GOVINDARAJAN STEEL QTY(TIE BEAM TO 1F)
Rebar including Straigtening, cutting to the
required length, bending to the shape as per
drawing , placing and binding etc complete., NOS NOS TOTAL BAR LENGTH WT/M 8mm 10mm 12mm 16mm
WT/M
8MM 0.394384
10MM 0.616225
12MM 0.887364
16MM 1.577536
20MM 2.4649
COLUMN(FROM TIE BEAM TO 1F)
A C1-12NOS
STIRRUPS 8MM 12 X 24 1.8 204.4 Kgs
C1
MAIN REBAR 16MM 12 X 8 3.6 545.2 Kgs
749.6 Kgs
B B1-FOR TIE BEAM
B1-8mm STIRUPPS 1 X 230 0.9 81.5 Kgs
16mm main bar 1 X 6 34.43 325.9 Kgs
B2-FOR TIE BEAM
B2- 8mm stirrups 1 X 175 1.8 124.2 Kgs
16mm main bar 1 X 6 26.24 248.4 Kgs
B1-MID LANDING
B2- 8mm stirrups 1 X 13.53333 1.8 9.6
16mm main bar 1 X 6 2.03 19.2
B1-FOR 1F
B1-8mm STIRUPPS 1 X 231 0.9 81.9 Kgs
16mm main bar 1 X 6 34.6 327.5 Kgs
B2-FOR 1F
B2 -8mm stirrups 1 X 212 1.8 150.8 Kgs
16mm main bar 1 X 6 31.86 301.6 Kgs
1670.4 Kgs 1012.8 206.8 95.0 1767.7 3082.3
C SLAB-1F kgs kgs kgs kgs kgs
S1-SHORT SPAN 1 X 1 81 31.9 Kgs 8mm 10mm 12mm 16mm TOTAL
S1-LONG SPAN 1 X 1 155 61.1 Kgs
S2-SHORT SPAN 1 X 1 135 83.2 Kgs
S2-LONG SPAN 1 x 1 177 69.8 Kgs TOTAL STEEL QTY FROM TIE BEAM TO 1F
S3-SHORT SPAN 1 x 1 104 41.0 Kgs
S3-LONG SPAN 1 X 3 130 153.8 Kgs 3082.3 KGS
S4-SHORT SPAN 1 x 3 35 64.7 Kgs
S4-LONG SPAN 1 x 3 37 43.8 Kgs
549.4 Kgs
D STAIRCASE
(FROM FFL TO 1F)
FLIGHT-1-X DIRECTION 10mm 1 X 11.35 0.8 5.6 KGS
FLIGHT1-Y-DIRECTION 12mm 1 X 10 4.5 39.9 KGS
FLIGHT-2-X DIRECTION 10mm 1 X 11.35 0.8 5.6 KGS
FLIGHT2-Y DIRECTION 12mm 1 X 10 4.5 39.9 KGS
LANDING -1 -X DIRECTION 10mm 1 X 6.35 1.7 6.7 KGS
LANDING-1 DIRECTION 12mm 1 X 19 0.9 15.2 KGS
112.9 Kgs