This document provides the design of the foundation for a lighting mast (LM) in a 400/220 kV GIS switchyard. It includes the foundation sketch, support reactions from the tower LM under normal wind conditions, load calculations for the pile cap, checking the pile capacity and designing the pile cap. The maximum compressive and tensile loads per leg of the tower LM under normal wind conditions are also given.

Uploaded by

Amarjit Kulkarni
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
436 views43 pages

2 2.F2

This document provides the design of the foundation for a lighting mast (LM) in a 400/220 kV GIS switchyard. It includes the foundation sketch, support reactions from the tower LM under normal wind conditions, load calculations for the pile cap, checking the pile capacity and designing the pile cap. The maximum compressive and tensile loads per leg of the tower LM under normal wind conditions are also given.

Uploaded by

Amarjit Kulkarni
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

This document is the property of Larsen & Toubro Limited, ECC Division - EDRC and must not be passed

on to any third person or firm not authorised by us, nor be copied/made use of in full or part by such person or firm without

4-Feb-11 A Issued For Approval STA AB/DA GASM


DATE REV. NO. DESCRIPTION Designed Checked Approved
REVISIONS

LARSEN & TOUBRO LIMITED


ECC Division - EDRC

CLIENT : CONSULTANT :

M/s NLC Tamil Nadu Power Ltd MECON LIMITED, BANGALORE


our prior permission writing

PROJECT :
2 X 500 MW Tuticorin Thermal Power Project
SUPPLIER / CONTRACTOR:
Not applicable
JOB No. O10038-C-SY
TOTAL NO. OF PAGES TITLE :
NAME SIGN DATE 400/220 kV GIS SWITCHYARD
DSGN STA 4-Feb-11
CHKD AB/DA 4-Feb-11 Design of Foundation for Lighting Mast -LM
APPD GASM 4-Feb-11
CODE REV.
DOC. No. O 1 0 0 3 8 - C - I S - S Y - D C - 0 0 5 3
A
RELEASED FOR PRELIMINARY TENDER INFORMATION P APPROVAL CONSTRUCTION
LARSEN & TOUBRO LIMITED
ECC Division - EDRC

PROJECT: DOCUMENT NO DATE


2 X 500 MW Tuticorin Thermal Power Project O10038-C-IS-SY-DC-0053 4-Feb-11

DESIGNED CHECKED SHEET


Design of Foundation for Lighting Mast -LM
TITLE: STA AB/DA OF

CONTENTS

1 Foundation sketch for Tower- LM

2 Support reactions from Tower LM

3 Load calculation for Pile Cap

4 Pile Capacity Check & Pile Cap Design

5 Pedestal Design
Tower - LM
Maximum Loads from STAAD- Support reactions at PL
Moment-X Moment-Y Moment-Z
Node L/C Force-X kg Force-Y kg Force-Z kg kg-m kg-m kg-m
Normal Condition
1 101 -818 -14090.74 -1713.82 0 0 0
102 -2422.65 -27005.03 -2254.24 0 0 0
2 101 818.7 -14090.74 -1713.82 0 0 0
102 -1040.37 4326.24 -582.93 0 0 0
3 101 -1332.19 22677.65 -2154.38 0 0 0
102 -2695.11 35526.37 -2863.53 0 0 0
4 101 1332.19 22677.65 -2154.38 0 0 0
102 -419.34 4326.24 -876.76 0 0 0

1332.19 35526.37 -582.93


-2695.11 -27005.03 -2863.53
Foundation Loads at PL from STAAD output
Tower main leg C/C at P.L. : Z-dir. = 4.1138
Tower main leg C/C at P.L. : X-dir. = 4.1138
Sl. Description Normal
no. Wind in Wind in
z-dir. 45 deg z-dir.
LC : 101 LC : 102

1 Horizontal shear : z-direction kg 7736.41 6577.47

2 Horizontal shear : x-direction kg 0.00 6577.47

3 Longitudinal moment : z-dir. kg 151265.14 128627.08


z-dir. loads * resp. ht
4 Transverse moment : x-dir. kg 0.00 128627.08
x-dir. loads * resp. ht
5 Vertical load kg 17173.83 17173.83

Compressive Load per leg kg = 22679 35561


Tensile Load per leg kg = 14092 26974
Shear in X-dir per leg kg = 0 1644.3675
Shear in Z-dir per leg kg = 1934.1025 1644.3675
Resultant Shear per leg kg = 1934 2325

Maximum Loads from Tower Support reactions From STAAD


Extraction of Maximum Loads at PL

Sl. Description Normal Normal


no. Wind in Wind in Wind in Wind in
z-dir. 45 deg z-dir. z-dir. 45 deg z-dir.
LC 101 LC 102

Max. Compressive Load per leg kg = 22679 35561 22678 35526


Max. Tensile Load per leg kg = 14092 26974 14091 27005
Shear in X-dir per leg kg = 0 1644 1332 2695
Shear in Z-dir per leg kg = 1934 1644 2154 2864
Resultant Shear per leg kg = 1934 2325 2533 3932
LARSEN & TOUBRO LIMITED
ECC Division - EDRC

PROJECT: DOCUMENT NO DATE


2 X 500 MW Tuticorin Thermal Power Project
O10038-C-IS-SY-DC-0053 4-Feb-11
DESIGNED CHECKED SHEET
TITLE: Design of Foundation for Lighting Mast -LM STA AB/DA

A Pile Stiffness Calculation:


Pile Concrete Grade fck = 25 N/mm2
Modulus of elasticity of concrete E = 5000 fck
= 25000 N/mm2
Dia of Pile = 550 mm
Area of Pile A = 237583 mm2
Pile Length (Below Cut off level) L = 6 m (Approx.)

Pile Stiffness = EA/L


= 25000 x 237583
6000

= 989929 N/mm

= ### kg/m

B LOAD CALCULATION

Dry Unit weight of Concrete = 2500 kg/m3

Submerged Unit weight of Concrete = 1500 kg/m3

Dry Unit weight of Soil = 1800 kg/m3

Submerged Unit weight of Soil = 1000 kg/m3

FGL 0.855

1 SUBMERGED CONDITION
1.495 2.595
Size of Base plate = 0.35 x 0.35 x 0.025 m
Size of pedestal = 0.6 x 0.6 x 2.35 m
Size of Pile Cap = 2.5 x 0.9 x 1.1 m 1.1
Size of Tie Beam = 0.45 x 0.45 m

Height of Plinth above FGL = 0.855 m


Depth of Pedestal below FGL = 1.495 m
1.65 2.5

Self weight of Pedestal = (0.6x0.6x0.855x2500) + (0.6x0.6x1.495x1500)

= 1577 kg

0.9
LARSEN & TOUBRO LIMITED
ECC Division - EDRC

PROJECT: DOCUMENT NO DATE


2 X 500 MW Tuticorin Thermal Power Project
O10038-C-IS-SY-DC-0053 4-Feb-11
DESIGNED CHECKED SHEET
TITLE: Design of Foundation for Lighting Mast -LM STA AB/DA

Self weight of Pile cap = (2.5x0.9x1.1x1500)


= 3713 kg

Weight of Soil on Pile cap = {(2.5x0.9) -(0.6x0.6)} x {(1.495x1000)}


= 2826 kg

Total load = 8116 kg as Node load

Self weight of Beam + = (0.45x0.45x 1500) ) + (0.45x1.495x1000)


Weight of Soil on Beam = 976.50 kg/m

2 DRY CONDITION

Self weight of Pedestal = (0.6x0.6x0.855x2500) + (0.6x0.6x1.495x2500)


= 2115 kg

Selg weight of Pile cap = (2.5x0.9x1.1x2500)


= 6188 kg

Weight of Soil on Pile cap = {(2.5x0.9) -(0.6x0.6)} x {(1.495x1800)}


= 5086 kg

Total load = 13389 kg as Node load

Self weight of Beam + = (0.45x0.45x 2500) ) + (0.45x1.495x1800)


Weight of Soil on Beam = 1717.2 kg/m
2 X 500 MW Tuticorin Thermal Power Project
ANALYSIS AND DESIGN OF FOUNDATION FOR LIGHTING MAST 'LM'

Data: Case 1: Wind in Z-direction (Check for Wet Condition)

1 Safe Bearing Capacity of the Pile (550 f, Bored Cast in - situ), in Compression = 70 T
Safe Bearing Capacity of the Pile (550 f, Bored Cast in - situ), in Tension = 20 T
Allowable Shear at Pile cut off level 3.25 T

2 Diameter of the Pile, Dp : 550 mm

3 Dry Unit Weight of Soil, gs : 1800 Kg / m3

Submerged Unit Weight of Soil, gs (for Design purpose) 1000 Kg / m4

Dry Unit Weight of Concrete, gc 2500 Kg / m2

Submerged Unit Weight of Concrete, gc (for Design purpose) : 1500 Kg / m3

4 Grade of Concrete : M 35

5 Grade of Reinforcing Steel : Fe 500

6 Base Width of Tower (B / B) : 4.20 m x 4.20


m
7 Height of Top of Pedestal above GL, htp : 0.855 m

8 Size of the Angle provided : L 150 x 150 x 16


CG of this angle : 4.31 cm

9 \Center to Center Dist. Betn. Legs, Cd : 4113.8 mm

Center to Center Dist. Betn. Legs in transverse direction, Cdz : 4113.8 mm

10 Depth of bottom of Pile Cap below GL : 2.670 m

11 F.O.S. for Normal Condition : 1.500


Case 1: Wind in Z-direction

12 Foundation Forces: Load Case 101

Note:The Foundation Forces as computed by STAAD are given in the Appendix.

Compression: : 22.678 T

Tension: : 14.091 T

Fx: : 1.332 T

Fz: : 2.154 T
(i) Calculation of No. of Piles required:

1 Length of the Pile Cap, Lr : 2.500 m

2 Breadth of Pile Cap, Br : 0.900 m

3 Thickness of Pile Cap, tr : 1.10 m

4 Top Level of Pile Cap wrt GL, Df = ( 2.67-1.1 ) : 1.570 m

5 \Thickness of Soil, ts = Df : 1.570 m

6 Length of the Pedestal, Lp : 0.60 m

7 Breadth of Pedestal, Bp : 0.60 m

8 Height of Pedstal, tp = (Df +htp) = ( 1.57 + 0.855 ) : 2.425 m

9 Spacing of Piles considered, Sp : 1.650 m

(Minimum spacing = 3 x d = 1.65m)

10 Length of Tie Beam in X- dir = 4.1138 - 2.5 : 1.6138 m

Length of Tie Beam in Z- dir = 4.1138 - 0.9 3.2138 m

11 Breadth of Tie Beam : 0.45 m

12 Thickness of Tie Beam : 0.45 m


a. Vertical Loads (Compressive)
(i) Weight of Pile Cap = Lr x Br x tr x gc = 2.5 x 0.9 x 1.1 x 1500 / 1000 : 3.71 T

(ii) Weight of Soil = = ( 2.5 x 0.9 - 0.6 x 0.6 ) x 1.57 x 1000 / 1000 : 2.97 T
(Lr x Br - Lp x Bp) x ts x gs

(iii) Weight of Pedestal = (0.6 x 0.6 x 1.57 x 1500 / 1000 ) + : 1.62 T


(0.6 x 0.6 x 0.855 x 2500 /1000 )
(Lp x Bp x tp x gc)

(iv) Vertical Load from the Tower Leg (Compn) : 22.68 T

Total Vertical Load (compression), Pc 31.00 T

b. Vertical Loads (Tensile)

(i) Weight of Pile Cap : 3.71 T

(ii) Weight of Soil = : 2.97 T

(iii) Weight of Pedestal : 1.62 T

(iv) Vertical Load from the Tower Leg (Tens) : -14.09 T

Total Vertical Load (Tension), Pt -5.79 T

Cosnider 2 Nos of Piles per pile cap i.e. for each Leg (n)

Moment Calculation at the Bottom of the Foundation:

Fx : 1.332 T

Fz : 2.154 T

Lever arm, La = 1.57 + 1.1 + 0.855-0.075 : 3.450 m

(Df +tr + htp)


Moment Mz due to Fx (X- Dirn. Moment) (=Fx * La) = 1.33219 x 3.45 : 4.596 Tm

Moment Mx due to Fz, (Z - Drin. Moment )Mx = (Fz x La) = 2.15438 x 3.45 : 7.433 Tm

Maximum Compression / Tension in the Piles:

Max. Comp. in Pile: P = Mx / Sp + Pc / n = (7.433 / 1.65) + (31 / 2) : 20.00 T < 70 T O.K.

Max. Tension Pile: P = Mx / Sp + Pt / n = (7.433/1.65) + (5.79/ 2) : 7.40 T < 20 T O.K.

Shear Check at top of pedestal level


Length of Fixcity of pile (Lf)
(As per Approved Doc No. O10038-C-IS-SY-DC-0141) : 6.25 m

Allowable shear at top of pedestal per pile = (3.25 x 6.25 )/ (6.25 + 3.525 ) : 2.08 T

Actual Shear per pile ( Z shear per pedestal / No. of pile) = 2.15438/ 2 : 1.08 T < 2.08 T O.K.

ii) Design of Pile Cap:

a. Bending Moment at the face of the Pedestal (due to Pile Reaction): =20 x (1.65 - 0.6) / 2 10.500 Tm

b. Weight of Pile cap on one side of pedestal =( (2.5- 0.6) / 2 ) x 0.9 x 1.1 x 1500 1.410 T

Distance from CG of pile cap on one side to face of pedestal = ( (2.5- 0.6) / 2 ) / 2 0.475 m

Bending Moment at the face of the Pedestal (due toWt of Pile cap): = 1.41 x 0.475 0.670 Tm

c. Bending Moment at the face of the Pedestal (due to Soil Wt.): 0.638 Tm
\ Net BM = =10.5 - 0.67 - 0.638 9.192 Tm
Provide overall thickness of 1100 mm
Clear cover to reinforcement = 50 mm
Effective Depth, d = = 1040 mm
Mu 9.192 x 1.5 x 9.807 x 10^ 6
= = 0.139 N / mm2
bd 2
900 x 1040^2
From SP 16, pt = 0.032 %
Minimum percentage of steel = 0.2 %
\ Ast reqd = 1872.00 mm2
a. Bottom Reinforcement
Provide 20 Tor @ 150 mm c/c Main Reinf. at bottom
Ast provided = 1885 mm2 > 1872.000 mm2
Hence Safe
Percentage of steel provided = 0.201 %
Provide 16 Tor @ 150 mm c/c distribution Reinf. at bottom
b. Top Reinforcement
Provide Minimum reinforcement of 0.12 %
Ast reqd = 1123.20 mm2
Provide 16 Tor @ 150 mm c/c Main Reinf. at Top
Ast provided = 1207 mm2 > 1123.200 mm2
Hence Safe
Provide 16 Tor @ 150 mm c/c distribution Reinf. at Top
c. Horizontal Reinforcement

Ast required (20% of max Ast provided) = 20 /100 * 1885 = 377.0 mm2
Provide 12 Tor @ 200 mm c/c Side Face Reinforcement
Ast provided = 509 mm2 > 377.0 mm2
Hence Safe

CHECK FOR ONE WAY SHEAR - Cl - 34.2.4.1a - IS 456-2000)


One way shear to be checked at distance d/2 from face of the column.

Effective depth of the footing d = 1040 mm


a i) Distance from centre of column to centre of pile = 825 mm
ii) Column size bc = 600 mm
Dc = 600 mm
Distance from centre of column to inner Edge of pile = 550 mm
Sum of effective depth 'd/2' and 0.5 times column size = 820 <
Shear check is required to be done in line with Cl 34.2 .4.2, IS 456-2000

Factored Shear=1.5*W=1.5*Max. Pile load x No. of Piles per side= = 1.5 x 20 x 1 = 300 kN

% of Shear developed = = ( 820 - 550-550 ) / 550 = 50.91

% of Shear = 50.91 %

Factored Shear @ 820mm from column centre = 0.51 x 300 = 152.73 kN

Nominal Shear Stress (ζv=Vu/bd) = 0.163 N/sqmm

% of Reinforcement steel provided = 0.201 %

Design Shear Strength of Concrete (Tc) as per Table - 19, IS:456 for concrete Grade M35 = 0.331 N/sqmm

Hence Safe

CHECK FOR PUNCHING SHEAR ( 2 - WAY SHEAR) - CL - 31.6.2 - IS 456 -2000


Total compressive load on pedestal (from Tower + wt. of pedestal) = 226.78 + 16.2

= 242.95 kN
Perimeter length [ 2 x (Column size + d/2 + d/2) on one side] 1800 mm
Shear area = Perimeter x depth = 1.87 m²
Nominal shear stress, ζv = 1.5 X Vu / shear area = 0.195 N/mm²

> ζv No Shear
1.479
Reinforcement is
Permissible shear stress, k.ζc ( 0.25 x sqrt(fck) ) = required

Maximum Shear stress allowed = 1.5 * ζc for the footing (cl.[Link]) = 2.219 > ζv Hence safe
PRELIMINARY DESIGN FOR APPROVAL 04.08.2015 CPK AGB NVP
DESCRIPTION DATE PPD BY CHK BY APD BY
TITLE 400 Kv gis - Layout &RC details of Pile cap PC2
DRAWING NO. B544-C-IS-SY-NR-0034
ANALYSIS AND DESIGN OF FOUNDATION

Data:

1 Safe Bearing Capacity of the Pile (500 f, Bored Cast in - situ), in Compression = 70 T
Safe Bearing Capacity of the Pile (500 f, Bored Cast in - situ), in Tension = 50 T
Allowable Shear at Pile cut off level 22 T

2 Diameter of the Pile, Dp : 500 mm

3 Dry Unit Weight of Soil, gs : 1800 Kg / m3


Submerged Unit Weight of Soil, gs (for Design purpose) 1000 Kg / m4
Dry Unit Weight of Concrete, gc 2500 Kg / m2
Submerged Unit Weight of Concrete, gc (for Design purpose) : 1500 Kg / m3

4 Grade of Concrete : M 30

5 Grade of Reinforcing Steel : Fe 415

9 Spacing of Piles considered, Sp 1.500

(Minimum spacing = 3 x d = 1.65m)

10 Depth of bottom of Pile Cap below GL : 3.300 m

11 F.O.S. for Normal Condition : 1.500

12 Width of column 0.400 m

13 Length of column 0.800 m

1 Length of the Pile Cap, Lr : 3m

2 Breadth of Pile Cap, Br : 1m

3 Thickness of Pile Cap, tr : 1.3 m

4 Top Level of Pile Cap wrt GL, Df = ( 3.3-1.3 ) : 2m

5 \Thickness of Soil, ts = Df : 2m
a. Vertical Loads (Compressive)
(i) Weight of Pile Cap = Lr x Br x tr x gc = 3 x 1 x 1.3 x 2500 / 1000 : 9.75 T

(ii) Weight of Soil = : 5.36 T


(Lr x Br - Lp x Bp) x ts x gs

(iv) Vertical Load (Compn) : 68.30 T

Fx 0.71 T

Fz 0.60 T

Mx 0.41 Tm

Mz -0.05 Tm

Total Vertical Load (compression), Pc 83.00 T

Cosnider 2 Nos of Piles per pile cap i.e. for each Leg (n)

Moment Calculation at the Bottom of the Foundation:

Lever arm 1.300 m

Moment Mz due to Fx (X- Dirn. Moment) (=Fx * La) : 0.923 Tm

Moment Mx due to Fz, (Z - Drin. Moment )Mx = (Fz x La) : 0.780 Tm


PRELIMINARY DESIGN FOR APPROVAL 04.08.2015 CPK AGB NVP

DESCRIPTION DATE PPD BY CHK BY APD BY

TITLE 400 Kv gis - Layout &RC details of Pile cap PC2

DRAWING NO. B544-C-IS-SY-NR-0034

Final moment Mz : 0.873 Tm

Final moment Mx : 1.190 Tm

Maximum Compression / Tension in the Piles:

Max. Comp. in Pile: P = Mx / Sp + Pc / n : 42.29 T < 70 T O.K.

Shear Check at top of pedestal level


Length of Fixcity of pile (Lf)
(As per Approved Doc No. O10038-C-IS-SY-DC-0141) : 6.00 m

Allowable shear at top of pedestal per pile : 14.19 T

Actual Shear per pile ( Z shear per pedestal / No. of pile) : 0.36 T < 14.19 T O.K.

ii) Design of Pile Cap:

a. Bending Moment at the face of the Pedestal (due to Pile Reaction): 46.519 Tm
b. Weight of Pile cap on one side of pedestal 2.150 T
Distance from CG of pile cap on one side to face of pedestal 0.550 m
Bending Moment at the face of the Pedestal (due toWt of Pile cap): = 2.15 x 0.55 1.180 Tm
c. Bending Moment at the face of the Pedestal (due to Soil Wt.): 1.210 Tm
\ Net BM = =46.519 - 1.18 - 1.21 44.129 Tm
Provide overall thickness of 1300 mm
Clear cover to reinforcement = 50 mm
Effective Depth, d = = 1240 mm
Mu = 44.129 x 1.5 x 9.807 x 10^ 6 = 0.422 N / mm2
bd2 1000 x 1240^2
From SP 16, pt = 0.119 %
Minimum percentage of steel = 0.12 %
\ Ast reqd = 1488.00 mm2
a. Bottom Reinforcement
Provide 20 Tor @ 100 mm c/c Main Reinf. at bottom
Ast provid . 3142 mm2 > 1488.000 mm2
Hence Safe
Percentage of steel provided = 0.253 %
Provide 16 Tor @ 250 mm c/c distribution Reinf. at bottom
b. Top Reinforcement
Provide Minimum reinforcement o 0.12 %
Ast reqd = 1488.00 mm2
Provide 16 Tor @ 125 mm c/c Main Reinf. at Top
Ast provided = 1609 mm2 > 1488.000 mm2
Hence Safe
Provide 16 Tor @ 250 mm c/c distribution Reinf. at Top
c. Horizontal Reinforcement
Ast required (20% of max Ast provided) = 20 /100 * 3142 = 628.4 mm2
Provide 12 Tor @ 175 mm c/c Side Face Reinforcement
Ast provided = 647 mm2 > 628.4 mm2
Hence Safe

CHECK FOR ONE WAY SHEAR - Cl - 34.2.4.1a - IS 456-2000)


One way shear to be checked at distance d/2 from face of the column.
Effective depth of the footing d = 1240 mm
a i) Distance from centre of column to centre of pile = 750 mm
PRELIMINARY DESIGN FOR APPROVAL 04.08.2015 CPK AGB NVP
DESCRIPTION DATE PPD BY CHK BY APD BY
TITLE 400 Kv gis - Layout &RC details of Pile cap PC2
DRAWING NO. B544-C-IS-SY-NR-0034

ii) Column size bc = 800 mm


Dc = 400 mm
Distance from centre of column to inner Edge of pile = 500 mm
Sum of effective depth 'd/2' and 0.5 times column size = 820
Shear check is required to be done in line with Cl 34.2 .4.2, IS 456-2000
Factored Shear=1.5*W=1.5*Max. Pile load x No. of Piles per side= = 1.5 x 42.29 x 1 = 622.08484 kN
% of Shear developed = = ( 820 - 500-500 ) / 500 = 36.00
% of Shear = 36.00 %
Factored Shear @ 820mm from column centre = 0.36 x 622.08484275 = 223.95 kN
Nominal Shear Stress (ζv=Vu/bd) = 0.181 N/sqmm
% of Reinforcement steel provided = 0.253 %
Design Shear Strength of Concrete (Tc) as per Table - 19, IS:456 for concrete Grade M25 = 0.372 N/sqmm

Hence Safe

CHECK FOR PUNCHING SHEAR ( 2 - WAY SHEAR) - CL - 31.6.2 - IS 456 -2000


Total compressive load on pedestal = 683.00
= 683.00 kN
Perimeter length [ 2 x (Column size + d/2 + d/2) on one side] 7360 mm
Shear area = Perimeter x depth = 9.13 m²
Nominal shear stress, ζv = 1.5 X Vu / shear area = 0.112 N/mm²
> ζv No Shear
Reinforcement is
Permissible shear stress, k.ζc 1.369
( 0.25 x sqrt(fck) ) = required
Maximum Shear stress allowed = 1.5 * ζc for the footing (cl.[Link]) = 2.054 > ζv Hence safe
2 X 500 MW Tuticorin Thermal Power Project
ANALYSIS AND DESIGN OF FOUNDATION FOR LIGHTING MAST 'LM'

Data: Case 2: Wind 45deg in Z-direction (Check for Wet Condition)

1 Safe Bearing Capacity of the Pile (550 f, Bored Cast in - situ), in Compression = 70 T
Safe Bearing Capacity of the Pile (550 f, Bored Cast in - situ), in Tension = 20 T
Allowable Shear at Pile cut off level 3.25 T

2 Diameter of the Pile, Dp : 550 mm

3 Dry Unit Weight of Soil, gs : 1800 Kg / m3

Submerged Unit Weight of Soil, gs (for Design purpose) 1000 Kg / m4

Dry Unit Weight of Concrete, gc 2500 Kg / m2

Submerged Unit Weight of Concrete, gc (for Design purpose) : 1500 Kg / m3

4 Grade of Concrete : M 35

5 Grade of Reinforcing Steel : Fe 500

6 Base Width of Tower (B / B) : 4.20 m x 4.20


m
7 Height of Top of Pedestal above GL, htp : 0.855 m

8 Size of the Angle provided : L 150 x 150 x 16


CG of this angle : 4.31 cm

9 \Center to Center Dist. Betn. Legs, Cd : 4113.8 mm

Center to Center Dist. Betn. Legs in transverse direction, Cdz : 4113.8 mm

10 Depth of bottom of Pile Cap below GL : 2.670 m

11 F.O.S. for Normal Condition : 1.500


Case 1: Wind in Z-direction

12 Foundation Forces: Load Case 102

Note:The Foundation Forces as computed by STAAD are given in the Appendix.

Compression: : 35.526 T

Tension: : 27.005 T

Fx: : 2.695 T

Fz: : 2.864 T
(i) Calculation of No. of Piles required:

1 Length of the Pile Cap, Lr : 2.500 m

2 Breadth of Pile Cap, Br : 0.900 m

3 Thickness of Pile Cap, tr : 1.10 m

4 Top Level of Pile Cap wrt GL, Df = ( 2.67-1.1 ) : 1.570 m

5 \Thickness of Soil, ts = Df : 1.570 m

6 Length of the Pedestal, Lp : 0.60 m

7 Breadth of Pedestal, Bp : 0.60 m

8 Height of Pedstal, tp = (Df +htp) = ( 1.57 + 0.855 ) : 2.425 m

9 Spacing of Piles considered, Sp : 1.650 m

(Minimum spacing = 3 x d = 1.65m)

10 Length of Tie Beam in X- dir = 4.1138 - 2.5 : 1.6138 m

Length of Tie Beam in Z- dir = 4.1138 - 0.9 3.2138 m

11 Breadth of Tie Beam : 0.45 m

12 Thickness of Tie Beam : 0.45 m


a. Vertical Loads (Compressive)
(i) Weight of Pile Cap = Lr x Br x tr x gc = 2.5 x 0.9 x 1.1 x 1500 / 1000 : 3.71 T

(ii) Weight of Soil = = ( 2.5 x 0.9 - 0.6 x 0.6 ) x 1.57 x 1000 / 1000 : 2.97 T
(Lr x Br - Lp x Bp) x ts x gs

(iii) Weight of Pedestal = (0.6 x 0.6 x 1.57 x 1500 / 1000 ) + : 1.62 T


(0.6 x 0.6 x 0.855 x 2500 /1000 )
(Lp x Bp x tp x gc)

(iv) Vertical Load from the Tower Leg (Compn) : 35.53 T

Total Vertical Load (compression), Pc 44.00 T

b. Vertical Loads (Tensile)

(i) Weight of Pile Cap : 3.71 T

(ii) Weight of Soil = : 2.97 T

(iii) Weight of Pedestal : 1.62 T

(iv) Vertical Load from the Tower Leg (Tens) : -27.01 T

Total Vertical Load (Tension), Pt -18.71 T

Cosnider 2 Nos of Piles per pile cap i.e. for each Leg (n)

Moment Calculation at the Bottom of the Foundation:

Fx : 2.695 T

Fz : 2.864 T

Lever arm, La = 1.57 + 1.1 + 0.855-0.075 : 3.450 m

(Df +tr + htp)


Moment Mz due to Fx (X- Dirn. Moment) (=Fx * La) = 2.69511 x 3.45 : 9.298 Tm

Moment Mx due to Fz, (Z - Drin. Moment )Mx = (Fz x La) = 2.86353 x 3.45 : 9.879 Tm

Maximum Compression / Tension in the Piles:

Max. Comp. in Pile: P = Mx / Sp + Pc / n = (9.879 / 1.65) + (44 / 2) : 27.99 T < 70 T O.K.

Max. Tension Pile: P = Mx / Sp + Pt / n = (9.879/1.65) + (18.71/ 2) : 15.34 T < 20 T O.K.

Shear Check at top of pedestal level


Length of Fixcity of pile (Lf)
(As per Approved Doc No. O10038-C-IS-SY-DC-0141) : 6.25 m

Allowable shear at top of pedestal per pile = (3.25 x 6.25 )/ (6.25 + 3.525 ) : 2.08 T

Actual Shear per pile ( Z shear per pedestal / No. of pile) = 2.86353/ 2 : 1.43 T < 2.08 T O.K.

ii) Design of Pile Cap:

a. Bending Moment at the face of the Pedestal (due to Pile Reaction): =27.99 x (1.65 - 0.6) / 2 14.695 Tm

b. Weight of Pile cap on one side of pedestal =( (2.5- 0.6) / 2 ) x 0.9 x 1.1 x 1500 1.410 T

Distance from CG of pile cap on one side to face of pedestal = ( (2.5- 0.6) / 2 ) / 2 0.475 m

Bending Moment at the face of the Pedestal (due toWt of Pile cap): = 1.41 x 0.475 0.670 Tm

c. Bending Moment at the face of the Pedestal (due to Soil Wt.): 0.638 Tm
\ Net BM = =14.695 - 0.67 - 0.638 13.387 Tm
Provide overall thickness of 1100 mm
Clear cover to reinforcement = 50 mm
Effective Depth, d = = 1040 mm
Mu 13.387 x 1.5 x 9.807 x 10^ 6
= = 0.202 N / mm2
bd 2
900 x 1040^2
From SP 16, pt = 0.047 %
Minimum percentage of steel = 0.2 %
\ Ast reqd = 1872.00 mm2
a. Bottom Reinforcement
Provide 20 Tor @ 150 mm c/c Main Reinf. at bottom
Ast provided = 1885 mm2 > 1872.000 mm2
Hence Safe
Percentage of steel provided = 0.201 %
Provide 16 Tor @ 150 mm c/c distribution Reinf. at bottom
b. Top Reinforcement
Provide Minimum reinforcement of 0.12 %
Ast reqd = 1123.20 mm2
Provide 16 Tor @ 150 mm c/c Main Reinf. at Top
Ast provided = 1207 mm2 > 1123.200 mm2
Hence Safe
Provide 16 Tor @ 150 mm c/c distribution Reinf. at Top
c. Horizontal Reinforcement

Ast required (20% of max Ast provided) = 20 /100 * 1885 = 377.0 mm2
Provide 12 Tor @ 200 mm c/c Side Face Reinforcement
Ast provided = 509 mm2 > 377.0 mm2
Hence Safe

CHECK FOR ONE WAY SHEAR - Cl - 34.2.4.1a - IS 456-2000)


One way shear to be checked at distance d/2 from face of the column.

Effective depth of the footing d = 1040 mm


a i) Distance from centre of column to centre of pile = 825 mm
ii) Column size bc = 600 mm
Dc = 600 mm
Distance from centre of column to inner Edge of pile = 550 mm
Sum of effective depth 'd/2' and 0.5 times column size = 820 <
Shear check is required to be done in line with Cl 34.2 .4.2, IS 456-2000

Factored Shear=1.5*W=1.5*Max. Pile load x No. of Piles per side= = 1.5 x 27.99 x 1 = 419.85 kN

% of Shear developed = = ( 820 - 550-550 ) / 550 = 50.91

% of Shear = 50.91 %

Factored Shear @ 820mm from column centre = 0.51 x 419.85 = 213.74 kN

Nominal Shear Stress (ζv=Vu/bd) = 0.228 N/sqmm

% of Reinforcement steel provided = 0.201 %

Design Shear Strength of Concrete (Tc) as per Table - 19, IS:456 for concrete Grade M35 = 0.331 N/sqmm

Hence Safe

CHECK FOR PUNCHING SHEAR ( 2 - WAY SHEAR) - CL - 31.6.2 - IS 456 -2000


Total compressive load on pedestal (from Tower + wt. of pedestal) = 355.26 + 16.2

= 371.44 kN
Perimeter length [ 2 x (Column size + d/2 + d/2) on one side] 1800 mm
Shear area = Perimeter x depth = 1.87 m²
Nominal shear stress, ζv = 1.5 X Vu / shear area = 0.298 N/mm²

> ζv No Shear
1.479
Reinforcement is
Permissible shear stress, k.ζc ( 0.25 x sqrt(fck) ) = required

Maximum Shear stress allowed = 1.5 * ζc for the footing (cl.[Link]) = 2.219 > ζv Hence safe
2 X 500 MW Tuticorin Thermal Power Project
ANALYSIS AND DESIGN OF FOUNDATION FOR LIGHTING MAST 'LM'

Data: Case 2: Wind 45deg in Z-direction (Check for Dry Condition)

1 Safe Bearing Capacity of the Pile (550 f, Bored Cast in - situ), in Compression = 70 T
Safe Bearing Capacity of the Pile (550 f, Bored Cast in - situ), in Tension = 20 T
Allowable Shear at Pile cut off level 3.25 T

2 Diameter of the Pile, Dp : 550 mm

3 Dry Unit Weight of Soil, gs : 1800 Kg / m3

Submerged Unit Weight of Soil, gs (for Design purpose) 1000 Kg / m4

Dry Unit Weight of Concrete, gc 2500 Kg / m2

Submerged Unit Weight of Concrete, gc (for Design purpose) : 1500 Kg / m3

4 Grade of Concrete : M 35

5 Grade of Reinforcing Steel : Fe 500

6 Base Width of Tower (B / B) : 4.20 m x 4.20


m
7 Height of Top of Pedestal above GL, htp : 0.855 m

8 Size of the Angle provided : L 150 x 150 x 16


CG of this angle : 4.31 cm

9 \Center to Center Dist. Betn. Legs, Cd : 4113.8 mm

Center to Center Dist. Betn. Legs in transverse direction, Cdz : 4113.8 mm

10 Depth of bottom of Pile Cap below GL : 2.670 m

11 F.O.S. for Normal Condition : 1.500


Case 1: Wind in Z-direction

12 Foundation Forces: Load Case 102

Note:The Foundation Forces as computed by STAAD are given in the Appendix.

Compression: : 35.526 T

Tension: : 27.005 T

Fx: : 2.695 T

Fz: : 2.864 T
(i) Calculation of No. of Piles required:

1 Length of the Pile Cap, Lr : 2.500 m

2 Breadth of Pile Cap, Br : 0.900 m

3 Thickness of Pile Cap, tr : 1.10 m

4 Top Level of Pile Cap wrt GL, Df = ( 2.67-1.1 ) : 1.570 m

5 \Thickness of Soil, ts = Df : 1.570 m

6 Length of the Pedestal, Lp : 0.60 m

7 Breadth of Pedestal, Bp : 0.60 m

8 Height of Pedstal, tp = (Df +htp) = ( 1.57 + 0.855 ) : 2.425 m

9 Spacing of Piles considered, Sp : 1.650 m

(Minimum spacing = 3 x d = 1.65m)

10 Length of Tie Beam in X- dir = 4.1138 - 2.5 : 1.6138 m

Length of Tie Beam in Z- dir = 4.1138 - 0.9 3.2138 m

11 Breadth of Tie Beam : 0.45 m

12 Thickness of Tie Beam : 0.45 m


a. Vertical Loads (Compressive)
(i) Weight of Pile Cap = Lr x Br x tr x gc = 2.5 x 0.9 x 1.1 x 2500 / 1000 : 6.19 T

(ii) Weight of Soil = = ( 2.5 x 0.9 - 0.6 x 0.6 ) x 1.57 x 1800 / 1000 : 5.34 T
(Lr x Br - Lp x Bp) x ts x gs

(iii) Weight of Pedestal = (0.6 x 0.6 x 1.57 x 1500 / 1000 ) + : 1.62 T


(0.6 x 0.6 x 0.855 x 2500 /1000 )
(Lp x Bp x tp x gc)

(iv) Vertical Load from the Tower Leg (Compn) : 35.53 T

Total Vertical Load (compression), Pc 49.00 T

b. Vertical Loads (Tensile)

(i) Weight of Pile Cap : 6.19 T

(ii) Weight of Soil = : 5.34 T

(iii) Weight of Pedestal : 1.62 T

(iv) Vertical Load from the Tower Leg (Tens) : -27.01 T

Total Vertical Load (Tension), Pt -13.86 T

Cosnider 2 Nos of Piles per pile cap i.e. for each Leg (n)

Moment Calculation at the Bottom of the Foundation:

Fx : 2.695 T

Fz : 2.864 T

Lever arm, La = 1.57 + 1.1 + 0.855-0.075 : 3.450 m

(Df +tr + htp)


Moment Mz due to Fx (X- Dirn. Moment) (=Fx * La) = 2.69511 x 3.45 : 9.298 Tm

Moment Mx due to Fz, (Z - Drin. Moment )Mx = (Fz x La) = 2.86353 x 3.45 : 9.879 Tm

Maximum Compression / Tension in the Piles:

Max. Comp. in Pile: P = Mx / Sp + Pc / n = (9.879 / 1.65) + (49 / 2) : 30.49 T < 70 T O.K.

Max. Tension Pile: P = Mx / Sp + Pt / n = (9.879/1.65) + (13.86/ 2) : 12.92 T < 20 T O.K.

Shear Check at top of pedestal level


Length of Fixcity of pile (Lf)
(As per Approved Doc No. O10038-C-IS-SY-DC-0141) : 6.25 m

Allowable shear at top of pedestal per pile = (3.25 x 6.25 )/ (6.25 + 3.525 ) : 2.08 T

Actual Shear per pile ( Z shear per pedestal / No. of pile) = 2.86353/ 2 : 1.43 T < 2.08 T O.K.

ii) Design of Pile Cap:

a. Bending Moment at the face of the Pedestal (due to Pile Reaction): =30.49 x (1.65 - 0.6) / 2 16.007 Tm

b. Weight of Pile cap on one side of pedestal =( (2.5- 0.6) / 2 ) x 0.9 x 1.1 x 1500 1.410 T

Distance from CG of pile cap on one side to face of pedestal = ( (2.5- 0.6) / 2 ) / 2 0.475 m

Bending Moment at the face of the Pedestal (due toWt of Pile cap): = 1.41 x 0.475 0.670 Tm

c. Bending Moment at the face of the Pedestal (due to Soil Wt.): 0.638 Tm
\ Net BM = =16.007 - 0.67 - 0.638 14.699 Tm
Provide overall thickness of 1100 mm
Clear cover to reinforcement = 50 mm
Effective Depth, d = = 1040 mm
Mu 14.699 x 1.5 x 9.807 x 10^ 6
= = 0.222 N / mm2
bd 2
900 x 1040^2
From SP 16, pt = 0.051 %
Minimum percentage of steel = 0.2 %
\ Ast reqd = 1872.00 mm2
a. Bottom Reinforcement
Provide 20 Tor @ 150 mm c/c Main Reinf. at bottom
Ast provided = 1885 mm2 > 1872.000 mm2
Hence Safe
Percentage of steel provided = 0.201 %
Provide 16 Tor @ 150 mm c/c distribution Reinf. at bottom
b. Top Reinforcement
Provide Minimum reinforcement of 0.12 %
Ast reqd = 1123.20 mm2
Provide 16 Tor @ 150 mm c/c Main Reinf. at Top
Ast provided = 1207 mm2 > 1123.200 mm2
Hence Safe
Provide 16 Tor @ 150 mm c/c distribution Reinf. at Top
c. Horizontal Reinforcement

Ast required (20% of max Ast provided) = 20 /100 * 1885 = 377.0 mm2
Provide 12 Tor @ 200 mm c/c Side Face Reinforcement
Ast provided = 509 mm2 > 377.0 mm2
Hence Safe

CHECK FOR ONE WAY SHEAR - Cl - 34.2.4.1a - IS 456-2000)


One way shear to be checked at distance d/2 from face of the column.

Effective depth of the footing d = 1040 mm


a i) Distance from centre of column to centre of pile = 825 mm
ii) Column size bc = 600 mm
Dc = 600 mm
Distance from centre of column to inner Edge of pile = 550 mm
Sum of effective depth 'd/2' and 0.5 times column size = 820 <
Shear check is required to be done in line with Cl 34.2 .4.2, IS 456-2000

Factored Shear=1.5*W=1.5*Max. Pile load x No. of Piles per side= = 1.5 x 30.49 x 1 = 457.35 kN

% of Shear developed = = ( 820 - 550-550 ) / 550 = 50.91

% of Shear = 50.91 %

Factored Shear @ 820mm from column centre = 0.51 x 457.35 = 232.83 kN

Nominal Shear Stress (ζv=Vu/bd) = 0.249 N/sqmm

% of Reinforcement steel provided = 0.201 %

Design Shear Strength of Concrete (Tc) as per Table - 19, IS:456 for concrete Grade M35 = 0.331 N/sqmm

Hence Safe

CHECK FOR PUNCHING SHEAR ( 2 - WAY SHEAR) - CL - 31.6.2 - IS 456 -2000


Total compressive load on pedestal (from Tower + wt. of pedestal) = 355.26 + 16.2

= 371.44 kN
Perimeter length [ 2 x (Column size + d/2 + d/2) on one side] 1800 mm
Shear area = Perimeter x depth = 1.87 m²
Nominal shear stress, ζv = 1.5 X Vu / shear area = 0.298 N/mm²

> ζv No Shear
1.479
Reinforcement is
Permissible shear stress, k.ζc ( 0.25 x sqrt(fck) ) = required

Maximum Shear stress allowed = 1.5 * ζc for the footing (cl.[Link]) = 2.219 > ζv Hence safe
Design of pedestal for Lighting Mast - LM

Normal

I. Data from Tower Design LC : 101 LC : 102


Max. Compressive Load per leg kg = 22678 35526

Max. Tensile Load per leg kg = 14091 27005

Shear in X-dir per leg kg = 1332 2695

Shear in Z-dir per leg kg = 2154 2864

Grade of concrete = M 35 M 35
Grade of steel reinforcement = Fe 500
Density of concrete for design kg/cum = 2500 2500

Limit state method - overload factor = 1.5 1.5


for strength design

Pedestal size in X - direction - b m = 0.6 0.6

Pedestal size in Z - direction - a m = 0.6 0.6

Least lateral dimension of ( b ) m = 0.6


pedestal

Height of pedestal ( Le ) m = 2.35

Height = 2.35 x 2
Least lateral dimension 0.600

= 7.83 > 3 Short Column


Hence the pedestal shall be designed as a Short Column

Maximum compressive load per kg = 22677.65 + = 35526.37 +


pedestal - wind along z-dir. 0.6 x 0.6 0.6 x 0.6
x 2.35 x 2500 x 2.35 x 2500
= 24792.65 = 37641.37

Normal SCF
Max. factored compressive load N = 1.5 x 24792.65 = 1.5 x 37641.37
on pedestal , Pu x 9.81 x 9.81
(Refer Punching shear calculation) = 364824 = 553893

Factored moment due to shear in Nm = 1332.19 x 1.5 = 2695.11 x 1.5


X - direction, Mux x 9.81 x 2.35 x 9.81 x 2.35
(From shear loads at PL) = 46067 = 93198

Factored moment due to shear in Nm = 2154.38 x 1.5 = 2863.53 x 1.5


Z - direction, Muz x 9.81 x 2.35 x 9.81 x 2.35
(From shear loads at PL) = 74499 = 99022
Addition moments due to Slenderness ratio (Applicable for long columns only) As per cl. 39.7.1 of IS 456
= (PuB/2000) x (lex/B)
2
additional moment in X direction
Nm = NA = NA
= (PuD/2000) x (lez/D)
2
additional moment in z direction (Applicable for long columns only)
Nm = NA = NA

Factored Total Moments in X - dir Nm = 46067 + 0 = 93198 + 0


= #VALUE! = #VALUE!
Factored Total Moments in Z - dir Nm = 74499 + 0 = 99022 + 0
= #VALUE! = #VALUE!
e min in X - direction m = 0.0247 = 0.0247
Maximum of [(Le / 500)+(b / 30)] or 20 mm as per IS 456 : 2000 Cl. 24.4
e min in Z - direction m = 0.0247 = 0.0247

[Link] Ped_z_dry
Moment due to e min - X Nm = 9011 = 13681

Moment due to e min - Z Nm = 9011 = 13681

Hence, design X - moment Nm = #VALUE! = #VALUE!

Hence, design Z - moment Nm = #VALUE! = #VALUE!

% of steel considered , pt = 0.992 = 0.992


Normal SCF
p / fck = 0.028 = 0.028
Clear cover to column mm = 50 50

Pu / fck b d = 364824 = 553893


( 35 x 600 ( 35 x 600
x 600 ) x 600 )

= 0.029 = 0.044

d' / D in X - direction = 62.5 / 600 = 62.5 / 600


= 0.104 = 0.104
Refer chart 48, SP : 16 , d' / D = 0.10 = 0.10

Mux1 / fck b d² = 0.06 = 0.06


Mux1 Nm =( 0.06 x 35 =( 0.06 x 35
x 600 x 600 ²)/ x 600 x 600 ²)/
1000 1000
= 453600 = 453600

d' / D in Z - direction = 62.5 / 600 = 62.5 / 600


= 0.104 = 0.104

Refer chart 48 , SP : 16 , d' / D = 0.10 = 0.10

Muz1 / fck b d² = 0.06 = 0.06


Muz1 Nm =( 0.06 x 35 =( 0.06 x 35
x 600 x 600 ²) / x 600 x 600 ²) /
1000 1000
= 453600 = 453600
Refer Chart 63 , SP :16 For pt = 0.992 %
Puz / Ag = 17 = 17
Puz = 17 x 600 = 17 x 600
x 600 x x 600
= 6120000 = 6120000

Pu / Puz = 364824 / 6120000 = 553893 / 6120000


= 0.06 = 0.091

Mux / Mux1 = #VALUE! / 453600 = #VALUE! / 453600


= #VALUE! = #VALUE!

Muz / Muz1 = #VALUE! / 453600 = #VALUE! / 453600


= #VALUE! = #VALUE!

Value of a = 1 = 1
a a
[ Mux ] + [ Muy ] = #VALUE! ^1.000+ #VALUE! ^1.00 = #VALUE! ^1.00 #VALUE! ^1.000
Mux1 Muy1 = #VALUE! ### 1 = #VALUE! ### 1
#VALUE! #VALUE!

Ast required mm² = 0.992 x 600 x = 0.992 x 600 x


100 600 100 600
= 3571 = 3571

[Link] Ped_z_dry
[Link] Ped_z_dry
Check for tension with bending Normal
Wind along z-dir.
Maximum tension load per kg = 14091 = 27005
pedestal

Max .Factored tensile load on N = 1.5 x 14091 = 1.5 x 27005


pedestal , Pu x 9.81 x 9.81
= 207345 = 397379
Mu - wind along z-dir. kgm = Mux + Muz = Mux + Muz
(Refer calculation of pedestal = #VALUE! + #VALUE! = #VALUE! + #VALUE!
with compression & bending above) = #VALUE! = #VALUE!

Mu / fck b d² ( Max. Mu of above) = #VALUE! x 1000 = #VALUE! x 1000


( 35 x 600 ( 35 x 600
x 600 ²) x 600 ²)
= #VALUE! = #VALUE!
Pu / fck b d = 207345 = 397379
( 35 x 600 ( 35 x 600
x 600 ) x 600 )
= 0.016 = 0.03
d' / D = 0.104 = 0.104
Refer chart 83 of SP - 16 for d1/D = = 0.1 0.1
p / fck = 0.028 = 0.02
Hence, p = 0.028 x 35 = 0.02 x 35
= 0.98 % = 0.7 %
Area of steel reqd., Ast mm² = 0.98 x 600 x = 0.7 x 600 x
600 / 100 600 / 100
= 3528 = 2520
Min % of steel to be provided % = 0.8 % of area reqd. to resist = 0.8 % of area reqd. to resist
comp. force comp. force
Area of concrete required for
resisting compressive load mm² = 364824 /( 0.4 = 553893 /( 0.4
x 35 ) x 35 )
= 26059 = 39564
Area of steel reqd., Ast mm² = 0.8 x 26059 = 0.8 x 39564
100 100
= 209 = 317
Hence area of steel required mm² = 3528 = 2520
Hence provide 4 nos. of 25 mm dia bars
& 8 nos. of 16 mm dia bars
Ast provided = 3572 > 3528.00 = 3572 > 2520.00
Hence safe Hence safe
Percentage of reinforcement % = 0.992
Lateral ties for pedestal
Use lateral ties of diameter = 8 mm
Pitch of lateral ties is the least of the following : as Per Cl. [Link] c of IS 456:2000
i Least lateral dimension of the column mm = 600
ii 16 times the dia of main bar mm = 16 x 16
= 256
iii 300 mm = 300
Therefore provide 8 RTS ties at 250 mm c/c

[Link] Ped_z_dry
[Link] Ped_z_dry