LAMPIRAN F
(PWD 142C - Rev.2012)
JABATAN PENGAIRAN DAN SALIRAN MALAYSIA
AS COMPLETED DETAILED ABSTRACT FOR
Total Amount of Main Tender: RM
Contractor for Main Works
Class
Date of Prossession of Site
Actual Date of Completion
Original Contract Period
Extension of Time (if any)
Head Sub/Head Year
Total Prov.
RM
Prov. for Const. RM
Amount of L&A Damages (if any)
BRIEF DESCRIPTION OF BUILDINGS
BUILDING
Frame
Wall
Roof
Floor
Ceiling
Window
Standard
a
b
c
d
e
f
PRIME COST AND PROVISIONAL SUMS
ITEM
ALLOWED RM
ACTUAL RM
a
b
c
d
e
f
g
h
BREAKDOWN OF COST
1 PRELIMINARIES
2 PILING/SPECIAL FOUNDATION
Type and Size
COST
RM
Being
% of Remainder of Main Tender
Unit
Quantity
Unit Cost
a
b
c
d
e
f
Floor
3 BUILDING
a
b
c
d
e
f
g
SUBTOTAL
carried forward
* Refer to Note 6.2 (b)
Drawing No.
Area m2
Cost/m2
Vol.m3*
Cost/m3*
BREAKDOWN OF COST (CONT'D)
COST RM
SUBTOTAL brought forward
4
INTERNAL SERVICES
Plumbing Installation
b
c
d
Sanitary Appliances
Electrical Installation
Fire Protection Installation
e
f
Air Conditioning Installation
Lift & Conveyor Installation
5
a
EXTERNAL WORKS
i) Site Preparation
ii) Earthwork (I.f. =
Roads, Hardstanding,
Footpaths & Paving
Fencing & Gates
Building
Served
Ref. No.
Turfing & Soft Landscaping
(S.t. =
%)
e
f
g
Surface Drainage
Sewerage
External Water Reticulation
Appropriate Unit
i) Hectares
%)
6
VARIATION OF PRICES
7 CONTRIBUTION FEE TO LOCAL
a
AND UTILITY AUTHORITY
TNB & JBA
Telekom
8
a
b
Floor Area Served
Cost
/m2
% of
Bldg.
RM
Cost
Quantity
ii) Cu. m moved (m3)
Surface Area (m2)
Perimeter (m)
Turfed Area (m2)
Tot. length of drn. & pipes (m)
No. of occupants served
Total length of pipe (m)
ALL IN UNIT RATE
Total Floor Area m2 :
(of Total Items 1 to 9)
Cost/m2 :
Project Officer
MISCELLANEOUS
Advertisement & Documentation
Soil Investigation
Date :
Division Director
CONTINGENCIES
TOTAL (Items 1 to 9)
10
11
SUPERVISION
PROFESSIONAL FEES
a
b
Architect
Civil & Structural Engineer
c
d
Mechanical Engineer
Electrical Engineer
Quantity Surveyor
TOTAL COST OF PROJECT
Unit Cost
Date :
* Refer to Note 7.1 (b) & 8.2
NOTES ON FILLING OF AS COMPLETED ABSTRACT FORM (ACDA)
1.0
GENERAL INFORMATION
1.1
1.2
2.0
TOTAL PROVISION
2.1
3.0
Total Provision shall be the Total Provision as stated in the latest approved ATDA.
PROVISION FOR CONSTRUCTION
3.1
4.0
The information given on this Detailed Abstract is for Government use only.
No portion of the form is to be left blank. Items not applicable in any particular case shall have a dash inserted against them.
If any item is included under `BUILDING' this shall be stated in the "COST" column.
Provision for Construction shall be the Total Cost of Project as stated in the latest approved ATDA.
BRIEF DESCRIPTION OF BUILDING
4.1
The following abbreviations shall be used in completing the "Brief description of Buildings":
Al
- Aluminium
CCR
- Coloured Cement
Rendering
MFB
- Mineral Fibre Board
AB
- Acoustic Board
CHB
- Concrete Hollow
Bricks
MSW
- Metal Framed Screen Wall
Tyn
AC
- Asbestos Cement
Ff
- Fairface
OGB
- Ordinary Gypsum Board
Tz
Bk
- Common Brick
FSW
- Fairface Screen
Wall
Pqt
- Parquet
TB
BRF
- Built-up Roofing Felt
FCB
- Fibre Cement
Board
PF
- Plastered Finish
TS
CBk
- Cement Sand Brick
GMD
- Galvanised Metal
Decking
PCM
- Precast Concrete Members
TT
CR
- Cement Rendering
GWB
- Glass Wool Board
QT
- Quarry Tiles
TSW
CT
- Ceramic Tiles
HP
- Hyrib Plaster
RC
- Reinforced Concrete
VT
Con
- Concrete
LV
- Marble Slab
RGB
- Reinforcement Gypsum
Board
WCB
Co.T
- Concrete Tiles
MS
- Mosaic Tiles
St.
- Steel
WCR
Both the base material and the finish shall be given in the case of floors, walls, and flat roofs, thus:
Con./VT
RC/WCR
Both the base material or the type of suspension/framing and the finish shall be given in the case of ceilings, thus:
T/WCB
4.2
Al./WFB
The standard of the building relates to the general standard of finishes rather than to construction and shall be given as one the
three categories:
High, normal, low.
5.0
PRIME COST AND PROVISIONAL SUMS
5.1
All Prime Cost and Provisional Sums shall be listed in the spaces provided or on an attached sheet. The sums as allowed and as
expended (including variation works) shall be shown.
6.0
7.0
PILING/SPECIAL FOUNDATION
6.1
Each type and size of Piling/Special Foundation and its unit quantity and unit cost shall be stated separately.
6.2
The Unit for piling shall be in linear metres and quantity for piling shall be the tendered/driven length. The Unit for special found
be in square metres and the quantity shall be the Floor Area of the building concerned.
BUILDING
7.1
The cost for the building shall be exclusive of all services.
7.2
(a)
The Floor Area shall mean the Gross Floor Area of all enclosed spaces fulfilling the functional requirements of the buildin
measured flat on plan to the internal face of the enclosing walls.
(b)
The Volume and Cost/m3 shall be stated only for buildings for which functional requirements is determined by volume s
Stores, Godowns, Warehouses Lecture Theatres, Auditoriums and the like.
7.3
8.0
9.0
10.0
INTERNAL SERVICES
8.1
The cost for internal services shall be inclusive of Profit and Attendance and all builders work in connection therewith where app
8.2
(a)
Reference for building served shall be the same as the reference in item 3 eg 3(a), 3(b), etc. The total cost of each inte
service, its Cost/m2 of the Floor Area served and its cost in relation to the cost of the buildings served by the respective
(b)
The spaces provided in the column marked with an asterisk shall be inserted with the letter T for items included in the M
Tender, D for items which have been or will be done Departmentally and X for other items not included in the Main Ten
EXTERNAL WORKS
9.1
The total cost of each of the External Work listed and its Appropriate Unit, Quantity and Unit Cost shall be inserted in the Detaile
forms.
9.2
The spaces provided in the column marked with an asterisk shall be inserted with the letter T for items included in the Main
Tender, D for items which have been or will be done Departmentally and X for other items not included in the Main Tender.
9.3
The relevant service authority to whose system the works are connected shall be consulted before costs of Capital/Service charg
inserted in the Detailed Abstract.
VARIATION OF PRICES
10.1
11.0
The amount to be allowed for Variation of Prices shall be calculated in accordance with the contract.
SAVINGS
11.1
12.0
The Drawing Numbers to be stated shall only be those of the architectural floors plans, sections and elevations. Structural and
detailed drawing numbers need not be inserted.
Saving shall be the difference between Provsion for Construction and the Total Cost of Project.
PROFESSIONAL FEES
12.1
The amount of Professional Fees for each Consultant shall be inserted in the "Cost" column.
inserted against them.
- Timber
- Tyrolene
- In-situ Terrazo
- Timber Boarding
- Timber Strip
- Terrazzo Tiles
- Timber Framed Screen
Wall
- Vinyl Tiles
- Wood Cement Rendering
- Waterproof Cement
Rendering
eilings, thus:
d shall be given as one the following
e sums as allowed and as actually
The Unit for special foundation shall
requirements of the building
s determined by volume such as
levations. Structural and other
ction therewith where applicable.
The total cost of each internal
s served by the respective services.
for items included in the Main
t included in the Main Tender.
l be inserted in the Detailed Abstract
s included in the Main
d in the Main Tender.
sts of Capital/Service charges are