DAFTAR HARGA UPAH DAN BAHAN
HARGA SATUAN
NO URAIAN UPAH SATUAN KET
(RP)
1 Pekerja Orang 100,000.00
2 Tukang Orang 131,000.00
3 Kepala Tukang Orang 157,000.00
4 Mandor Orang 118,000.00
HARGA SATUAN
NO URAIAN BAHAN SATUAN KET
(RP)
1 Air Liter 100.00
2 Batu Bata Buah 1,192.00
3 Batu Kali/Batu Belah (Sungai/Gunung) M3 207,075.00
4 Besi Beton Polos Kg 17,068.00
5 Besi Beton Ulir Kg 23,343.00
6 Baja Profil Kg 29,925.00
7 Beton Roster / Kerawang Bh 41,415.00
8 Kawat Beton Kg 25,100.00
9 Semen @ 40 Kg Zak 65,260.00
10 Semen @ 40 Kg per- Kg Kg 1,631.50
11 Semen Warna @ 50 Kg Zak 232,175.00
12 Semen Warna @ 50 Kg per- Kg Kg 4,643.50
13 Seng Spandek t = 0,3 mm M2 78,000.00 seng tebal 0,35 p=2,4 l=75cm, harga per lbr
14 Nok Bubungan Seng Spandek M 42,500.00 1.8
15 Tanah Timbun M3 100,400.00 69444.44444
16 Pasir Urug M3 125,500.00
17 Pasir Pasang (lokal) M3 156,875.00
18 Pasir Beton/Kerikil (daratan) M3 564,750.00
19 Pasir Beton/Kerikil (daratan) Kg 418.33
20 Keramik 30 x 60 cm M2 155,000.00
21 Granit Tile 60 x 60 cm M2 326,300.00 326,300.00
22 Step Nosing Granit 10 x 60 cm Bh 45,000.00
23 Batu Alam Andesit M2 313,750.00
24 Kayu Kelas I M3 8,157,500.00
25 Kayu Kelas II M3 6,902,500.00
26 Kayu Kelas III M3 5,647,500.00
27 Papan Kayu Bouwplank 3/20 M3 5,647,500.00
28 Papan kayu Meuranti 3/20 M3 8,157,500.00
29 Kayu untuk Perancah M3 5,647,500.00
30 Dolken Kayu ø 8-10/4 m Btg 30,000.00
31 Multipleks 4 mm Lbr 94,125.00
32 Multipleks 9 mm Lbr 169,425.00
33 Gypsum Lbr 200,800.00
34 List Profil Gypsum M 16,315.00
35 Kloset Duduk Setara TOTO Bh 4,000,000.00
36 Wastafel Setara TOTO Bh 1,250,000.00
37 Shower Mandi Setara TOTO Bh 475,000.00
38 Kran Air Bh 45,000.00
39 Sealtape Bh 4,000.00
40 Sealent Kg 32,500.00
41 Floor Drain Bh 55,000.00
42 Roof Drain Bh 60,000.00
43 Pipa PVC 1/2 Inc M 7,600.00
44 Pipa PVC 3/4 Inc M 9,100.00
45 Pipa PVC 1 Inc M 12,600.00
46 Pipa PVC 2 Inc M 19,000.00
47 Pipa PVC 3 Inc M 42,000.00
48 Pipa PVC 4 Inc M 51,000.00
49 Kuas cat Bh 31,375.00
50 Plamir Tembok Kg 27,610.00
51 Dempul Kayu Kg 25,100.00
52 Cat Kayu Dasar Kg 52,710.00
53 Cat Menie Kg 81,575.00
54 Cat Kayu Mengkilat Kg 81,575.00
55 Cat Dinding Tembok setara Jotun/Dulux Kg 175,700.00
56 Paku Kayu Kg 18,825.00
57 Paku Seng Kg 25,100.00
58 Paku Skrup Kg 31,500.00
59 Minyak Cat Liter 31,375.00
60 Minyak Bekisting Liter 9,450.00
61 Kertas Amplas Lbr 12,550.00
62 Thinner Kg 31,375.00
63 Residu Liter 9,450.00
8,000
1,000
1,000
2,000
1,000
13,000
,4 l=75cm, harga per lbr 125rb 62,750.00
1,194
207,078
17,072
23,348
25,108
65,269
1,642
232,186
125,516
156,892
564,768
8,157,524
6,902,525
5,647,526
5,647,527
8,157,528
5,647,529
30,030
94,156
169,457
27,660
25,151
52,762
81,628
81,629
175,755
18,881
31,434
9,510
12,611
31,437
9,513
DAFTAR ANALISA HARGA SATUAN
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A. [Link] Pembersihan 1 m2 Lapangan dan Perataan
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.100 ### 10,000.00
Mandor OH 0.050 ### 5,900.00
Jumlah Tenaga Kerja 15,900.00
B BAHAN
Jumlah Harga Bahan 0.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 15,900.00
E Overhead & Profit (10%) 10% x D 1,590.00
F Harga Satuan Pekerjaan (D+E) 17,490.00
A. [Link] Pengukuran dan Pemasangan 1m' Bouwplank
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.100 ### 10,000.00
Tukang kayu OH 0.100 ### 13,100.00
Kepala Tukang OH 0.010 ### 1,570.00
Mandor OH 0.005 ### 590.00
Jumlah Tenaga Kerja 25,260.00
B BAHAN
Kayu Balok 5/7 m3 0.012 ### 67,770.00
Paku 2"-3" Kg 0.020 18,825.00 376.50
Kayu Papan 3/20 m3 0.007 ### 39,532.50
Jumlah Harga Bahan 107,679.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 132,939.00
E Overhead & Profit (10%) 10% x D 13,293.90
F Harga Satuan Pekerjaan (D+E) 146,232.90
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A. [Link] Penggalian 1 m3 Tanah Biasa sedalam 1 m
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.750 ### 75,000.00
Mandor OH 0.025 ### 2,950.00
Jumlah Tenaga Kerja 77,950.00
B BAHAN
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 77,950.00
E Overhead & Profit (10%) 10% x D 7,795.00
F Harga Satuan Pekerjaan (D+E) 85,745.00
A. [Link] Penggalian 1 m3 Tanah Biasa sedalam 2 m
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.900 ### 90,000.00
Mandor OH 0.045 ### 5,310.00
Jumlah Tenaga Kerja 95,310.00
B BAHAN
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 95,310.00
E Overhead & Profit (10%) 10% x D 9,531.00
F Harga Satuan Pekerjaan (D+E) 104,841.00
A. [Link] Pengurugan kembali 1 m3 galian tanah
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koofisien pekerjaan g
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.500 ### 50,000.00
Mandor OH 0.050 ### 5,900.00
Jumlah Tenaga Kerja 55,900.00
B BAHAN
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 55,900.00
E Overhead & Profit (10%) 10% x D 5,590.00
F Harga Satuan Pekerjaan (D+E) 61,490.00
A. 2.3.1.11Pengurugan 1 m3 dengan pasir urug
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.300 ### 30,000.00
Mandor OH 0.010 ### 1,180.00
Jumlah Tenaga Kerja 31,180.00
B BAHAN
Pasir Urug m3 1.200 ### 150,600.00
Jumlah Harga Bahan 150,600.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 181,780.00
E Overhead & Profit (10%) 10% x D 18,178.00
F Harga Satuan Pekerjaan (D+E) 199,958.00
A. 2.3.1.11Pengurugan 1 m3 Tanah Timbun
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.300 ### 30,000.00
Mandor OH 0.010 ### 1,180.00
Jumlah Tenaga Kerja 31,180.00
B BAHAN
Tanah Timbun m3 1.200 ### 120,480.00
Jumlah Harga Bahan 120,480.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 151,660.00
E Overhead & Profit (10%) 10% x D 15,166.00
F Harga Satuan Pekerjaan (D+E) 166,826.00
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A. [Link] Pemasangan 1m3 pondasi batu belah campuran 1SP : 4PP
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.500 ### 150,000.00
Tukang batu OH 0.750 ### 98,250.00
Kepala Tukang OH 0.075 ### 11,775.00
Mandor OH 0.075 ### 8,850.00
Jumlah Tenaga Kerja 268,875.00
B BAHAN
Batu Belah/ Kali m3 1.200 ### 248,490.00
Semen Portland Kg ### 1,631.50 265,934.50
Pasir Pasang m3 0.520 ### 81,575.00
Jumlah Harga Bahan 595,999.50
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 864,874.50
E Overhead & Profit (10%) 10% x D 86,487.45
F Harga Satuan Pekerjaan (D+E) 951,361.95
A. [Link] Pemasangan 1m3 batu kosong (Aanstamping)
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.780 ### 78,000.00
Tukang batu OH 0.390 ### 51,090.00
Kepala Tukang OH 0.039 ### 6,123.00
Mandor OH 0.039 ### 4,602.00
Jumlah Tenaga Kerja 139,815.00
B BAHAN
Batu Belah/ Kali m3 1.200 ### 248,490.00
Pasir Urug m3 0.432 ### 54,216.00
Jumlah Harga Bahan 302,706.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 442,521.00
E Overhead & Profit (10%) 10% x D 44,252.10
F Harga Satuan Pekerjaan (D+E) 486,773.10
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
Catatan : Bobot isi pasir = 1400 kg/m3 , Bobot isi kerikil = 1350 kg/m3
A. [Link] Membuat 1 m3 beton mutu f'c = 7.4 Mpa (K 100),slump (12 ± 2) cm, w
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.650 ### 165,000.00
Tukang batu OH 0.275 ### 36,025.00
Kepala Tukang OH 0.028 ### 4,396.00
Mandor OH 0.083 ### 9,794.00
Jumlah Tenaga Kerja 215,215.00
B BAHAN
Semen Portland kg 247 1,631.50 402,980.50
Pasir Beton kg 869 418.33 363,531.67
Kerikil (Maks 30 mm) kg 999 418.33 417,915.00
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 142,114.22
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Membuat 1 m3 beton mutu f'c = 9.8 Mpa (K 125),slump (12 ± 2) cm, w
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.650 ### 165,000.00
Tukang batu OH 0.275 ### 36,025.00
Kepala Tukang OH 0.028 ### 4,396.00
Mandor OH 0.083 ### 9,794.00
Jumlah Tenaga Kerja 215,215.00
B BAHAN
Semen Portland kg 276 1,631.50 450,294.00
Pasir Beton kg 828 418.33 346,380.00
Kerikil (Maks 30 mm) kg 1,012 418.33 423,353.33
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 145,674.23
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Membuat 1 m3 beton mutu f'c = 12.2 Mpa (K 150),slump (12 ± 2) cm,
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.650 ### 165,000.00
Tukang batu OH 0.275 ### 36,025.00
Kepala Tukang OH 0.028 ### 4,396.00
Mandor OH 0.083 ### 9,794.00
Jumlah Tenaga Kerja 215,215.00
B BAHAN
Semen Portland kg 299 1,631.50 487,818.50
Pasir Beton kg 799 418.33 334,248.33
Kerikil (Maks 30 mm) kg 1,017 418.33 425,445.00
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 148,422.68
F Harga Satuan Pekerjaan (D+E) ###
Membuat 1 m3 lantai kerja beton mutu f'c = 7.4 Mpa (K
A. [Link]
No. 100),slump
Uraian (3 - 6) cm, w/c = 0.87
SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.200 ### 120,000.00
Tukang batu OH 0.200 ### 26,200.00
Kepala Tukang OH 0.020 ### 3,140.00
Mandor OH 0.060 ### 7,080.00
Jumlah Tenaga Kerja 156,420.00
B BAHAN
Semen Portland kg 230 1,631.50 375,245.00
Pasir Beton kg 893 418.33 373,571.67
Kerikil (Maks 30 mm) kg 1,027 418.33 429,628.33
Air Liter 200 100.00 20,000.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 135,486.50
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K 175), slump (12 ± 2) cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.650 ### 165,000.00
Tukang batu OH 0.275 ### 36,025.00
Kepala Tukang OH 0.028 ### 4,396.00
Mandor OH 0.083 ### 9,794.00
Jumlah Tenaga Kerja 215,215.00
B BAHAN
Semen Portland kg 326 1,631.50 531,869.00
Pasir Beton kg 760 418.33 317,933.33
Kerikil (Maks 30 mm) kg 1,029 418.33 430,465.00
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 151,698.23
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Membuat 1 m3 beton mutu f'c = 16.9 Mpa (K 200), slump (12 ± 2) cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.650 ### 165,000.00
Tukang batu OH 0.275 ### 36,025.00
Kepala Tukang OH 0.028 ### 4,396.00
Mandor OH 0.083 ### 9,794.00
Jumlah Tenaga Kerja 215,215.00
B BAHAN
Semen Portland kg 352 1,631.50 574,288.00
Pasir Beton kg 731 418.33 305,801.67
Kerikil (Maks 30 mm) kg 1,031 418.33 431,301.67
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 154,810.63
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Membuat 1 m3 beton mutu f'c = 19.3 Mpa (K 225), slump (12 ± 2) cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.650 ### 165,000.00
Tukang batu OH 0.275 ### 36,025.00
Kepala Tukang OH 0.028 ### 4,396.00
Mandor OH 0.083 ### 9,794.00
Jumlah Tenaga Kerja 215,215.00
B BAHAN
Semen Portland kg 371 1,631.50 605,286.50
Pasir Beton kg 698 418.33 291,996.67
Kerikil (Maks 30 mm) kg 1,047 418.33 437,995.00
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 157,199.32
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Membuat 1 m3 beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.650 ### 165,000.00
Tukang batu OH 0.275 ### 36,025.00
Kepala Tukang OH 0.028 ### 4,396.00
Mandor OH 0.083 ### 9,794.00
Jumlah Tenaga Kerja 215,215.00
B BAHAN
Semen Portland kg 384 1,631.50 626,496.00
Pasir Beton kg 692 418.33 289,486.67
Kerikil (Maks 30 mm) kg 1,039 418.33 434,648.33
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 158,734.60
F Harga Satuan Pekerjaan (D+E) ###
A. 4.1.1.17Pembesian 10 kg dengan besi polos
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.070 ### 7,000.00
Tukang besi OH 0.070 ### 9,170.00
Kepala Tukang OH 0.007 ### 1,099.00
Mandor OH 0.004 ### 472.00
Jumlah Tenaga Kerja 17,741.00
B BAHAN
Besi Beton Polos kg 10.500 17,068.00 179,214.00
Kawat Beton kg 0.150 25,100.00 3,765.00
Jumlah Harga Bahan 182,979.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 200,720.00
E Overhead & Profit (10%) 10% x D 20,072.00
F Harga Satuan Pekerjaan (D+E) 220,792.00
G Harga Satuan per kg besi F : 10 kg 22,079.20
A. 4.1.1.17Pembesian 10 kg dengan besi ulir
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.070 ### 7,000.00
Tukang besi OH 0.070 ### 9,170.00
Kepala Tukang OH 0.007 ### 1,099.00
Mandor OH 0.004 ### 472.00
Jumlah Tenaga Kerja 17,741.00
B BAHAN
Besi Beton Ulir kg 10.500 23,343.00 245,101.50
Kawat Beton kg 0.150 25,100.00 3,765.00
Jumlah Harga Bahan 248,866.50
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 266,607.50
E Overhead & Profit (10%) 10% x D 26,660.75
F Harga Satuan Pekerjaan (D+E) 293,268.25
G Harga Satuan per kg besi F : 10 kg 29,326.83
A. 4.1.1.20Pemasangan 1m2 bekesting untuk pondasi
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.520 ### 52,000.00
Tukang kayu OH 0.260 ### 34,060.00
Kepala Tukang OH 0.026 ### 4,082.00
Mandor OH 0.026 ### 3,068.00
Jumlah Tenaga Kerja 93,210.00
B BAHAN
Kayu Klas III m3 0.040 ### 225,900.00
Paku 5 - 10 cm kg 0.300 18,825.00 5,647.50
Minyak Bekesting liter 0.100 9,450.00 945.00
Jumlah Harga Bahan 232,492.50
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 325,702.50
E Diambil Untuk 2 x pakai 162,851.25
F Overhead & Profit (10%) 10% x D 16,285.13
G Harga Satuan Pekerjaan (E+F) 179,136.38
A. 4.1.1.21Pemasangan 1m2 bekesting untuk sloof
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.520 ### 52,000.00
Tukang kayu OH 0.260 ### 34,060.00
Kepala Tukang OH 0.026 ### 4,082.00
Mandor OH 0.026 ### 3,068.00
Jumlah Tenaga Kerja 93,210.00
B BAHAN
Kayu Klas III m3 0.045 ### 254,137.50
Paku 5 - 10 cm kg 0.300 18,825.00 5,647.50
Minyak Bekesting liter 0.100 9,450.00 945.00
Jumlah Harga Bahan 260,730.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 353,940.00
E Diambil Untuk 2 x pakai 176,970.00
F Overhead & Profit (10%) 10% x D 17,697.00
G Harga Satuan Pekerjaan (E+F) 194,667.00
A. 4.1.1.22Pemasangan 1m2 bekesting untuk kolom
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.660 ### 66,000.00
Tukang kayu OH 0.330 ### 43,230.00
Kepala Tukang OH 0.033 ### 5,181.00
Mandor OH 0.033 ### 3,894.00
Jumlah Tenaga Kerja 118,305.00
B BAHAN
Kayu Klas III m3 0.040 ### 225,900.00
Paku 5 - 10 cm kg 0.400 18,825.00 7,530.00
Minyak Bekesting liter 0.200 9,450.00 1,890.00
Balok Kayu Klas II m3 0.015 ### 103,537.50
Plywood tebal
Dolken kayu ᴓ9 8 mm
- 10 Lbr 0.350 ### 59,298.75
Batan2.000 30,000.00 60,000.00
cm Bahan
Jumlah Harga - panjang 4 m 458,156.25
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 576,461.25
E Diambil Untuk 2 x pakai 288,230.63
F Overhead & Profit (10%) 10% x D 28,823.06
G Harga Satuan Pekerjaan (E+F) 317,053.69
A. [Link].Pemasangan 1m2 bekesting untuk kolom Praktis dan Balok Praktis
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.660 ### 66,000.00
Tukang kayu OH 0.330 ### 43,230.00
Kepala Tukang OH 0.033 ### 5,181.00
Mandor OH 0.033 ### 3,894.00
Jumlah Tenaga Kerja 118,305.00
B BAHAN
Kayu Klas III m3 0.020 ### 112,950.00
Paku 5 - 10 cm kg 0.200 18,825.00 3,765.00
Minyak Bekesting liter 0.200 9,450.00 1,890.00
Balok Kayu Klas II m3 0.007 ### 48,317.50
Jumlah Harga Bahan 166,922.50
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 285,227.50
E Diambil Untuk 2 x pakai 142,613.75
F Overhead & Profit (10%) 10% x D 14,261.38
G Harga Satuan Pekerjaan (E+F) 156,875.13
A. 4.1.1.23Pemasangan 1m2 bekesting untuk balok
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.660 ### 66,000.00
Tukang kayu OH 0.330 ### 43,230.00
Kepala Tukang OH 0.033 ### 5,181.00
Mandor OH 0.033 ### 3,894.00
Jumlah Tenaga Kerja 118,305.00
B BAHAN
Kayu Klas III m3 0.040 ### 225,900.00
Paku 5 - 10 cm kg 0.400 18,825.00 7,530.00
Minyak Bekesting liter 0.200 9,450.00 1,890.00
Balok Kayu Klas II m3 0.018 ### 124,245.00
Plywood tebal
Dolken kayu ᴓ98 mm
- 10 Lbr 0.350 ### 59,298.75
Batan2.000 30,000.00 60,000.00
cm - panjang
Jumlah Harga Bahan 4 m 478,863.75
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 597,168.75
E Diambil Untuk 2 x pakai 298,584.38
F Overhead & Profit (10%) 10% x D 29,858.44
G Harga Satuan Pekerjaan (E+F) 328,442.81
A. 4.1.1.24Pemasangan 1m2 bekesting untuk lantai
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.660 ### 66,000.00
Tukang kayu OH 0.330 ### 43,230.00
Kepala Tukang OH 0.033 ### 5,181.00
Mandor OH 0.033 ### 3,894.00
Jumlah Tenaga Kerja 118,305.00
B BAHAN
Kayu Klas III m3 0.040 ### 225,900.00
Paku 5 - 10 cm kg 0.400 18,825.00 7,530.00
Minyak Bekesting liter 0.200 9,450.00 1,890.00
Balok Kayu Klas II m3 0.015 ### 103,537.50
Plywood tebal
Dolken kayu ᴓ98 mm
- 10 Lbr 0.350 ### 59,298.75
Batan6.000 30,000.00 180,000.00
cm - panjang
Jumlah Harga Bahan 4 m 578,156.25
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 696,461.25
E Diambil Untuk 2 x pakai 348,230.63
F Overhead & Profit (10%) 10% x D 34,823.06
G Harga Satuan Pekerjaan (E+F) 383,053.69
A. 4.1.1.26Pemasangan 1m2 bekesting untuk tangga
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.660 ### 66,000.00
Tukang kayu OH 0.330 ### 43,230.00
Kepala Tukang OH 0.033 ### 5,181.00
Mandor OH 0.033 ### 3,894.00
Jumlah Tenaga Kerja 118,305.00
B BAHAN
Kayu Klas III m3 0.030 ### 169,425.00
Paku 5 - 10 cm kg 0.400 18,825.00 7,530.00
Minyak Bekesting liter 0.150 9,450.00 1,417.50
Balok Kayu Klas II m3 0.010 ### 69,025.00
Plywood tebal
Dolken kayu ᴓ98 mm
- 10 Lbr 0.350 ### 59,298.75
Batan2.000 30,000.00 60,000.00
cm Bahan
Jumlah Harga - panjang 4 m 366,696.25
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 485,001.25
E Overhead & Profit (10%) 10% x D 48,500.13
F Harga Satuan Pekerjaan (D+E) 533,501.38
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM
A. [Link] Memasang 1 kg besi profil
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.060 ### 6,000.00
Tukang besi OH 0.060 ### 7,860.00
Kepala Tukang OH 0.006 ### 942.00
Mandor OH 0.003 ### 354.00
Jumlah Tenaga Kerja 15,156.00
B BAHAN
Besi Baja Profil kg 1.150 29,925.00 34,413.75
Jumlah Harga Bahan 34,413.75
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 49,569.75
E Overhead & Profit (10%) 10% x D 4,956.98
F Harga Satuan Pekerjaan (D+E) 54,526.73
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A. [Link] Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu c
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.300 ### 30,000.00
Tukang batu OH 0.100 ### 13,100.00
Kepala Tukang OH 0.010 ### 1,570.00
Mandor OH 0.015 ### 1,770.00
Jumlah Tenaga Kerja 46,440.00
B BAHAN
Bata Merah bh 70.000 1,192.00 83,440.00
Semen Portland kg 18.950 1,631.50 30,916.93
Pasir Pasang m3 0.038 ### 5,961.25
Jumlah Harga Bahan 120,318.18
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 166,758.18
E Overhead & Profit (10%) 10% x D 16,675.82
F Harga Satuan Pekerjaan (D+E) 183,433.99
A. [Link] Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu c
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.300 ### 30,000.00
Tukang batu OH 0.100 ### 13,100.00
Kepala Tukang OH 0.010 ### 1,570.00
Mandor OH 0.015 ### 1,770.00
Jumlah Tenaga Kerja 46,440.00
B BAHAN
Bata Merah bh 70.000 1,192.00 83,440.00
Semen Portland kg 11.500 1,631.50 18,762.25
Pasir Pasang m3 0.043 ### 6,745.63
Jumlah Harga Bahan 108,947.88
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 155,387.88
E Overhead & Profit (10%) 10% x D 15,538.79
F Harga Satuan Pekerjaan (D+E) 170,926.66
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
A. [Link] Pemasangan 1 m2 Plesteran 1SP : 2PP tebal 15 mm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.300 ### 30,000.00
Tukang batu OH 0.150 ### 19,650.00
Kepala Tukang OH 0.015 ### 2,355.00
Mandor OH 0.015 ### 1,770.00
Jumlah Tenaga Kerja 53,775.00
B BAHAN
Semen Portland kg 10.224 1,631.50 16,680.46
Pasir Pasang m3 0.020 ### 3,137.50
Jumlah Harga Bahan 19,817.96
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 73,592.96
E Overhead & Profit (10%) 10% x D 7,359.30
F Harga Satuan Pekerjaan (D+E) 80,952.25
A. [Link] Pemasangan 1 m2 Plesteran 1SP : 4PP tebal 15 mm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.300 ### 30,000.00
Tukang batu OH 0.150 ### 19,650.00
Kepala Tukang OH 0.015 ### 2,355.00
Mandor OH 0.015 ### 1,770.00
Jumlah Tenaga Kerja 53,775.00
B BAHAN
Semen Portland kg 6.240 1,631.50 10,180.56
Pasir Pasang m3 0.024 ### 3,765.00
Jumlah Harga Bahan 13,945.56
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 67,720.56
E Overhead & Profit (10%) 10% x D 6,772.06
F Harga Satuan Pekerjaan (D+E) 74,492.62
A. 4.4.2.27Pemasangan 1 m2 Acian
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.200 ### 20,000.00
Tukang batu OH 0.100 ### 13,100.00
Kepala Tukang OH 0.010 ### 1,570.00
Mandor OH 0.010 ### 1,180.00
Jumlah Tenaga Kerja 35,850.00
B BAHAN
Semen Portland kg 3.250 1,631.50 5,302.38
Jumlah Harga Bahan 5,302.38
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 41,152.38
E Overhead & Profit (10%) 10% x D 4,115.24
F Harga Satuan Pekerjaan (D+E) 45,267.61
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP D
A. [Link] Pemasangan 1 m2 Lantai Granit ukuran 60 x 60 cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.250 ### 25,000.00
Tukang batu OH 0.125 ### 16,375.00
Kepala Tukang OH 0.013 ### 2,041.00
Mandor OH 0.013 ### 1,534.00
Jumlah Tenaga Kerja 44,950.00
B BAHAN
Granit 60 x 60 cm m2 1.060 ### 345,878.00
Semen Portland kg 9.800 1,631.50 15,988.70
Pasir Pasang m3 0.045 ### 7,059.38
Semen Warna kg 1.300 4,643.50 6,036.55
Jumlah Harga Bahan 374,962.63
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 419,912.63
E Overhead & Profit (10%) 10% x D 41,991.26
F Harga Satuan Pekerjaan (D+E) 461,903.89
A. 4.4.3.24Pemasangan 1 m' Step Nosing Granit ukuran 10 x 60 cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.090 ### 9,000.00
Tukang batu OH 0.090 ### 11,790.00
Kepala Tukang OH 0.009 ### 1,413.00
Mandor OH 0.005 ### 590.00
Jumlah Tenaga Kerja 22,793.00
B BAHAN
Plint Granit 10 x 60 cm Bh 1.767 45,000.00 79,500.00
Semen Portland kg 1.140 1,631.50 1,859.91
Semen Warna kg 0.100 4,643.50 464.35
Pasir Pasang m3 0.003 ### 470.63
Jumlah Harga Bahan 82,294.89
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 105,087.89
E Overhead & Profit (10%) 10% x D 10,508.79
F Harga Satuan Pekerjaan (D+E) 115,596.67
A. 4.4.3.54Pemasangan 1 m2 Dinding Keramik ukuran 30 x 60 cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.900 ### 90,000.00
Tukang batu OH 0.450 ### 58,950.00
Kepala Tukang OH 0.045 ### 7,065.00
Mandor OH 0.045 ### 5,310.00
Jumlah Tenaga Kerja 161,325.00
B BAHAN
Keramik 30 x 60 cm m2 1.060 ### 164,300.00
Semen Portland kg 9.300 1,631.50 15,172.95
Pasir Pasang m3 0.018 ### 2,823.75
Semen Warna kg 1.940 4,643.50 9,008.39
Jumlah Harga Bahan 191,305.09
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 352,630.09
E Overhead & Profit (10%) 10% x D 35,263.01
F Harga Satuan Pekerjaan (D+E) 387,893.10
A.4.5.1. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
A. [Link] Pemasangan 1 m2 Langit-langit Gypsum Board ukuran (120 x 240) cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.100 ### 10,000.00
Tukang Kayu OH 0.050 ### 6,550.00
Kepala Tukang OH 0.005 ### 785.00
Mandor OH 0.005 ### 590.00
Jumlah Tenaga Kerja 17,925.00
B BAHAN
Gypsum Board Lemba 0.364 ### 73,091.20
Paku Skrup kg 0.110 31,500.00 3,465.00
Jumlah Harga Bahan 76,556.20
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 94,481.20
E Overhead & Profit (10%) 10% x D 9,448.12
F Harga Satuan Pekerjaan (D+E) 103,929.32
A. [Link] Pemasangan 1 m' List Langit-langit Gypsum
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.050 ### 5,000.00
Tukang Kayu OH 0.050 ### 6,550.00
Kepala Tukang OH 0.005 ### 785.00
Mandor OH 0.003 ### 354.00
Jumlah Tenaga Kerja 12,689.00
B BAHAN
List Profil Gypsum m' 1.050 16,315.00 17,130.75
Paku Skrup kg 0.010 31,500.00 315.00
Jumlah Harga Bahan 17,445.75
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 30,134.75
E Overhead & Profit (10%) 10% x D 3,013.48
F Harga Satuan Pekerjaan (D+E) 33,148.23
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A. 4.5.2.38Pemasangan 1 m2 Atap Seng Spandek
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.120 ### 12,000.00
Tukang Kayu OH 0.060 ### 7,860.00
Kepala Tukang OH 0.006 ### 942.00
Mandor OH 0.006 ### 708.00
Jumlah Tenaga Kerja 21,510.00
B BAHAN
Seng Spandek m2 1.100 78,000.00 85,800.00
Paku Seng kg 0.200 25,100.00 5,020.00
Jumlah Harga Bahan 90,820.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 112,330.00
E Overhead & Profit (10%) 10% x D 11,233.00
F Harga Satuan Pekerjaan (D+E) 123,563.00
A. 4.5.2.39Pemasangan 1 m' Nok Atap Seng Spandek
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.150 ### 15,000.00
Tukang Kayu OH 0.070 ### 9,170.00
Kepala Tukang OH 0.007 ### 1,099.00
Mandor OH 0.006 ### 708.00
Jumlah Tenaga Kerja 25,977.00
B BAHAN
Nok seng Spandek m 1.100 42,500.00 46,750.00
Paku Seng kg 0.100 25,100.00 2,510.00
Jumlah Harga Bahan 49,260.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 75,237.00
E Overhead & Profit (10%) 10% x D 7,523.70
F Harga Satuan Pekerjaan (D+E) 82,760.70
A. [Link] m' Pasang talang datar/ jurai seng
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.200 ### 20,000.00
Tukang Kayu OH 0.400 ### 52,400.00
Kepala Tukang OH 0.250 ### 39,250.00
Mandor OH 0.010 ### 1,180.00
Jumlah Tenaga Kerja 112,830.00
B BAHAN
Seng Plat Lbr 0.375 42,500.00 15,937.50
Papan Kayu m3 0.002 ### 15,499.25
Paku Seng Kg 0.285 25,100.00 7,153.50
Jumlah Harga Bahan 38,590.25
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 151,420.25
E Overhead & Profit (10%45 10% x D 15,142.03
F Harga Satuan Pekerjaan (D+E) 166,562.28
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
A. 4.6.1.21Pemasangan 1 m' Listplank ukuran (3 x 20) cm, Kayu Klas II
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.100 ### 10,000.00
Tukang Kayu OH 0.200 ### 26,200.00
Kepala Tukang OH 0.020 ### 3,140.00
Mandor OH 0.005 ### 590.00
Jumlah Tenaga Kerja 39,930.00
B BAHAN
Papan Kayu m3 0.011 ### 88,101.00
Paku 5 dan 7 cm kg 0.100 18,825.00 1,882.50
Jumlah Harga Bahan 89,983.50
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 129,913.50
E Overhead & Profit (10%) 10% x D 12,991.35
F Harga Satuan Pekerjaan (D+E) 142,904.85
A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN
A. [Link] Pengecatan 1 m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.070 ### 7,000.00
Tukang Cat OH 0.009 ### 1,179.00
Kepala Tukang OH 0.006 ### 942.00
Mandor OH 0.003 ### 354.00
Jumlah Tenaga Kerja 9,475.00
B BAHAN
Cat Menie kg 0.200 81,575.00 16,315.00
Plamur kg 0.150 27,610.00 4,141.50
Cat Dasar kg 0.170 52,710.00 8,960.70
Cat Penutup kg 0.260 ### 45,682.00
Kuas Bh 0.010 31,375.00 313.75
Pengencer/Thinner kg 0.030 31,375.00 941.25
Amplas Lbr 0.200 12,550.00 2,510.00
Jumlah Harga Bahan 78,864.20
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 88,339.20
E Overhead & Profit (10%) 10% x D 8,833.92
F Harga Satuan Pekerjaan (D+E) 97,173.12
A. [Link] Pelaburan 1 m2 bidang kayu dengan cat residu dan Ter
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.100 ### 10,000.00
Mandor OH 0.006 ### 708.00
Jumlah Tenaga Kerja 10,708.00
B BAHAN
Residu atau ter Liter 0.350 9,450.00 3,307.50
Jumlah Harga Bahan 3,307.50
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 14,015.50
E Overhead & Profit (10%) 10% x D 1,401.55
F Harga Satuan Pekerjaan (D+E) 15,417.05
A. 4.7.1.10Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapi
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.020 ### 2,000.00
Tukang Cat OH 0.063 ### 8,253.00
Kepala Tukang OH 0.0063 ### 989.10
Mandor OH 0.003 ### 354.00
Jumlah Tenaga Kerja 11,596.10
B BAHAN
Plamur kg 0.100 27,610.00 2,761.00
Cat Dasar kg 0.100 52,710.00 5,271.00
Cat Penutup kg 0.260 ### 45,682.00
Jumlah Harga Bahan 53,714.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 65,310.10
E Overhead & Profit (10%) 10% x D 6,531.01
F Harga Satuan Pekerjaan (D+E) 71,841.11
A. 4.7.1.12Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.028 ### 2,800.00
Tukang Cat OH 0.042 ### 5,502.00
Kepala Tukang OH 0.0042 ### 659.40
Mandor OH 0.003 ### 354.00
Jumlah Tenaga Kerja 9,315.40
B BAHAN
Cat Dasar kg 0.120 52,710.00 6,325.20
Cat Penutup kg 0.180 ### 31,626.00
Jumlah Harga Bahan 37,951.20
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 47,266.60
E Overhead & Profit (10%) 10% x D 4,726.66
F Harga Satuan Pekerjaan (D+E) 51,993.26
A. 4.7.1.18Pengecatan 1 m2 Permukaan baja 4 lapis
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.250 ### 25,000.00
Tukang Cat OH 0.250 ### 32,750.00
Kepala Tukang OH 0.025 ### 3,925.00
Mandor OH 0.0013 ### 153.40
Jumlah Tenaga Kerja 61,828.40
B BAHAN
Cat Menie kg 0.200 81,575.00 16,315.00
Cat Penutup kg 0.160 81,575.00 13,052.00
Kuas Bh 0.010 31,375.00 313.75
Pengencer Ltr 0.010 31,375.00 313.75
Jumlah Harga Bahan 29,994.50
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 91,822.90
E Overhead & Profit (10%) 10% x D 9,182.29
F Harga Satuan Pekerjaan (D+E) 101,005.19
A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A. [Link] Pemasangan 1 buah Kloset Duduk
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 3.300 ### 330,000.00
Tukang OH 1.100 ### 144,100.00
Kepala Tukang OH 0.010 ### 1,570.00
Mandor OH 0.160 ### 18,880.00
Jumlah Tenaga Kerja 494,550.00
B BAHAN
Kloset Duduk Bh 1.000 ### ###
Perlengkapan 6% x KlosLs 1.000 ### 240,000.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 473,455.00
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Pemasangan 1 buah Wastafel
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.200 ### 120,000.00
Tukang OH 1.450 ### 189,950.00
Kepala Tukang OH 0.150 ### 23,550.00
Mandor OH 0.060 ### 7,080.00
Jumlah Tenaga Kerja 340,580.00
B BAHAN
Wastafel Unit 1.000 ### ###
Semen Portland Kg 6.000 1,631.50 9,789.00
Pasir Pasang M3 0.010 ### 1,568.75
Perlengkapan 12% x WaLs 1.000 ### 150,000.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 175,193.78
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Pemasangan 1 buah Shower Mandi
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.200 ### 120,000.00
Tukang OH 1.450 ### 189,950.00
Kepala Tukang OH 0.150 ### 23,550.00
Mandor OH 0.060 ### 7,080.00
Jumlah Tenaga Kerja 340,580.00
B BAHAN
Shower Mandi Unit 1.000 ### 475,000.00
Semen Portland Kg 6.000 1,631.50 9,789.00
Pasir Pasang M3 0.010 ### 1,568.75
Perlengkapan 12% x ShLs 1.000 57,000.00 57,000.00
Jumlah Harga Bahan 543,357.75
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 883,937.75
E Overhead & Profit (10%) 10% x D 88,393.78
F Harga Satuan Pekerjaan (D+E) 972,331.53
A. 5.1.1.19Pemasangan Kran Air 1/2" atau 3/4"
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.010 ### 1,000.00
Tukang OH 0.400 ### 52,400.00
Kepala Tukang OH 0.040 ### 6,280.00
Mandor OH 0.005 ### 590.00
Jumlah Tenaga Kerja 60,270.00
B BAHAN
Kran Air Bh 1.000 45,000.00 45,000.00
Sealtape Bh 0.025 4,000.00 100.00
Jumlah Harga Bahan 45,100.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 105,370.00
E Overhead & Profit (10%) 10% x D 10,537.00
F Harga Satuan Pekerjaan (D+E) 115,907.00
A. [Link] Bh Pemasangan Floord
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.010 ### 1,000.00
Tukang OH 0.100 ### 13,100.00
Kepala Tukang OH 0.010 ### 1,570.00
Mandor OH 0.005 ### 590.00
Jumlah Tenaga Kerja 16,260.00
B BAHAN
Floor Drain Bh 1.000 55,000.00 55,000.00
0.00
Jumlah Harga Bahan 55,000.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 71,260.00
E Overhead & Profit (10%) 10% x D 7,126.00
F Harga Satuan Pekerjaan (D+E) 78,386.00
A. [Link] Bh Pemasangan Roof d
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.010 ### 1,000.00
Tukang OH 0.100 ### 13,100.00
Kepala Tukang OH 0.010 ### 1,570.00
Mandor OH 0.005 ### 590.00
Jumlah Tenaga Kerja 16,260.00
B BAHAN
Roof Drain Bh 1.000 60,000.00 60,000.00
0.00
Jumlah Harga Bahan 60,000.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 76,260.00
E Overhead & Profit (10%) 10% x D 7,626.00
F Harga Satuan Pekerjaan (D+E) 83,886.00
A. 5.1.1.25Pemasangan Pipa PVC Tipe AW Diameter 1/2"
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.036 ### 3,600.00
Tukang Pipa OH 0.060 ### 7,860.00
Kepala Tukang OH 0.006 ### 942.00
Mandor OH 0.002 ### 236.00
Jumlah Tenaga Kerja 12,638.00
B BAHAN
Pipa PVC 1/2" M 1.200 7,600.00 9,120.00
Perlengkapan 35% x Pi Ls 1.000 2,660.00 2,660.00
Jumlah Harga Bahan 11,780.00
C PERALATAN
Jumlah Harga Alat 0.00
D Jumlah (A + B + C) 24,418.00
E Overhead & Profit (10%) 10% x D 2,441.80
F Harga Satuan Pekerjaan (D+E) 26,859.80
A. 5.1.1.26Pemasangan Pipa PVC Tipe AW Diameter 3/4"
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.036 ### 3,600.00
Tukang Pipa OH 0.060 ### 7,860.00
Kepala Tukang OH 0.006 ### 942.00
Mandor OH 0.002 ### 236.00
Jumlah Tenaga Kerja 12,638.00
B BAHAN
Pipa PVC 3/4" M 1.200 9,100.00 10,920.00
Perlengkapan 35% x Pi Ls 1.000 3,185.00 3,185.00
Jumlah Harga Bahan 14,105.00
C PERALATAN
Jumlah Harga Alat 0.00
D Jumlah (A + B + C) 26,743.00
E Overhead & Profit (10%) 10% x D 2,674.30
F Harga Satuan Pekerjaan (D+E) 29,417.30
A. 5.1.1.27Pemasangan Pipa PVC Tipe AW Diameter 1"
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.036 ### 3,600.00
Tukang Pipa OH 0.060 ### 7,860.00
Kepala Tukang OH 0.006 ### 942.00
Mandor OH 0.002 ### 236.00
Jumlah Tenaga Kerja 12,638.00
B BAHAN
Pipa PVC 1" M 1.200 12,600.00 15,120.00
Perlengkapan 35% x Pi Ls 1.000 4,410.00 4,410.00
Jumlah Harga Bahan 19,530.00
C PERALATAN
Jumlah Harga Alat 0.00
D Jumlah (A + B + C) 32,168.00
E Overhead & Profit (10%) 10% x D 3,216.80
F Harga Satuan Pekerjaan (D+E) 35,384.80
A. 5.1.1.29Pemasangan Pipa PVC Tipe AW Diameter 2"
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.054 ### 5,400.00
Tukang Pipa OH 0.090 ### 11,790.00
Kepala Tukang OH 0.009 ### 1,413.00
Mandor OH 0.003 ### 354.00
Jumlah Tenaga Kerja 18,957.00
B BAHAN
Pipa PVC 2" M 1.200 19,000.00 22,800.00
Perlengkapan 35% x Pi Ls 1.000 6,650.00 6,650.00
Jumlah Harga Bahan 29,450.00
C PERALATAN
Jumlah Harga Alat 0.00
D Jumlah (A + B + C) 48,407.00
E Overhead & Profit (10%) 10% x D 4,840.70
F Harga Satuan Pekerjaan (D+E) 53,247.70
A. 5.1.1.31Pemasangan Pipa PVC Tipe AW Diameter 3"
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.081 ### 8,100.00
Tukang Pipa OH 0.135 ### 17,685.00
Kepala Tukang OH 0.0135 ### 2,119.50
Mandor OH 0.004 ### 472.00
Jumlah Tenaga Kerja 28,376.50
B BAHAN
Pipa PVC 3" M 1.200 42,000.00 50,400.00
Perlengkapan 35% x Pi Ls 1.000 14,700.00 14,700.00
Jumlah Harga Bahan 65,100.00
C PERALATAN
Jumlah Harga Alat 0.00
D Jumlah (A + B + C) 93,476.50
E Overhead & Profit (10%) 10% x D 9,347.65
F Harga Satuan Pekerjaan (D+E) 102,824.15
A. 5.1.1.32Pemasangan Pipa PVC Tipe AW Diameter 4"
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.081 ### 8,100.00
Tukang Pipa OH 0.135 ### 17,685.00
Kepala Tukang OH 0.0135 ### 2,119.50
Mandor OH 0.004 ### 472.00
Jumlah Tenaga Kerja 28,376.50
B BAHAN
Pipa PVC 4" M 1.200 51,000.00 61,200.00
Perlengkapan 35% x Pi Ls 1.000 17,850.00 17,850.00
Jumlah Harga Bahan 79,050.00
C PERALATAN
Jumlah Harga Alat 0.00
D Jumlah (A + B + C) 107,426.50
E Overhead & Profit (10%) 10% x D 10,742.65
F Harga Satuan Pekerjaan (D+E) 118,169.15
h Harga
h Harga
h Harga
h Harga
ien pekerjaan galian
h Harga
h Harga
h Harga
h Harga
h Harga
kg/m3
p (12 ± 2) cm, w/c = 0.87
h Harga
p (12 ± 2) cm, w/c = 0.78
h Harga
mp (12 ± 2) cm, w/c = 0.72
h Harga
h Harga
mp (12 ± 2) cm, w/c = 0.66
h Harga
125000
65000 14 4642.9
90000 25 3600
mp (12 ± 2) cm, w/c = 0.61
h Harga
mp (12 ± 2) cm, w/c = 0.58
h Harga
mp (12 ± 2) cm, w/c = 0.56
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
Balok Praktis
h Harga
h Harga
h Harga
h Harga
h Harga
tebal 1/2 batu campuran 1SP : 2PP
h Harga
tebal 1/2 batu campuran 1SP : 4PP
h Harga
h Harga
h Harga
h Harga
Dasar acuan [Link].ker.60x60
h Harga
0.382 57.5
Dasar acuan [Link].ker.60x60
h Harga
1.06 2.65
1.06 1.76666667
h Harga
(120 x 240) cm, tebal 9 mm
h Harga
1 2.9768 0.336
h Harga
h Harga
-12
h Harga
h Harga
2.858 ###
71736
Klas II
h Harga
apis cat dasar, 2 lapis cat penutup)
h Harga
h Harga
cat dasar, 2 lapis cat penutup)
h Harga
is cat penutup)
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
ditail
h Harga
h Harga
DAFTAR ANALISA HARGA SATUAN
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A. [Link] Pembersihan 1 m2 Lapangan dan Perataan
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.100 ### 10,000.00
Mandor OH 0.050 ### 5,900.00
Jumlah Tenaga Kerja 15,900.00
B BAHAN
Jumlah Harga Bahan 0.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 15,900.00
E Overhead & Profit (10%) 10% x D 1,590.00
F Harga Satuan Pekerjaan (D+E) 17,490.00
A. [Link] Pengukuran dan Pemasangan 1m' Bouwplank
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.100 ### 10,000.00
Tukang kayu OH 0.100 ### 13,100.00
Kepala Tukang OH 0.010 ### 1,570.00
Mandor OH 0.005 ### 590.00
Jumlah Tenaga Kerja 25,260.00
B BAHAN
Kayu Balok 5/7 m3 0.012 ### 67,770.00
Paku 2"-3" Kg 0.020 18,825.00 376.50
Kayu Papan 3/20 m3 0.007 ### 39,532.50
Jumlah Harga Bahan 107,679.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 132,939.00
E Overhead & Profit (10%) 10% x D 13,293.90
F Harga Satuan Pekerjaan (D+E) 146,232.90
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A. [Link] Penggalian 1 m3 Tanah Biasa sedalam 1 m
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.750 ### 75,000.00
Mandor OH 0.025 ### 2,950.00
Jumlah Tenaga Kerja 77,950.00
B BAHAN
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 77,950.00
E Overhead & Profit (10%) 10% x D 7,795.00
F Harga Satuan Pekerjaan (D+E) 85,745.00
A. [Link] Penggalian 1 m3 Tanah Biasa sedalam 2 m
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.900 ### 90,000.00
Mandor OH 0.045 ### 5,310.00
Jumlah Tenaga Kerja 95,310.00
B BAHAN
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 95,310.00
E Overhead & Profit (10%) 10% x D 9,531.00
F Harga Satuan Pekerjaan (D+E) 104,841.00
A. [Link] Pengurugan kembali 1 m3 galian tanah
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koofisien pekerjaan g
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.500 ### 50,000.00
Mandor OH 0.050 ### 5,900.00
Jumlah Tenaga Kerja 55,900.00
B BAHAN
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 55,900.00
E Overhead & Profit (10%) 10% x D 5,590.00
F Harga Satuan Pekerjaan (D+E) 61,490.00
A. 2.3.1.11Pengurugan 1 m3 dengan pasir urug
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.300 ### 30,000.00
Mandor OH 0.010 ### 1,180.00
Jumlah Tenaga Kerja 31,180.00
B BAHAN
Pasir Urug m3 1.200 ### 150,600.00
Jumlah Harga Bahan 150,600.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 181,780.00
E Overhead & Profit (10%) 10% x D 18,178.00
F Harga Satuan Pekerjaan (D+E) 199,958.00
A. 2.3.1.11Pengurugan 1 m3 Tanah Timbun
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.300 ### 30,000.00
Mandor OH 0.010 ### 1,180.00
Jumlah Tenaga Kerja 31,180.00
B BAHAN
Tanah Timbun m3 1.200 ### 120,480.00
Jumlah Harga Bahan 120,480.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 151,660.00
E Overhead & Profit (10%) 10% x D 15,166.00
F Harga Satuan Pekerjaan (D+E) 166,826.00
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A. [Link] Pemasangan 1m3 pondasi batu belah campuran 1SP : 4PP
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.500 ### 150,000.00
Tukang batu OH 0.750 ### 98,250.00
Kepala Tukang OH 0.075 ### 11,775.00
Mandor OH 0.075 ### 8,850.00
Jumlah Tenaga Kerja 268,875.00
B BAHAN
Batu Belah/ Kali m3 1.200 ### 248,490.00
Semen Portland Kg ### 1,631.50 265,934.50
Pasir Pasang m3 0.520 ### 81,575.00
Jumlah Harga Bahan 595,999.50
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 864,874.50
E Overhead & Profit (10%) 10% x D 86,487.45
F Harga Satuan Pekerjaan (D+E) 951,361.95
A. [Link] Pemasangan 1m3 batu kosong (Aanstamping)
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.780 ### 78,000.00
Tukang batu OH 0.390 ### 51,090.00
Kepala Tukang OH 0.039 ### 6,123.00
Mandor OH 0.039 ### 4,602.00
Jumlah Tenaga Kerja 139,815.00
B BAHAN
Batu Belah/ Kali m3 1.200 ### 248,490.00
Pasir Urug m3 0.432 ### 54,216.00
Jumlah Harga Bahan 302,706.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 442,521.00
E Overhead & Profit (10%) 10% x D 44,252.10
F Harga Satuan Pekerjaan (D+E) 486,773.10
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
Catatan : Bobot isi pasir = 1400 kg/m3 , Bobot isi kerikil = 1350 kg/m3
A. [Link] Membuat 1 m3 beton mutu f'c = 7.4 Mpa (K 100),slump (12 ± 2) cm, w
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.650 ### 165,000.00
Tukang batu OH 0.275 ### 36,025.00
Kepala Tukang OH 0.028 ### 4,396.00
Mandor OH 0.083 ### 9,794.00
Jumlah Tenaga Kerja 215,215.00
B BAHAN
Semen Portland kg 247 1,631.50 402,980.50
Pasir Beton kg 869 418.33 363,531.67
Kerikil (Maks 30 mm) kg 999 418.33 417,915.00
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 142,114.22
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Membuat 1 m3 beton mutu f'c = 9.8 Mpa (K 125),slump (12 ± 2) cm, w
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.650 ### 165,000.00
Tukang batu OH 0.275 ### 36,025.00
Kepala Tukang OH 0.028 ### 4,396.00
Mandor OH 0.083 ### 9,794.00
Jumlah Tenaga Kerja 215,215.00
B BAHAN
Semen Portland kg 276 1,631.50 450,294.00
Pasir Beton kg 828 418.33 346,380.00
Kerikil (Maks 30 mm) kg 1,012 418.33 423,353.33
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 145,674.23
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Membuat 1 m3 beton mutu f'c = 12.2 Mpa (K 150),slump (12 ± 2) cm,
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.650 ### 165,000.00
Tukang batu OH 0.275 ### 36,025.00
Kepala Tukang OH 0.028 ### 4,396.00
Mandor OH 0.083 ### 9,794.00
Jumlah Tenaga Kerja 215,215.00
B BAHAN
Semen Portland kg 299 1,631.50 487,818.50
Pasir Beton kg 799 418.33 334,248.33
Kerikil (Maks 30 mm) kg 1,017 418.33 425,445.00
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 148,422.68
F Harga Satuan Pekerjaan (D+E) ###
Membuat 1 m3 lantai kerja beton mutu f'c = 7.4 Mpa (K
A. [Link]
No. 100),slump
Uraian (3 - 6) cm, w/c = 0.87
SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.200 ### 120,000.00
Tukang batu OH 0.200 ### 26,200.00
Kepala Tukang OH 0.020 ### 3,140.00
Mandor OH 0.060 ### 7,080.00
Jumlah Tenaga Kerja 156,420.00
B BAHAN
Semen Portland kg 230 1,631.50 375,245.00
Pasir Beton kg 893 418.33 373,571.67
Kerikil (Maks 30 mm) kg 1,027 418.33 429,628.33
Air Liter 200 100.00 20,000.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 135,486.50
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K 175), slump (12 ± 2) cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.650 ### 165,000.00
Tukang batu OH 0.275 ### 36,025.00
Kepala Tukang OH 0.028 ### 4,396.00
Mandor OH 0.083 ### 9,794.00
Jumlah Tenaga Kerja 215,215.00
B BAHAN
Semen Portland kg 326 1,631.50 531,869.00
Pasir Beton kg 760 418.33 317,933.33
Kerikil (Maks 30 mm) kg 1,029 418.33 430,465.00
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 151,698.23
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Membuat 1 m3 beton mutu f'c = 16.9 Mpa (K 200), slump (12 ± 2) cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.650 ### 165,000.00
Tukang batu OH 0.275 ### 36,025.00
Kepala Tukang OH 0.028 ### 4,396.00
Mandor OH 0.083 ### 9,794.00
Jumlah Tenaga Kerja 215,215.00
B BAHAN
Semen Portland kg 352 1,631.50 574,288.00
Pasir Beton kg 731 418.33 305,801.67
Kerikil (Maks 30 mm) kg 1,031 418.33 431,301.67
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 154,810.63
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Membuat 1 m3 beton mutu f'c = 19.3 Mpa (K 225), slump (12 ± 2) cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.650 ### 165,000.00
Tukang batu OH 0.275 ### 36,025.00
Kepala Tukang OH 0.028 ### 4,396.00
Mandor OH 0.083 ### 9,794.00
Jumlah Tenaga Kerja 215,215.00
B BAHAN
Semen Portland kg 371 1,631.50 605,286.50
Pasir Beton kg 698 418.33 291,996.67
Kerikil (Maks 30 mm) kg 1,047 418.33 437,995.00
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 157,199.32
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Membuat 1 m3 beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.650 ### 165,000.00
Tukang batu OH 0.275 ### 36,025.00
Kepala Tukang OH 0.028 ### 4,396.00
Mandor OH 0.083 ### 9,794.00
Jumlah Tenaga Kerja 215,215.00
B BAHAN
Semen Portland kg 384 1,631.50 626,496.00
Pasir Beton kg 692 418.33 289,486.67
Kerikil (Maks 30 mm) kg 1,039 418.33 434,648.33
Air Liter 215 100.00 21,500.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 158,734.60
F Harga Satuan Pekerjaan (D+E) ###
A. 4.1.1.17Pembesian 10 kg dengan besi polos
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.070 ### 7,000.00
Tukang besi OH 0.070 ### 9,170.00
Kepala Tukang OH 0.007 ### 1,099.00
Mandor OH 0.004 ### 472.00
Jumlah Tenaga Kerja 17,741.00
B BAHAN
Besi Beton Polos kg 10.500 17,068.00 179,214.00
Kawat Beton kg 0.150 25,100.00 3,765.00
Jumlah Harga Bahan 182,979.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 200,720.00
E Overhead & Profit (10%) 10% x D 20,072.00
F Harga Satuan Pekerjaan (D+E) 220,792.00
G Harga Satuan per kg besi F : 10 kg 22,079.20
A. 4.1.1.17Pembesian 10 kg dengan besi ulir
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.070 ### 7,000.00
Tukang besi OH 0.070 ### 9,170.00
Kepala Tukang OH 0.007 ### 1,099.00
Mandor OH 0.004 ### 472.00
Jumlah Tenaga Kerja 17,741.00
B BAHAN
Besi Beton Ulir kg 10.500 23,343.00 245,101.50
Kawat Beton kg 0.150 25,100.00 3,765.00
Jumlah Harga Bahan 248,866.50
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 266,607.50
E Overhead & Profit (10%) 10% x D 26,660.75
F Harga Satuan Pekerjaan (D+E) 293,268.25
G Harga Satuan per kg besi F : 10 kg 29,326.83
A. 4.1.1.20Pemasangan 1m2 bekesting untuk pondasi
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.520 ### 52,000.00
Tukang kayu OH 0.260 ### 34,060.00
Kepala Tukang OH 0.026 ### 4,082.00
Mandor OH 0.026 ### 3,068.00
Jumlah Tenaga Kerja 93,210.00
B BAHAN
Kayu Klas III m3 0.040 ### 225,900.00
Paku 5 - 10 cm kg 0.300 18,825.00 5,647.50
Minyak Bekesting liter 0.100 9,450.00 945.00
Jumlah Harga Bahan 232,492.50
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 325,702.50
E Diambil Untuk 2 x pakai 162,851.25
F Overhead & Profit (10%) 10% x D 16,285.13
G Harga Satuan Pekerjaan (E+F) 179,136.38
A. 4.1.1.21Pemasangan 1m2 bekesting untuk sloof
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.520 ### 52,000.00
Tukang kayu OH 0.260 ### 34,060.00
Kepala Tukang OH 0.026 ### 4,082.00
Mandor OH 0.026 ### 3,068.00
Jumlah Tenaga Kerja 93,210.00
B BAHAN
Kayu Klas III m3 0.045 ### 254,137.50
Paku 5 - 10 cm kg 0.300 18,825.00 5,647.50
Minyak Bekesting liter 0.100 9,450.00 945.00
Jumlah Harga Bahan 260,730.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 353,940.00
E Diambil Untuk 2 x pakai 176,970.00
F Overhead & Profit (10%) 10% x D 17,697.00
G Harga Satuan Pekerjaan (E+F) 194,667.00
A. 4.1.1.22Pemasangan 1m2 bekesting untuk kolom
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.660 ### 66,000.00
Tukang kayu OH 0.330 ### 43,230.00
Kepala Tukang OH 0.033 ### 5,181.00
Mandor OH 0.033 ### 3,894.00
Jumlah Tenaga Kerja 118,305.00
B BAHAN
Kayu Klas III m3 0.040 ### 225,900.00
Paku 5 - 10 cm kg 0.400 18,825.00 7,530.00
Minyak Bekesting liter 0.200 9,450.00 1,890.00
Balok Kayu Klas II m3 0.015 ### 103,537.50
Plywood tebal
Dolken kayu ᴓ9 8 mm
- 10 Lbr 0.350 ### 59,298.75
Batan2.000 30,000.00 60,000.00
cm Bahan
Jumlah Harga - panjang 4 m 458,156.25
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 576,461.25
E Diambil Untuk 2 x pakai 288,230.63
F Overhead & Profit (10%) 10% x D 28,823.06
G Harga Satuan Pekerjaan (E+F) 317,053.69
A. [Link].Pemasangan 1m2 bekesting untuk kolom Praktis dan Balok Praktis
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.660 ### 66,000.00
Tukang kayu OH 0.330 ### 43,230.00
Kepala Tukang OH 0.033 ### 5,181.00
Mandor OH 0.033 ### 3,894.00
Jumlah Tenaga Kerja 118,305.00
B BAHAN
Kayu Klas III m3 0.020 ### 112,950.00
Paku 5 - 10 cm kg 0.200 18,825.00 3,765.00
Minyak Bekesting liter 0.200 9,450.00 1,890.00
Balok Kayu Klas II m3 0.007 ### 48,317.50
Jumlah Harga Bahan 166,922.50
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 285,227.50
E Diambil Untuk 2 x pakai 142,613.75
F Overhead & Profit (10%) 10% x D 14,261.38
G Harga Satuan Pekerjaan (E+F) 156,875.13
A. 4.1.1.23Pemasangan 1m2 bekesting untuk balok
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.660 ### 66,000.00
Tukang kayu OH 0.330 ### 43,230.00
Kepala Tukang OH 0.033 ### 5,181.00
Mandor OH 0.033 ### 3,894.00
Jumlah Tenaga Kerja 118,305.00
B BAHAN
Kayu Klas III m3 0.040 ### 225,900.00
Paku 5 - 10 cm kg 0.400 18,825.00 7,530.00
Minyak Bekesting liter 0.200 9,450.00 1,890.00
Balok Kayu Klas II m3 0.018 ### 124,245.00
Plywood tebal
Dolken kayu ᴓ98 mm
- 10 Lbr 0.350 ### 59,298.75
Batan2.000 30,000.00 60,000.00
cm - panjang
Jumlah Harga Bahan 4 m 478,863.75
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 597,168.75
E Diambil Untuk 2 x pakai 298,584.38
F Overhead & Profit (10%) 10% x D 29,858.44
G Harga Satuan Pekerjaan (E+F) 328,442.81
A. 4.1.1.24Pemasangan 1m2 bekesting untuk lantai
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.660 ### 66,000.00
Tukang kayu OH 0.330 ### 43,230.00
Kepala Tukang OH 0.033 ### 5,181.00
Mandor OH 0.033 ### 3,894.00
Jumlah Tenaga Kerja 118,305.00
B BAHAN
Kayu Klas III m3 0.040 ### 225,900.00
Paku 5 - 10 cm kg 0.400 18,825.00 7,530.00
Minyak Bekesting liter 0.200 9,450.00 1,890.00
Balok Kayu Klas II m3 0.015 ### 103,537.50
Plywood tebal
Dolken kayu ᴓ98 mm
- 10 Lbr 0.350 ### 59,298.75
Batan6.000 30,000.00 180,000.00
cm - panjang
Jumlah Harga Bahan 4 m 578,156.25
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 696,461.25
E Diambil Untuk 2 x pakai 348,230.63
F Overhead & Profit (10%) 10% x D 34,823.06
G Harga Satuan Pekerjaan (E+F) 383,053.69
A. 4.1.1.26Pemasangan 1m2 bekesting untuk tangga
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.660 ### 66,000.00
Tukang kayu OH 0.330 ### 43,230.00
Kepala Tukang OH 0.033 ### 5,181.00
Mandor OH 0.033 ### 3,894.00
Jumlah Tenaga Kerja 118,305.00
B BAHAN
Kayu Klas III m3 0.030 ### 169,425.00
Paku 5 - 10 cm kg 0.400 18,825.00 7,530.00
Minyak Bekesting liter 0.150 9,450.00 1,417.50
Balok Kayu Klas II m3 0.010 ### 69,025.00
Plywood tebal
Dolken kayu ᴓ98 mm
- 10 Lbr 0.350 ### 59,298.75
Batan2.000 30,000.00 60,000.00
cm Bahan
Jumlah Harga - panjang 4 m 366,696.25
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 485,001.25
E Overhead & Profit (10%) 10% x D 48,500.13
F Harga Satuan Pekerjaan (D+E) 533,501.38
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM
A. [Link] Memasang 1 kg besi profil
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.060 ### 6,000.00
Tukang besi OH 0.060 ### 7,860.00
Kepala Tukang OH 0.006 ### 942.00
Mandor OH 0.003 ### 354.00
Jumlah Tenaga Kerja 15,156.00
B BAHAN
Besi Baja Profil kg 1.150 29,925.00 34,413.75
Jumlah Harga Bahan 34,413.75
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 49,569.75
E Overhead & Profit (10%) 10% x D 4,956.98
F Harga Satuan Pekerjaan (D+E) 54,526.73
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A. [Link] Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu c
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.300 ### 30,000.00
Tukang batu OH 0.100 ### 13,100.00
Kepala Tukang OH 0.010 ### 1,570.00
Mandor OH 0.015 ### 1,770.00
Jumlah Tenaga Kerja 46,440.00
B BAHAN
Bata Merah bh 70.000 1,192.00 83,440.00
Semen Portland kg 18.950 1,631.50 30,916.93
Pasir Pasang m3 0.038 ### 5,961.25
Jumlah Harga Bahan 120,318.18
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 166,758.18
E Overhead & Profit (10%) 10% x D 16,675.82
F Harga Satuan Pekerjaan (D+E) 183,433.99
A. [Link] Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu c
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.300 ### 30,000.00
Tukang batu OH 0.100 ### 13,100.00
Kepala Tukang OH 0.010 ### 1,570.00
Mandor OH 0.015 ### 1,770.00
Jumlah Tenaga Kerja 46,440.00
B BAHAN
Bata Merah bh 70.000 1,192.00 83,440.00
Semen Portland kg 11.500 1,631.50 18,762.25
Pasir Pasang m3 0.043 ### 6,745.63
Jumlah Harga Bahan 108,947.88
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 155,387.88
E Overhead & Profit (10%) 10% x D 15,538.79
F Harga Satuan Pekerjaan (D+E) 170,926.66
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
A. [Link] Pemasangan 1 m2 Plesteran 1SP : 2PP tebal 15 mm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.300 ### 30,000.00
Tukang batu OH 0.150 ### 19,650.00
Kepala Tukang OH 0.015 ### 2,355.00
Mandor OH 0.015 ### 1,770.00
Jumlah Tenaga Kerja 53,775.00
B BAHAN
Semen Portland kg 10.224 1,631.50 16,680.46
Pasir Pasang m3 0.020 ### 3,137.50
Jumlah Harga Bahan 19,817.96
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 73,592.96
E Overhead & Profit (10%) 10% x D 7,359.30
F Harga Satuan Pekerjaan (D+E) 80,952.25
A. [Link] Pemasangan 1 m2 Plesteran 1SP : 4PP tebal 15 mm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.300 ### 30,000.00
Tukang batu OH 0.150 ### 19,650.00
Kepala Tukang OH 0.015 ### 2,355.00
Mandor OH 0.015 ### 1,770.00
Jumlah Tenaga Kerja 53,775.00
B BAHAN
Semen Portland kg 6.240 1,631.50 10,180.56
Pasir Pasang m3 0.024 ### 3,765.00
Jumlah Harga Bahan 13,945.56
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 67,720.56
E Overhead & Profit (10%) 10% x D 6,772.06
F Harga Satuan Pekerjaan (D+E) 74,492.62
A. 4.4.2.27Pemasangan 1 m2 Acian
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.200 ### 20,000.00
Tukang batu OH 0.100 ### 13,100.00
Kepala Tukang OH 0.010 ### 1,570.00
Mandor OH 0.010 ### 1,180.00
Jumlah Tenaga Kerja 35,850.00
B BAHAN
Semen Portland kg 3.250 1,631.50 5,302.38
Jumlah Harga Bahan 5,302.38
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 41,152.38
E Overhead & Profit (10%) 10% x D 4,115.24
F Harga Satuan Pekerjaan (D+E) 45,267.61
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP D
A. [Link] Pemasangan 1 m2 Lantai Granit ukuran 60 x 60 cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.250 ### 25,000.00
Tukang batu OH 0.125 ### 16,375.00
Kepala Tukang OH 0.013 ### 2,041.00
Mandor OH 0.013 ### 1,534.00
Jumlah Tenaga Kerja 44,950.00
B BAHAN
Granit 60 x 60 cm m2 1.060 ### 345,878.00
Semen Portland kg 9.800 1,631.50 15,988.70
Pasir Pasang m3 0.045 ### 7,059.38
Semen Warna kg 1.300 4,643.50 6,036.55
Jumlah Harga Bahan 374,962.63
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 419,912.63
E Overhead & Profit (10%) 10% x D 41,991.26
F Harga Satuan Pekerjaan (D+E) 461,903.89
A. 4.4.3.24Pemasangan 1 m' Step Nosing Granit ukuran 10 x 60 cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.090 ### 9,000.00
Tukang batu OH 0.090 ### 11,790.00
Kepala Tukang OH 0.009 ### 1,413.00
Mandor OH 0.005 ### 590.00
Jumlah Tenaga Kerja 22,793.00
B BAHAN
Plint Granit 10 x 60 cm Bh 1.767 45,000.00 79,500.00
Semen Portland kg 1.140 1,631.50 1,859.91
Semen Warna kg 0.100 4,643.50 464.35
Pasir Pasang m3 0.003 ### 470.63
Jumlah Harga Bahan 82,294.89
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 105,087.89
E Overhead & Profit (10%) 10% x D 10,508.79
F Harga Satuan Pekerjaan (D+E) 115,596.67
A. 4.4.3.54Pemasangan 1 m2 Dinding Keramik ukuran 30 x 60 cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.900 ### 90,000.00
Tukang batu OH 0.450 ### 58,950.00
Kepala Tukang OH 0.045 ### 7,065.00
Mandor OH 0.045 ### 5,310.00
Jumlah Tenaga Kerja 161,325.00
B BAHAN
Keramik 30 x 60 cm m2 1.060 ### 164,300.00
Semen Portland kg 9.300 1,631.50 15,172.95
Pasir Pasang m3 0.018 ### 2,823.75
Semen Warna kg 1.940 4,643.50 9,008.39
Jumlah Harga Bahan 191,305.09
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 352,630.09
E Overhead & Profit (10%) 10% x D 35,263.01
F Harga Satuan Pekerjaan (D+E) 387,893.10
A.4.5.1. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
A. [Link] Pemasangan 1 m2 Langit-langit Gypsum Board ukuran (120 x 240) cm
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.100 ### 10,000.00
Tukang Kayu OH 0.050 ### 6,550.00
Kepala Tukang OH 0.005 ### 785.00
Mandor OH 0.005 ### 590.00
Jumlah Tenaga Kerja 17,925.00
B BAHAN
Gypsum Board Lemba 0.364 ### 73,091.20
Paku Skrup kg 0.110 31,500.00 3,465.00
Jumlah Harga Bahan 76,556.20
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 94,481.20
E Overhead & Profit (10%) 10% x D 9,448.12
F Harga Satuan Pekerjaan (D+E) 103,929.32
A. [Link] Pemasangan 1 m' List Langit-langit Gypsum
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.050 ### 5,000.00
Tukang Kayu OH 0.050 ### 6,550.00
Kepala Tukang OH 0.005 ### 785.00
Mandor OH 0.003 ### 354.00
Jumlah Tenaga Kerja 12,689.00
B BAHAN
List Profil Gypsum m' 1.050 16,315.00 17,130.75
Paku Skrup kg 0.010 31,500.00 315.00
Jumlah Harga Bahan 17,445.75
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 30,134.75
E Overhead & Profit (10%) 10% x D 3,013.48
F Harga Satuan Pekerjaan (D+E) 33,148.23
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A. 4.5.2.38Pemasangan 1 m2 Atap Seng Spandek
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.120 ### 12,000.00
Tukang Kayu OH 0.060 ### 7,860.00
Kepala Tukang OH 0.006 ### 942.00
Mandor OH 0.006 ### 708.00
Jumlah Tenaga Kerja 21,510.00
B BAHAN
Seng Spandek m2 1.100 78,000.00 85,800.00
Paku Seng kg 0.200 25,100.00 5,020.00
Jumlah Harga Bahan 90,820.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 112,330.00
E Overhead & Profit (10%) 10% x D 11,233.00
F Harga Satuan Pekerjaan (D+E) 123,563.00
A. 4.5.2.39Pemasangan 1 m' Nok Atap Seng Spandek
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.150 ### 15,000.00
Tukang Kayu OH 0.070 ### 9,170.00
Kepala Tukang OH 0.007 ### 1,099.00
Mandor OH 0.006 ### 708.00
Jumlah Tenaga Kerja 25,977.00
B BAHAN
Nok seng Spandek m 1.100 42,500.00 46,750.00
Paku Seng kg 0.100 25,100.00 2,510.00
Jumlah Harga Bahan 49,260.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 75,237.00
E Overhead & Profit (10%) 10% x D 7,523.70
F Harga Satuan Pekerjaan (D+E) 82,760.70
A. [Link] m' Pasang talang datar/ jurai seng
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.200 ### 20,000.00
Tukang Kayu OH 0.400 ### 52,400.00
Kepala Tukang OH 0.250 ### 39,250.00
Mandor OH 0.010 ### 1,180.00
Jumlah Tenaga Kerja 112,830.00
B BAHAN
Seng Plat Lbr 0.375 42,500.00 15,937.50
Papan Kayu m3 0.002 ### 15,499.25
Paku Seng Kg 0.285 25,100.00 7,153.50
Jumlah Harga Bahan 38,590.25
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 151,420.25
E Overhead & Profit (10%45 10% x D 15,142.03
F Harga Satuan Pekerjaan (D+E) 166,562.28
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
A. 4.6.1.21Pemasangan 1 m' Listplank ukuran (3 x 20) cm, Kayu Klas II
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.100 ### 10,000.00
Tukang Kayu OH 0.200 ### 26,200.00
Kepala Tukang OH 0.020 ### 3,140.00
Mandor OH 0.005 ### 590.00
Jumlah Tenaga Kerja 39,930.00
B BAHAN
Papan Kayu m3 0.011 ### 88,101.00
Paku 5 dan 7 cm kg 0.100 18,825.00 1,882.50
Jumlah Harga Bahan 89,983.50
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 129,913.50
E Overhead & Profit (10%) 10% x D 12,991.35
F Harga Satuan Pekerjaan (D+E) 142,904.85
A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN
A. [Link] Pengecatan 1 m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.070 ### 7,000.00
Tukang Cat OH 0.009 ### 1,179.00
Kepala Tukang OH 0.006 ### 942.00
Mandor OH 0.003 ### 354.00
Jumlah Tenaga Kerja 9,475.00
B BAHAN
Cat Menie kg 0.200 81,575.00 16,315.00
Plamur kg 0.150 27,610.00 4,141.50
Cat Dasar kg 0.170 52,710.00 8,960.70
Cat Penutup kg 0.260 ### 45,682.00
Kuas Bh 0.010 31,375.00 313.75
Pengencer/Thinner kg 0.030 31,375.00 941.25
Amplas Lbr 0.200 12,550.00 2,510.00
Jumlah Harga Bahan 78,864.20
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 88,339.20
E Overhead & Profit (10%) 10% x D 8,833.92
F Harga Satuan Pekerjaan (D+E) 97,173.12
A. [Link] Pelaburan 1 m2 bidang kayu dengan cat residu dan Ter
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.100 ### 10,000.00
Mandor OH 0.006 ### 708.00
Jumlah Tenaga Kerja 10,708.00
B BAHAN
Residu atau ter Liter 0.350 9,450.00 3,307.50
Jumlah Harga Bahan 3,307.50
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 14,015.50
E Overhead & Profit (10%) 10% x D 1,401.55
F Harga Satuan Pekerjaan (D+E) 15,417.05
A. 4.7.1.10Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapi
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.020 ### 2,000.00
Tukang Cat OH 0.063 ### 8,253.00
Kepala Tukang OH 0.0063 ### 989.10
Mandor OH 0.003 ### 354.00
Jumlah Tenaga Kerja 11,596.10
B BAHAN
Plamur kg 0.100 27,610.00 2,761.00
Cat Dasar kg 0.100 52,710.00 5,271.00
Cat Penutup kg 0.260 ### 45,682.00
Jumlah Harga Bahan 53,714.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 65,310.10
E Overhead & Profit (10%) 10% x D 6,531.01
F Harga Satuan Pekerjaan (D+E) 71,841.11
A. 4.7.1.12Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.028 ### 2,800.00
Tukang Cat OH 0.042 ### 5,502.00
Kepala Tukang OH 0.0042 ### 659.40
Mandor OH 0.003 ### 354.00
Jumlah Tenaga Kerja 9,315.40
B BAHAN
Cat Dasar kg 0.120 52,710.00 6,325.20
Cat Penutup kg 0.180 ### 31,626.00
Jumlah Harga Bahan 37,951.20
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 47,266.60
E Overhead & Profit (10%) 10% x D 4,726.66
F Harga Satuan Pekerjaan (D+E) 51,993.26
A. 4.7.1.18Pengecatan 1 m2 Permukaan baja 4 lapis
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.250 ### 25,000.00
Tukang Cat OH 0.250 ### 32,750.00
Kepala Tukang OH 0.025 ### 3,925.00
Mandor OH 0.0013 ### 153.40
Jumlah Tenaga Kerja 61,828.40
B BAHAN
Cat Menie kg 0.200 81,575.00 16,315.00
Cat Penutup kg 0.160 81,575.00 13,052.00
Kuas Bh 0.010 31,375.00 313.75
Pengencer Ltr 0.010 31,375.00 313.75
Jumlah Harga Bahan 29,994.50
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 91,822.90
E Overhead & Profit (10%) 10% x D 9,182.29
F Harga Satuan Pekerjaan (D+E) 101,005.19
A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A. [Link] Pemasangan 1 buah Kloset Duduk
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 3.300 ### 330,000.00
Tukang OH 1.100 ### 144,100.00
Kepala Tukang OH 0.010 ### 1,570.00
Mandor OH 0.160 ### 18,880.00
Jumlah Tenaga Kerja 494,550.00
B BAHAN
Kloset Duduk Bh 1.000 ### ###
Perlengkapan 6% x KlosLs 1.000 ### 240,000.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 473,455.00
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Pemasangan 1 buah Wastafel
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.200 ### 120,000.00
Tukang OH 1.450 ### 189,950.00
Kepala Tukang OH 0.150 ### 23,550.00
Mandor OH 0.060 ### 7,080.00
Jumlah Tenaga Kerja 340,580.00
B BAHAN
Wastafel Unit 1.000 ### ###
Semen Portland Kg 6.000 1,631.50 9,789.00
Pasir Pasang M3 0.010 ### 1,568.75
Perlengkapan 12% x WaLs 1.000 ### 150,000.00
Jumlah Harga Bahan ###
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) ###
E Overhead & Profit (10%) 10% x D 175,193.78
F Harga Satuan Pekerjaan (D+E) ###
A. [Link] Pemasangan 1 buah Shower Mandi
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 1.200 ### 120,000.00
Tukang OH 1.450 ### 189,950.00
Kepala Tukang OH 0.150 ### 23,550.00
Mandor OH 0.060 ### 7,080.00
Jumlah Tenaga Kerja 340,580.00
B BAHAN
Shower Mandi Unit 1.000 ### 475,000.00
Semen Portland Kg 6.000 1,631.50 9,789.00
Pasir Pasang M3 0.010 ### 1,568.75
Perlengkapan 12% x ShLs 1.000 57,000.00 57,000.00
Jumlah Harga Bahan 543,357.75
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 883,937.75
E Overhead & Profit (10%) 10% x D 88,393.78
F Harga Satuan Pekerjaan (D+E) 972,331.53
A. 5.1.1.19Pemasangan Kran Air 1/2" atau 3/4"
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.010 ### 1,000.00
Tukang OH 0.400 ### 52,400.00
Kepala Tukang OH 0.040 ### 6,280.00
Mandor OH 0.005 ### 590.00
Jumlah Tenaga Kerja 60,270.00
B BAHAN
Kran Air Bh 1.000 45,000.00 45,000.00
Sealtape Bh 0.025 4,000.00 100.00
Jumlah Harga Bahan 45,100.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 105,370.00
E Overhead & Profit (10%) 10% x D 10,537.00
F Harga Satuan Pekerjaan (D+E) 115,907.00
A. [Link] Bh Pemasangan Floord
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.010 ### 1,000.00
Tukang OH 0.100 ### 13,100.00
Kepala Tukang OH 0.010 ### 1,570.00
Mandor OH 0.005 ### 590.00
Jumlah Tenaga Kerja 16,260.00
B BAHAN
Floor Drain Bh 1.000 55,000.00 55,000.00
0.00
Jumlah Harga Bahan 55,000.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 71,260.00
E Overhead & Profit (10%) 10% x D 7,126.00
F Harga Satuan Pekerjaan (D+E) 78,386.00
A. [Link] Bh Pemasangan Roof d
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.010 ### 1,000.00
Tukang OH 0.100 ### 13,100.00
Kepala Tukang OH 0.010 ### 1,570.00
Mandor OH 0.005 ### 590.00
Jumlah Tenaga Kerja 16,260.00
B BAHAN
Roof Drain Bh 1.000 60,000.00 60,000.00
0.00
Jumlah Harga Bahan 60,000.00
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C) 76,260.00
E Overhead & Profit (10%) 10% x D 7,626.00
F Harga Satuan Pekerjaan (D+E) 83,886.00
A. 5.1.1.25Pemasangan Pipa PVC Tipe AW Diameter 1/2"
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.036 ### 3,600.00
Tukang Pipa OH 0.060 ### 7,860.00
Kepala Tukang OH 0.006 ### 942.00
Mandor OH 0.002 ### 236.00
Jumlah Tenaga Kerja 12,638.00
B BAHAN
Pipa PVC 1/2" M 1.200 7,600.00 9,120.00
Perlengkapan 35% x Pi Ls 1.000 2,660.00 2,660.00
Jumlah Harga Bahan 11,780.00
C PERALATAN
Jumlah Harga Alat 0.00
D Jumlah (A + B + C) 24,418.00
E Overhead & Profit (10%) 10% x D 2,441.80
F Harga Satuan Pekerjaan (D+E) 26,859.80
A. 5.1.1.26Pemasangan Pipa PVC Tipe AW Diameter 3/4"
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.036 ### 3,600.00
Tukang Pipa OH 0.060 ### 7,860.00
Kepala Tukang OH 0.006 ### 942.00
Mandor OH 0.002 ### 236.00
Jumlah Tenaga Kerja 12,638.00
B BAHAN
Pipa PVC 3/4" M 1.200 9,100.00 10,920.00
Perlengkapan 35% x Pi Ls 1.000 3,185.00 3,185.00
Jumlah Harga Bahan 14,105.00
C PERALATAN
Jumlah Harga Alat 0.00
D Jumlah (A + B + C) 26,743.00
E Overhead & Profit (10%) 10% x D 2,674.30
F Harga Satuan Pekerjaan (D+E) 29,417.30
A. 5.1.1.27Pemasangan Pipa PVC Tipe AW Diameter 1"
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.036 ### 3,600.00
Tukang Pipa OH 0.060 ### 7,860.00
Kepala Tukang OH 0.006 ### 942.00
Mandor OH 0.002 ### 236.00
Jumlah Tenaga Kerja 12,638.00
B BAHAN
Pipa PVC 1" M 1.200 12,600.00 15,120.00
Perlengkapan 35% x Pi Ls 1.000 4,410.00 4,410.00
Jumlah Harga Bahan 19,530.00
C PERALATAN
Jumlah Harga Alat 0.00
D Jumlah (A + B + C) 32,168.00
E Overhead & Profit (10%) 10% x D 3,216.80
F Harga Satuan Pekerjaan (D+E) 35,384.80
A. 5.1.1.29Pemasangan Pipa PVC Tipe AW Diameter 2"
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.054 ### 5,400.00
Tukang Pipa OH 0.090 ### 11,790.00
Kepala Tukang OH 0.009 ### 1,413.00
Mandor OH 0.003 ### 354.00
Jumlah Tenaga Kerja 18,957.00
B BAHAN
Pipa PVC 2" M 1.200 19,000.00 22,800.00
Perlengkapan 35% x Pi Ls 1.000 6,650.00 6,650.00
Jumlah Harga Bahan 29,450.00
C PERALATAN
Jumlah Harga Alat 0.00
D Jumlah (A + B + C) 48,407.00
E Overhead & Profit (10%) 10% x D 4,840.70
F Harga Satuan Pekerjaan (D+E) 53,247.70
A. 5.1.1.31Pemasangan Pipa PVC Tipe AW Diameter 3"
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.081 ### 8,100.00
Tukang Pipa OH 0.135 ### 17,685.00
Kepala Tukang OH 0.0135 ### 2,119.50
Mandor OH 0.004 ### 472.00
Jumlah Tenaga Kerja 28,376.50
B BAHAN
Pipa PVC 3" M 1.200 42,000.00 50,400.00
Perlengkapan 35% x Pi Ls 1.000 14,700.00 14,700.00
Jumlah Harga Bahan 65,100.00
C PERALATAN
Jumlah Harga Alat 0.00
D Jumlah (A + B + C) 93,476.50
E Overhead & Profit (10%) 10% x D 9,347.65
F Harga Satuan Pekerjaan (D+E) 102,824.15
A. 5.1.1.32Pemasangan Pipa PVC Tipe AW Diameter 4"
No. Uraian SatuaKoefisieHarga SatuJumlah Harga
A TENAGA
Pekerja OH 0.081 ### 8,100.00
Tukang Pipa OH 0.135 ### 17,685.00
Kepala Tukang OH 0.0135 ### 2,119.50
Mandor OH 0.004 ### 472.00
Jumlah Tenaga Kerja 28,376.50
B BAHAN
Pipa PVC 4" M 1.200 51,000.00 61,200.00
Perlengkapan 35% x Pi Ls 1.000 17,850.00 17,850.00
Jumlah Harga Bahan 79,050.00
C PERALATAN
Jumlah Harga Alat 0.00
D Jumlah (A + B + C) 107,426.50
E Overhead & Profit (10%) 10% x D 10,742.65
F Harga Satuan Pekerjaan (D+E) 118,169.15
h Harga
h Harga
h Harga
h Harga
ien pekerjaan galian
h Harga
h Harga
h Harga
h Harga
h Harga
kg/m3
p (12 ± 2) cm, w/c = 0.87
h Harga
p (12 ± 2) cm, w/c = 0.78
h Harga
mp (12 ± 2) cm, w/c = 0.72
h Harga
h Harga
mp (12 ± 2) cm, w/c = 0.66
h Harga
125000
65000 14 4642.9
90000 25 3600
mp (12 ± 2) cm, w/c = 0.61
h Harga
mp (12 ± 2) cm, w/c = 0.58
h Harga
mp (12 ± 2) cm, w/c = 0.56
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
Balok Praktis
h Harga
h Harga
h Harga
h Harga
h Harga
tebal 1/2 batu campuran 1SP : 2PP
h Harga
tebal 1/2 batu campuran 1SP : 4PP
h Harga
h Harga
h Harga
h Harga
Dasar acuan [Link].ker.60x60
h Harga
0.382 57.5
Dasar acuan [Link].ker.60x60
h Harga
1.06 2.65
1.06 1.76666667
h Harga
(120 x 240) cm, tebal 9 mm
h Harga
1 2.9768 0.336
h Harga
h Harga
-12
h Harga
h Harga
2.858 ###
71736
Klas II
h Harga
apis cat dasar, 2 lapis cat penutup)
h Harga
h Harga
cat dasar, 2 lapis cat penutup)
h Harga
is cat penutup)
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
h Harga
ditail
h Harga
h Harga