Project Information Sheet
Earthwork Boundary Wall Other Works for Land Development of
Sr.
Name of Work National Maritime Heritage Complex Site at Lothal near Saragwala village
No.
in Dholka Taluka of Ahmedabad district in the state of Gujarat
Indian Port Rail Corporation Ltd.
1 Name of Client 4th Floor Nirman Bhavan Mbpt Building Mp Road Mazgoan East Mumbai
400010
2 Estimated Cost Rs.95,45,00,000
3 Tender Fee Rs.11200
4 EMD Rs.19000000
5 Time Period 12 months (including monsoon)
6 Date of Submission 09.11.2020
a) The Performance Security shall be for an amount of 5% (Five percent)
of the Accepted Contract Amount and in the same currency(ies) of the
Accepted Contract amount in the prescribed form for the stated amount
valid for a period of 28 days beyond issue of performance certificate.
A Cashier’s or Banker’s certified cheque drawn on a Scheduled /
7 Performance Guarantee Nationalized Bank in India in favour of “Indian Port Rail & Ropeway
Corporation Ltd.(formerly known as Indian Port Rail Corporation Ltd.) “
payable at Mumbai,
The bank guarantee shall be from a bank as under:
(i) Any Public sector Bank in India, or
(ii) a Private sector Bank in India possessing net worth of Rs 10, 000/-
crore.,
If for any bill/ schedule of quantities % age above or below quoted by
the bidder on the estimated price is beyond 10% below the overall % age
difference between the quoted contract price and the engineers
estimated price, then the price for that particular schedule shall be
treated as seriously unbalanced and bidder shall be bound to furnish
additional performance security for such unbalanced price. Example
8 Additional Performance Guarantee
below demonstrates the method of calculation to arrive at unbalanced
price and additional performance security
(b) Additional Performance Security, if any, shall be for an amount as
determined by Employer in terms of ITB 35.5 and informed through
letter of award and in the same currency(ies) of the Accepted Contract
amount in the prescribed form valid for a period of 28 days beyond issue
of performance certificate.
9 Mobilisation Advance Not Applicable
Sr.
Description Our Eligibility
No
1 Joint Venture is not allowed.
Minimum average annual turnover in equivalent INR 190.90Crores for the
1 last Five financial years calculated as per audited balance sheet or certified Our Average annual turnover is Rs.166.76 Cr
by Chartered Accountant , (refer note below the table).
2.3.1 Construction Experience in Key Activities (Executed during the last
Seven years prior to the applications submission deadline)
(I) Execution as contractor, or subcontractor, at least One contract with
minimum quantity of 10,80,000 Lakh Cum. of Earthwork / blanketing/sub
base in railway/road formations/dams/ runways /taxiway system of airports [Link] Borsi -14188Cum
through each contract. [Link] Arnej : 61080Cum
OR [Link]: 30776 Cum
ii Execution as contractor, or subcontractor, at least Two contracts with [Link]: 2016Cum
2
minimum quantity of 7,20,000 Lakh Cum. of Earthwork / blanketing/sub base [Link] :100000Cum
in railway/road formations/dams/ runways /taxiway system of airports [Link] Palanpur:56000Cum
through each contract. Total: 2,64,060 Cum
OR
iii Execution as contractor, or subcontractor, at least Three Contracts with
minimum quantity of 5,40,000 Lakh Cum. of Earthwork / blanketing/sub base
in railway/road formations/dams/ runways /taxiway system of airports
through each contract.
UNDERTAKING FOR DEPLOYMENT OF SPECIALIST SUB-CONTRACTOR: NOT
3
APPLICABLE
Page 1 of 1