Anchor Bolt Detail: Base Plate Schedule

The document contains a base plate schedule detailing specifications for two types of base plates (BP-1 and BP-2) used in construction, including dimensions, bolt types, and anchor bolt details. It also includes a pedestal schedule and anchor bolt detail, specifying the number and size of vertical bars and ties. The document is part of a construction project for the DPWH Region IV-A office in Calamba, Laguna, Philippines.

Uploaded by

Christian Reyes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views1 page

Anchor Bolt Detail: Base Plate Schedule

The document contains a base plate schedule detailing specifications for two types of base plates (BP-1 and BP-2) used in construction, including dimensions, bolt types, and anchor bolt details. It also includes a pedestal schedule and anchor bolt detail, specifying the number and size of vertical bars and ties. The document is part of a construction project for the DPWH Region IV-A office in Calamba, Laguna, Philippines.

Uploaded by

Christian Reyes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

BASE PLATE SCHEDULE

BP-1 BP-2
650
34 mm BOLT
250 250 HOLE TYP.

700
34 mm BOLT
250 250 HOLE TYP.

300
CJP
CJP

325
300
CL

800
1400
CL

325
300
300
CL
CJP

CL
CJP

THREAD LENGTH AT P1 & THREAD


TYPE STEEL COLUMN BASE PLATE ANCHOR BOLT LENGTH PROJECTION "P"
TOP LENGTH AT BOT

BP-1 W 36X652 1300 x 650 x 25mm THK. 12-SETS OF 25MMØBOLTS 850mm 160mm 50mm 100mm
SEE ANCHOR BOLT CALLOUT ON
DESIGN DRAWING FOR NUMBER
BASE PLATE OF NUTS
BP-2 W 14X730 800 x 650 x 25mm THK. 4-SETS OF 20MMØBOLTS 850mm 160mm 500mm 100mm

SEE ANCHOR BOLT SCHEDULE


"P" PROJECTION
25mm THK.

EMBEDMENT DEPTH
NON-SHRINK GROUT

LENGTH
PEDESTAL SCHEDULE

"L"

"E"
1050
100 95 95 95 95 95 95 95 95 95 100
100 130 130 130 130 130 100

LENGTH AND BOTTOM


130

P1 AND THREAD
100
160

160
TACK WELD
160

IN SHOP
160
160

(3 PLACES)
160
160

160
1700
160

160
167

100
160
160

ANCHOR BOLT DETAIL


160

3
130

S-4 SCALE 1:150 M

PED-1 PED-2

VERTICAL BARS 36-D25MM VERTICAL BARS 20-D25MM

TIES 5-SETS OF D12MM TIES 4-SETS OF D12MM

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND LOCAL PROGRAM CHRISTIAN B. REYES
HIGHWAYS NATIONAL BUILDING PROGRAM
BASE PLATE SCHEDULE
ENGINEER I
S S
BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES KAREN L. MOLANO RAY ANDREW K. MOLANO ISIDRO O. ENCARNACION JOVEL G. MENDOZA
REGIONAL OFFICE NO. IV-A CONSTRUCTION OF DPWH REGION IV-A OFFICE
PEDESTAL SCHEDULE PREPARED:
ENGINEER III ENGINEER IV OFFICER-IN-CHARGE DIRECTOR IV
ANCHOR BOLT DETAIL 04 10 04
DPWH REGION IV-A CANLUBANG INTERCHANGE, CANLUBANG INTERCHANGE, BRGY. MAYAPA, CONCURRENT OIC, BUILDINGS UNIT OIC, OFFICE OF THE DIVISION CHIEF ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
CITY OF CALAMBA, LAGUNA CHRISTIAN B. REYES OFFICE OF THE REGIONAL DIRECTOR PLANNING AND DESIGN DIVISION
BRGY. MAYAPA, CITY OF CALAMBA, LAGUNA ENGINEER I