =

1250

mm

ex =

mm

ey =

mm

Px =

250

mm

Py =

2300

mm

H=
H1 =

980

mm

300

mm

H2 =

680

mm

Df =

300

mm

25

kN/m3

Wc

1.31
32.84

m3
kN

OR PRECAST PIPE SLEEPER FOUNDATIONS


Input Cells

(Footing width)
(Footing length)

PLAN

(Left Ftg edge to Ped center)


(Right Ftg edge to Ped center)

(eccentricity along x)
(eccentricity along y)
(Pedestal width)
(Pedestal length)
(Pedestal height)

(Footing thickness)

Rev. 0

COG and
Concrete Strength
Consider Strength of Concrete at 7 Days is:
Steel Reinforcement Yield Strength

fc'
60.00%
fy

Concrete Weight
Impact factor

Wt
I
Wi =W x I

Dead Load with Impact


Number of sleeves for lifting
Maximum Sling Angle (with Vertical Plane)
Tension in Concrete along sling line at 2

n
Wi/n

Ti=Wi/(2cos

Center of Gravity of Foundation

Sleeve distance from Edge of Pedestal

X
Y
Z
Sy

Sleeve distance from TOG-Required Shear Based


Sleeve distance from TOG (input)
Sleeve distance from TOF

hs1
hs1'
hs2'

Sleeve height from origin "O"


Distance between COG and sleeve location

hso
hoffset

Tension per rebar


Ft = Fy =0.75*Fy
Area of steel required to resist applied tension
Number of Rebars to resist applied tension
Rebar Size
Bar Area
Tension Capacity of vertical rebar at one Sleeve

As
K

req

Wt

Development Length
Required development length of pedestal main rebars
Available development length of pedestal main
bars below the lifting sleeve location

Ldh

W1 or W2

Ldh
Thk.
Cv=75m m

Fig.

COG and Pedestal Rebar Check


28.00
16.8
420.00

Mpa
Mpa
Mpa

32.84
1.20

kN

39.41
2

kN

19.70
30

kN

22.75

kN

Z
Y

0.50
1.25
0.42
766.6666666667

m
m
m
mm

45.24
830
150

mm
mm
mm

OK, within Pedestal

450
25

mm
mm

OK, above COG


OK, close to COG

315.00

Mpa

62.55
4
16

mm

200.96
253.21

mm2
KN

260

mm

560

mm

: Use 1/3rd of Pedestal Width

mm

Pipe Sleeve for Lifting


Foundation

Pedestal main bar

Wi/2

Sy
OK

OK

Footing

Footing bar (bottom)

Wi

Wi/2

Ti

Wi/2

Sy

Sy

Wt

Moment and Shear Check for Footing


cv

75
20
100
190

mm
mm
mm (Main bar)
mm (Main bar)

Width:

Wx =

1.00

Length:

Wy =

2.50

W1 =

0.38

W2 =

0.38

Df =

0.30

M1-1

0.53

kN-m/m

Lf
I

1.2
1.20

M1-1

0.76

0.180
12

Minimum Reinforcement Cover


Max. aggregate size :
Minimum Bar pitch =
Maximum Bar pitch =
Footing Size:

Thickness:

Moment at section 1-1 due to self weight, during lifting:

Dead Load Factor


Impact Factor

Check of Footing for X-Direction Top Rebars

Factored Moment at section 1-1, with impact factor:

min. =
Top Bar size:

Bar size
:D
Bar pitch(@) :

12
190

mm CTC

Sectional area =
Bar nos =

113.1
5.3

Min. Bar pitch=


Max. Bar pitch=

100
190

Bar pitch of min./ max. Requirment :

Mu (max.)=

0.76

kN-m/m

b=
Fh =
d=

1000
300
219

w1

kN-m/m
%

mm2 (as per one bar)


Nos / one meter

tp

w2

Total nos =

14

r x b x d =

10

mm2 / One meter

270

mm2 / One meter

mm CTC
mm CTC

93

mm (as per one meter)


mm
mm

Bar requirment
Rn = Mu/0.9bd^2 =
r = 0.85f'c/fy x (1-(1-2Rn/0.85fc')^0.5) =
Mimimum req. :
min :
req. =

0.02
N/mm2
4.1692E-005

0.5 x 0.18%

0.0009

Max.(r, mim) =

min x b x Fh =

270

mm2 / One meter

675

mm2

Check of Re-bar arrangement (X-Dir Top bar design)


As Req. (min.) =

<

Provide As =

1583

mm2

Pass

Check of Shear Capacity


Df =

0.30

d=

219

mm

1.17

kN/m

Wt

Shear at section 1-1 due to self weight, during lifting:


1-1

<

486.87
OK

kN/m

Vu

Vu

Df

Moment and Shear Check for Footing


cv

75
20
100
190

mm
mm
mm (Main bar)
mm (Main bar)

Width:

Wx =

1.00

(Footing width)

Length:

Wy =

2.50

(Footing length)

W1 =

0.38

W2 =

0.38

Df =

0.30

(Footing thickness)

Px =
H=

0.25
0.98

m
m

(Pedestal width)
(Pedestal height)

Lc3 =

0.10

Sy

0.767

Wi =W x I

39.41

kN

Mx1
Mx2
Mx3

-0.04
-4.62
-2.36

kN-m
kN-m
kN-m

M1-1

2.36

kN-m/m

Lf
I

1.2
1.20

Minimum Reinforcement Cover


Max. aggregate size :
Minimum Bar pitch =
Maximum Bar pitch =
Footing Size:

Thickness:
Pedestal Size:

Sleeve distance from Edge of Pedestal

Dead Load with Impact

Moment at Pedestal Edge along Y direction


Moment at Sleeve Location
Mid Span Moment

: Use 1/3rd of Pedestal Width

Moment at section 1-1 due to self weight, during lifting:

Dead Load Factor


Impact Factor

Check of Footing for Y-Direction Bottom Rebars


Factored Moment at section 1-1, with impact factor:

min. =
Bottom Bar size:

Bar size
:D
Bar pitch(@) :

12
190

mm CTC

Bar pitch of min./ max. Requirment :

Mu (max.)=

3.39

M1-1

3.39

0.180
12

Sectional area =
Bar nos =

113.1
5.3

Min. Bar pitch=


Max. Bar pitch=

100
190

kN-m/m

b=
Fh =
d=

1000
300
219

kN-m/m
%

mm2 (as per one bar)


Nos / one meter

Total nos =

93

r x b x d =

42

mm2 / One meter

270

mm2 / One meter

679

mm2

mm CTC
mm CTC
mm (as per one meter)
mm
mm

Bar requirment
Rn = Mu/0.9bd^2 =
r = 0.85f'c/fy x (1-(1-2Rn/0.85fc')^0.5) =
Mimimum req. :
min :
req. =

0.5 x 0.18%
Max.(r, mim) =

0.08
0.0001876607

N/mm2

0.0009

min x b x Fh =

270

mm2 / One meter

270

mm2

Check of Re-bar arrangement (X-Dir Top bar design)


As Req. (min.) =

<

Provide As =
Pass

WikiEngineer.com Concrete T-Beam Calculator

Version 1.0

Concrete T-Beam Designer


Beam Geometries:
total height of the beam + slab
width of the beam
cover
distance to rebar
Thickness of the slab

h=
b=
cov =
d=
ts =

Concrete Properties:
Strength of the Steel
Strength of the Concrete
Stress Block Ratio
Strength Reduction Factor
Steel in Member

fy =
fc' =
1 =
=
As =

Location Properties
Total length of beam
Beam spacing
Effective Flange Width

L=
s=
be =

Effective Flange Area


Check Min Steel:
Min amount of steel:
Steel to be used:
Find the depth to the centroid:
Area of Concrete in Compression
Is the compressive depth in the flange?

Aflange =

As-min =
As =

Ac =

28 in
12 in
3.5 in
24.5 in
5 in

60000 psi
3000 psi
0.85
0.9
4.74 in2

72 in
120 in
18 in
90 in2

0.98 in2
4.74 in2

111.53 in2
no 1

Equations Used:

As min (beams)
Ac

f c 'bw d

f y As
0.85 f c '

M n As f y ( d )

a
1

Compression in Web
Estimate a

Flange Depth or Depth into web:


Finding Alpha

aest =
d=
=

6.20 in
1.79 in
3.16 in
Notes:

Copyright Wikiengineer.com. All Rights Reserved

fy

WikiEngineer.com Concrete T-Beam Calculator


Solve for Capacity:

1) Created using:

Mn = 6070301.471 lb-in
Mn =

Check Tension Controlled:


Find Compression depth:
Tension control check:

Version 1.0

5463271.324 lb-in
455.3 k-ft

ACI 2005, Chapter 9


Wight & Macgregor, Rein
Leet and Bernal, Reinforc
2) See Example in Cerm pg: 50-22

This spreadsheet is
a=
c=

6.79 in
7.99 in
Tension Controlled

The newest available ver


http://www.wikiengineer.com/S

Copyright Wikiengineer.com. All Rights Reserved

ms)

WikiEngineer.com Concrete T-Beam Calculator

f c 'bw d
fy

Version 1.0

200bw d
fy

Copyright Wikiengineer.com. All Rights Reserved

WikiEngineer.com Concrete T-Beam Calculator

Version 1.0

ACI 2005, Chapter 9


Wight & Macgregor, Reinforced Concrete 5th Ed, 2009
Leet and Bernal, Reinforced Concrete Design 3rd Ed., 1997

This spreadsheet is provided by www.wikiengineer.com

he newest available version of this spreadsheet can be found at:


://www.wikiengineer.com/Structural/ConcreteT-BeamDesignSpreadsheet

Copyright Wikiengineer.com. All Rights Reserved

Bending Moment Diagram Along Length of Sleeper :


Wx =

1000

mm

(Footing width)

Wy =

2500

mm

(Footing length)

Df =

300

mm

(Footing thickness)

Px =

250

mm

(Pedestal width)

H=

980

mm

(Pedestal height)

Lc3 =

100

mm

Sy

767

mm

Thickness:

Moment at Pedestal Edge along Y direction


Moment at Sleeve Location
Mid Span Moment

: Use 1/3rd of Pedestal Width

Mx1
Mx2
Mx3

-0.04
-4.62
-2.36

eeper :

0.00
0

Axis Title

500

1000

1500

-5.00
Axis Title

estal Width

kN-m
kN-m
kN-m

2000

2000

2500

3000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

x
0

Mx
0.00

62.5
125

62.5
125.0

-0.01
-0.06

187.5
250
312.5
375

187.5
250.0
312.5
375.0

-0.16
-0.30
-0.50
-0.76

437.5
500.0
562.5
625.0
687.5
750.0
812.5
875.0
937.5
1000.0
1062.5
1125.0
1187.5
1250.0

-1.07
-1.43
-1.84
-2.31
-2.83
-3.40
-4.03
-4.55
-4.05
-3.60
-3.21
-2.87
-2.59
-2.36

1312.5
1375.0
1437.5
1500.0
1562.5
1625.0
1687.5
1750.0
1812.5
1875.0
1937.5
2000.0
2062.5
2125.0
2187.5
2250.0
2312.5
2375.0
2437.5
2500.0

-2.59
-2.87
-3.21
-3.60
-4.05
-4.55
-4.03
-3.40
-2.83
-2.31
-1.84
-1.43
-1.07
-0.76
-0.50
-0.30
-0.16
-0.06
-0.01
0.00

437.5
500
562.5
625
687.5
750
812.5
875
937.5
1000
1062.5
1125
1187.5
1250

KN-m

Moment Capacity Table for Top Rebars

Footing Thk.

Spacing
(mm)

Footing Thk.

Spacing
(mm)

Footing Thk.

Spacing
(mm)

Footing Thk.

Spacing
(mm)

250

Rebar Size
100
125
150
175
200

* Use light grey cell Moment values

12
69.24
56.80
48.12
41.73
36.83

Moment Capacity Table : kN-m/m


16
20
25
92.90
93.83
123.19
83.22
93.40
114.48
71.24
92.65
104.24
62.22
84.18
94.77
55.20
75.19
93.71

12
93.26
76.02
64.13
55.45
48.84

Moment Capacity Table : kN-m/m


16
20
25
137.02
159.44
191.72
113.01
152.32
169.30
96.06
130.73
160.32
83.49
114.38
159.60
73.81
101.61
158.66

12
117.28
95.23
80.15
69.18
60.85

Moment Capacity Table : kN-m/m


16
20
25
174.25
234.69
260.24
142.79
194.59
244.49
120.88
165.96
242.97
104.77
144.58
239.65
92.43
128.03
214.61

12
141.30
114.45
96.16
82.90
72.86

Moment Capacity Table : kN-m/m


16
20
25
211.48
287.54
346.82
172.58
236.87
344.46
145.70
201.19
334.10
126.04
174.78
293.87
111.04
154.45
262.06

300

Rebar Size
100
125
150
175
200
350

Rebar Size
100
125
150
175
200
400

Rebar Size
100
125
150
175
200

bars

ey cell Moment values

kN-m/m
32
100.85
121.82
124.38
120.61
114.72

kN-m/m
32
211.01
209.95
197.82
183.56
169.80

kN-m/m
32
321.17
298.08
271.26
246.50
244.52

kN-m/m
32
431.33
386.21
347.01
346.18
344.53