Nokia
Project Name LTE
LTE Solution LTE Combiner
Site Name DUMYAT DESR ENT_0744DE
Site ID 0744DE
Site area Dumyat
City Dumyat
0744DE
Nokia
Site Name DUMYAT DESR ENT_0744DE
Site Code 0744DE
2G Site Type Feeder
3G Site Type RRH and Feeder
Site GF or RT GF
Key # 3
visit date Thursday, May 25, 2017
Sub-contractor INNOVATECH GROUP
Eng/ name Mohamed Abd Elrasol
Mobile 1223001442
ENT_0744DE
DE
der
Feeder
ay 25, 2017
CH GROUP
bd Elrasol
01442
log file singed
Site Data photo
3G NODE-B
Front View R Side View
2G BTS 1
Front View R Side View
2G BTS 2 (if found)
Front View R Side View
2G BTS 3 (if found)
Front View R Side View
Tray photos
1 2
5 6
Shelter Wall photos(put outdoor photos if site outdoor)
1 2
Panorama photos
Upper
1 2
Lower
1 2
Rectifier
no
Inside Is there free [Link]
3G DC-BOX (if found)
C.B inside Bar Photo
Roxtec
Roxtec-1 Roxtec-2
Mobinil LINK
Link type photo No. of links available
L Side View Panorama with jumbers/tray
L Side View Panorama with jumbers/tray
L Side View Panorama with jumbers/tray
L Side View Panorama with jumbers/tray
3 4
7 8
ite outdoor)
3 4
3 4
3 4
yes
Is there are free places to
BAR photo
install new [Link]
C.B connected to (inside Rectifier Panorama
Panorama Free feeders
Krones Ethernet ports/ for Dual stack
h jumbers/tray SYS-Power Sockets SYS-Optical interface
h jumbers/tray SYS-Power Sockets SYS-Optical interface
h jumbers/tray SYS-Power Sockets SYS-Optical interface
h jumbers/tray SYS-Power Sockets SYS-Optical interface
5
5
ree places to
# rectifier modules Panorama/ rectifer
ew [Link]
rama
Free feeders if found
for Dual stack Panorama
YS-Optical interfaces
YS-Optical interfaces
YS-Optical interfaces
YS-Optical interfaces
6
6
orama/ rectifer type
7 8
7 8
9 10
11 12
2
Transmission Information
Transmision Type
# of links in sites
M.W lDU type
# Crones/connected
# Ethernet ports for DS (busy)
# Ethernet ports for DS (Free)
Is there is SFP converter on DS ports(yes /no)
# free E1 ports on LINK DDF
Remarks
smission Information
NEC
1
I PASO 200
13 krones/4 connected
1 DS port no ? 2
3 DS port no ? 1,3,4
NO DS port no ? 5,6
11
Antenna System Information:
Desciption Sectors
Tower type Tower
Height of Tower/Pole/Mast
Antenna1
Height of Antenna from ground (m) 36m
Antenna Model N/A
Air Combiner (yes/no) No
Cell has Air Combiner No
Quantity of Antenna/cell 1
Antenna Azimuth (°) 160
Antenna Height 36m
Antenna total# ports 4
12 Port antenna data (fill in for cells have 12-p
free ports on antenna/band
Quantity of Feeder connected
Remarks
probably Sector 2 & Sector 3 in the sam
tors
Tower shared with Etisalat and Vodafone
80m
Antenna 2 Antenna 3 Antenna 4 Antenna 5
36m 37m 36m
N/A Huawei N/A
No No No
No No No
1 1 1
245 250 340
36m 37m 36m
4 6 4
n for cells have 12-port antenna)
ector 3 in the same Azimuth
Existing Generator / Solar power system
■Commercial
Power System Type
Remark:
Existing AC Power Panel
Main Power supply: Commercial
AC Power Type ■380V
Capacity 1: 63A 4Pole
Capacity 2: 32A
Capacity3: 10A
Circuit breakers capacities Capacity4 : 6A
Capacity5 : 25A
Capacity6 :
capacity7:
Rating (Amp):
AC power meter rating AC Cable from AC power meter to AC
distribution box
Remark:
Existing DC Power Equipment Information
Delta
DC Equipment Model (Rectifier
Type)
Rectifiers Circuit Breakers
1
Rectifiers Circuit Breakers
SITE DC Box (yes/no) NO
Capacity 1:
Existing DC Box (1) Capacity 2:
Circuit Breakers Capacity 3: A
Capacity 4: A
Dc-BOX has free Holes ? No
(yes/no)
Is there is 3G DC Box NO
Remarks : We need 1 CB 63A and there is a free pl
ommercial
■380V
Total Quantity: 2 In Use: 2
Total Quantity: 2 In Use: 2
Total Quantity: 6 In Use: 6
Total Quantity: 1 In Use: 1
Total Quantity: 1 In Use: 1
Total Quantity: In Use:
Total Quantity: In Use:
cable length (m):
No. of Modules
Capacity 1: 125A Total Quantity: 2
Capacity 2: 80A Total Quantity:1
Capacity 3: 63A Total Quantity: 1
Capacity 4: 6A Total Quantity: 6
Capacity 5: 25A Total Quantity: 1
Capacity 6: Total Quantity:
Capacity 7: Total Quantity:
Capacity 8: Total Quantity:
Capacity 2: A Total Quantity:
Capacity 1: A Total Quantity:
Capacity 2: A Total Quantity:
Total Quantity: In Use:
Total Quantity: In Use:
Total Quantity: In Use:
Total Quantity: In Use:
Quantity : 1
Connected to Rectifier by C.B
Capacity:
rate?
is a free place to install it
54.7V & 39.2A
Amp. Reading No. of connected Batteries
In Use: 2 Capacity : Total Quantity:
In Use: 1 Capacity : Total Quantity:
In Use: 1 Capacity : Total Quantity:
In Use: 0
In Use: 0
In Use:
In Use:
In Use:
In Use:
In Use: Free:
In Use: Free:
Capacity 1: A Total Quantity:
Existing DC Box Capacity 2: A Total Quantity:
(2) Circuit
Breakers
Capacity 1 Total Quantity:
Total Quantity of
C.B in 3G-DC- Capacity 2: Total Quantity:
BOX Capacity 3: A Total Quantity:
8 (SBS)12V, 170 Ah
Batteries
Type
In Use: In Use: Free:
In Use: In Use: Free:
In Use: In Use: Free:
In Use: Free:
In Use: Free:
In Use:
In Use:
In Use:
In Use:
In Use:
Below Antennas da
Tray outdoor
Part 1 Part 2
Tower ( Panorama )
Lower Middle
Tower (1) Tower (2)
3G RF Modules (if RRH)
RF-1 RF-2(U900)
2G RF Modules (if RRH)
RF-1 RF-2
RF-5 RF-6
( Sector 1 ) and Jumpers-Must be provided
Antenna No. of ports(4) Jumpers on Antenna
( Sector 2 ) and Jumpers-Must be provided
Antenna No. of ports (4) Jumpers on Antenna
( Sector 3 ) and Jumpers-Must be provided
Antenna No. of ports(6) Jumpers on Antenna
( Sector 4 ) and Jumpers-Must be provided
Antenna No. of ports (4) Jumpers on Antenna
( Sector 5 ) and Jumpers-Must be provided
Antenna No. of ports (12/6) Jumpers on Antenna
Antennas data must be provided for any solution
Part 3 Panorama
Upper Panorama
Tower (3)
RF-3 RF-4
RF-3 RF-4
RF-7 RF-8
Azimuth
Antenna type
Antenna # ports
Bi-beam antenna
(yes/no)
Panorama
Azimuth
Antenna type
Antenna # ports
Bi-beam antenna
(yes/no)
Panorama
Azimuth
Antenna type
Antenna # ports
Bi-beam antenna
(yes/no)
Panorama
Azimuth
Antenna type
Antenna # ports
Bi-beam antenna
(yes/no)
Panorama
Azimuth
Antenna type
Antenna # ports
Bi-beam antenna
(yes/no)
Panorama
solution
ma
ma
160
N/A
4
No
245
N/A
4
No
255
Huawei
6
No
340
N/A
4
No
Proposal -1
1-Put LTE cabinet here above 3G
cabinet
2-Swap S1,S2 and S4 (4 port
antennas ) to (6 port antennas).
3-we need civil team to install 4 pair
of feeder for LTE
Indoor Preparation Needed:
Outdoor Preparation Needed:
RRH Preparation Needed:
RRH Preparation Needed:
RET Preparation Needed:
Proposal -1 Proposal -2
1-Put LTE cabinet here over 3G cabinet
ve 3G
2-put RF feeder for S1, S2, S4 note: we
port need to combine between DCS and
ennas). LTE
nstall 4 pair 3-we need civil team to install side
arm on Leg 3 above S3 antenna to put
RF module for S3
we neeed civil team to ins
2 we need baske
r Preparation Needed: 3 we need 20m DC po
4 we need 70m power
5
1 No Prep
2
or Preparation Needed:
3
4
1 we need side
2
H Preparation Needed:
H Preparation Needed: 3
4
5
T Preparation Needed: 1
No Prepa
Proposal -3
1-Put LTE cabinet here over 3G cabinet
2-Remove DCS sectors and put LTE
sectors instead of it at the same
combiners
3-we need civil team to install 1pair
of feeder for the sector 3
we neeed civil team to install Roxtec for Proposal 1 and 3
we need basket tray for any proposal
we need 20m DC power cablefor any proposal
we need 70m power cable for RRH RF module
No Preparation needed
we need side arm for proposal 2
No Preparation needed
Proposal -1
Put LTE cabinet here above 3G
cabinet
Photo of the proposal location
Proposal -2
put LTE Cabinet here as shown
Proposal -3
Put LTE cabinet here above 2G
cabinet
Recommended place for System Module
1st proposal
Put LTE cabinet above 3G cabinet
Recommended place for Side Arm
S3 on leg 3
S4 on leg 3
For Prposal 2 : we need c
install side arm on Leg 3 a
antenna to put RF modul
Shown
Recommended place for Side Arm:
we need side arm as shown on leg 3 above S3 antenna for Proposal 2
2nd Proposal 3rd Proposal
Put LTE cabinet here as shown
S2 on leg 4
S1 on leg 1
For Prposal 2 : we need civil team to
install side arm on Leg 3 above S3
antenna to put RF module for S3 as
Shown
3rd Proposal
S2 on leg 4
S1 on leg 1
2G BTS
2G BTS 2
3G BTS
LTE solution check list-very important to fill in carefully (the below
data is for example)
Item description Master BCF 3G NODE-B
Relocation needed no
1 # sectors/2G and 3G 4
2 BCF ID 441
3 BTS ID 35
4 # RFs 3 3
5 #GSM sectors 3
6 #DCS sectors 3 1
7 # 3G sectors 4
8 RF types 2 FXDA & 1 FXEA 2 FRGT & 1 FXDA
9 SYS-type ESMC FSMD
10 Conn-type/ GSM sectors C/C/C
11 Conn-type/ DCS sectors A/A/A
12 Conn-type/ 3G sectors A/A/A/A
13 # TRXs/sector(GSM) 5/4/3
14 TRXs power (GSM) watt 12W/15W/20W
15 # TRXs/sector(DCS) 1/1/1
16 TRXs power (DCS) watt 12W/15W/20W
17 3G 2nd carrier exist NO
18 # 3G Cells 4
19 3G carrier pow-watt 40W
20 #GSM TRXs/BCF
GSM TRXs ID exceed 18/
21
BCF
Site Info
Shelter/GSM
Site Name Site Code # of AC's
Room/Outdoor
DUMYAT DESR ENT_0744DE 0744DE Shelter N/A
Power Source Battery
AC's Site TE Generator # Of
Capacity Nodality Batteries
Secured Unsecured Main Standby
N/A BTS secured ### ### ------- 8
Battery Rectifier
# of # of
Batteries Type Brand/V/Ah Rectifier Rectifier Brand Modules/ DC Load
Cabinets rectifier
(SBS)12v/170 Ah 1 Delta 6 54.7V
Transmission 2G & 3G
Mind (Ericsson/NEC)
Vendor # of BTS's # of RF Modules
No. Type (CN,6Por 20P/ IPASO)
1 NEC IPASO 200 Nokia 2 6 2
G & 3G
Add RF Modules