BASE PLATE SCHEDULE
BP-1 BP-2
650
34 mm BOLT
250 250 HOLE TYP.
700
34 mm BOLT
250 250 HOLE TYP.
300
CJP
CJP
325
300
CL
800
1400
CL
325
300
300
CL
CJP
CL
CJP
THREAD LENGTH AT P1 & THREAD
TYPE STEEL COLUMN BASE PLATE ANCHOR BOLT LENGTH PROJECTION "P"
TOP LENGTH AT BOT
BP-1 W 36X652 1300 x 650 x 25mm THK. 12-SETS OF 25MMØBOLTS 850mm 160mm 50mm 100mm
SEE ANCHOR BOLT CALLOUT ON
DESIGN DRAWING FOR NUMBER
BASE PLATE OF NUTS
BP-2 W 14X730 800 x 650 x 25mm THK. 4-SETS OF 20MMØBOLTS 850mm 160mm 500mm 100mm
SEE ANCHOR BOLT SCHEDULE
"P" PROJECTION
25mm THK.
EMBEDMENT DEPTH
NON-SHRINK GROUT
LENGTH
PEDESTAL SCHEDULE
"L"
"E"
1050
100 95 95 95 95 95 95 95 95 95 100
100 130 130 130 130 130 100
LENGTH AND BOTTOM
130
P1 AND THREAD
100
160
160
TACK WELD
160
IN SHOP
160
160
(3 PLACES)
160
160
160
1700
160
160
167
100
160
160
ANCHOR BOLT DETAIL
160
3
130
S-4 SCALE 1:150 M
PED-1 PED-2
VERTICAL BARS 36-D25MM VERTICAL BARS 20-D25MM
TIES 5-SETS OF D12MM TIES 4-SETS OF D12MM
REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND LOCAL PROGRAM CHRISTIAN B. REYES
HIGHWAYS NATIONAL BUILDING PROGRAM
BASE PLATE SCHEDULE
ENGINEER I
S S
BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES KAREN L. MOLANO RAY ANDREW K. MOLANO ISIDRO O. ENCARNACION JOVEL G. MENDOZA
REGIONAL OFFICE NO. IV-A CONSTRUCTION OF DPWH REGION IV-A OFFICE
PEDESTAL SCHEDULE PREPARED:
ENGINEER III ENGINEER IV OFFICER-IN-CHARGE DIRECTOR IV
ANCHOR BOLT DETAIL 04 10 04
DPWH REGION IV-A CANLUBANG INTERCHANGE, CANLUBANG INTERCHANGE, BRGY. MAYAPA, CONCURRENT OIC, BUILDINGS UNIT OIC, OFFICE OF THE DIVISION CHIEF ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
CITY OF CALAMBA, LAGUNA CHRISTIAN B. REYES OFFICE OF THE REGIONAL DIRECTOR PLANNING AND DESIGN DIVISION
BRGY. MAYAPA, CITY OF CALAMBA, LAGUNA ENGINEER I
DATE: DATE:
DATE: DATE: