Moderate Risk Assessment Template

The document is a risk assessment matrix for BIIS staff activities. It assesses the probability and consequence of risks and assigns a risk factor level. Two key risks are identified: 1) Non-standard and improper lifting equipment inspections, which could lead to equipment breakdowns and accidents. The risk factor is moderate. 2) Relationship management between technical staff and clients, which could result in certificates issued without inspections. The risk factor is low. Control measures are outlined to mitigate the risks, such as impartiality agreements, internal audits, management reviews, and separating technical and sales functions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
297 views3 pages

Moderate Risk Assessment Template

The document is a risk assessment matrix for BIIS staff activities. It assesses the probability and consequence of risks and assigns a risk factor level. Two key risks are identified: 1) Non-standard and improper lifting equipment inspections, which could lead to equipment breakdowns and accidents. The risk factor is moderate. 2) Relationship management between technical staff and clients, which could result in certificates issued without inspections. The risk factor is low. Control measures are outlined to mitigate the risks, such as impartiality agreements, internal audits, management reviews, and separating technical and sales functions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Risk Assessment Matrix - Page 2
  • Risk Assessment Matrix - Page 1
  • Risk Assessment Matrix - Page 3

RISK ASSESSMENT MATRIX

Document Number: BIIS-FRM-01RAM


BIIS-IBM-01 (4.1 Impartiality and
Reference Document
Independence)
TITLE: Risk Assessment Matrix

Assessment Type: All kind of work carrying out by BIIS staff within the assign scope and company’s policies.

1. Inspections
2. Sales / marketing
Activities: 3. Accounts/ finance
4. Delivery and dispatch of documents (related to the inspections carried out)

Location: United Arab Emirates

RISK FACTOR (RF)


Consequence (C)
Probability Insignificant Mino Moderat Majo Catastroph
(P) (1) r e r ic
Low Risk Moderate Risk High Extreme Risk
(2) (3) (4) (5) Risk
Rare (1) 1 2 3 4 5 1-3 4-6 8-12 15-25
Possible (2) 2 4 6 8 10 Activity should be
Likely (3) 3 6 9 12 15 Activity can operate
No action required, modified with remedial Activity should not proceed
subject to management
Often (4) 4 8 12 16 20 unless escalation of planning, action and in current form
and/or modification
Frequent (5) 5 10 15 20 25 risk is possible further EHS
assessment

No Risk Identified Risk Who is at Risk? P C RF Control Measures P C RF


▪ Passing of malfunctioning ▪ Impartiality agreements with the
equipment’s & items employee.
▪ Issuance of certificates and ▪ Effective technical internal Audits and
/or report without inspection inspectors monitoring as per plan
▪ Equipment breakdown and ▪ Surprise monitoring of inspectors by the
accidents while working. technical manager and management
▪ Losing customers ▪ Management reviews on impartiality and
▪ Fines and legal penalties ▪ Inspection Body independence
▪ Accreditation withdrawal etc. ▪ Public Property ▪ Frequent Analysis of all the quality and
Non-Standard and improper
1 ▪ Client 3 5 15 technical data including inspectors’ 1 2 2
lifting equipment inspections
▪ Employees schedules
▪ Equipment ▪ Independent technical jobs& issue
management and resolution by the
technical staff
▪ No sales commission to technical staff
▪ Clients’ inspections are managed by TM
without interfere of management

Issued by QHSE Manager Document Number BIIS-FRM-01RAM Revision No. 0.1


Page 1 of 3
Authorized by Managing Director Date 20-07-2021
RISK ASSESSMENT MATRIX
Document Number: BIIS-FRM-01RAM
BIIS-IBM-01 (4.1 Impartiality and
Reference Document
Independence)
TITLE: Risk Assessment Matrix

▪ Impartiality agreements with the


employees including their adherence
monitoring.
▪ Clients’ inspections are managed by TM
without interfere of management, staff and
sales staff.
▪ Effective technical internal audit and
inspectors monitoring as per plan.
Relationship of management and ▪ Inspection Body
▪ Issuance of certificates ▪ Surprise monitoring of inspectors by the
Technical staff with clients by ▪ Public Property
without inspections. technical manager and management.
2 having friends, relatives and ▪ Client 4 2 8 1 3 3
▪ Passing of mal functioning ▪ Independent technical jobs & issue
other personals at the client ▪ Employees
equipment’s & items. management and resolution by the
company ▪ Equipment
technical staff.
▪ Reviewing the work activity like time sheet
copies, photo evidence of inspection and
certificate summary.
▪ All the job should be routed through the
[Link] one single person is not
involving in any activity.

▪ Once a year inspection of same equipment


by one engineer.
▪ Impartiality agreements with the
employees
Compromise on impartiality due ▪ Job Descriptions and Technical staff
▪ Inspection Body
to inspection activities from the ▪ Passing of malfunctioning appraisal system
▪ Public property
relation of its own relationship equipment’s & items. ▪ Surprise monitoring of inspectors by the
3 ▪ Client 4 2 8 1 2 2
(Due to ownership governance, ▪ Issuance of certificates technical manager and management
▪ Employees
Management, Personal, finance, without inspections ▪ Review on impartiality and independence.
▪ Equipment
Contracts, Marketing etc.) ▪ Independent technical jobs & Inspections
management by the technical staff.
▪ Client inspections are managed by TM
without interfere of management, staff &
sales staff.
▪ Not conducting thorough
inspection due to time ▪ Inspection Body ▪ No more than 03 equipment’s (Class A)
Engineers doing inspection for concerns ▪ Public Property should be inspected on one day by an
4 more than 3 equipment (for class ▪ Issue certificates without ▪ Client 4 4 16 engineer. 1 3 3
a as mentioned in ETR-06) thorough inspection. ▪ Employees ▪ Technical Department not allocating job no
▪ Passing malfunctioning ▪ Equipment for more than 03 class A equipment.
equipment’s.
▪ Outcome of inspection’s ▪ BIIS ▪ BIIS making agreement with all the
Self -interest threat arises from
5 result. ▪ Public Property 3 4 12 inspectors for not releasing the certificates 1 2 2
(Inspector’s self-interest)
▪ Company confidentiality ▪ Client on the basis of self-interest or by accepting

Issued by QHSE Manager Document Number BIIS-FRM-01RAM Revision No. 0.1


Page 2 of 3
Authorized by Managing Director Date 20-07-2021
RISK ASSESSMENT MATRIX
Document Number: BIIS-FRM-01RAM
BIIS-IBM-01 (4.1 Impartiality and
Reference Document
Independence)
TITLE: Risk Assessment Matrix

policy ▪ Employees any kind of gift or vouchers


▪ Company independence policy ▪ BIIS made the policy of salary in a way
▪ Company income that, inspectors’ salary is not relying on his
daily activities.
▪ BIIS reviewing the work activities like time
sheet copies, photos of inspection evidence
and certificate summary
▪ BIIS making agreement with all the
inspectors for not releasing the certificates
▪ Outcome of inspection’s
on the basis of self-interest or by accepting
result. ▪ BIIS
any kind of gift or vouchers
▪ Company confidentiality ▪ Public Property
Self -interest threat arises from ▪ BIIS made the policy of salary in a way
6 policy ▪ Client 3 4 12 1 2 2
(Marketing / Sales team) that, inspectors’ salary is not relying on his
▪ Company independence policy ▪ Employees
daily activities.
▪ Company reputation
▪ BIIS reviewing the work activities like time
sheet copies, photos of inspection evidence
and certificate summary
▪ Passing of malfunctioning ▪ Impartiality agreements with the
equipment & items ▪ Inspection Body employees
Threatening inspectors, openly or ▪ Equipment breakdown and ▪ Public property ▪ Client inspections are managed by TM
7 secretly coerced (by the sales/ accident while working. ▪ Employees 3 5 15 without interfere of management. 1 2 2
marketing team or clients) ▪ Company policy ▪ Equipment ▪ Independent technical jobs & issues
▪ BIIS management and resolution by the
technical staff.
▪ Final approval of the certificate is by
▪ Inspection technical manager or Quality Engineer.
▪ Issuance of certificates
Self-Review of work (By certificates ▪ BIIS assigns the duty and responsibility of
8 without review. 3 5 15 1 2 2
Inspectors) ▪ Client each employees so review work should go
▪ Fines and legal penalties.
▪ Inspection body to the concern person like technical
manager and Quality engineer.

Issued by QHSE Manager Document Number BIIS-FRM-01RAM Revision No. 0.1


Page 3 of 3
Authorized by Managing Director Date 20-07-2021