0% found this document useful (0 votes)
629 views76 pages

Daily Fit-Up Inspection Report

This document provides a daily fit up inspection report for the Rapid Package 6A LLDPE Project. It lists 7 items that were inspected, including line numbers, drawing numbers, pipe information like class and size. For each item, it provides the spool number, joint number, joint type, and remarks. The inspection was prepared and checked by quality control personnel with their names, signatures, and dates.

Uploaded by

nguyennamxm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
629 views76 pages

Daily Fit-Up Inspection Report

This document provides a daily fit up inspection report for the Rapid Package 6A LLDPE Project. It lists 7 items that were inspected, including line numbers, drawing numbers, pipe information like class and size. For each item, it provides the spool number, joint number, joint type, and remarks. The inspection was prepared and checked by quality control personnel with their names, signatures, and dates.

Uploaded by

nguyennamxm
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • Daily Fit-Up Inspection Report
  • Samsung Engineering Report
  • Daily Fit-Up Inspection Report
  • Samsung Engineering Report
  • Daily Fit-Up Inspection Report
  • Samsung Engineering Report
  • Daily Fit-Up Inspection Report
  • Samsung Engineering Report
  • Daily Fit-Up Inspection Report
  • Samsung Engineering Report
  • Daily Fit-Up Inspection Report
  • Samsung Engineering Report
  • Daily Fit-Up Inspection Report
  • Samsung Engineering Report
  • Daily Fit-Up Inspection Report
  • Samsung Engineering Report
  • Daily Fit-Up Inspection Report
  • Samsung Engineering Report
  • Daily Fit-Up Inspection Report
  • Samsung Engineering Report
  • Daily Fit-Up Inspection Report
  • Samsung Engineering Report
  • Daily Fit-Up Inspection Report
  • Samsung Engineering Report
  • Daily Fit-Up Inspection Report
  • Samsung Engineering Report
  • Daily Fit-Up Inspection Report
  • Samsung Engineering Report

DAILY FIT UP INSPECTION REPO

RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

40-OH_20820_7S10-N
1 12610 02 7S10 SP-006 903 PS-003 1-1/2
12610_P2612_ISO-3200-0201-05

40-OH_20820_7S10-N
2 12610 02 7S10 SP-006 904 PS-004 1-1/2
12610_P2612_ISO-3200-0201-05

40-OH_20820_7S10-N
3 12610 02 7S10 SP-005 905 PS-005 1-1/2
12610_P2612_ISO-3200-0201-05

40-OH_20820_7S10-N
4 12610 02 7S10 SP-005 906 PS-006 1-1/2
12610_P2612_ISO-3200-0201-05

40-OH_20820_7S10-N
5 12610 02 7S10 SP-004 907 PS-007 1-1/2
12610_P2612_ISO-3200-0201-05

40-OH_20816_7S10-N
6 12610 03 7S10 SP-007 901 PS-013 1-1/2
12610_P2612_ISO-3200-0201-07

40-OH_20817_7S10-N
7 12610 03 7S10 SP-007 901 PS-015 1-1/2
12610_P2612_ISO-3200-0201-08

40-OH_20817_7S10-N
8 12610 03 7S10 SP-006 902 PS-016 1-1/2
12610_P2612_ISO-3200-0201-08

40-OH_20817_7S10-N
9 12610 03 7S10 SP-006 903 PS-017 1-1/2
12610_P2612_ISO-3200-0201-08
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8174


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

721223
P6A-WPS-PI-PV-0002 7-Apr-18
V15200

721223
P6A-WPS-PI-PV-0002 7-Apr-18
V15200

721223
P6A-WPS-PI-PV-0002 7-Apr-18
V15200

721223
P6A-WPS-PI-PV-0002 7-Apr-18
V15200

721223
P6A-WPS-PI-PV-0002 7-Apr-18
V15200

721223
P6A-WPS-PI-PV-0002 7-Apr-18
V15200

721223
P6A-WPS-PI-PV-0002 7-Apr-18
V51200

721223
P6A-WPS-PI-PV-0002 7-Apr-18
V51200

721223
P6A-WPS-PI-PV-0002 7-Apr-18
V51200
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2111-ET-3200-00001-02
1 12110 01 3C354 SP-001 905 S2-1-01-2551 10
P006A-SCS-PIP-ISO-3200-2111-0019

P2111-ET-3200-00001-03
2 12110 01 3C354 SP-001 908 S2-1-01-2553 10
P006A-SCS-PIP-ISO-3200-2111-0020
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8175


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

1611097
P6A-WPS-PI-PV-0003 7-Apr-18
1634894V

1611097
P6A-WPS-PI-PV-0003 7-Apr-18
1634894V
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2111-HBFW-3200-10001-01
1 12110 01 9C139EQ SP-001 909 T-Post-01-5431 2
P006A-SCS-PIP-ISO-3200-2111-0036
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8176


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

HB0459
P6A-WPS-PI-PV-0002 7-Apr-18
666335
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2112-ET-3200-00002-01
1 12110 00 3C354 SP-001 907 SS1-1-01-10128 1
P006A-SCS-PIP-ISO-3200-2112-0005

P2112-ET-3200-00002-01
2 12110 00 3C354 SP-001 909 SS1-1-01-10129 1
P006A-SCS-PIP-ISO-3200-2112-0005

P2112-ET-3200-00002-02
3 12110 00 3C354 SP-001 911 SS1-1-01-10151 1
P006A-SCS-PIP-ISO-3200-2112-0006

P2112-ET-3200-00002-02
4 12110 00 3C354 SP-001 913 SS1-1-01-10130 1
P006A-SCS-PIP-ISO-3200-2112-0006

P2112-ET-3200-00113-01
5 12110 00 3C354 SP-006 909 CN1-1-01-2181 3/4
P006A-SCS-PIP-ISO-3200-2112-0008

P2112-ET-3200-00113-01
6 12110 00 3C354 SP-006 910 SS1-1-01-5301 3/4
P006A-SCS-PIP-ISO-3200-2112-0008

P2112-ET-3200-00113-01
7 12110 00 3C354 SP-004 912 SS1-1-01-10154 3/4
P006A-SCS-PIP-ISO-3200-2112-0008

P2112-ET-3200-00113-01
8 12110 00 3C354 SP-002 913 SS1-1-01-10153 3/4
P006A-SCS-PIP-ISO-3200-2112-0008

P2112-ET-3200-00113-01
9 12110 00 3C354 SP-002 914 SS1-1-01-10152 3/4
P006A-SCS-PIP-ISO-3200-2112-0008

P2112-ET-3200-00113-02
10 12110 00 3C354 SP-002 906 SS1-1-01-10155 3/4
P006A-SCS-PIP-ISO-3200-2112-0009
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8177


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

HB0456
P6A-WPS-PI-PV-0003 7-Apr-18
016070157

HB0456
P6A-WPS-PI-PV-0003 7-Apr-18
016070157

HB0456
P6A-WPS-PI-PV-0003 7-Apr-18
721223

HB0456
P6A-WPS-PI-PV-0003 7-Apr-18
721223

721223
P6A-WPS-PI-PV-0002 7-Apr-18
015110232

HB0456
P6A-WPS-PI-PV-0003 7-Apr-18
015110232

HB0456
P6A-WPS-PI-PV-0003 7-Apr-18
015110232

HB0456
P6A-WPS-PI-PV-0003 7-Apr-18
015110232

HB0456
P6A-WPS-PI-PV-0003 7-Apr-18
015110232

HB0456
P6A-WPS-PI-PV-0003 7-Apr-18
015110232
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2112-HG-3200-00070-01
1 12110 00 3C353-KS SP-003 909 SS1-1-01-10202 3/4
P006A-SCS-PIP-ISO-3200-2112-0010
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8178


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

HB0459
P6A-WPS-PI-PV-0003 7-Apr-18
016070158
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2211-CWS-3200-10011-02
1 12210 01 1C136EQ SP-003 904 SS1-1-01-8362 1-1/2
P006A-SCS-PIP-ISO-3200-2211-0054

P2211-CWS-3200-10011-02
2 12210 01 1C136EQ SP-001 909 CN2-1-01-1672 1-1/2
P006A-SCS-PIP-ISO-3200-2211-0054
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8179


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

HB0456
P6A-WPS-PI-PV-0001 7-Apr-18
ZY479

721223
P6A-WPS-PI-PV-0002 7-Apr-18
ZY479
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2211-FW-3200-00644-01
1 12210 03 1G100EQ SP-002 908 MC4-01-2421 3
P006A-SCS-PIP-ISO-3200-2211-0079

P2211-FW-3200-00644-01
2 12210 03 1G100EQ SP-002 910 MC4-01-2401 3
P006A-SCS-PIP-ISO-3200-2211-0079

P2211-FW-3200-00644-06
3 12210 00 1G100EQ SP-001 908 T-Post-01-4472 1
P006A-SCS-PIP-ISO-3200-2211-1094
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8180


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

721223
P6A-WPS-PI-PV-0002 7-Apr-18
1624325

721223
P6A-WPS-PI-PV-0002 7-Apr-18
1624325

HB0459
P6A-WPS-PI-PV-0002 7-Apr-18
989923
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2211-SL-3200-10015-02
1 12210 01 1C139EQ SP-001 915 CN2-1-01-2481 3
P006A-SCS-PIP-ISO-3200-2211-1046
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8181


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

721223
P6A-WPS-PI-PV-0002 7-Apr-18
665423
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2211-VA-3200-00044-02
1 12210 00 1C136EQ SP-002 907 SS1-1-01-6813 2
P006A-SCS-PIP-ISO-3200-2211-1129

P2211-VA-3200-10069-01
2 12210 00 1C136EQ SP-003 907 T-Post-01-8672 2
P006A-SCS-PIP-ISO-3200-2211-1132

P2211-VA-3200-10069-01
3 12210 00 1C136EQ SP-003 908 T-Post-01-8671 2
P006A-SCS-PIP-ISO-3200-2211-1132
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8182


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

HB0459
P6A-WPS-PI-PV-0001 7-Apr-18
665708

HB0459
P6A-WPS-PI-PV-0001 7-Apr-18
666335

HB0459
P6A-WPS-PI-PV-0001 7-Apr-18
666335
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2212-LNS-3200-10058-02
1 12210 02 1C108EQ SP-005 912 T-Post-01-2531 1-1/2
P006A-SCS-PIP-ISO-3200-2212-1037
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8183


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

HB0459
P6A-WPS-PI-PV-0002 7-Apr-18
254211
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2212-PL-3200-00049-02
1 12210 01 1C108EQ SP-006 904 S1-1-01-14561 1-1/2
P006A-SCS-PIP-ISO-3200-2212-1112

P2212-PL-3200-00050-01
2 12210 00 1C108EQ SP-003 910 MC7-8-01-2671 1-1/2
P006A-SCS-PIP-ISO-3200-2212-1113
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8184


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

1611097
P6A-WPS-PI-PV-0001 7-Apr-18
254211

721223
P6A-WPS-PI-PV-0002 7-Apr-18
335623
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2212-SL-3200-10217-01
1 12210 00 1C139EQ SP-004 910 T-Post-01-8302 3/4
P006A-SCS-PIP-ISO-3200-2212-1139
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8185


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

HB0459
P6A-WPS-PI-PV-0002 7-Apr-18
256421

,,
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2221-WP-3200-10008-01
1 12220 00 1G100EQ SP-001 904 VR1-A-01-201 3
P006A-SCS-PIP-ISO-3200-2221-0029
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8186


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

1624325
P6A-WPS-PI-PV-0001 7-Apr-18
1624325
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2611-CWR-3200-10003-03
1 12610 00 1C136EQ SP-002 908 SS2-1-01-3566 4
P006A-SCS-PIP-ISO-3200-2611-0003
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8187


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

HB0456
P6A-WPS-PI-PV-0001 7-Apr-18
1634043
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2611-CWS-3200-10003-03
1 12610 00 1C136EQ SP-002 907 SS2-1-01-8567 4
P006A-SCS-PIP-ISO-3200-2611-0007

P2611-CWS-3200-10003-03
2 12610 00 1C136EQ SP-002 908 SS2-1-01-3565 4
P006A-SCS-PIP-ISO-3200-2611-0007
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8188


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

HB0459
P6A-WPS-PI-PV-0001 7-Apr-18
1634043

HB0459
P6A-WPS-PI-PV-0001 7-Apr-18
1634043
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2611-DMW-3200-10001-01
1 12610 02 1S105EQ SP-001 907 S1-1-01-19585 4
P006A-SCS-PIP-ISO-3200-2611-0009

P2611-DMW-3200-10001-01
2 12610 02 1S105EQ SP-001 908 S1-1-01-19613 4
P006A-SCS-PIP-ISO-3200-2611-0009

P2611-DMW-3200-10001-01
3 12610 02 1S105EQ SP-001 909 S1-1-01-19612 4
P006A-SCS-PIP-ISO-3200-2611-0009

P2611-DMW-3200-10001-01
4 12610 02 1S105EQ SP-002 910 S1-1-01-19611 4
P006A-SCS-PIP-ISO-3200-2611-0009

P2611-DMW-3200-10001-01
5 12610 02 1S105EQ SP-003 911 S1-1-01-19590 4
P006A-SCS-PIP-ISO-3200-2611-0009

P2611-DMW-3200-10005-01
6 12610 02 1S105EQ SP-001 907 S1-1-01-19614 3
P006A-SCS-PIP-ISO-3200-2611-0318
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8189


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

AF312316
P6A-WPS-PI-PV-0007 7-Apr-18
11K374

AF312316
P6A-WPS-PI-PV-0007 7-Apr-18
11K374

AF312316
P6A-WPS-PI-PV-0007 7-Apr-18
11K374

AF312316
P6A-WPS-PI-PV-0007 7-Apr-18
11K374

AF312316
P6A-WPS-PI-PV-0007 7-Apr-18
11K374

AF312316
P6A-WPS-PI-PV-0009 7-Apr-18
11L003
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2611-PA-3200-10175-01
1 12610 00 1C108EQ SP-003 911 SS1-1-01-3880 2
P006A-SCS-PIP-ISO-3200-2611-0025

P2611-PA-3200-10175-01
2 12610 00 1C108EQ SP-003 912 SS1-1-01-3884 2
P006A-SCS-PIP-ISO-3200-2611-0025
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8190


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

HB0456
P6A-WPS-PI-PV-0001 7-Apr-18
861697

HB0456
P6A-WPS-PI-PV-0001 7-Apr-18
861697
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2611-PG-3200-00109-04
1 12610 02 1C108EQ SP-002 905 SS2-1-01-7901 6
P006A-SCS-PIP-ISO-3200-2611-0787
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8191


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

HB0459
P6A-WPS-PI-PV-0001 7-Apr-18
1625928
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1
DAILY FIT UP INSPECTION REPO
RAPID PACKAGE 6A LLDPE PROJECT

INFORMATION
INSPECTION DATE 10-Apr-18
ITP NO. RAPID-P006A-SCS-QAC-ITP-3200-0007 REV. 2

No Area Line No / Drawing No Rev. No Pipe Class Spool No Joint No Type Size(Inch)

P2612-SL-3200-10171-01
1 12610 01 1C139EQ SP-001 907 S1-1-01-17234 3/4
P006A-SCS-PIP-ISO-3200-2612-0222

P2612-SL-3200-10171-01
2 12610 01 1C139EQ SP-001 908 S1-1-01-17233 3/4
P006A-SCS-PIP-ISO-3200-2612-0222

P2612-SL-3200-10171-01
3 12610 01 1C139EQ SP-001 909 S1-1-01-17232 3/4
P006A-SCS-PIP-ISO-3200-2612-0222

P2612-SL-3200-10171-01
4 12610 01 1C139EQ SP-001 910 S1-1-01-17231 3/4
P006A-SCS-PIP-ISO-3200-2612-0222
REMARKS:

PREPARED BY CHECKED BY
(Subcontractor QA/QC) (Contractor QA/QC)

Name/Signature/Date Name/Signature/Date
P6A-WD-FORM-014 REV. 1
NSPECTION REPORT
KAGE 6A LLDPE PROJECT

REPORT NO. P6A-FIT-PI-PV-8192


RFI NO. P6A-RFI-PI-PV-3410

Heat No(Mat'l) WPS No Fit-Up Date Remark

1611097
P6A-WPS-PI-PV-0001 7-Apr-18
1623080

1611097
P6A-WPS-PI-PV-0001 7-Apr-18
1623080

1611097
P6A-WPS-PI-PV-0001 7-Apr-18
1623080

1611097
P6A-WPS-PI-PV-0001 7-Apr-18
1623080
CHECKED BY ACKNOWLEDGED BY
Contractor QA/QC) (Owner)

Name/Signature/Date Name/Signature/Date
PAGE 1 OF 1