ECRL Bridge Construction Inspection RFI

This document contains a request for inspection of bridge works on the East Coast Rail Link project in Malaysia. Specifically, it requests inspection of precast T-beam installation, concreting, prestressing and grouting, and testing for Bridge 76A. The inspection activities are described in detail. The supervising consultant has the option to proceed without attending or to require re-inspection. Level 1, 2 and 3 checks are performed and the request requires final approval from the supervising consultant.

Uploaded by

ammar.sahak10
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
175 views240 pages

ECRL Bridge Construction Inspection RFI

This document contains a request for inspection of bridge works on the East Coast Rail Link project in Malaysia. Specifically, it requests inspection of precast T-beam installation, concreting, prestressing and grouting, and testing for Bridge 76A. The inspection activities are described in detail. The supervising consultant has the option to proceed without attending or to require re-inspection. Level 1, 2 and 3 checks are performed and the request requires final approval from the supervising consultant.

Uploaded by

ammar.sahak10
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD

EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/9

Ref No: ECRL - 54 - BR076A- P50- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am

Works are intended to commence at Date: 2023/10/9


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/9
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P49-P50/TB1 (T-beam) (76A501)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/26
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P50- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am

Works are intended to commence at Date: 2023/10/26


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/26
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P49-P50/ B-2 ( T - beam ) (76A502)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/26

Ref No: ECRL - 54 - BR076A- P50- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am

Works are intended to commence at Date: 2023/10/26


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/26
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P49-P50/ B-3 ( T - beam ) (76A503)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/26

I
I
Ref No: ECRL -S4-BR076A-P50-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am
Works are intended to commence at Date: 2023/10/26
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/26
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P49-P50/TB-4 ( Tbeam ) - (76A504)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/9

Ref No: ECRL - 54 - BR076A- P51- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am

Works are intended to commence at Date: 2023/10/9


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/9
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P50-P51/TB1 (T-beam) (76A511)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/26
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P51- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am

Works are intended to commence at Date: 2023/10/26


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/26
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P50-P51/ B-2 ( T - beam ) (76A512)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/26

Ref No: ECRL - 54 - BR076A- P51- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am

Works are intended to commence at Date: 2023/10/26


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/26
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P50-P51/ B-3 ( T - beam ) (76A513)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/26

I
I
Ref No: ECRL -S4-BR076A-P51-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am
Works are intended to commence at Date: 2023/10/26
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/26
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P50-P51/TB-4 ( Tbeam ) - (76A514)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/3

Ref No: ECRL - 54 - BR076A- P52- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/3
Time: 08.00 am

Works are intended to commence at Date: 2023/10/3


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/3
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P51-P52/TB1 (T-beam) (76A521)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/26
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P52- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am

Works are intended to commence at Date: 2023/10/26


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/26
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P51-P52/ B-2 ( T - beam ) (76A522)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/26

Ref No: ECRL - 54 - BR076A- P52- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am

Works are intended to commence at Date: 2023/10/26


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/26
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P51-P52/ B-3 ( T - beam ) (76A523)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/26

I
I
Ref No: ECRL -S4-BR076A-P52-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/26
Time: 08.00 am
Works are intended to commence at Date: 2023/10/26
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/26
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P51-P52/TB-4 ( Tbeam ) - (76A524)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/3

Ref No: ECRL - 54 - BR076A- P53- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/3
Time: 08.00 am

Works are intended to commence at Date: 2023/10/3


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/3
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P52-P53/TB1 (T-beam) (76A531)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/25
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P53- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/25
Time: 08.00 am

Works are intended to commence at Date: 2023/10/25


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/25
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P52-P53/ B-2 ( T - beam ) (76A532)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/25

Ref No: ECRL - 54 - BR076A- P53- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/25
Time: 08.00 am

Works are intended to commence at Date: 2023/10/25


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/25
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P52-P53/ B-3 ( T - beam ) (76A533)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/25

I
I
Ref No: ECRL -S4-BR076A-P53-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/25
Time: 08.00 am
Works are intended to commence at Date: 2023/10/25
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/25
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P52-P53/TB-4 ( Tbeam ) - (76A534)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/3

Ref No: ECRL - 54 - BR076A- P54- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/3
Time: 08.00 am

Works are intended to commence at Date: 2023/10/3


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/3
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P53-P54/TB1 (T-beam) (76A541)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/24
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P54- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/24
Time: 08.00 am

Works are intended to commence at Date: 2023/10/24


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/24
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P53-P54/ B-2 ( T - beam ) (76A542)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/24

Ref No: ECRL - 54 - BR076A- P54- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/24
Time: 08.00 am

Works are intended to commence at Date: 2023/10/24


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/24
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P53-P54/ B-3 ( T - beam ) (76A543)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/24

I
I
Ref No: ECRL -S4-BR076A-P54-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/24
Time: 08.00 am
Works are intended to commence at Date: 2023/10/24
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/24
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P53-P54/TB-4 ( Tbeam ) - (76A544)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/3

Ref No: ECRL - 54 - BR076A- P55- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/3
Time: 08.00 am

Works are intended to commence at Date: 2023/10/3


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/3
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P54-P55/TB1 (T-beam) (76A551)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/23
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P55- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am

Works are intended to commence at Date: 2023/10/23


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/23
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P54-P55/ B-2 ( T - beam ) (76A552)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/23

Ref No: ECRL - 54 - BR076A- P55- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am

Works are intended to commence at Date: 2023/10/23


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/23
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P54-P55/ B-3 ( T - beam ) (76A553)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/23

I
I
Ref No: ECRL -S4-BR076A-P55-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am
Works are intended to commence at Date: 2023/10/23
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/23
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P54-P55/TB-4 ( Tbeam ) - (76A554)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/3

Ref No: ECRL - 54 - BR076A- P56- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/3
Time: 08.00 am

Works are intended to commence at Date: 2023/10/3


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/3
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P55-P56/TB1 (T-beam) (76A561)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/23
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P56- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am

Works are intended to commence at Date: 2023/10/23


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/23
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P55-P56/ B-2 ( T - beam ) (76A562)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/23

Ref No: ECRL - 54 - BR076A- P56- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am

Works are intended to commence at Date: 2023/10/23


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/23
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P55-P56/ B-3 ( T - beam ) (76A563)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/23

I
I
Ref No: ECRL -S4-BR076A-P56-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am
Works are intended to commence at Date: 2023/10/23
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/23
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P55-P56/TB-4 ( Tbeam ) - (76A564)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/3

Ref No: ECRL - 54 - BR076A- P57- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/3
Time: 08.00 am

Works are intended to commence at Date: 2023/10/3


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/3
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P56-P57/TB1 (T-beam) (76A571)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/23
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P57- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am

Works are intended to commence at Date: 2023/10/23


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/23
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P56-P57/ B-2 ( T - beam ) (76A572)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/23

Ref No: ECRL - 54 - BR076A- P57- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am

Works are intended to commence at Date: 2023/10/23


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/23
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P56-P57/ B-3 ( T - beam ) (76A573)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/23

I
I
Ref No: ECRL -S4-BR076A-P57-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/23
Time: 08.00 am
Works are intended to commence at Date: 2023/10/23
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/23
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P56-P57/TB-4 ( Tbeam ) - (76A574)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/9/29
REQUEST FOR INSPECTION (RFI)
I
Ref No: ECRL - 54 - BR076A- P58- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/29
Time: 08.00 am

Works are intended to commence at Date: 2023/9/29


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/9/29
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P57-P58/TB1 (T-beam) (76A581)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/16
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P58- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am

Works are intended to commence at Date: 2023/10/16


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/16
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P57-P58/ B-2 ( T - beam ) (76A582)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/16

Ref No: ECRL - 54 - BR076A- P58- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am

Works are intended to commence at Date: 2023/10/16


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/16
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P57-P58/ B-3 ( T - beam ) (76A583)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/16

I
I
Ref No: ECRL -S4-BR076A-P58-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
Works are intended to commence at Date: 2023/10/16
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/16
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P57-P58/TB-4 ( Tbeam ) - (76A584)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/9/29
REQUEST FOR INSPECTION (RFI)
I
Ref No: ECRL - 54 - BR076A- P59- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/29
Time: 08.00 am

Works are intended to commence at Date: 2023/9/29


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/9/29
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P58-P59/TB1 (T-beam) (76A591)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/16
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P59- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am

Works are intended to commence at Date: 2023/10/16


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/16
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P58-P59/ B-2 ( T - beam ) (76A592)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/16

Ref No: ECRL - 54 - BR076A- P59- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am

Works are intended to commence at Date: 2023/10/16


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/16
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P58-P59/ B-3 ( T - beam ) (76A593)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/16

I
I
Ref No: ECRL -S4-BR076A-P59-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
Works are intended to commence at Date: 2023/10/16
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/16
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P58-P59/TB-4 ( Tbeam ) - (76A594)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/9/29
REQUEST FOR INSPECTION (RFI)
I
Ref No: ECRL - 54 - BR076A- P60- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/29
Time: 08.00 am

Works are intended to commence at Date: 2023/9/29


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/9/29
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P59-P60/TB1 (T-beam) (76A601)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/16
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P60- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am

Works are intended to commence at Date: 2023/10/16


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/16
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P59-P60/ B-2 ( T - beam ) (76A602)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/16

Ref No: ECRL - 54 - BR076A- P60- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am

Works are intended to commence at Date: 2023/10/16


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/16
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P59-P60/ B-3 ( T - beam ) (76A603)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/16

I
I
Ref No: ECRL -S4-BR076A-P60-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
Works are intended to commence at Date: 2023/10/16
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/16
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P59-P60/TB-4 ( Tbeam ) - (76A604)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/9/29
REQUEST FOR INSPECTION (RFI)
I
Ref No: ECRL - 54 - BR076A- P61- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/29
Time: 08.00 am

Works are intended to commence at Date: 2023/9/29


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/9/29
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P60-P61/TB1 (T-beam) (76A611)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/16
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P61- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am

Works are intended to commence at Date: 2023/10/16


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/16
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P60-P61/ B-2 ( T - beam ) (76A612)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/16

Ref No: ECRL - 54 - BR076A- P61- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am

Works are intended to commence at Date: 2023/10/16


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/16
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P60-P61/ B-3 ( T - beam ) (76A613)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/16

I
I
Ref No: ECRL -S4-BR076A-P61-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
Works are intended to commence at Date: 2023/10/16
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/16
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P60-P61/TB-4 ( Tbeam ) - (76A614)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI)
Date: 2023/9/25
I
Ref No: ECRL - 54 - BR076A- P62- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/25
Time: 08.00 am

Works are intended to commence at Date: 2023/9/25


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/9/25
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P61-P62/TB1 (T-beam) (76A621)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/16
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P62- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am

Works are intended to commence at Date: 2023/10/16


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/16
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P61-P62/ B-2 ( T - beam ) (76A622)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/16

Ref No: ECRL - 54 - BR076A- P62- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am

Works are intended to commence at Date: 2023/10/16


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/16
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P61-P62/ B-3 ( T - beam ) (76A623)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/16

I
I
Ref No: ECRL -S4-BR076A-P62-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/16
Time: 08.00 am
Works are intended to commence at Date: 2023/10/16
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/16
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P61-P62/TB-4 ( Tbeam ) - (76A624)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI)
Date: 2023/9/25
I
Ref No: ECRL - 54 - BR076A- P63- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/25
Time: 08.00 am

Works are intended to commence at Date: 2023/9/25


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/9/25
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P62-P63/TB1 (T-beam) (76A631)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/13
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P63- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am

Works are intended to commence at Date: 2023/10/13


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/13
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P62-P63/ B-2 ( T - beam ) (76A632)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/13

Ref No: ECRL - 54 - BR076A- P63- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am

Works are intended to commence at Date: 2023/10/13


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/13
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P62-P63/ B-3 ( T - beam ) (76A633)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/13

I
I
Ref No: ECRL -S4-BR076A-P63-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am
Works are intended to commence at Date: 2023/10/13
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/13
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P62-P63/TB-4 ( Tbeam ) - (76A634)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI)
Date: 2023/9/25
I
Ref No: ECRL - 54 - BR076A- P64- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/25
Time: 08.00 am

Works are intended to commence at Date: 2023/9/25


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/9/25
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P63-P64/TB1 (T-beam) (76A641)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/13
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P64- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am

Works are intended to commence at Date: 2023/10/13


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/13
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P63-P64/ B-2 ( T - beam ) (76A642)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/13

Ref No: ECRL - 54 - BR076A- P64- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am

Works are intended to commence at Date: 2023/10/13


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/13
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P63-P64/ B-3 ( T - beam ) (76A643)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/13

I
I
Ref No: ECRL -S4-BR076A-P64-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am
Works are intended to commence at Date: 2023/10/13
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/13
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P63-P64/TB-4 ( Tbeam ) - (76A644)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI)
Date: 2023/9/25
I
Ref No: ECRL - 54 - BR076A- P65- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/25
Time: 08.00 am

Works are intended to commence at Date: 2023/9/25


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/9/25
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P64-P65/TB1 (T-beam) (76A651)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/13
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P65- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am

Works are intended to commence at Date: 2023/10/13


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/13
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P64-P65/ B-2 ( T - beam ) (76A652)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/13

Ref No: ECRL - 54 - BR076A- P65- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am

Works are intended to commence at Date: 2023/10/13


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/13
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P64-P65/ B-3 ( T - beam ) (76A653)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/13

I
I
Ref No: ECRL -S4-BR076A-P65-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/13
Time: 08.00 am
Works are intended to commence at Date: 2023/10/13
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/13
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P64-P65/TB-4 ( Tbeam ) - (76A654)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI)
Date: 2023/9/25
I
Ref No: ECRL - 54 - BR076A- P66- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/25
Time: 08.00 am

Works are intended to commence at Date: 2023/9/25


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/9/25
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P65-P66/TB1 (T-beam) (76A661)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/12
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P66- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/12
Time: 08.00 am

Works are intended to commence at Date: 2023/10/12


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/12
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P65-P66/ B-2 ( T - beam ) (76A662)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/12

Ref No: ECRL - 54 - BR076A- P66- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/12
Time: 08.00 am

Works are intended to commence at Date: 2023/10/12


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/12
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P65-P66/ B-3 ( T - beam ) (76A663)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/12

I
I
Ref No: ECRL -S4-BR076A-P66-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/12
Time: 08.00 am
Works are intended to commence at Date: 2023/10/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/12
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P65-P66/TB-4 ( Tbeam ) - (76A664)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI)
Date: 2023/9/24
I
Ref No: ECRL - 54 - BR076A- P67- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/24
Time: 08.00 am

Works are intended to commence at Date: 2023/9/24


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/9/24
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P66-P67/TB1 (T-beam) (76A671)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/12
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P67- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/12
Time: 08.00 am

Works are intended to commence at Date: 2023/10/12


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/12
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P66-P67/ B-2 ( T - beam ) (76A672)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/12

Ref No: ECRL - 54 - BR076A- P67- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/12
Time: 08.00 am

Works are intended to commence at Date: 2023/10/12


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/12
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P66-P67/ B-3 ( T - beam ) (76A673)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/12

I
I
Ref No: ECRL -S4-BR076A-P67-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/12
Time: 08.00 am
Works are intended to commence at Date: 2023/10/12
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/12
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P66-P67/TB-4 ( Tbeam ) - (76A674)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I
Date: 2023/9/19

I
REQUEST FOR INSPECTION (RFI)
I
Ref No: ECRL - 54 - BR076A- P68- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/19
Time: 08.00 am

Works are intended to commence at Date: 2023/9/19


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/9/19
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P67-P68/TB1 (T-beam) (76A681)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/9
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P68- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am

Works are intended to commence at Date: 2023/10/9


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/9
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P67-P68/ B-2 ( T - beam ) (76A682)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/9

Ref No: ECRL - 54 - BR076A- P68- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am

Works are intended to commence at Date: 2023/10/9


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/9
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P67-P68/ B-3 ( T - beam ) (76A683)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/9

I
I
Ref No: ECRL -S4-BR076A-P68-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am
Works are intended to commence at Date: 2023/10/9
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/9
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P67-P68/TB-4 ( Tbeam ) - (76A684)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I
Date: 2023/9/19

I
REQUEST FOR INSPECTION (RFI)
I
Ref No: ECRL - 54 - BR076A- P69- PB - RFI - 0001 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/9/19
Time: 08.00 am

Works are intended to commence at Date: 2023/9/19


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/9/19
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P68-P69/TB1 (T-beam) (76A691)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
Date: 2023/10/9
REQUEST FOR INSPECTION (RFI)

Ref No: ECRL - 54 - BR076A- P69- PB - RFI - 0002 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am

Works are intended to commence at Date: 2023/10/9


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/9
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P68-P69/ B-2 ( T - beam ) (76A692)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

I I
REQUEST FOR INSPECTION (RFI) Date: 2023/10/9

Ref No: ECRL - 54 - BR076A- P69- PB - RFI - 0003 REV 00

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am

Works are intended to commence at Date: 2023/10/9


Time: 08.30 am
Request by:
Name: Designation: Company: Date:
WANG RUI ENGINEER cccc 2023/10/9
Signature:
��
DESCRIPTION OF WORKS
Location:
BRIDGE 76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00021-00022
inspection activity:
BR76A/P68-P69/ B-3 ( T - beam ) (76A693)
1) Inspection for installation of rebar and formwork of precast,T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube for Protective Layer
NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)

D I
Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

CJ
Comments:
Pass
ICJ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SDN BHD CCC (ECRL) SDN BHD QAQC Representative Supervising Consultant (SC) {SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


4
vt2
>E
4.e
JE
3A A

ra gE

*iE EH
tc EE
Bi
HH sE

T-

xll

5
I
,
I
J

i
I
o
F
(J
V
F
a
z
o
()
t
e
o
LLt

=
u)
:J 9,
i: :;
1ri
.i. I

;.li

ltr
lii
e;:i.

r.[
E,I:
ptl
I:ll
ii
:./st
+!
B,
r1l
ft,L

s
Fil
g{
Slt
ffi
H]

H
E

fi
r

t
I
il

I
ll

1
I
CHINA COMMUNICATIONS CONSTRUCTION (ECRL) SDN BHD
EAST COAST RAIL LINK (ECRL) PROJECT

REQUEST FOR INSPECTION (RFI) Date: 2023/10/9

I
I
Ref No: ECRL -S4-BR076A-P69-PB -RFl -0004 REVOO

Discipline:
BRIDGE
The following works are/will be ready for inspection/testing at
I Section:
CONSTRUCTION S4
Date: 2023/10/9
Time: 08.00 am
Works are intended to commence at Date: 2023/10/9
Time: 08.30 am
Request by:
Name: Designation: Company: Date:

-A"J3' ., � t
NIE DAPENG ENGINEER cccc 2023/10/9
Signature:

DESCRIPTION OF WORKS
Location:
BRIDGE76A
Type of Work:
Precast T - beam
MS/ITP Ref No: Drawing No & Rev:
ECRL-S4-BR-MS-0016 CD/ECRL/C/ML/BR/RFD/32BE01/00027-00028
inspection activity:
BR76A/P68-P69/TB-4 ( Tbeam ) - (76A694)
1) Inspection for installation of rebar and fo rmwork of precast T- beam
2) Inspection for concreting of precast T - beam
3) Inspection for Prestressing and grouting of precast T - beam
4) Post concreting
5) 28days cube Test for precast T-Beam and tendon grouting
6) Sealing Anchorage
7) 28days cube test for sealing Anchorage
8) Protective Layer
9) 28 days cube fo r Protective Layer

I NOTIFICATION STATUS BY SUPERVISING CONSULTANT (SC)


Works to proceed to the next stage without the need for Supervising Consultant to attend for the work or material inspection testing
at the laboratory

Supervising Consultant Engineer's Remarks

[Link]J
Comments:
Pass
I□ Fail (Re-inspect)
ID Cancelled

LEVEL 1 LEVEL 2 LEVEL 3


Checked by: Checked by: Approved by:
CCC (ECRL) SON BHD CCC (ECRL) SON BHD QAQC Representative Supervising Consultant (SC) (SE/SrSC)
Name: Name: Name:
Designation: Designation: Designation:
Signature: Signature: Signature:

Date: Date: Date:


MRL / ICE WITNESS SECTION (Optional)
Name: Signature & Date:
Designation

Comments:

RFI Rev: 03 Date: 24 Mar 2020


i;:-r-, i
.,'. '
il ., ",' ., i 1- ...^,t