ECRL Bridge Construction Inspection RFI
ECRL Bridge Construction Inspection RFI
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/9
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/26
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/26
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P50-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am
Works are intended to commence at Date: 2023/10/26
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/26
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P49-P50/TB-4 ( Tbeam ) - (76A504)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/9
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/26
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/26
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P51-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am
Works are intended to commence at Date: 2023/10/26
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/26
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P50-P51/TB-4 ( Tbeam ) - (76A514)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/3
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/3
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/26
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/26
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P52-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am
Works are intended to commence at Date: 2023/10/26
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/26
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P51-P52/TB-4 ( Tbeam ) - (76A524)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/3
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/3
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/25
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/25
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/25
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/25
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P53-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/25
Time: 08.00 am
Works are intended to commence at Date: 2023/10/25
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/25
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P52-P53/TB-4 ( Tbeam ) - (76A534)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/3
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/3
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/24
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/24
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/24
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/24
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P54-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/24
Time: 08.00 am
Works are intended to commence at Date: 2023/10/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/24
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P53-P54/TB-4 ( Tbeam ) - (76A544)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/3
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/3
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/23
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/23
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P55-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am
Works are intended to commence at Date: 2023/10/23
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/23
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P54-P55/TB-4 ( Tbeam ) - (76A554)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/3
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/3
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/23
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/23
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P56-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am
Works are intended to commence at Date: 2023/10/23
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/23
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P55-P56/TB-4 ( Tbeam ) - (76A564)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/3
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/3
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/23
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/23
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P57-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am
Works are intended to commence at Date: 2023/10/23
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/23
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P56-P57/TB-4 ( Tbeam ) - (76A574)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/9/29
REQUEST FOR INSPECTION (RFI)
I
Ref No: ECRL - 54 - BR076A- P58- PB - RFI - 0001 REV 00
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/29
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/16
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/16
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P58-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
Works are intended to commence at Date: 2023/10/16
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/16
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P57-P58/TB-4 ( Tbeam ) - (76A584)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/9/29
REQUEST FOR INSPECTION (RFI)
I
Ref No: ECRL - 54 - BR076A- P59- PB - RFI - 0001 REV 00
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/29
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/16
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/16
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P59-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
Works are intended to commence at Date: 2023/10/16
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/16
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P58-P59/TB-4 ( Tbeam ) - (76A594)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/9/29
REQUEST FOR INSPECTION (RFI)
I
Ref No: ECRL - 54 - BR076A- P60- PB - RFI - 0001 REV 00
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/29
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/16
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/16
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P60-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
Works are intended to commence at Date: 2023/10/16
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/16
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P59-P60/TB-4 ( Tbeam ) - (76A604)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/9/29
REQUEST FOR INSPECTION (RFI)
I
Ref No: ECRL - 54 - BR076A- P61- PB - RFI - 0001 REV 00
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/29
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/16
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/16
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P61-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
Works are intended to commence at Date: 2023/10/16
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/16
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P60-P61/TB-4 ( Tbeam ) - (76A614)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
REQUEST FOR INSPECTION (RFI)
Date: 2023/9/25
I
Ref No: ECRL - 54 - BR076A- P62- PB - RFI - 0001 REV 00
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/25
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/16
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/16
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P62-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
Works are intended to commence at Date: 2023/10/16
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/16
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P61-P62/TB-4 ( Tbeam ) - (76A624)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
REQUEST FOR INSPECTION (RFI)
Date: 2023/9/25
I
Ref No: ECRL - 54 - BR076A- P63- PB - RFI - 0001 REV 00
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/25
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/13
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/13
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P63-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am
Works are intended to commence at Date: 2023/10/13
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/13
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P62-P63/TB-4 ( Tbeam ) - (76A634)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
REQUEST FOR INSPECTION (RFI)
Date: 2023/9/25
I
Ref No: ECRL - 54 - BR076A- P64- PB - RFI - 0001 REV 00
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/25
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/13
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/13
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P64-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am
Works are intended to commence at Date: 2023/10/13
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/13
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P63-P64/TB-4 ( Tbeam ) - (76A644)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
REQUEST FOR INSPECTION (RFI)
Date: 2023/9/25
I
Ref No: ECRL - 54 - BR076A- P65- PB - RFI - 0001 REV 00
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/25
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/13
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/13
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P65-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am
Works are intended to commence at Date: 2023/10/13
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/13
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P64-P65/TB-4 ( Tbeam ) - (76A654)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
REQUEST FOR INSPECTION (RFI)
Date: 2023/9/25
I
Ref No: ECRL - 54 - BR076A- P66- PB - RFI - 0001 REV 00
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/25
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/12
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/12
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/12
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/12
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P66-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/12
Time: 08.00 am
Works are intended to commence at Date: 2023/10/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/12
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P65-P66/TB-4 ( Tbeam ) - (76A664)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I I
REQUEST FOR INSPECTION (RFI)
Date: 2023/9/24
I
Ref No: ECRL - 54 - BR076A- P67- PB - RFI - 0001 REV 00
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/24
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/12
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/12
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/12
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/12
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P67-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/12
Time: 08.00 am
Works are intended to commence at Date: 2023/10/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/12
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P66-P67/TB-4 ( Tbeam ) - (76A674)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I
Date: 2023/9/19
I
REQUEST FOR INSPECTION (RFI)
I
Ref No: ECRL - 54 - BR076A- P68- PB - RFI - 0001 REV 00
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/19
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/9
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/9
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I
I
Ref No: ECRL -S4-BR076A-P68-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am
Works are intended to commence at Date: 2023/10/9
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/9
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P67-P68/TB-4 ( Tbeam ) - (76A684)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments:
I
Date: 2023/9/19
I
REQUEST FOR INSPECTION (RFI)
I
Ref No: ECRL - 54 - BR076A- P69- PB - RFI - 0001 REV 00
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/19
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
I I
Date: 2023/10/9
REQUEST FOR INSPECTION (RFI)
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/9
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am
D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory
CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled
Comments:
ra gE
*iE EH
tc EE
Bi
HH sE
T-
xll
5
I
,
I
J
i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt
=
u)
:J 9,
i: :;
1ri
.i. I
;.li
ltr
lii
e;:i.
r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L
s
Fil
g{
Slt
ffi
H]
H
E
fi
r
t
I
il
I
ll
1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT
I
I
Ref No: ECRL -S4-BR076A-P69-PB -RFl -0004 REVOO
Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am
Works are intended to commence at Date: 2023/10/9
Time: 08.30 am
Request by:
Name: Designation: Company: Date:
-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/9
Signature:
DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P68-P69/TB-4 ( Tbeam ) - (76A694)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer
[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled
Comments: