Power plant and calculations
Power plant and calculation site basically includes the detailed study of power plant operation and maintenance, its related all calculations and thumb rules. It also
troubleshooting guides for operation and maintenance of power plant processes and equipments.
Danfoss
High
Pressure
Pumps
We offer fast
service and
competitive prices
for Danfoss
pumps and spare
parts.
Procedure for Boiler Gauge glass line up & Flushing
Boiler Gauge glass: is a transparent glass of shape tubular, flat or square blocks fitted to the boiler
steam drum to facilitate a visual indication of the water level of a steam drum. These types of glasses
are manufactured by borosilicate glass which is robust, temperature & chemical resistant.
TOP-6 BEST POWER PLANT O&M BOOKS
Boiler calculations for Boiler operation engineer (BOE) exam
Line up of Gauge glass:
[Link] 1/6
3/23/23, 11:15 AM Power plant and calculations: Procedure for Boiler Gauge glass line up & Flushing
Ensure all tools & required PPEs are taken to operate the valves (Hand gloves, Safety
goggles, “F” rods etc)
CLOSE ADS Ensure steam & water side valve of gauge glass are healthy & operating properly CLOSE ADS
Ensure there are no any leakages
Ensure steam side & water side valves are closed
Ensure gauge glass drain valve is open & drain is connected/extended to safe location
Now crack open the steam valve & check for any leakages in gauge glass. Wait for some
times until system heats uniformly.
Then crack open the water side valve, wait for some time for stabilization
Then close the drain valve
Open the steam valve & water valve fully
Observe water collected in glass & showing the level
Cross check the level glass with other side level glass or control room transmitter reading
or with Hydra step
Factors considered for Boiler Engineering
Flushing of gauge glass
Ensure all tools & required PPEs are taken to operate the valves (Hand gloves, Safety goggles, “F”
rods etc)
Step-I
Close the water side valve & open the drain valve for flushing, wait for some time
Then close the drain valve & open the water side valve
Note: After opening the water side valve, water level should retain its normal operating level, if not
then there might be blockages in valve or line
Step-II
Close the steam side valve & open the drain valve for flushing, wait for some time
Then close the drain valve & open the steam side valve
Note: After opening the steam side valve, water level should retain its normal operating level, if not
then there might be blockages in valve or line
Questions & Answers on AFBC Boiler
Power plant maintenance calculations
Questions & Answers of Boiler safety valves
Challenging situations & troubleshooting during boiler light up &
start up
Viva QnA on Boiler Safety Valves
Boiler safety valves overhauling steps
at December 24, 2020
Labels: Boiler
1 comment:
Alvin Evans 21 April 2021 at 05:06
You have done a good job by publishing this article about Gauge Glass. I appreciate your
efforts which you have put into this article, It is a beneficial article for us. Thanks for sharing
such informative thoughts.
Klinger Gauge Glass
Reply
Enter comment
Hi all,
This article is written based on practical experience..If liked, share with others, or any suggestions
leave in comment box.
[Link] 2/6
3/23/23, 11:15 AM Power plant and calculations: Procedure for Boiler Gauge glass line up & Flushing
CLOSE ADS CLOSE ADS
Newer Post Home Older Post
Subscribe to: Post Comments (Atom)
11-differences between star connection and delta connections
11-differences between start connection and delta connections Sl No. Star connection Delta
connection 1 Two types of star connections are ...
Frequently visited posts
Calculation of heat rate & efficiency of the power plant
Heat rate is the amount of energy used by an electrical generator/power plant to generate one kilo
Watt-hour (kWh) of electricity Hea...
Boiler feed pumps (BFP) questions & answers for interview
Boiler feed pumps (BFP) questions & answers for interview: 1-What is the function of
Boiler feed pumps (BFP) in power plant? ...
STEAM CONDENSER,VACUUM AND CALCULATIONS
A steam condenser is device or an appliance in which steam condenses and heat
released by steam is absorbed by water. Heat is basi...
Objective & Viva Questions & Answers for preparation of Boiler operation Engineer (BOE) exam &
Boiler Interview
1-Why Boiler is considered as explosive equipment / system? Boiler involves the generation of steam
at higher pressure & temperature u...
Basic things you must know about nut bolts & spanners
A Bolt is a mechanical device which has head on one end of a body and a thread on
the other end designed for fastening of two parts. Bo...
50-Interview questions & answers on centrifugal pumps
1. What are the centrifugal pumps? Centrifugal pumps are the mechanical devices
which pump or transport various fluids by converting their...
Boiler calculations for Boiler operation Engineer Exam (BOE)
1-Oxygen percentage in Boiler outlet flue gas is 4.9%, then what will be the percentage of excess
air? We have excess air EA = O2 X 100 / ...
[Link] 3/6
3/23/23, 11:15 AM Power plant and calculations: Procedure for Boiler Gauge glass line up & Flushing
CLOSE ADS CLOSE ADS
About Me
Powerplant and calculations
View my complete profile
► 2023 (1)
► 2022 (20)
► 2021 (45)
▼ 2020 (58)
December (2)
November (2)
October (4)
September (3)
August (5)
July (11)
June (8)
May (23)
[Link] 4/6
3/23/23, 11:15 AM Power plant and calculations: Procedure for Boiler Gauge glass line up & Flushing
Labels
AVR
CLOSE ADS CLOSE ADS
Boiler
Efficiency & performance
Electrical & Instrumentation
energy conservation & thumb rules in
power plant
ESP
fuel handling
Mechanical Engineering
pmg
power generation
power plant
Power plant best operation &
maintenance books
power plant maintenance
power plants
pumps/compressors/fans
safety and energy
steam turbine
Water treatment plant
Report Abuse
Home
Boiler
Turbine
Maintenance
Fuel handling
Efficiency&Performance
WTP
E&I
Pumps/compressors/fans
Home Search This
Blog
Boiler
Search
Turbine
Maintenance
Fuel handling
Efficiency&Perf
ormance
WTP
E&I
Pumps/compre
ssors/fans
Disclaimer
Privacy policy
About us
Contact us
[Link] 5/6
3/23/23, 11:15 AM Power plant and calculations: Procedure for Boiler Gauge glass line up & Flushing
CLOSE ADS CLOSE ADS
Awesome Inc. theme. Theme images by molotovcoketail. Powered by Blogger.
[Link] 6/6