0% found this document useful (0 votes)
355 views3 pages

Concentricity Inspection Guide

This document provides instructions for inspecting the concentricity of flare cartridge components using a universal concentricity gauge. It lists the components and their corresponding item numbers that will be inspected on each gauge. The procedure describes placing the component on the roller assembly, setting the dial point and making a zero reading, then rotating the spindle to inspect and record readings. A parts list identifies the main pieces of the inspection device.

Uploaded by

Divyansh Saxena
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
355 views3 pages

Concentricity Inspection Guide

This document provides instructions for inspecting the concentricity of flare cartridge components using a universal concentricity gauge. It lists the components and their corresponding item numbers that will be inspected on each gauge. The procedure describes placing the component on the roller assembly, setting the dial point and making a zero reading, then rotating the spindle to inspect and record readings. A parts list identifies the main pieces of the inspection device.

Uploaded by

Divyansh Saxena
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Concentricity Inspection DAP Drawing: Describes the parameters and procedure for checking concentricity using specific component measurements and dial inspections.
  • Parts List: Lists parts required for assembly with corresponding quantities and descriptions for building the described gauge.
  • Technical Diagram: Provides a technical sketch showcasing the design and dimensions of the component arrangement for concentricity inspection.

6 5 4 3 2 1

Parameter:-
Component :- 26 mm flare cartridge
D item no. 1, 2, 12, 16. this Dimension D
will be inspected on this Gauge

Component :- 50 mm flare cartridge


item no. 3, 7, this Dimension
will be inspected on this Gauge
C C

Procedure:-
1. place Componet on roller by
B B
lifting bearing Assembly.
2. place dialpoint on Component as per
requirement and make zero on dial.
3. rotate spindle (spindle will rotate componet)
note down reading on dial.
4. repeat procedure for next Component.
A Designed by

USEr
Checked by Approved by Date Date

05-12-2023
A
Concentricity inspection DAP drg Universal Concentricity
1/3 G
Edition Sheet

6 5 4 3 2 1
6 5 4 3 2 1

PARTS LIST
D 9 3 13 11 ITEM QTY PART NUMBER DESCRIPTION D
1 1 Base Plate
2 1 Main Spindle Block
3 4 Bearing Cap
12 4 4 Bearing
5 2 Brg spacer Inner race
2 6 2 Brg spacer outer race
14 7 2 Live Center
C 8 2 Bearing Locknut C
9 2 Rotating Knob
10 1 Case for Cartridge 26 flare
11 1 Vertical Column to Hold spring
12 1 Bearing Holder
13 1 Bearing Shaft
14 1 Bearing 625zz
15 1 MGWR15R110CM-Rail STEP AP214
16 1 MGW15CZFC-Block STEP AP214
B 17 4 Foot B
17 1
18 1 base for Dial stand
Note;-
1. spindle Rotation with help of belt design Pending
2. Stopper for component will be opposite to Dial
7 18 16 15 3. Dial Attachment design Pending
A Designed by

USEr
Checked by Approved by Date Date

05-12-2023
A

Universal Concentricity
2/3 G
Edition Sheet

6 5 4 3 2 1
6 5 A-A ( 1 : 2 ) 4 3 2 1
50
4
D D
4
256

C C

25
B B

200

A
A
A Designed by

USEr
Checked by Approved by Date Date

05-12-2023
A
300
Universal Concentricity
3/3 G
Edition Sheet

6 5 4 3 2 1

You might also like