Renovation Work Permit Application Form

This document appears to be a renovation application form for Damen Service Apartment. It requests information such as the unit number, owner/tenant name, contact details of the contractor, proposed start and end dates of the renovation work, and a description of the scope of works. It provides notes that landlords must submit the application at least 7 days in advance and submit drawings for any structural changes. It also includes reminders that work cannot be done on weekends or public holidays and that drilling/grinding must only occur between 11am-4pm on weekdays. Signatures of related parties are requested at the bottom.

Uploaded by

Frida Suarez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
128 views1 page

Renovation Work Permit Application Form

This document appears to be a renovation application form for Damen Service Apartment. It requests information such as the unit number, owner/tenant name, contact details of the contractor, proposed start and end dates of the renovation work, and a description of the scope of works. It provides notes that landlords must submit the application at least 7 days in advance and submit drawings for any structural changes. It also includes reminders that work cannot be done on weekends or public holidays and that drilling/grinding must only occur between 11am-4pm on weekdays. Signatures of related parties are requested at the bottom.

Uploaded by

Frida Suarez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

DAMEN MANAGEMENT CORPORATION ([Link].

51/1/1-P/17-17) Renovation &


DAMEN Main Management Office, Level B1, DA:MEN USJ 1, Application Form
Persiaran Kewajipan, USJ 1, 47600 Subang Jaya, Selangor Darul Ehsan. Service Only
Shop & Office: Tel: 03-8011 2658 / 0653 Fax: 03-8011 6546 Email: damen@[Link]
Service Apartment: Tel: 03-8011 2308 Email: [Link]@[Link]

DA: MEN SERVICE APARTMENT


RENOVATION WORK IN PROGRESS
Name of Owner / Tenant : _________________________________________________

Unit No : ________________________ Date of Application : ________________________

Name of Contractor’s Company : ____________________________________

Name of Contractor : _________________________________ Contact No. Contractor : ______________________

Date of Commencement : _____________________________ Date of Completion: _________________________

Scope of Work(s) : ___________________________________________________________________________________________

___________________________________________________________________________________________________________

Note:
All landlords are required to submit the application for installation, minor repairs, major renovation and upgrading works with
minimum seven (7) working days’ notice to the Management Office.

All owners are required to submit to Management one (1) week in advance for the approval for the following drawings relating any
structural alterations or deviation from the approval plans before the commencement work.

I. Renovation plan
II. Load Declaration
III. Method statement of the work
IV. Authority approval letter

REMINDER NOTE
THIS NOTICE MUST BE PLACED INFRONT OF THE DOOR
 Contractors are not allowed to work on Saturday,
UPON COMMENCING WORK UNTIL THE WORK COMPLETED.
after 1.00 pm, Sunday and Public Holiday.
THE MANAGEMENT RESEVES THE RIGHT TO ASK THE
CONTRACTOR TO LEAVE THE PREMISES IF THIS IS NOT  Except for sudden breakdown :
FOLLOWED OR HE HAS BREACHES
1) Power/electric failure
THE RENOVATION GUIDELINE/HOUSE RULES.
2) Air Condition breakdown

3) Plumbing work [leakage]


SIGNATURE OF OWNER/TENANT/CONTRACTOR :
 DRILLING/HACKING/GRINDING works to be carried
SIGNATURE OF RESIDENT MANAGER : out only from :

SIGNATURE OF CHARGEMAN/TECHNICIAN : 11.00 am to 4.00 pm only, Monday to Friday

Immediate action will be taken if the contractor is


found doing the particular works after 5.00pm